OLENTANGY RIVER ROAD CLOSING Between Hard Road and SR 315 WHEN: 8:00 p.m. Friday, June 11 HOW LONG: Six weeks DETOUR: Clubview Boulevard (see map) HARD ROAD CLOSING Between Olentangy River Road and Linworth Road (Access Maintained for Residents) WHEN: 8:00 p.m. Friday, June 11 to 5:00 a.m. Monday, June 14 HOW LONG: Only One Weekend DETOUR: SR 315 south to SR 161 west to Olentangy River Road north to Linworth Road BY MONDAY JUNE 14 AT 5 A.M. New Intersection at Hard Road and SR 315 OPEN (See map on Back) All lanes on Hard Road OPEN New Traffic Signal at SR 315 and Hard Road QUESTIONS Call 740-833-8268 email [email protected] NOTICE TRAFFIC PATTERN CHANGE 315 315 Hard Road Olentangy River Roa d Gatehouse Lane Northbridge Lane Cherr y e l d A v e n u e Southview Drive C l u b v i e w B o u l e v a r d South Norhill Road HARD ROAD PROJECT UPDATE

Upload: others

Post on 12-Sep-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HARD ROAD PROJECT UPDATE

OLENTANGY RIVER ROAD CLOSINGBetween Hard Road and SR 315WHEN: 8:00 p.m. Friday, June 11HOW LONG: Six weeksDETOUR: Clubview Boulevard (see map)

HARD ROAD CLOSINGBetween Olentangy River Road and Linworth Road (Access Maintained for Residents)WHEN: 8:00 p.m. Friday, June 11 to 5:00 a.m. Monday, June 14HOW LONG: Only One WeekendDETOUR: SR 315 south to SR 161 west to Olentangy River Road north to Linworth Road

BY MONDAY JUNE 14 AT 5 A.M.• New Intersection at Hard Road and

SR 315 OPEN (See map on Back)• All lanes on Hard Road OPEN• New Traffic Signal at SR 315 and

Hard Road

QUESTIONSCall 740-833-8268

email [email protected]

NOTICETRAFFIC PATTERN CHANGE

315

315

Hard Road

Ole

ntan

gy R

iver

Roa

d

Gatehouse Lane

Northbridge Lane

Cherry�eld Avenue

Sout

hvie

w D

rive

Club

view Boulevard South

Nor

hill

Road

HARD ROAD PROJECT UPDATE

Page 2: HARD ROAD PROJECT UPDATE

NEW TRAFFIC PATTERNHARD ROAD AND SR 315