Hanley Road Corridor Study - St. Louis County, Missouri
Hanley Road Corridor Study
A Corridor Approach to Traffic Impact Studies
September 20, 2005
Presentation to:
TEAM
Given By: Stephanie Leon Streeter, P.E.
Hanley Road Corridor Study - St. Louis County, Missouri
Project History• Steering Committee formed in 2002
– St. Louis County – City of Brentwood– City of Maplewood – City of Richmond
Heights
• Notice to Proceed given to PB June 2003
• Partnership funded study– St. Louis County– The 3 Cities– 7 Stakeholder groups
Hanley Road Corridor Study - St. Louis County, Missouri
Stakeholder Involvement
• Major landowners and developers• Dierberg’s Markets
• Pace Properties, Inc.
• THF Realty, Inc
• Sunnen Products Company
• KV Pharmaceutical
• DCM
• MoDOT, Metro and EWGCOG
Hanley Road Corridor Study - St. Louis County, Missouri
I-170
I-64
Study Area and Developments
Hanley Road Corridor Study - St. Louis County, Missouri
Mission StatementThe Hanley Road Corridor Steering Committee will provide a transportation corridor from I-64 to Laclede Station Road that addresses current and future transportation needs of the local and regional community, supporting economic growth, minimizing residential impacts and enhancing the quality of life in the cities of Brentwood, Maplewood, Richmond Heights, and St. Louis County.
Hanley Road Corridor Study - St. Louis County, Missouri
Decision Making StructureSteering Committee
Determines Final Direction• St. Louis County
• Brentwood• Maplewood
• Richmond Heights
Project StakeholdersProvides Input and Feedback
• MoDOT• Metro
• EWGCC• Major Landowners
• Developers
Technical Consultant Provides Data and Analysis andFacilitates Steering Committee
• Parsons Brinckerhoff (PB)
Hanley Road Corridor Study - St. Louis County, Missouri
Study Objectives• The improvement of circulation
around and in the study area• The development of alternative
concepts to address problems related to congestion
• A consistent streetscape• The safe movement of peds and
vehicles
Hanley Road Corridor Study - St. Louis County, Missouri
Project Goals1. To develop alternatives that can move
easily into the design phase by completion of the study
2. To achieve a LOS of D at signalized intersections with our alternatives
3. To develop creative alternatives to address access and capacity issues
Hanley Road Corridor Study - St. Louis County, Missouri
Project Goals continued…
4. To provide safe pedestrian access across and along the corridor as best possible
5. To improve the streetscape of Hanley Road
6. To improve vehicular access to the corridor
Hanley Road Corridor Study - St. Louis County, Missouri
Hanley Road Background
YearHanley north of Rt.
100Hanley south of Dale
Ave.
1994 32,020 vehicles/day 33,460 vehicles/day
1996 36,910 41,050
1998 38,910 42,680
2000 38,870 47,960
2002 39,300 45,830
By 2015 53,000 60,000
Hanley Road Corridor Study - St. Louis County, Missouri
Traffic Analysis - Existing Conditions
IntersectionAM Peak
LOS
PM Peak
LOS
Saturday Peak
LOS
WB Off Ramp A A A
EB On/Off Ramps C B E
Eager Road B E C
Dale Avenue C F B
Elinore Avenue D D C
Hanley Industrial Court A C A
Litzsinger Road B B A
Manchester Road E F C
Sunnen Entrance C A A
Laclede Station Road C A A
No
rth
Are
aS
ou
th A
rea
Hanley Road Corridor Study - St. Louis County, Missouri
Initial Alternatives Developed• I-64/Eager/Dale Area
– N1 - Geometric Improvements I– N2 - Geometric Improvements II– N3 - Tunnel to WB Eager– N4 - Tunnel between Eager/Hanley– N5 - Revised Geometric Improvements– N6 - Realign Eager and Dale– N7 - Combination of N3 and N5– N8 - Relocate Eager under Hanley, connect
Eager to Dale
Hanley Road Corridor Study - St. Louis County, Missouri
Initial Alternatives Developed
• Manchester Road Area– S1 - Manchester Road at-grade with dual
left-turns in all directions
– S2 - Hanley Road over Manchester Road with urban single-point interchange
Hanley Road Corridor Study - St. Louis County, Missouri
Initial Screening – Eager/Dale Area
LegendPoor (i.e. poor capacity, high cost)Moderate/AverageGood (i.e. good capacity, low cost)
Initial Screening Criteria
Alternative
N1 N2 N3 N4 N5 N6 N7 N8
Capacity
Weaving/Safety
Physical Coordination w/I-64 Improvements
Traffic Coordination w/I-64 Improvements
Property/Development Impacts
Cost
Hanley Road Corridor Study - St. Louis County, Missouri
Intersection LOS (South Area)
IntersectionAM – PM – Sat Peak LOS
No-Build Alt S1 Alt S2
Strassner Road/W. Bruno C – F – F B – D – D B – D – C
Sam’s/Wal-Mart Entrance B – E – F B – B – B B – B – B
Hanley Industrial Court B – D – C C – D – B C – C – C
Litzsinger Road B – E – E B – D – A B – B – A
Manchester Road F – F – F E – F – C B – B – C
Sunnen Drive E – A – B C – A – C B – B – A
Hanley Road Corridor Study - St. Louis County, Missouri
Intersection LOS (North Area)
IntersectionAM – PM – Sat Peak LOS
No-Build ALT N3 ALT N5 ALT N7
Westbound off-ramp C – F* – C A – F* – D A – F* – A A – F* – A
Eastbound off-ramp F – F – F B – D – F D – E – D C – D – D
Eager Road B – C – D B – B – D NA NA
Dale Avenue D – F – F C – D – E E – F – D C – D – C
Elinore Avenue D – F – F D – C – F E – D – D C – C – D
Strassner Road/W. Bruno C – F – F E – C – F E – C – C C – C – C
* Note that significant improvement to the WB off-ramp was not practical prior to I-64 improvements..
Hanley Road Corridor Study - St. Louis County, Missouri
Preferred Concept – North
Total Cost: $22 MTotal Cost: $22 M
Hanley Road Corridor Study - St. Louis County, Missouri
Preferred Concept – South
Total Cost: $32 MTotal Cost: $32 M
Hanley Road Corridor Study - St. Louis County, Missouri
Improvement Costs:
• Design: $3.4 million (that will be offset by using in-house forces)
• R/W: $13 million—estimate
• Construction: $38 million
Total: $54 million
Hanley Road Corridor Study - St. Louis County, Missouri
Next StepsConclude Study
Spring 2004Access Justification Report
Concept approval from FHWA Establish Funding
$$ Transportation Development District (TDD)
$$ MoDOT Cost-Sharing$$ Local/Federal Dollars
$$ Other
Hanley Road Corridor Study - St. Louis County, Missouri
Next Steps Cont’dPreliminary/Final Design
Environmental DocumentLand AcquisitionConstruction
Hanley Road Corridor Study - St. Louis County, Missouri
Funding Mechanisms• Federal Earmark in Highway Bill
– $8M• Regional Transportation Development District (TDD)
– Estimate $10M in revenue• MoDOT Cost-Sharing Program
– Estimate $16M in revenue• MTFC loan
– $25M• STP funds• Future Developer Improvements
Hanley Road Corridor Study - St. Louis County, Missouri
Current Status
• St. Louis County In-House Design (Dan Dreisewerd Project Manager)
• Additional Funding Sought for Construction
Hanley Road Corridor Study - St. Louis County, Missouri
Questions and Discussion