S/N REPRESENTATIVE 2 3 HAND OVER REPORT Mr.REGO & Mr.YUVARAJ , PRADEEP THIRD LINE WORK-SHOP JL-1100694 1-Chilled water pipe line work & flushing & first camical completed. 2-Stanllone control wiring completed to operate the system 3- RF shielding area work balance 4-Power will get on 13/14th March 2011 DESCRIPTION 1 Mr.PRADEEP BIN OMAIR RESIDENCE JL-1100608 1- Commission report & O/M manual to be submit DIPU Mr.PRADEEP, SAQIB SIYABI SOHAR JL-1100421 1-Commissioning Completed. 2-Material require for maintenance quantity attached Mr.PRADEEP, SAQIB KHALIFA AL RASHID JL-1100719 1-Copper Pipe & Insulation ordered to start the work. Mr.SANTOSH PATIL RCA SOHAR JL-1100745 1-Commissioning Completed. 2-Final inspection for hand-over the system on 14th March 2011 3- O/M manual will submit on 26th March 2011 4 5 8 Complains Mr. Sam is handling ENTERTAINMENT CENTER JL-1100604 1- Copper Pipe & Insulation completed 2- Package Unit Cable wiring balance being of main contractor not yet provided isolator Mr.DIPU & Mr.PRADEEP 7 6 OMAN FOOD STUFF RUSYAL JL-1100775 1- 4 Nos Package unit commissioned & other activity is going on

Upload: rami-allouh

Post on 21-Jul-2016

13 views

Category:

Documents


2 download

TRANSCRIPT

S/N REPRESENTATIVE

2

3

HAND OVER REPORT

Mr.REGO & Mr.YUVARAJ ,

PRADEEP

THIRD LINE WORK-SHOP JL-1100694

1-Chilled water pipe line work & flushing & first camical completed.

2-Stanllone control wiring completed to operate the system

3- RF shielding area work balance

4-Power will get on 13/14th March 2011

DESCRIPTION

1

Mr.PRADEEP

BIN OMAIR RESIDENCE JL-1100608

1- Commission report & O/M manual to be submit DIPU

Mr.PRADEEP, SAQIB

SIYABI SOHAR JL-1100421

1-Commissioning Completed.

2-Material require for maintenance quantity attached Mr.PRADEEP, SAQIB

KHALIFA AL RASHID JL-1100719

1-Copper Pipe & Insulation ordered to start the work. Mr.SANTOSH PATIL

RCA SOHAR JL-1100745

1-Commissioning Completed.

2-Final inspection for hand-over the system on 14th March 2011

3- O/M manual will submit on 26th March 2011

4

5

8Complains

Mr. Sam is handling

ENTERTAINMENT CENTER JL-1100604

1- Copper Pipe & Insulation completed

2- Package Unit Cable wiring balance being of main contractor not

yet provided isolator

Mr.DIPU & Mr.PRADEEP7

6

OMAN FOOD STUFF RUSYAL JL-1100775

1- 4 Nos Package unit commissioned & other activity is going on