    Hady Habib's Hydraulic calculationNFPA® 13 : Standard for the Installation of Sprinkler Systes

    Pro%ect Nae A&

    Address A

    ity

    ontract No. / I+ 0 (N-,

    +ate #

    Nae of contractor (N

    Nae of desi4ner HA

    Address +$SI5N

    Special (ccupanc

    1## ft7

    +ensity/+0 : #.12 4p8ft7

    -otal area protection/Ap0 : 12## ft7

    2.9

    Nuber of sprinkler Ap8As 12 sprinkler

    Flo; rate per sprinkler/.1>2 psi

    eent!lined

    1?#

    Hazard classifcation :

    Area coverage by sprinkler(As) :

    K actor

    Pipe material

    Hazen–Williams !al"es

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    2/62

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    3/62

    Hady Habib's Hydraulic calculation sheet usein4 NFPA® 13 : Standard for the Installation of Sprinkler Syst

    path

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    4/62

    ,%a 2'.. in'

    -./ standard elbo0 &

    none .

    none .

    none .

    a%b &$'+-1 in'

    -./ standard elbo0 &

    none .

    none .

    none .

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    5/62

    Hady Habib's Hydraulic calculation sheet usein4 NFPA® 13 : Standard for the Installation of Sprinkler Syst

    path

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    6/62

    % ' 'none .

    none .

    e% &2'.& in'

    -./ standard elbo0 &$

    &,none .

    none .

    none .

    &$'1,. bar '2+.1,+1$ barP riction and resid"al 9 P static 9

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    7/62

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    8/62

     

     e

     

    k l   er  s  c  al   c  "l  

     y

    &   2 

     . '  +  g pm *    t C  

     g pm   + 

     

     d i  t i   on

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    9/62

    s ! "#13 $dition

    Friction loss pressureP/psi0 Notes

    /Psi8ft0 friction/Psi0

    &'-21>%..2 .'...-2, $'$2.+1+

    P& 9 $'$2 Psi

    k 9 +'2

    & 9 +'.. gpm

    .'..$+2$122 .'1+2-- $'&,-+.$

    P 9 $'&-. Psi

    k 9 +'2

    9 +'- gpm

    .'..&2.2$ '+$2-,.$ .',2&.-

    P1 9 .',2 Psi

    k 9 +'2

    1 9 ,'1+2 gpm

    .'..,&+ '&2$&&.1 &'&,1&

    .'.+$-$2-&- .'$+-.$- $'12,

    P2 9 $'12 Psi

    k 9 +'2

    2 9 +'$, gpm

    .'&.,1$.,1$$ .'2&+1&+1 $'-$$+.+

    P$ 9 $'-$& Psi

    k 9 +'2

    $ 9 +', gpm

    .'1+11-1+2+ '21,.$ -'+&2

    P, 9 -'+ Psi

    k 9 +'2

    , 9 $'. gpm

    NicearbEyahoo.co

    mailto:[email protected]:[email protected]

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    10/62

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    11/62

    s ! "#13 $dition

    Friction loss pressureP/psi0 Notes

    /Psi8ft0 friction/Psi0

    ,'$-2+>%..+ .'...,--$2& $'$+211$

    P. 9 $'$2 Psi

    k 9 +'2

    . 9 +'.. gpm

    .'&.2&.-$1, .'2,2&-&11 $'$-1&$-

    P 9 $'$-1 Psi

    k 9 +'2

    9 +'21 gpm

    .'..2-+,2 .'.1,2+-$.& $',1&-2

    P& 9 $',1 Psi

    k 9 +'2

    & 9 +'2, gpm

    .'$$,+&12- &'&+.+$1 .'211-

    b 9 ,,'1, gpm

    +'$++>%..+ .'.-&-- &'12.+$

    $'-+.12$&$+ 1-,'&.++$2 +-'+2

    NicearbEyahoo.co

    mailto:[email protected]:[email protected]

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    12/62

    ' ' '

    $'-+.12$&$+ &&&'2.,& -21'+$$,

    &$1'--,+ barP total 9

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    13/62

    + e si   4n

     d  at  a: 

     ont r  a ct N o

     

    A =

    =@ >  5  5 %  ?  8  

     

    A 3 

         <IP A ; 

       <;8 @ A   8 ; JI3 > @ 

    H y

     d r  a ul  i   c '  a

    l   c ul   at i  

    f  or 

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    14/62

     at  e .  + % K   an%  + 

    n s

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    15/62

    Fittin4s

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    16/62

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    17/62

    Fittin4s 3.>3

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    18/62

    ,ate -otal+.'.. .

    .'.. .

    $'.. .

    &+'.. .

    .'.. .

    $'.. '..

    1'+. .

    +.'.. &..'..

    +2'+. .

    2'.. .

    2-'+. .

    $2'.. .

    ,&'+. .

    ,-'.. .

    -+'+. .

    .'.. .

    &.'.. .

    $'.. +'..

    &+'.. .

    .'.. .

    +'.. +'..

    &'+. &'+.

    &'1. .

    &'. .

    &'&. 1&'1.

    &'. .

    &'.. .&.'-. .1'+

    &.',. .

    &.'$. &.'$.

    .'.. .

    1'.. .

    1+'.. 1+'..

    11'2$ .

    +&'$ .

    +-'2$ +-'22222222$

    2$'$ .-'.. .

    2.'.. .

    tes ! "#13 $dition

    NicearbEyahoo.co

    mailto:[email protected]:[email protected]

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    19/62

    ,ate -otal

    tes ! "#13 $dition

    NicearbEyahoo.co

    +-'2$ .

    21'2$ .

    2-'2$ .

    $1'2$ .

    '.. .

    1.'.. .

    .'.. .

    ++'+2 .

    11', .'..

    11', .

    11', .

    11', .

    11', .

    +1',. +1,.'$

    +'2- .

    +&'+, .

    +'1$ .

    1-'&& .

    +'+& .

    1$'.. .

    2.'.. ,.'..

    1.'.. .

    ,.'.. .

    1,'., 11'&+

    1,'., .

    1,'., .

    1,'., .1,'., .

    .+'- .

    -'22 .

    $,'1 +12-'+-&+-&2

    21'2 .

    12'.2 .

    1$'2 1&',22222$

    -'.. .

    &'&+ .

    +'.. .1.'.. .

    +' &.+'

    mailto:[email protected]:[email protected]

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    20/62

    ,ate -otal

    tes ! "#13 $dition

    NicearbEyahoo.co

    +' .

    +' .

    +' .

    +' .

    -'+$ .

    .'-1 .

    ,1'. .

    22'2$ .

    1&',- .

    1'2- 1'2,,,,,,,-

    $'2& .

    &'+ .

    +,'.. .

    -2'2$ .

    ,,'&+ 11'&+

    $-', .

    $'1& .

    2'.. .

    +1'+, .

    12'$ .

    $'$+ .

    &-' &-'

    --'+$ .

    $,', .

    +$'- 1..'

    2'.. .

    1', .

    mailto:[email protected]:[email protected]

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    21/62

    Here yo" can add and edit t#e fttings prices as yo" 0is#

    & 1 + 2 $ ,

    1/2 in. *1 in' in' *1 in' *& in' & in' & *& in'

    & 1+/ elbo0 +.'.. .'.. $'.. &+'.. .'.. $'.. 1'+.

    -./ standard elbo0 .'.. &.'.. $'.. &+'.. .'.. +'.. &'+.

    1 -./ long%t"rn elbo0 .'.. 1'.. 1+'.. 11'2$ +&'$ +-'2$ 2$'$

    +  8ee or cross (4o0 t"rned -./) .'.. ++'+2 11', 11', 11', 11', 11',

    2 3"tter4y valve 1.'.. ,.'.. 1,'., 1,'., 1,'., 1,'., 1,'.,

    $ 7ate valve +'.. 1.'.. +' +' +' +' +'

    , 50ing c#eck6 +,'.. -2'2$ ,,'&+ $-', $'1& 2'.. +1'+,

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    22/62

    - . & 1 + 2

    in' *& in' 1 in' + in' 2 in' , in' . in' & in'

    +.'.. +2'+. 2'.. 2-'+. $2'.. ,&'+. ,-'.. -+'+.

    &'1. &'. &'&. &'. &'.. &.'-. &.',. &.'$.

    -'.. 2.'.. +-'2$ 21'2$ 2-'2$ $1'2$ '.. 1.'..

    +1',. +'2- +&'+, +'1$ 1-'&& +'+& 1$'.. 2.'..

    .+'- -'22 $,'1 21'2 12'.2 1$'2 -'.. &'&+

    -'+$ .'-1 ,1'. 22'2$ 1&',- 1'2- $'2& &'+

    12'$ $'$+ &-' --'+$ $,', +$'- 2'.. 1',

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    23/62

    lassication of (ccupancies:

    Light Hazard Occupancies

    Ordinary Hazard Group 1

    Ordinary Hazard Group 2

    Extra Hazard Group 1

    Extra Hazard Group 2

    Special Occupancy (High-iled! Hazards

    ;EPAF

    5tandard or t#e?nstallation o 5prinkler

    5ystems&. >dition

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    24/62

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    25/62

    Di4ht Ha6ard (ccupancies.(rdinary Ha

    Group 1

    "hurches #uto$o%ile par&ing

    "lu%s 'a&eries

    Eaes and oerhangs) 'eerage $anu*acturing

    Educational "anneries

    Hospitals +airy products

    ,nstitutional Electronic plants

    Li%raries) glass products $anu*acturing

    useu$s Laundries

    ursing or acco$odation estaurant serice areasO**ices) sho0roo$s

    esidential

    estaurant seating areas

    heaters and auditoriu$s)

    nused attics

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    26/62

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    27/62

      ard (ccupancies $tra Ha6ard (cc

    Group 2 Group 1

    "ereal $ills #ircra*t hangars

    "he$ical plants 3 ordinary "o$%usti%le hydraulic *luid use areas

    "on*ectionery products +ie casting

    +istilleries etal extruding

    +ry cleaners ly0ood and particles

    4eed $ills rinting

    Horse sta%les u%%er

    Leather goods $anu*acturing Sa0 $ills

    Li%raries 3 large stac& roo$ areas extile #ll &indachine shops pholstering 0ith plastic *oa$s

    etal 0or&ing

    ercantile

    aper and pulp $ills

    aper process plants

    iers and 0hares

    ost o**ices

    rinting and pu%lishing

    epair garages

    esin application area

    Stages

    extile $anu*acturing

    ire $anu*acturing

    o%acco products $anu*acturing

    5ood $achining

    5ood product asse$%ly

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    28/62

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    29/62

      pancies

    Group 2

     #sphalt saturating

    4la$$a%le li6uids spraying

    4lo0 coating

    anu*actured ho$e

    Open oil 6uenching

    lastics processing

    Solent cleaning

    7arnish and paint dipping

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    30/62

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    31/62

    -able "3.?.?.>.1 Ha6enJillias Kalues

    Jnlined cast or d"ctile iron ..

    3lack steel (dry systems incl"ding preaction) ..

    3lack steel (0et systems incl"ding del"ge) &.

    7alvanized steel (dry systems incl"ding preaction) ..

    7alvanized steel (0et systems incl"ding del"ge) &.

    Plastic (listed) all +.

    ement%lined cast% or d"ctile iron 1.

    opper t"be or stainless steel +.

    Asbestos cement 1.

    oncrete 1.

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    32/62

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    33/62

    -able 9.".3.1 Sprinkler +ischar4e haracteristics Identic

    '1 &. '–'+

    '- &, ',–&'.

    &', 1. &'2%&'-

    1'& 2 1'.%1'1

    +'2 , +'%+',

    ,'. + $'1%,'&

    .

    .

    '& 2. .'$%'$

    .

    .

    1'. &.. '+%1'+

    2', &1. 2'.%$'2

    -'2 &,. ,'2%&.'2

    &&'1 &. &'%&'+

    &+'& 2. &'-%&2'+

    &,'. 1.. &2'2%&-'1

    NoinalL!Factor

    M4p8/psi018"

    NoinalL!Factor

    MD8in8/bar018"

    L!Factor ,an4eM4p8/psi018"L

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    34/62

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    35/62

    tion

    -–&& &+ M& in' ;P8

     &2–&- ' M& in' ;P8

    ,–1& +. M& in' ;P8

    +$%2 $+ M& in' ;P8

    $2%,1 .. M& in' ;P8

    .$%, 1. *1 in' ;P8

    or

    M& in' ;P8

    +-%22 &.. M& in' ;P8

    orM1 in' ;P8

    -+%&.- &+. M1 in' ;P8

    &%&+1 .. M1 in' ;P8

    &$&%. +. in' ;P8

    %1 1.. & in' ;P8

    1-%,$ 1+. in' ;P8

    ,-%1. +.. 1 in' ;P8

    L!Factor ,an4eMD8in8/bar018"

    Percent of Noinal

    L!2.9+ischar4e

    -hread-ype

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    36/62

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    37/62

    -able O.9.".".1/a0 Protection Areas and )aiu Spacin4 of Standard Pendent and p

    onstruction -ype

    ;oncomb"stible "nobstr"cted

    ;oncomb"stible "nobstr"cted

    ;oncomb"stible obstr"cted

    ;oncomb"stible obstr"cted

    omb"stible "nobstr"cted 0it# no eNposed members

    omb"stible "nobstr"cted 0it# no eNposed members

    omb"stible "nobstr"cted 0it# eNposed members t (.'- m) or more on center

    omb"stible "nobstr"cted 0it# eNposed members t (.'- m) or more on center

    omb"stible "nobstr"cted 0it# members less t#an t (.'- m) on centeromb"stible obstr"cted 0it# eNposed members t (.'- m) or more on center

    omb"stible obstr"cted 0it# members less t#an t (.'- m) on cente

    omb"stible concealed spaces in accordance 0it# ,'2'1''1

    65ee ,'2'1''1'1'

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    38/62

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    39/62

    t Spray Sprinklers for Di4ht Ha6ard

    Syste -ype)aiu Spacin4

    Hydra"lically calc"lated &&+ &.'- + 1'2

    Pipe sc#ed"le &&. ,'2 + 1'2

    Hydra"lically calc"lated &&+ &.'- + 1'2

    Pipe sc#ed"le &.. ,'2 + 1'2

    Hydra"lically calc"lated &&+ &.'- + 1'2

    Pipe sc#ed"le &.. ,'2 + 1'2

    Hydra"lically calc"lated &&+ &.'- + 1'2

    Pipe sc#ed"le &.. ,'2 + 1'2

    All . &' + 1'2All 2, +'2 + 1'2

    All . &' + 1'2

    All &. ' + 1'2

    )aiuProtection Area

    t& m& t& m&

    Parallel tot#e slope .perpendic"l

    ar to t#eslop 6

    Parallel tot#e slope

    '.+perpendic"l

    ar to t#eslop 6

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    40/62

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    41/62

    onstruction -ype)aiu

    All All . &' +

    -able O.9.".".1/b0 Protection Areas and )aiu Spacin4 of StaPendent and pri4ht Spray Sprinklers for (rdinary Ha6ard

    Syste-ype

    )aiuProtection Area

    t& m& t&

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    42/62

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    43/62

     Spacin4onstruction -ype

    1'2 All

    All

    All

    dard -able O.9.".".1/c0 PSprinklers for $tra

    m&

    6?n b"ildings 0#ere sis permitted "p to &

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    44/62

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    45/62

    Syste -ype)aiu

    Pipe sc#ed"le -. ,'1 &6

    Hydra"lically calc"lated 0it# density .'&+ .. -' &6

    Hydra"lically calc"lated 0it# density Q.'&+ . &' +

      rotection Areas and )aiu Spacin4 of Standard Pendent and pri4ht SprayHa6ard

    )aiuProtection Area

    t& m& t&

    lid str"ct"ral members create bays "p to &+ t ($'2 m) 0ideO maNim"m spacing bet0eent 2 in' (', m)'

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    46/62

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    47/62

     Spacin4

    '$6 All

    '$6 All

    1'2

    -able O.9.".".Sprinklers for

    onstruction-ype

    m&

    6?n b"ildings 0sprinklers is pesprinklers

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    48/62

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    49/62

    Syste -ype

    Hydra"lically calc"lated 0it# density .'&+ .. -'

    Hydra"lically calc"lated 0it# density Q.'&+ . &'

    /d0 Protection Areas and )aiu Spacin4 of Standard Pendent andHi4h!Piled Stora4e

    )aiuProtection Area

    t& m&

      ere solid str"ct"ral members create bays "p to &+ t ($'2 m) 0ideO maNim"m smitted "p to & t 2 in' (', m)'

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    50/62

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    51/62

    -able "3.?.3.1.1 $BuiCalent Schedule ?# Ste

    )aiu Spacin4

    1/2 in.

    &6 '$6 fttings and valves (+mm)

    + 1'2 1+/ elbo0 %

    -./ standard elbo0

    .'

    -./ long%t"rn elbo0 .'+

    .'&

     8ee or cross (4o0 t"rned -./)

    .'-3"tter4y valve %

    7ate valve %

    50ing c#eck6 %

    none

    Eor 5? "nitsO in' 9 &+'1 mmR t 9 .'.1, m'

    ;ote: ?normation on M& in' pipe is incl"ded in t#i

    6="e to t#e variation in design o s0ing c#eck val

    pri4ht Spray

    t& m&

      pacing bet0een

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    52/62

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    53/62

    el Pipe Den4th hart

    Fittin4s and CalCes $pressed in $BuiClant Feet /)ete

    *1 in' in' *1 in' *& in' & in' & *& in' in'

    (&.mm) (&+mm) (&mm) (1.mm) (+.mm) (2+mm) (,.mm)

    & &

    .' .' .' .'2 .'2 .'- .'-

    & & 1 + 2 $

    .'2 .'2 .'- '& '+ ', &'

    & & & 1 +

    .' .'2 .'2 .'2 .'- '& '+

    1 + 2 , . & +

    '& '+ ', &'1 '$ 1'2% % % % 2 $ .

    ', &'

    % % % %

    .' .' .'

    % + $ - 1 2

    '+ &' &'$ '1 1' 1'-

    table only beca"se it is allo0ed "nder ,'+'-'1 and ,'+'-'+'

      vesO t#e pipe eB"ivalents indicated in t#is table are considered average'

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    54/62

    . .

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    55/62

    s0 of Pipe

    *& in' 1 in' + in' 2 in' , in' . in' & in'

    (-.mm) (..mm) (&+mm) (+.mm) (&..mm) (&+.mm) (..mm)

    1 + $ -

    .'- '& '+ &' &'$ '1 1

    , . & 1 , && &$

    &'1 '$ 1' +'+ 2'$ ,'&

    + 2 , - 2 ,

    '+ ', &'1 &'$ 1 1'- +'+

    $ &. &+ . + +. 2.

    +'& 2' $'2 -' .'$ +'& ,'% & - . & - &

    '$ &'$ '$ +', 2'1

    & & 1 + 2

    .' .'2 .'2 .'- '& '+ ',

    - && &$ & 1+ ++ 2+

    +', 2'$ ,'& -'+ '$ 2', &.

    none

    1+/ elbo0

    -./ standard elbo0-./ long%t"rn elbo0

     8ee or cross (4o0 t"rned -./)

    3"tter4y valve

    7ate valve

    50ing c#eck6

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    56/62

    . . . . . . .

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    57/62

    External ,nternal External ,nternal

    1/2 in. .',1 .'2& .' .'++ .'

    *1 in' '.+ .',& .' .',$ .'+

    in' '& '.+ .' '2 .',2

    *1 in' '22 ', .'1 &'2 '+

    *& in' '- '2 .'+ &',1 &'.1

    & in' &', &'.$ .'+ 1'1 '2

    & *& in' &',, &'1$ .'& 2'1- 1'$-

    in' '+ '.$ .'&& -'2& $'-

    *& in' 1 '++ .'& &'+2 -',-

    1 in' 1'+ 1'. .'&1 +'- &'$+ in' +'+2 +'.+ .'&2 &1' &.

    2 in' 2'2 2'.$ .'&, 1'1$ &,',-

    , in' ,'2 $'-, .'& +,'1& +.'.&

    . in' .'$+ .'.& .'$ -.'$2 $,',+

    & in' &'$+ '-1 .'1 &$'21 '-

    Pipe 5ize

    =iameter(in)

    ;ominal 8#ickness

    (in)

     8ransverse Are(in&)

    'ased on #S #89 - Standard Speci*ication *or ipe) Steel) 'lac& and Hot-+i

     #S #89 pipe - also re*erred to as #SE S#89 pipe - is intended *or $echan0elding and *or$ing li&e coiling) %ending and *langing.

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    58/62

    . . . . . .

  • 8/18/2019 Hady Habibs Hydraulic Calculation Sheet 00

    59/62

    Weig#t

    Steel l%/*t &g/$

    .'&+ 1'++ 2'1 .'..& .',+ '&2 1

    .' '21 1'21 .'..$ ' '2, 1

    .'1- &'- '21 .'..2 '2, &'+ T

    .'2$ &' &'$$ .'..1 &'&$ ', T

    .', &'. &'$ .'.1 &'$& 1'.1 T

    '., '2 ',+ .'.& '2+ +'1 T

    '$ ' '++ .'. +'$- ,'2& ,

    &'& '.- '&+ .'.+ $'+, '&$ ,

    &'2, .'-+ '., .'.2,$ -' '+2 ,

    '$ .',+ .'-+ .'.,,1 .'$- 2'.2 ,1' .'2- .'$2 .',- 1'2 &'$1 ,

    +'+, .'+, .'2 .'&..2 ,'-$ &,'& ,

    ,'1 .'11 .'1, .'++& &,'++ 1&'1- ,

    '- .'2 .', .'+1$2 1.'1, 2.'&1 ,

    +'$1 .' .'& .'$$2 +'2 $-'$$ ,

      as Uengt# o Pipe(per sB' oot o)

    !ol"me(t*t)

    ;"mber o 8#reads per

    inc# o5cre0

    >Nternal5"race

    (t)

    ?nternal5"race (t)

    pped) :inc-"oated) 5elded and Sea$less

    ical and pressure applications. "an %e used in stea$) 0ater) gas and air lines. Suita%le *or