gulf of mexico update...2014/02/19 · jack-up rig = 25 drillship = 19 drilling rigs working in...
TRANSCRIPT
Regulatory Update
Published proposed rulemaking Oil and Gas Production Safety Systems – Subpart H
Published August 22, 2013, comment period was extended and closed December 5, 2013 Includes: safety and pollution prevention equipment lifecycle analysis, production safety systems, subsurface safety devices, and safety device testing
In preparation, due out mid-2014 Blowout Prevention Systems Arctic (joint with BOEM)
Upcoming Proposed Rules
Suspensions of Production and Operations
Natural Gas Fluids Measurement
Oil Spill Mechanical Recovery
Drilling Permits
Year
Shallow Water < 500 ft. Deepwater > 500 ft. Total
Approved New Well Bypass Sidetrack New Well Bypass Sidetrack
2013 72 51 120 57 34 23 357
2012 67 42 108 112 25 23 377
2011 71 40 87 38 19 22 277
2010 72 32 92 32 19 23 270
2009 95 28 70 76 26 46 341
Platform Rig = 24
Semi-submersible = 20
Jack-up rig = 25
Drillship = 19
Drilling Rigs Working
in U.S. Gulf of Mexico
U.S. Gulf of Mexico
New Deepwater Rigs
Deepwater Rig & Type
Operator Quarter Expected
Seadrill West Auriga drillship BP 3rd Qtr. 2013 Noble Don Taylor drillship Shell
Seadrill West Vela – drillship BP 4th Qtr. 2013 Stena IceMAX – drillship Shell
1st Qtr. 2014
Diamond Offshore Ocean Onyx – rebuilt semi Apache Atwood Advantage - drillship Noble Energy Maersk Viking – drillship ExxonMobil Sevan Louisiana – cylinder hull LLOG Exploration Diamond Offshore Ocean Blackhawk - drillship Anadarko
2nd Qtr 2014 Noble Bob Douglas - drillship Anadarko Maersk Valiant - drillship ConocoPhillips Pacific Sharav – drillship Chevron
3rd Qtr. 2014
Diamond Offshore Ocean BlackHornet – drillship Anadarko Transocean Deepwater Invictus – drillship BHP Billiton Noble Sam Croft – drill ship Freeport McMoran Rowan Resolute – drillship Anadarko Seadrill West Neptune – drillship LLOG Exploration 4th Qtr 2014 Rowan Reliance - drillship Cobalt Intl. Energy
1st Qtr 2015 Noble Tom Madden - drillship Freeport McMoran
Deepwater Appraisal
Activity
Deepwater Prospect
Operator Map Area
North Platte Cobalt Intl. Energy Garden Banks 959 Stampede(Pony)*Sanction ‘14, 1st prod.–’16 Hess Corp Green Canyon 468 Stampede(Knotty Head)*Sanction ‘14, 1st prod.–‘16 Hess Corp Green Canyon 512 Big Dog (Mad Dog B) BP Green Canyon 825 Appomattox Shell Mississippi Canyon 806 Vito Shell Mississippi Canyon 984 Gunflint Noble Energy Mississippi Canyon 948 Hadrian North ExxonMobil Keathley Canyon 918 Buckskin/Moccasin Chevron Keathley Canyon 872/736 Kaskida/Tiber/Gila BP Keathley Canyon 292/102/93 Shenandoah Anadarko Walker Ridge 52 Coronada Chevron Walker Ridge 98
Shallow Water
Production Facilities (less than 500 ft)
2647
4 Pile Caisson
Deepwater
Production Facilities (greater than 500 ft)
73
Single Caisson
Fixed
SPAR
TLP
FPSO
Production Facilities
Fixed
New Gulf of Mexico
Deepwater Projects
Deepwater Project
Operator 1st Production Expected
Olympus TLP (Mars B) {**subsea} Mississippi Canyon 806 Shell Started production
1st Qtr. 2014 Jack – St. Malo Walker Ridge 718
Chevron 2014
Big Foot Walker Ridge 29
Chevron 2014
Lucius (oil/gas)/S. Hadrian (gas) Keathley Canyon 875
Anadarko/ ExxonMobil 2014
Tubular Bells Mississippi Canyon 725
Hess 2014
Delta House Mississippi Canyon 254
LLOG Exploration 2015
Olympus TLP (Mars B) {**platform} Mississippi Canyon 806
Shell 2015
Heidelberg Green Canyon 860
Anadarko 2016
Stones (**2nd FPSO in GOM) Walker Ridge 508
Shell 2016
Gulf of Mexico OCS Oil Production
Total vs. Deepwater
0.8 0.9 0.9
1.0 1.1
1.2 1.4
1.4 1.5 1.6 1.5
1.5
1.3 1.3 1.3 1.2
1.6 1.6
1.3 1.3 1.2
0.1 0.1 0.2 0.2 0.3
0.4
0.6 0.7
0.9 1.0 1.0 1.0
0.9 0.9 0.9 0.9
1.3 1.3
1.0 1.0 1.0
0.000
0.200
0.400
0.600
0.800
1.000
1.200
1.400
1.600
1.800
2.000
1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013(est)
MM Bbls /Day
Total Deepwater Portion (> 1000 ft)
Gulf of Mexico OCS Gas Production
Total vs. Deepwater
13.0 13.5 13.3 14.2 14.4 14.0 13.9 13.6 13.9
12.4 12.1 11.0
8.7 8.0 7.7
6.4 6.7 6.2 5.0
4.2 3.6
0.3 0.4 0.5 0.8 1.1 1.6 2.3 2.7 3.2 3.5 3.9 3.8 3.3 3.0 2.8 2.5 3.0 2.9 2.3 2.0 1.7
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013(est)
BCF / Day
Total Deepwater Portion (> 1000 ft)
Looking to the Future
Increased drilling activity Industry mastering enhanced information requirements for APDs Inspections and Enforcement efforts
BOP test witnessing Increased inspection force and helicopter fleet eInspections
Increased coordination with USCG
Looking to the Future
Production Projects Start-ups Pre-production Inspections Inspections and Enforcement efforts
Increased inspection force and helicopter fleet eInspections
New and emerging technologies Review of Deepwater Operation Plans (DWOPs)
Decommissioning of subsea and deepwater structures, i.e. Spars & TLPs
Total Inspections
Performed by Type
Inspection
Type
2009 2010 2011 2012 2013
Well
Operations 619 586 640 942 960
Production 3,267 2,737 2,266 2,420 2,690
Recent Response to
Incidents
July 8, 2013 – Energy Resource Technology, LLC (ERT) Loss of well control @ Ship Shoal 225, 146 feet water depth BSEE oversees response through Houma District
July 23, 2013 – Walter Oil and Gas Loss of well control @ South Timbalier 220, 154 feet water depth BSEE participates in Unified Command with US Coast Guard, Joint Information Center is stood up
January 30, 2014 - EnVen Loss of well control @ Vermilion 356, 262 feet water depth BSEE leads coordinated response with US Coast Guard