November 16, 2010

Whispering Pines Core Renovation and Classroom Addition Sitework

School District of Palm Beach County Project No: 1781-8434

Guaranteed Maximum Price for

Pirtle Construction Company 1489 N. Military Trail, Suite 208 West Palm Beach, Florida 33409

Tel: 561.688.2010 Fax: 561.688.2090

 

Tuesday, November 16, 2010 School District of Palm Beach County Program Management 3661 Interstate Park Rd N, Suite 200 Riviera Beach, FL 33404 Attention: Phyllis Karp Re: Whispering Pines Core Renovation and Classroom Addition Site Work Project SDPBC Project No.: 1781-8434 GUARANTEED MAXIMUM PRICE Dear Phyllis, James B. Pirtle Construction Company, Inc., d/b/a Pirtle Construction Company is pleased to provide a Guaranteed Maximum Price (GMP) of $3,938,941.00 based on 100% Construction Documents and clarified by this GMP. In accordance with the project agreement, this price is inclusive of all costs for construction of the project and preconstruction services. James B. Pirtle Construction Company, Inc., d/b/a Pirtle Construction Company understands that timely completion of this project is important for your plans to have the school open to accept students in August 2011. With the allotted construction time of 9 months, with 3 months for punch-list work and project close-out, we will work diligently to meet your schedule. We are ready to proceed with the construction of this project and provide a quality project for the School District of Palm Beach County. Your review and approval is requested. Very truly yours,

Gary N. Pirtle, Vice President  

PROJECT NAME: Whispering Pines Core Renovation and Classroom Addition Sitework PROJECT NO.: 1781-8434

TABLE OF CONTENTS

1. Executive Summary

2. Qualifications & Clarifications

3. Guaranteed Maximum Price Summary a. GMP Summary - Exhibit B b. Owner accepted Value Engineering Items c. Allowances d. Required Submittals:

Exhibit D – Summary of Construction Phase Service Fees Exhibit E – CM Staff Per Diem for Time Extensions Exhibit F – Construction Team Assigned Representatives Exhibit H – Builder’s Risk Questionnaire Appendix E – PBSD 1526 (two parts): - Subcontractor Participation Division 1 – 16 - List of Major Subcontractors

4. Construction Detail Summary Sheet – Detailed by CSI Division a. General Conditions Breakdown b. General Requirements Breakdown

5. Schedule of Values

6. Letter certifying the percent of Work by the Construction Manager

7. Project Schedule containing the following:

a. Schedule Narrative b. CPM Schedule

8. M/WBE

a. Participation Detail (Form PBSD 1526) b. Letter of Intent (Form PBSD 1525) c. Statement of Good Faith Efforts (Form PBSD 1527) d. Good Faith M/WBE Subcontractor Participation Invitation (Form PBSD 1611)

9. Document List

10. State Licenses of all Subcontractors identified in PBSD 1526

11. Unit Prices, Trench Safety Act Compliance Statement.

PROJECT NAME: Whispering Pines Core Renovation and Classroom Addition Sitework PROJECT NO.: 1781-8434 BACKGROUND AND EXECUTIVE SUMMARY James B. Pirtle Construction Company Inc., d/b/a Pirtle Construction Company is the Construction Manager (CM) At Risk, contracted with the School Board of Palm Beach County, Florida (Owner). The Construction Management at Risk Agreement, and approved GMP is for the total construction project, which includes preconstruction administration and coordination, design review and analysis, bidding and proposal phase and complete construction through turnover and closeout. The Project Architect is CJS Architects, PLLC (Architect) and their Engineering Consultants, contracted by separate contract with the Owner for Construction Documents and Construction Phase Administration. The Whispering Pines Core Renovation and Sitework project includes renovation and expansion of the Administration Offices suite as well as an expansion of the school Clinic. In addition, a new kitchen will be constructed, and the existing kitchen will be demolished to allow for an expansion and renovation of the existing Dining/Multipurpose Room. Also included in this project, is the renovation of the school’s Media Center, and site improvements including landscaping, walkway canopies, site utilities, and systems for the 2-Story Classroom Addition (NIC). The overall size of the project is approximately 35,000SF. Over the last 2 months the CM has been involved in Preconstruction Meetings and discussions with the Architect and the Owner regarding the project with specific attention to design, design constructability, construction coordination, and schedule of the project. A preconstruction schedule has been administered by the CM and presented at each meeting. The CM also established a 100% Construction Document estimate during the preconstruction process that was presented to the Owner based on the project documents by the Architect. The bidding process with interested subcontractors began in the month of October 2010 and culminated with a Bid opening on October 28, 2010. The bidding was very successful with numerous bids submitted on the Bid Date. A combination of the CM’s large subcontractor database and the weakening construction economy contributed to the substantial submission of bids.

PROJECT NAME: Whispering Pines Core Renovation and Classroom Addition Sitework PROJECT NO.: 1781-8434 BASIS OF COSTS, QUALIFICATIONS, AND CLARIFICATIONS The scope of this GMP is based on 100% Construction Documents issued by the Architect. The CM administered a public and competitive bidding format to establish most of the pricing of this GMP. Some costs are represented by estimated budgets. Upon completion of bidding, the CM conducted scope reviews and clarifications with most bidders and especially with the low bidders in order to establish the lowest and most responsive bid for each scope of work. Any clarifications and qualifications to the GMP Construction Documents are listed in the individual divisions below. Division 2 – Building Demolition & Site Construction 2.1. GMP includes pre-condition video before work commences. 2.2. GMP includes the collection of all mercury containing light fixtures and

ballasts to be turned over to the SDPBC. During construction, some of the fixtures will be retained for use as temporary lighting, and will be turned over to the SDPBC upon completion of the work in each area.

2.3. GMP includes salvage of SDPBC requested equipment. A list of items to be salvaged to be provided to Pirtle Construction prior to the start of demolition to ensure that all requested items will be saved.

2.4 GMP includes Type D curb in lieu of thickened sidewalk at locations where sidewalk is adjacent with asphalt surfaces.

2.5 GMP includes site work and underground connections to the new two-story addition that is to be furnished and installed by Royal Concrete Concepts (RCC). GMP includes bringing the building pad for the two-story addition to bottom of footer elevation with proper density. GMP includes additional suitable fill to be supplied near the two-story addition for RCC to install inside footers to bottom of slab. RCC will perform needed compaction and density for new two-story addition slab.

2.6 GMP includes offsite work associated with road entrance on Lyon’s Road. All permits and design approvals are to be obtained by the Civil Engineer of Record.

2.7 GMP includes connection of sanitary force main to a lift station at the PE building only as shown on Drawing C-4.0. The lift station is not shown on the drawings and not included in this GMP.

2.9 GMP does not include any work at existing ball field and at the south east area of the site. Fill from the existing earth berm areas were stock piled by the owner and available for use throughout the project.

PROJECT NAME: Whispering Pines Core Renovation and Classroom Addition Sitework PROJECT NO.: 1781-8434 2.16 GMP includes pricing for additional landscaping and irrigation work for the

2-Story Classroom Addition as stated in the Memorandum of Work provided by Land Stewardship Company at time of bidding. Drawings were not provided for this work.

Division 5 – Metals

5.1. GMP includes all interior railings as powder coated steel and all exterior railings as powder coated aluminum. The single rail at the kitchen serving line is included as stainless steel.

5.2. GMP includes bike racks as a part of the Structural Steel and Misc. Metals package.

Division 6 – Wood, Plastics and Composites

6.1. GMP does not include Alternate No. 3: Media Check Out Desk as noted on sheet G-2.0 of the Construction Documents.

6.2. GMP does not include Alternate No. 4: Technical Processing Casework as noted on sheet G-2.0 of the Construction Documents.

Division 7 – Thermal and Moisture Protection

7.1. GMP includes all sheet metal associated with roofing scope of work as 22 gauge galvanized steel.

Division 9 – Finishes

7.1. GMP does not include Alternate No. 1: Forbo Flooring as noted on sheet G-2.0 of the Construction Documents.

Division 10 – Specialties 10.1. GMP includes all aluminum walkway cover wet columns to be connected

to underground drainage. Divisions 15 – Mechanical 15.1. GMP does not include the underground propane tanks or site gas piping

as part of the Plumbing line item or the Site Utilities line item. This work will be completed through the SBPBC with a purchase order.

EXHIBIT B

PROJECT NAME: Whispering Pines Core Renovation and Classroom Addition Sitework

PROJECT NO.: 1781-8434

DIVISION 1 - GENERAL REQUIREMENTS (Direct Cost Items Related to Site) 151,227$

DIVISION 2 - SITE CONSTRUCTION 312,384$

DIVISION 3 - CONCRETE 138,215$

DIVISION 4 - MASONRY 67,370$

DIVISION 5 - STEEL 173,000$

DIVISION 6 - CARPENTRY 42,650$

DIVISION 7 - THERMAL/MOISTURE 111,140$

DIVISION 8 - WINDOWS AND DOORS 104,907$

DIVISION 9 - FINISHES 331,890$

DIVISION 10 - SPECIALTIES 131,462$

DIVISION 11 - EQUIPMENT 324,008$

DIVISION 12 - FURNISHINGS 6,736$

DIVISION 13 - SPECIAL CONSTRUCTION N/A

DIVISION 14 - ELEVATOR N/A

DIVISION 15 - MECHANICAL 597,470$

DIVISION 16 - ELECTRICAL 656,800$

TOTAL DIVISIONS 1-16 ( including accepted value engineered items) 3,149,259$

GUARANTEED MAXIMUM PRICE SUMMARY

BONDS AND INSURANCE 36,516$

CONSTRUCTION PHASE FEE (On Site Staff) 299,358$

GENERAL CONDITIONS (Direct Cost Items Related to Field Staff) 44,878$

CONSTRUCTION MANAGER FEE (Overhead & Profit) 188,160$

OWNER'S CONSTRUCTION CONTINGENCY 157,463$

ALLOWANCES 75,730$

SUB-TOTAL (DIVISIONS 1-16, BONDS AND INSURANCE, GENERAL

CONDITIONS, FEES, OWNER'S CONTINGENCY) 3,951,364$

DEDUCT: MCIP PREMUIM PAID BY OWNER (4% of Sub-total) N/A

DEDUCT: GUARANTEED SALES TAX RECOVERY (50,000)$

TOTAL GUARANTEED MAXIMUM PRICE 3,901,364$

PRECONSTRUCTION PHASE FEE 37,577$

TOTAL CONSTRUCTION COST (Preconstruction Fee + GMP) 3,938,941$

Certified True and Correct by:

, Vice President 11/16/10

NAME / TITLE DATE

Whispering Pines Core Renovation and Classroom Addition SiteworkProject No.: 1781-8434

RECAP

Div. # DELETED SCOPE ITEMS (VALUE ENGINEERING) $ VALUE $ $ ACCEPTED $

09 Deletion of Soffits in Multipurpose & Media Center with add for ACT:

Drywall ($15,500)

Acoustical Tile Ceilings $1,540

TOTAL: ($13,960) (13,960.00)$

09 Delete Frey Reglet System in Cafeteria ($1,500) (1,500.00)$

11 Reuse of Kitchen Specified Equipment ($40,000) (40,000.00)$

($55,460) ($55,460)

Division Allowance Amount

1 16 Additional Devices as shown on Sheet E-4.1 56,000$

2 04 Brick to match existing Material Allowance 12,730$

3 02 Security Fencing at Buildings 1, 9, and 10 7,000$

TOTAL DIRECT COST ALLOWANCES 75,730$

Description of Allowances

1 02

2 04

A cost of $56,000.00 is included to provide additional devices as listed on sheet E-4.1 as required.

A cost of $12,730.00 is included to provide brick to match the existing brick on other buildings.

ALLOWANCES SUMMARY

PROJECT NAME: Whispering Pines Core Renovation and Classroom Addition SiteworkPROJECT NO.: 1781-8434

3 02 A cost of $7,000.00 is included to provide security fencing and gates with panic hardware at the exterior of Buildings 1, 9, and 10.

EXHIBIT D

PERSONNEL ASSIGNED DURING CONSTRUCTIONSUMMARY OF CONSTRUCTION PHASE SERVICES FEES

PROJECT NAME: Whispering Pines Core Renovation and Classroom Addition SiteworkPROJECT NO.: 1781-8434

Name/Title Percentage of Time Hours/Wk Rate/Hour Duration (weeks) Total

Gary Pirtle / Project Executive 5% 40 $125.00 20 $5,000.00

Rhondia Katz / Project Manager 50% 40 $85.00 40 $68,000.00

Tony Sicignano / Project Superintendent 100% 40 $97.97 36 $141,076.80

PIRTLE CONSTRUCTION

Kristina Kidder / Project Coordinator 30% 40 $34.52 40 $16,569.60

Project Scheduler / Jacob Katz 10% 40 $85.00 40 $13,600.00SUBTOTAL $244,246.00

ASSET BUILDERS (M/WBE CM PARTNER)

Name/Title Percentage of Time Hours/Wk Rate/Hour Duration (weeks) TotalName/Title Percentage of Time Hours/Wk Rate/Hour Duration (weeks) Total

Wayne Messam / Project Executive 5% 40 $125.00 20 $5,000.00

Mellany Paynter / Project Engineer 60% 40 $58.00 36 $50,112.00

SUBTOTAL $55,112.00

TOTAL $299,358.00

EXHIBIT E

PIRTLE CONSTRUCTION STAFF

Name/Title Hours/Day Rate/Hour Per Diem RateGary Pirtle / Project Executive 1 $125.00 $125.00Rhondia Siano / Project Manager 8 $85.00 $680.00Tony Sicignano / Project Superintendent 8 $97.97 $783.76Kristina Kidder / Project Coordinator 3 $34.52 $103.56Jacob Katz / Project Scheduler 1 $85.00 $85.00

Asset Builders (M/WBE CM PARTNER)

Name/Title Hours/Day Rate/Hour Per Diem RateWayne Messam / Project Executive 1 $125.00 $125.00Mellany Paynter / Project Engineer 8 $58.00 $464.00

PROJECT NO.: 1781-8434

CONSTRUCTION MANAGER'S STAFF PER DIEM FOR TIME EXTENSIONS

PROJECT NAME: Whispering Pines Core Renovation and Classroom Addition Sitework

EXHIBIT F

CONSTRUCTION TEAM AUTHORIZED REPRESENTATIVES

PROJECT NAME: Whispering Pines Core Renovation and Classroom Addition Sitework Project

PROJECT NO.: 1781-8434 OWNER: School Board of Palm Beach County, Florida Phyllis Karp 3361 Interstate Parkway Road N. West Palm Beach, FL 33406 Phone: (561) 882-1913 Cellular: (561) 719-8286 Email: [email protected] School Board of Palm Beach County, Florida Rob Crews 3361 Interstate Parkway Road N. West Palm Beach, FL 33406 Phone: (561) 882-1900 Cellular: (561) 719-8135 Email: [email protected] CONSTRUCTION MANAGER: James B Pirtle Construction Company, Inc. d/b/a Pirtle Construction Company Gary Pirtle 5700 Griffin Road, Suite 200 Davie, FL 33314 Phone: (954) 797-0410 Fax: (954) 797-6330 Cellular: (954) 658-7128 Email: [email protected] James B Pirtle Construction Company, Inc. d/b/a Pirtle Construction Company Rhondia Katz 2101 Vista Parkway, Suite 105 West Palm Beach, FL 33411 Phone: (561) 939-4844 Fax: (561) 939-4845 Cellular: (561) 239-2339 Email: [email protected] Asset Builders, LLC. Wayne Messam 3600 Red Road, Ste 303 Miramar, FL 33025 Phone: (954) 430-4361 Fax: (954) 430-4369 Email: [email protected] ARCHITECT: CJS Architects, PLLC Ann Chaintreul 500 S Ocean Blvd. Suite 1205 Boca Raton FL 33432 Phone: (561) 926-8385 Fax: (585) 244-1294 Email: [email protected]

PROJECT NAME: Whispering Pines Core Renovation and Classroom Addition Sitework PROJECT NO.: 1781-8434

EXHIBIT H

Builder’s Risk Questionnaire Owner: USchool District of Palm Beach County, FloridaU

Contractor Name & Address: James B. Pirtle Construction d/b/a Pirtle Construction Company 5700 Grffin Rd. Suite 200, Davie, FL 33314. Project Title, Project Number & Description: _Whispering Pines Core Renovation and Classroom Addition Site Work, SDPBC PN 1781-8434. Renovation of Administration, a new Kitchen, expansion of the Dining/Multipurpose Room, and Renovation of the Media Center. Site Work includes landscaping, irrigation, covered walkways, drainage modifications, water and sewer tie-ins, and power and systems to the new addition. Project Address: _9090 Spanish Isles Blvd. Boca Raton, FL 33498______________________________ Estimated Cost of Construction: New- _$1,800,000.00__________ Modernization- _$1,529,163.00____ Intended Use of Completed Structure: __Educational Facility__________________________________ Number of Stories: _1________________ Number of Buildings:_4______________________________ Total GSF of Construction: _35,000_______________________________________________________ Construction Commencement: _December 2010______ Construction Completion: _October 2011_____ Type of Construction: Walls-_CMU and Brick____________ Roof: _Shingles____________________ Footings on Fill, Ground, Piles or Other: __Footings on Fill_______________________________ ____ Foundation Materials: ___Concrete_______________________________________________________ Distance to Nearest Fire Hydrant: _100’___________________________________________________ Distance to Fire Department: _2 miles_____________________________________________________ Distance to Nearest Structure: __30’_______________________________________________ _______ Will Sprinklers Be Installed:__Yes________________________________________________________ Site Security (Fencing, Lighting, Security Service): _Fencing and Site Lighting_____________________ Material Storage On-Site- How Will Material Be Stored:_In a fenced enclosure___________Value:_$1,500,000.00_____________ Will Flammables Be Stored On-Site & How: _In a secured fenced enclosure._______________________ List the Major Subcontractors and Estimated Percent of Work:- _Fastrac Electric – 17%, Quantum Mechanical – 9.6%, Al Hill Plumbing – 5%, Design Furnishings – 8%, Devland Site – 5.3%, Applegate Interiors – 3.8%, Bowers Roofing – 2.8%, Suncor Inc. – 4.5%, Ron Kendal Masonry – 5.6%._______________________ Is Demolition Required (Describe): _Interior Demolition – Flooring, lighting, drywall partitions, ductwork, conduit, kitchen equipment, and bathroom fixtures. Exterior Demolition – Concrete, covered walkways, asphalt paving, sewer piping.______________________________________________________

Completed By: _________________________________________ Date: _November 12, 2010_____________

PBSD 1526 (Rev. 8/31/2010)

THE SCHOOL DISTRICT OF PALM BEACH COUNTY 2. PROJECT NUMBER1. PROJECT NAME 3. PHASE (Precon, Demo, Const) 4. TOTAL BID OR CM SERVICES* AMT. (Required)

* GMP SUMMARY AMOUNTS (Pre-construction phase fee + Construction phase fee + CM Fee only) Subject to Agreement with the Construction Manager, the Subcontractor firms (minority & non-minority) listed below will participate in this project for the Contract (Trade) Items and the dollar amounts shown.

Subcontractors represented as Certified MWBEs/SBEs are certified according to requirements established in the Proposal & Contract documents. A copy of the certification and signed Letter of Intent must be attached for each MWBE/SBE. List must also include non-minority firms.CM's Firm Name

Name/Position

Signature/Date

TOTAL SBE/MWBE Services Participation

TOTAL Percentage of Total Bid (Alternates & Change Orders)

TOTAL Non-MWBE/SBE Participation

Page 1 of 3

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

PERCENTAGE %AMOUNT

MWBE or SBE (Yes or No )DESCRIPTION

CONTRACT AMOUNT

BUDGET (Est. Cost)

SUBCONTRACTOR / SUBCONSULTANT / VENDOR NAME

Div. No.

Subconsultant Subcontractor VendorCheck One:

Subconsultant, Subcontractor & Vendor Participation Services

SUBTOTAL (this page only)>

MWBE SBE Check One:

(Do not exceed 100%)

James B. Pirtle Construction Co., Inc. d/b/a Pirtle Construction Company

Kristina Kidder, Senior Project Coordinator

1 James B. Pirtle Construction Co., Inc d/b/a Pirtle Construction $151,227.00 $151,227.00 General Requirements $151,227.00 4.429813178

2 BG Group $43,060.00 $43,060.00 Building Demolition $43,060.00 1.26133399

2 Devland Site, Inc $86,985.00 $86,985.00 Earthwork & Paving $86,985.00 2.548005973

2 Devland Site, Inc $113,554.00 $113,554.00 Water, Sewer & Drainage $113,554.00 3.326277752

2 Carlson Fence Company $28,150.00 $28,150.00 Chain Link Fencing $28,150.00 0.824583182

2 Dixie Landscaping $13,000.00 $13,000.00 Irrigation $13,000.00 0.380802180

2 Dixie Landscaping $27,635.00 $27,635.00 Landscaping, Sod & Tree Relocation $27,635.00 0.809497557

3 Ron Kendall Masonry $138,215.00 $138,215.00 Concrete Shell $138,215.00 4.048659488

4 Ron Kendall Masonry $67,370.00 $67,370.00 Masonr $67,370.00 1.973434068

5 Suncor, Inc $173,000.00 $173,000.00 Structural & Misc Steel $173,000.00 5.067598245

6 Institutional Products $42,650.00 $42,650.00 Casework $42,650.00 1.249324076

7 Bowers Roofing $108,000.00 $108,000.00 Roofing $108,000.00 3.163587344

7 CoMan Caulking $3,140.00 $3,140.00 Caulking $3,140.00 0.091978372

$995,986.00 29.1748954

92.25222

$764,109.00 22.38264409

$2,385,240.00 69.86958404

Whispering Pines Core Reno. & Classroom Addition Sitework 1781-8434 Const $3,413,846.00

PBSD 1526 (Rev. 8/31/2010)

SUBTOTAL (this page only)>Page 2 of 3

TOTAL BID OR CM SERVICES* AMT. (Required) PHASE (Precon, Demo, Const) PROJECT NUMBERPROJECT NAMESubconsultant, Subcontractor & Vendor Participation Services

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

No.MWBE/SBE (Yes or No )

MWBE ONLY AMOUNT

PERCENTAGE %

SUBCONTRACTOR / SUBCONSULTANT / VENDOR NAME DESCRIPTION

CONTRACT AMOUNT

BUDGET (Est. Cost)

Door & Hardware Supply8 Next Door Distribution

Door & Hardware Install8 Hurricane Resistant

Coiling Doors & grilles8 Un-purchased Scope

Aluminum Windows8 Superior Windows

Metal Framing & Gypsum Board9 Applegate Interiors

Ceramic & Quarry Tile9 Zaharion Tile

Acoustical Tile Ceiling9 Acousti Engineering

Resilient Tile Flooring & Carpet9 United Flooring

Painting9 Stephens & Sons

Visual Display Boards & Cases10 Multiline Building

Signage10 Environmental Graphics

Toilet Partitions & Accessories10 Multiline Building

Fire Extinguishers & Cabinets10 Multiline Building

Metal Shelving & Lockers10 Multiline Building

Aluminum Walkway Covers10 Peachtree

Residential Appliances/Misc Equipment11 Un-purchased Scope

Food Service Equipment11 Design, Furnishings & Equipment

Projection Screens11 All Specialty Sales

$3,413,846.00Const1781-8434Whispering Pines Core Reno. & Classroom Addition Sitework

$77,435.00 2.268262833

$9,100.00 0.266561526

$2,000.00 0.058584950

$16,372.00 0.479576407

$146,600.00 4.294276894

$74,115.00 2.171011814

$41,405.00 1.212854944

$30,990.00 0.907773812

$38,870.00 1.138598519

$8,093.00 0.237064003

$8,612.00 0.25226679

$7,885.00 0.23097116

$1,822.00 0.053370890

$14,904.00 0.436575053

$90,146.00 2.64059948

$5,000.00 0.146462377

$312,105.00 9.142328037

$6,903.00 0.202205957

26.13934547$892,357.00

$77,435.00 $77,435.00

$9,100.00 $9,100.00

$2,000.00 $2,000.00

$16,372.00 $16,372.00

$146,600.00 $146,600.00

$74,115.00 $74,115.00

$41,405.00 $41,405.00

$30,900.00 $30,900.00

$38,870.00 $38,870.00

$8,093.00 $8,093.00

$8,612.00 $8,612.00

$7,885.00 $7,885.00

$1,822.00 $1,822.00

$14,904.00 $14,904.00

$90,146.00 $90,146.00

$5,000.00 $5,000.00

$312,105.00 $312,105.00

$6,903.00 $6,903.00

PBSD 1526 (Rev. 8/31/2010)

SUBTOTAL (this page only) >

TOTAL BID OR CM SERVICES* AMT. (Required) PHASE (Precon, Demo, Const) PROJECT NUMBERPROJECT NAME

Page 3 of 3

Subconsultant, Subcontractor & Vendor Participation Services

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

PERCENTAGE %

MWBE ONLY AMOUNT

MWBE/SBE (Yes or No )No.

SUBCONTRACTOR / SUBCONSULTANT / VENDOR NAME DESCRIPTION

CONTRACT AMOUNT

BUDGET (Est. Cost)

Fire Suppression System15 Arfran II

Plumbing Systems15 Al Hill Plumbing

HVAC Systems15 Quantum Mechanical

Electrical16 Fastrac

Window Blinds, Cubicle and CCTV 12 National Stage & Windows

$3,413,846.00Const1781-8434Whispering Pines Core Reno. & Classroom Addition Sitework

$6,736.00 0.197314114

$33,900.00 0.99301491

$194,152.00 5.68719268

$369,418.00 10.8211676

$656,800.00 19.23929784

36.93798724$1,261,006.00

$33,900.00 $33,900.00

$194,152.00 $194,152.00

$369,418.00 $369,418.00

$656,800.00 $656,800.00

$6,736.00 $6,736.00

PBSD 1526 (Rev. 8/31/2010)

THE SCHOOL DISTRICT OF PALM BEACH COUNTY 2. PROJECT NUMBER1. PROJECT NAME 3. PHASE (Precon, Demo, Const) 4. TOTAL BID OR CM SERVICES* AMT. (Required)

* GMP SUMMARY AMOUNTS (Pre-construction phase fee + Construction phase fee + CM Fee only) Subject to Agreement with the Construction Manager, the Subcontractor firms (minority & non-minority) listed below will participate in this project for the Contract (Trade) Items and the dollar amounts shown.

Subcontractors represented as Certified MWBEs/SBEs are certified according to requirements established in the Proposal & Contract documents. A copy of the certification and signed Letter of Intent must be attached for each MWBE/SBE. List must also include non-minority firms.CM's Firm Name

Name/Position

Signature/Date

TOTAL SBE/MWBE Services Participation

TOTAL Percentage of Total Bid (Alternates & Change Orders)

TOTAL Non-MWBE/SBE Participation

Page 1 of 3

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

PERCENTAGE %AMOUNT

MWBE or SBE (Yes or No )DESCRIPTION

CONTRACT AMOUNT

BUDGET (Est. Cost)

SUBCONTRACTOR / SUBCONSULTANT / VENDOR NAME

Div. No.

Subconsultant Subcontractor VendorCheck One:

Subconsultant, Subcontractor & Vendor Participation Services

SUBTOTAL (this page only)>

MWBE SBE Check One:

(Do not exceed 100%)

James B. Pirtle Construction d/b/a Pirtle Construction Company

Kristina Kidder, Senior Project Coordinator

0 Asset Builders LLC $55,112.00 $55,221.00 Partnership (Construction Phase Fee) $55,112.00 11.30460824

0 Asset Builders LLC $28,224.00 $28,224.00 Partnership (Construction Manager Fee) $28,224.00 5.78932470

$83,336.00 17.09393294

17.093932

$83,336.00 17.09393294

Whispering Pines Core Reno. & Classroom Addition Sitework 1781-8434 Const $487,518.00

Division of Work Corporate Name and Address

Principal or 

Officer's Name License Number

Concrete / Masonry Ron Kendall Masonry Ron Kendall CGC052784

101 Benoist Farms Road

West Palm Beach, FL  33411

Roofing Bower's Roofing Randall Bowers CCC1329468

36 SW 8th Court

Deerfield Beach, FL  33441

Metal Framing Applegate Interiors, Inc. William Applegate RX0066758

2100 2nd Avenue North, Suite 1

Lake Worth, FL  33461

Fire Sprinkler System Arfran II, Inc. Jorge Asencio 05967100011983

2300 NW 94 Avenue

Miami, FL  33172

Plumbing Al Hill Plumbing Albert Hill CFC058101

4714 NW 165th Street

Miami Gardens, FL 33014

HVAC Quantum Specialty Contractors Patrick Gordon CMC1249550

445 West Drive, Suite 103

Melbourne, FL  32904

Electrical  Fastrac Electic Corporation Shaun Bly 02876

810 Saturn Street

Jupiter, FL  33477

Site Utilities Devland Site Development Carl Devaux U‐21333

1302 Wingfield Street

Lake Worth, FL  33460

Earthwork Devland Site Development Carl Devaux U‐21331

1302 Wingfield Street

Lake Worth, FL  33460

LIST OF MAJOR SUBCONTRACTORS

Whispering Pines Core Renovation and Classroom Addition Sitework

1781‐8434

Whispering Pines Core Renovation and Classroom Addition Sitework

Project No: 1781-8434

1 2 3 5 6 7 10

CSIDiv. Cost Bid NumberNo. Code Package Bid Amount Name of Bidder Bids MWBE

01 - - 151,227 Pirtle 1 -

02 02 41 16.13 02050 43,060 BG Group 2 -02 31 00 00 02220 86,985 Devland 5 A02 33 10 00 02600 113,554 Devland 5 A02 32 13 13 02840 Incl. In Concrete 002 32 13 13 02830 28,150 Carlson 2 -02 32 84 00 02810 13,000 Dixie 402 32 93 00 02900 27,635 Dixie 2 -

03 03 30 00 03000 138,215 Ron Kendall 6 -

04 04 22 00 04220 67,370 Ron Kendall 4 -

05 05 12 23 05120 173,000 Suncor 2 -

06 06 41 16 06410 42,650 Institutional 6 -

07 07 51 00 07510 108,000 Bowers 407 07 92 00 07900 3,140 Coman 2 -

08 08 11 13 08100 77,435 Next Door 1 -08 08 11 13 08100 9,100 HRC 1 I08 08 33 00 08330 2,000 Budget(Un-Purchased) 1 -08 08 51 13 08520 16,372 Superior 2 -

09 09 29 82 09260 146,600 Applegate 3 I09 09 30 00 09310 74,115 Zaharion 3 I09 09 51 23 09510 41,405 Acousti 4 -09 09 65 19 09660 30,900 United 4 -09 09 90 00 09900 38,870 Stephens & Sons 1 -

10 10 11 16 10100 8,093 Multiline 310 10 14 00 10400 8,612 Environmental Graphics 2 -10 10 21 00 10165 7,885 Multiline 3 -10 10 44 16 10522 1,822 Multiline 2 -10 10 56 13 10675 14,904 Multiline 2 -10 10 73 26 10532 90,146 Peachtree 5 -

11 11 31 00 11452 5,000 Budget (Un-Purchased) 1 -11 11 40 00 11400 312,105 Design Furnishings 3 -11 11 52 13 11132 6,903 All Specialty 3 -

12 12 21 00 12510 6,736 National Stage 2 -12 12 93 13 - Incl. In Misc. Steel 0

15 21 13 13 15300 33,900 Afran 415 22 10 00 15400 194,152 Al Hill Plumbing 2 A15 23 00 00 15500 369,418 Quantum 4 A15 23 13 00 - By SDPBC 0

16 26 00 00 16000 656,800 Fastrac 6 -

3,149,2591.425% 44,8785.000% 157,463

75,7309.506% 299,3580.240% 8,762

-

3,735,4500.743% 27,753

3,763,204

5.000% 188,160

3,951,364

-1.59% (50,000)

-

Estimate Grand Total = $3,901,364

Palm BeachBID DATE: October 28, 2010

4

Description of Work

Pirtle Construction Company

CONSTRUCTION DETAIL SUMMARY ESTIMATE NO./REF. 100% CD BidsTIME TO COMPLETE (days): 315PROJECT NUMBER: Pirtle PN. 10437LOCATION/OWNER:

Roofing

PaintingDivision 10 - Specialties

Division 08 - OpeningsDoors, Frames & Hardware SupplyDoors, Frames, & Hardware InstallCoiling Doors & GrillesAluminum Windows

Division 01 - General RequirementsGeneral Requirements

Joint Sealants

Division 03 - ConcreteConcrete Shell

Division 04 - MasonryConcrete Unit Masonry (CMU)

Division 05 - MetalsStructural Steel & Misc. Metals

Division 06 - Wood, Plastics & Composites

Division 02 - Existing ConditionsBuilding Demolition

PlumbingHVACFacility Fuel Storage Tanks

Division 16 - Electrical

OH&P

GENERAL & PROF. LIABILITY INSURANCEBUILDERS RISK INSURANCE

SUB TOTAL WITH INSURANCE

Electrical

OWNER'S CONTINGENCY ALLOWANCES

Earthwork & PavingWater, Sewer & Drainage UtilitiesConcrete PavingChain Link FencingIrrigation

(Direct Owner Purchase Program):

Sub Total Direct Cost =GENERAL CONDITIONS

BOND

SUB TOTAL WITH BOND

CM PHASE FEE

Bicycle RacksDivision 13 - Special Construction Division 14 - Conveying EquipmentDivision 15 - Mechanical

Fire Suppression Sprinkler System

Window Blinds, Cubicle and CCTV Curtains

Visual Display Boards and CasesSignageToilet Partitions and Accessories

Landscaping, Sod, & Tree Relocation

SUB TOTAL WITH FEE

1) All percentage calculations are based on the Sub Total Direct Cost

Fire Extinguishers & CabinetsMetal Shelving & LockersAluminum Walkway Covers

Division 11 - EquipmentResidential AppliancesFood Service Equipment

Division 09 - FinishesMetal Framing and Gypsum BoardCeramic & Quarry TileAcoustical Tile CeilingResilient Tile Flooring & Carpet

Division 12 - FurnishingsProjection Screens

Plastic Laminate Architectural CabinetsDivision 07 - Thermal & Moisture Protection

Whispering Pines Bid Tabulation - Rhondia 11-16-10 Form ES-40201 of 1

1100 Field Office Rental 4,000.00$ 1101 Field Office Setup 3,500.00$ 1104 Field Office Security 1,000.00$ 1110 Office Supplies 2,000.00$ 1115 Copy & Fax Machines 2,500.00$ 1120 Computer Systems & Equipment 4,750.00$ 1125 Postage & Courier 1,600.00$ 1130 Blueprint and copies 3,500.00$ 1132 As-Built and Close Out Documents 2,000.00$ 1185 Drug Testing 1,000.00$ 1190 Vehicle / Travel Expenses 13,400.00$ 1610 Telephone System/Charges 5,628.00$

TOTAL 44,878.00$

LIST OF GENERAL CONDITIONS

PROJECT NAME: Whispering Pines Core Renovation and Classroom Addition SiteworkPROJECT NO.: 1781-8434

CONSTRUCTION MANAGER'S GENERAL CONDITIONS

Project No: 1781-8434

Date of Bid:Scope of Work: General Requirements 100% CD BidsBid Package Number: - Pirtle PN. 10437Cost Code: - $151,227.00Division: 01

SCOPE OF WORK SUBCONTRACTOR:Description Quantity Pirtle Bidder 2 Bidder 3 Bidder 4 Bidder 5 Bidder 6 *Estimate*Subcontractor Bid Proposal 1 LSBond Premium n/a n/a n/a n/a n/a n/a n/aTemporary Storage Containers 1,500Small Tools 2,000Final Cleaning and Waxing 8,500Trash Dumpsters and Fees 22,500Surveying 3,000Job Signs 1,000First Aid Supplies 477Water, Ice & Cups 6,048Temporary Fire Extinguishers 6,000Site Maintenance / Bobcat Rental 1,500Tree Protection 1,500Temporary Fencing & Gates 3,000Punch List 5,000Warranty 5 000

SUBCONTRACTOR BID EVALUATION

Pirtle Construction Company

Pirtle Estimate No/Ref: Project Number:

October 28, 2010

Whispering Pines Core Renovation and Classroom Addition Sitework

Cost per SF:

Form ES-4025 Page 1 of 1 Subcontractor Evaluation

Warranty 5,000Temporary Electric Charges - Site & Const. 7,500Permanent Electric Charges - Startup & Maint. 10,000Temporary Water Charges 2,500Portable Toilets and Tanks 5,000General Purpose Labor 17,661General Purpose Carpenter 12,791Progress Photos 1,500Daily Clean up 20,000Temporary Plywood Partitions 1,500Cleaning Supplies 750IAQ/Dust Control 5,000Bond Premium AdjustmentFinal Price AdjustmentMWBE Participation (A,W,H,O) - - - - - - -

TOTALS: 151,227 0 0 0 0 0 0

BEST COMBINATION: 151,227 Pirtle

SELECTED SUBCONTRACTOR: PirtleEstimate Prepared by: Rhondia KatzEstimate Reviewed by: Gary Pirtle

2)3)4)

1)

Notes:

Form ES-4025 Page 1 of 1 Subcontractor Evaluation

PROJECT SUMMARY - Whispering Pines Core Renovation and Classroom Addition Sitework

CONTINUATION SHEET SD703 APPLICATION #: 0APPLICATION AND CERTIFICATE FOR PAYMENT,containing APPLICATION DATE: 11/04/10Contractor's signed Certification is attached. PERIOD FROM: 11/04/10In tabulations below,amounts are stated to the nearest dollar. TO: 11/04/10

TOTAL DIV DESCRIPTION OF WORK ORIGINAL INTERNAL EXTERNAL DIRECT REVISED PREVIOUS COMPLETED BALANCE TOTAL

NO. SCHEDULED CHANGE CHANGE PAYMENTS SCHEDULED APPLICATION WORK IN STORED & STORED % TO FINISH RET RETAINAGEVALUE CCA CCD DPO VALUE PLACE MAT'LS TO DATE (C-G) %

(actual)

1.00 GENERAL REQUIREMENTS 151,227.00 0.00 0.00 0.00 151,227.00 0.00 0.00 0.00 0.00 0.0% 151,227.00 10% 0.00SUB TOTAL 151,227.00 0.00 0.00 0.00 151,227.00 0.00 0.00 0.00 0.00 151,227.00 0.00

2.00 SITE CONSTRUCTION -Buyout/surplus-Re-route to Contingency-Use Log 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0% 0.00 10% 0.00

2.10 SBE Sub - BG Group - Building Demolition 43,060.00 0.00 0.00 0.00 43,060.00 0.00 0.00 0.00 0.00 0.0% 43,060.00 10% 0.002.20 MWBE Sub - Devland- Earthwork & Paving 86,985.00 0.00 0.00 0.00 86,985.00 0.00 0.00 0.00 0.00 0.0% 86,985.00 10% 0.002.30 MWBE Sub - Devland- Water, Sewer & Drainage 113,554.00 0.00 0.00 0.00 113,554.00 0.00 0.00 0.00 0.00 0.0% 113,554.00 10% 0.002.40 Sub - Carlson - Chain Link Fencing 28,150.00 0.00 0.00 0.00 28,150.00 0.00 0.00 0.00 0.00 0.0% 28,150.00 10% 0.002.50 Sub - Dixie Landscaping - Irrigation 13,000.00 0.00 0.00 0.00 13,000.00 0.00 0.00 0.00 0.00 0.0% 13,000.00 10% 0.002.60 Sub - Dixie Landscaping - Landscaping, Sod & Tree Relocation 27,635.00 0.00 0.00 0.00 27,635.00 0.00 0.00 0.00 0.00 0.0% 27,635.00 10% 0.00

SUB TOTAL 312,384.00 0.00 0.00 0.00 312,384.00 0.00 0.00 0.00 0.00 312,384.00 0.00

3.00 CONCRETE -Buyout/surplus-Re-route to Contingency-Use Log 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10% 0.00

3.10 Sub - Ron Kendall - Concrete Shell 138,215.00 0.00 0.00 0.00 138,215.00 0.00 0.00 0.00 0.00 0.0% 138,215.00 10% 0.00SUB TOTAL 138,215.00 0.00 0.00 0.00 138,215.00 0.00 0.00 0.00 0.00 138,215.00 0.00

4.00 MASONRY - Buyout/surplus-Re-route to Contingency-Use Log 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0% 0.00 10% 0.00

4.10 Sub - Ron Kendall - Masonry 67,370.00 0.00 0.00 0.00 67,370.00 0.00 0.00 0.00 0.00 0.0% 67,370.00 10% 0.00SUB TOTAL 67,370.00 0.00 0.00 0.00 67,370.00 0.00 0.00 0.00 0.00 67,370.00 0.00

5.00 STEEL - Buyout/surplus-Re-route to Contingency-Use Log 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0% 0.00 10% 0.00

5.10 Sub - Suncor - Structural & Misc. Steel 173,000.00 0.00 0.00 0.00 173,000.00 0.00 0.00 0.00 0.00 0.0% 173,000.00 10% 0.00SUB TOTAL 173,000.00 0.00 0.00 0.00 173,000.00 0.00 0.00 0.00 0.00 173,000.00 0.00

6.00 CARPENTRY - Buyout/surplus-Re-route to Contingency-Use Log 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0% 0.00 10% 0.00

6.10 Sub - Institutional Products - Casework 42,650.00 0.00 0.00 0.00 42,650.00 0.00 0.00 0.00 0.00 0.0% 42,650.00 10% 0.00SUB TOTAL 42,650.00 0.00 0.00 0.00 42,650.00 0.00 0.00 0.00 0.00 42,650.00 0.00

7.00 THERMAL/MOISTURE -

Buyout/surplus-Re-route to Contingency-Use Log 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0% 0.00 10% 0.007.10 Sub - Bowers - Roofing 108,000.00 0.00 0.00 0.00 108,000.00 0.00 0.00 0.00 0.00 0.0% 108,000.00 10% 0.007.20 Sub - CoMan - Caulking 3,140.00 0.00 0.00 0.00 3,140.00 0.00 0.00 0.00 0.00 0.0% 3,140.00 10% 0.00

SUB TOTAL 111,140.00 0.00 0.00 0.00 111,140.00 0.00 0.00 0.00 0.00 111,140.00 0.00

8.00 WINDOWS AND DOORS - Buyout/surplus-Re-route to Contingency-Use Log 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0% 0.00 10% 0.00

8.10 Sub - Next Door - Door and Hardware Supply 77,435.00 0.00 0.00 0.00 77,435.00 0.00 0.00 0.00 0.00 0.0% 77,435.00 10% 0.008.20 MWBE Sub - HRC - Door and Hardware Install 9,100.00 0.00 0.00 0.00 9,100.00 0.00 0.00 0.00 0.00 0.0% 9,100.00 10% 0.008.30 Un-purchased Scope - Coiling Doors & Grilles 2,000.00 0.00 0.00 0.00 2,000.00 0.00 0.00 0.00 0.00 0.0% 2,000.00 10% 0.008.40 Sub - Superior - Aluminum Windows 16,372.00 0.00 0.00 0.00 16,372.00 0.00 0.00 0.00 0.00 0.0% 16,372.00 10% 0.00

SUB TOTAL 104,907.00 0.00 0.00 0.00 104,907.00 0.00 0.00 0.00 0.00 104,907.00 0.00

9.00 FINISHES -

Buyout/surplus-Re-route to Contingency-Use Log 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0% 0.00 10% 0.009.10 MWBE Sub - Applegate - Metal Framing & Gypsum Board 146,600.00 0.00 0.00 0.00 146,600.00 0.00 0.00 0.00 0.00 0.0% 146,600.00 10% 0.009.20 MWBE Sub - Zaharion - Ceramic & Quarry Tile 74,115.00 0.00 0.00 0.00 74,115.00 0.00 0.00 0.00 0.00 0.0% 74,115.00 10% 0.009.30 Sub - Acousti - Acoustical Tile Ceiling 41,405.00 0.00 0.00 0.00 41,405.00 0.00 0.00 0.00 0.00 0.0% 41,405.00 10% 0.009.40 MWBE Sub - United Flooring - Resilient Flooring & Carpet 30,900.00 0.00 0.00 0.00 30,900.00 0.00 0.00 0.00 0.00 0.0% 30,900.00 10% 0.009.50 Sub - Stephens & Sons - Painting 38,870.00 0.00 0.00 0.00 38,870.00 0.00 0.00 0.00 0.00 0.0% 38,870.00 10% 0.00

SUB TOTAL 331,890.00 0.00 0.00 0.00 331,890.00 0.00 0.00 0.00 0.00 331,890.00 0.00

CURRENT APPLICATION

TOTAL DIV DESCRIPTION OF WORK ORIGINAL INTERNAL EXTERNAL DIRECT REVISED PREVIOUS COMPLETED BALANCE TOTAL

NO. SCHEDULED CHANGE CHANGE PAYMENTS SCHEDULED APPLICATION WORK IN STORED & STORED % TO FINISH RET RETAINAGEVALUE CCA CCD DPO VALUE PLACE MAT'LS TO DATE (C-G) %

(actual)

CURRENT APPLICATION

10.00 SPECIALTIES -

Buyout/surplus-Re-route to Contingency-Use Log 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0% 0.00 10% 0.0010.10 Sub - Multiline - Visual Disp. Boards & Cases 8,093.00 0.00 0.00 0.00 8,093.00 0.00 0.00 0.00 0.00 0.0% 8,093.00 10% 0.0010.20 Sub - Environmental Graphics - Signage 8,612.00 0.00 0.00 0.00 8,612.00 0.00 0.00 0.00 0.00 0.0% 8,612.00 10% 0.0010.30 Sub - Multiline - Toilet Partitions & Accessories 7,885.00 0.00 0.00 0.00 7,885.00 0.00 0.00 0.00 0.00 0.0% 7,885.00 10% 0.0010.40 Sub - Multiline - Fire Extinguishers & Cabinets 1,822.00 0.00 0.00 0.00 1,822.00 0.00 0.00 0.00 0.00 0.0% 1,822.00 10% 0.0010.50 Sub - Multiline - Metal Shelving & Lockers 14,904.00 0.00 0.00 0.00 14,904.00 0.00 0.00 0.00 0.00 0.0% 14,904.00 10% 0.0010.60 Sub - Peachtree - Aluminum Walkway Covers 90,146.00 0.00 0.00 0.00 90,146.00 0.00 0.00 0.00 0.00 0.0% 90,146.00 10% 0.00

SUB TOTAL 131,462.00 0.00 0.00 0.00 131,462.00 0.00 0.00 0.00 0.00 131,462.00 0.00

11.00 EQUIPMENT -Buyout/surplus-Re-route to Contingency-Use Log 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0% 0.00 10% 0.00

11.10 Un-purchased Scope - Residential Appliances/Misc Equipment 5,000.00 0.00 0.00 0.00 5,000.00 0.00 0.00 0.00 0.00 0.0% 5,000.00 10% 0.0011.20 Sub - Design Furnishings - Food Service Equipment 312,105.00 0.00 0.00 0.00 312,105.00 0.00 0.00 0.00 0.00 0.0% 312,105.00 10% 0.0011.30 MWBE Sub - All Specialty - Projection Screens 6,903.00 0.00 0.00 0.00 6,903.00 0.00 0.00 0.00 0.00 0.0% 6,903.00 10% 0.00

SUB TOTAL 324,008.00 0.00 0.00 0.00 324,008.00 0.00 0.00 0.00 0.00 324,008.00 0.00

12.00 FURNISHINGS -Buyout/surplus-Re-route to Contingency-Use Log 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0% 0.00 10% 0.00

12.10 Sub - National Stage - Window Blinds, Cubicle and CCTV 6,736.00 0.00 0.00 0.00 6,736.00 0.00 0.00 0.00 0.00 0.0% 6,736.00 10% 0.00SUB TOTAL 6,736.00 0.00 0.00 0.00 6,736.00 0.00 0.00 0.00 0.00 6,736.00 0.00

13.00 SPECIAL CONSTRUCTION -14.00 CONVEYING SYSTEMS -

15.00 MECHANICAL Buyout/surplus-Re-route to Contingency-Use Log 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0% 0.00 10% 0.00

15.10 Sub - Afran - Fire Suppression System 33,900.00 0.00 0.00 0.00 33,900.00 0.00 0.00 0.00 0.00 0.0% 33,900.00 10% 0.0015.20 MWBE Sub - Al Hill Plumbing - Plumbing 194,152.00 0.00 0.00 0.00 194,152.00 0.00 0.00 0.00 0.00 0.0% 194,152.00 10% 0.0015.30 MWBE Sub - Quantum - HVAC 369,418.00 0.00 0.00 0.00 369,418.00 0.00 0.00 0.00 0.00 0.0% 369,418.00 10% 0.00

SUB TOTAL 597,470.00 0.00 0.00 0.00 597,470.00 0.00 0.00 0.00 0.00 597,470.00 0.0016.00 ELECTRICAL -

Buyout/surplus-Re-route to Contingency-Use Log 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0% 0.00 10% 0.0016.10 Sub - Fastrac - Electrical 656,800.00 0.00 0.00 0.00 656,800.00 0.00 0.00 0.00 0.00 0.0% 656,800.00 10% 0.00

SUB TOTAL 656,800.00 0.00 0.00 0.00 656,800.00 0.00 0.00 0.00 0.00 656,800.00 0.00

TOTAL OF DIVISIONS 1-33 3,149,259.00 0.00 0.00 0.00 3,149,259.00 0.00 0.00 0.00 0.00 0.00 3,149,259.00 0.00 0.00

ALLOWANCES1.00 Additional Devices as shown on Sheet E-4.1 56,000.00 0.00 0.00 0.00 56,000.00 0.00 0.00 0.00 0.00 0.0% 56,000.00 10% 0.002.00 Brick to match existing Material Allowance 12,730.00 0.00 0.00 0.00 12,730.00 0.00 0.00 0.00 0.00 0.0% 12,730.00 10% 0.003.00 Security Fencing at Buildings 1, 9, and 10 7,000.00 0.00 0.00 0.00 7,000.00 0.00 0.00 0.00 0.00 0.0% 7,000.00 10% 0.00

SUB TOTAL 75,730.00 0.00 0.00 0.00 75,730.00 0.00 0.00 0.00 0.00 75,730.00 0.00

TOTAL DIV DESCRIPTION OF WORK ORIGINAL INTERNAL EXTERNAL DIRECT REVISED PREVIOUS COMPLETED BALANCE TOTAL

NO. SCHEDULED CHANGE CHANGE PAYMENTS SCHEDULED APPLICATION WORK IN STORED & STORED % TO FINISH RET RETAINAGEVALUE CCA CCD DPO VALUE PLACE MAT'LS TO DATE (C-G) %

(actual)

CURRENT APPLICATION

GENERAL CONDITIONS 44,878.00 0.00 0.00 0.00 44,878.00 0.00 0.00 0.00 0.00 0.0% 44,878.00 0% 0.00

SALES TAXES RECOVERY -50,000.00 0.00 0.00 0.00 (50,000.00) 0.00 0.00 0.00 0.00 0.0% (50,000.00) 0% 0.00

CONSTRUCTION PHASE FEE 244,246.00 0.00 0.00 0.00 244,246.00 0.00 0.00 0.00 0.00 0.0% 244,246.00 0% 0.00MWBE Sub - Asset Builders 55,112.00 0.00 0.00 0.00 55,112.00 0.00 0.00 0.00 0.00 0.0% 55,112.00 0% 0.00

CONSTRUCTION MANAGER FEE 159,936.00 0.00 0.00 0.00 159,936.00 0.00 0.00 0.00 0.00 0.0% 159,936.00 10% 0.00MWBE Sub - Asset Builders 28,224.00 0.00 0.00 0.00 28,224.00 0.00 0.00 0.00 0.00 0.0% 28,224.00 10% 0.00

INSURANCE 8,762.00 0.00 0.00 0.00 8,762.00 0.00 0.00 0.00 0.00 0.0% 8,762.00 0% 0.00BONDS 27,753.00 0.00 0.00 0.00 27,753.00 0.00 0.00 0.00 0.00 0.0% 27,753.00 0% 0.00

*****OWNER CONSTRUCTION CONTINGENCY 157,463.00 0.00 0.00 0.00 157,463.00 0.00 0.00 0.00 0.00 0.0% 157,463.00 0% 0.00***** (Division Surpluses Entered in Constr. Contingency)

TOTAL GMP 3,901,363.00 0.00 0.00 0.00 3,901,363.00 0.00 0.00 0.00 0.00 0.0% 3,901,363.00 0.00

PRECONSTRUCTION PHASE FEE 37,577.00 0.00 0.00 0.00 37,577.00 0.00 0.00 0.00 0.00 0% 37,577.00 0% 0.000.00

TOTAL CONSTRUCTION COSTS 3,938,941.00 0.00 0.00 0.00 3,938,941.00 0.00 0.00 0.00 0.00 0.00% 3,938,941.00 0.00

CCD CHANGE ORDERS-BOARD APPROV 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0% 0.00 0% 0.00DPO WHEN CHANGE ORDERS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0%(Net of Sales Tax Recovery already deducted)Excess DPO deduct 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0%Excess Sales tax Recovery 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0%

***** NEW TOTAL CONSTRUCTION COSTS 3,938,941.00 0.00 0.00 0.00 3,938,941.00 0.00 0.00 0.00 0.00 0.00% 3,938,941.00 0.00 0.00

TOTAL DPO BELOW THE LINE - P/GMP 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0% 0.00when not a Change Order

ADJUSTED CONSTRUCTION COSTSAFTER DPO REDUCTION 3,938,941.00 0.00 0.00 0.00 3,938,941.00 0.00 0.00 0.00 0.00 0.00% 3,938,941.00 0.00

Scope of Work Amount Percentage

General Requirements: $151,227.00 3.92%

Whispering Pines Core Renovation and Classroom Addition Sitework

% of Work Preformed By Construction Manager

Project No.:1781‐8434

Pirtle Construction will be performing the following Scope of Work:

PROJECT NAME: Whispering Pines Core Renovation and Classroom Addition Sitework PROJECT NO.: 1781-8434 JOB EXECUTION – SCHEDULE NARRATIVE The construction schedule is based on an overall schedule of 12 months from date of SBPBC Board Approval of the GMP through Final Completion. The core construction of the school is based on a 12 month schedule with the first 9 months allotted to the renovation of the Administration Office Building (Building 1), construction of the new Kitchen and Custodial Receiving area, and Site work for the new Kitchen as well as for the 2-Story Classroom Addition (NIC). The remaining 3 months are allotted to the renovation of the Dining/Multipurpose Building (Building 2), and the Media Center (Building 4), punch-list, project completion and closeout. Based on the above narrative and the included Primavera Schedule, we are proposing the following major milestones: Board Meeting GMP Approval: December 15, 2010 Notice to Proceed: December 21, 2010 Substantial Completion: August 8, 2011 Final Completion: December 15, 2011

Activity Name OD RD TotalFloat

Start Finish

Whispering Pines Elementary School 352 293 0 20-Jul-10 A 15-Dec-11

PRECONSTRUCTION 94 35 258 20-Jul-10 A 20-Dec-10

CM Selection 0 0 11-Aug-10 A

CM Contract Award 1 0 15-Sep-10 A 15-Sep-10 A

CM Prepare Project Manual 15 0 16-Sep-10 A 05-Oct-10 A

CM Prepare Quality Assurance Manual 22 7 -18 16-Sep-10 A 10-Nov-10

CM Submit Project Manual 2 0 18-Oct-10 A 18-Oct-10 A

CM Submit Quality Assurance Manual 2 2 -18 11-Nov-10 12-Nov-10*

Community Meeting 1 1 0 17-Nov-10* 17-Nov-10

Building Department Review & Permit 76 17 276 20-Jul-10 A 24-Nov-10

A/E Submit 100% CD to Bldg Dept 1 0 20-Jul-10 A 20-Jul-10 A

Bldg Dept Review 100% CD 20 0 21-Jul-10 A 18-Aug-10 A

Bldg Dept Issue Comments I 1 0 19-Aug-10 A 19-Aug-10 A

A/E Prepare Revision I to Address Comments I 10 0 23-Aug-10 A 13-Sep-10 A

A/E Issue Revision I 2 0 14-Sep-10 A 15-Sep-10 A

Bldg Dept Review Revision I 20 0 16-Sep-10 A 21-Oct-10 A

Bldg Dept Issue Comments II 2 0 21-Oct-10 A 21-Oct-10 A

A/E Prepare Revision II to Address Comments II 8 0 22-Oct-10 A 01-Nov-10 A

A/E Issue Revision II 1 0 02-Nov-10 A 02-Nov-10 A

Bldg Dept Review Revision II 15 15 15 02-Nov-10 22-Nov-10

Bldg Dept Issue Permit 2 2 15 23-Nov-10 24-Nov-10

100% CD Design Review & Estimate 54 1 292 19-Aug-10 A 02-Nov-10

CM Prepare Estimate 30 0 19-Aug-10 A 19-Oct-10 A

CM Prepare Review 30 0 19-Aug-10 A 24-Sep-10 A

CM Submit Review 1 0 27-Sep-10 A 27-Sep-10 A

CM Submit Estimate 1 1 -23 02-Nov-10 02-Nov-10*

Guaranteed Maximum Price 62 35 258 26-Sep-10 A 20-Dec-10

CM Advertize to Public 11 0 26-Sep-10 A 11-Oct-10 A

CM Administer Bidding Process 18 1 0 29-Sep-10 A 02-Nov-10

CM Prepare GMP 15 2 0 05-Oct-10 A 03-Nov-10

Bidders Site Visit 1 0 07-Oct-10 A 07-Oct-10 A

Bid Due Date & Opening 1 0 28-Oct-10 A 28-Oct-10 A

CM Submit GMP 1 1 0 04-Nov-10 04-Nov-10

SDPBC Review GMP 28 28 0 05-Nov-10 14-Dec-10

SDPBC Board Approve GMP 1 1 0 15-Dec-10 15-Dec-10

SDPBC Issue NTP 3 3 0 16-Dec-10 20-Dec-10*

CONSTRUCTION 165 165 0 21-Dec-10 08-Aug-11

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

0 2011 2012

CM Selection

CM Contract Award

CM Prepare Project Manual

CM Prepare Quality Assurance Manual

CM Submit Project Manual

CM Submit Quality Assurance Manual

Community Meeting

A/E Submit 100% CD to Bldg Dept

Bldg Dept Review 100% CD

Bldg Dept Issue Comments I

A/E Prepare Revision I to Address Comments I

A/E Issue Revision I

Bldg Dept Review Revision I

Bldg Dept Issue Comments II

A/E Prepare Revision II to Address Comments II

A/E Issue Revision II

Bldg Dept Review Revision II

Bldg Dept Issue Permit

CM Prepare Estimate

CM Prepare Review

CM Submit Review

CM Submit Estimate

CM Advertize to Public

CM Administer Bidding Process

CM Prepare GMP

Bidders Site Visit

Bid Due Date & Opening

CM Submit GMP

SDPBC Review GMP

SDPBC Board Approve GMP

SDPBC Issue NTP

Actual Work

Remaining Work

Critical Remaining ...

Milestone

GMP Schedule

11/2/10

Whispering Pines Elementary School

Page 1 of 3

Activity Name OD RD TotalFloat

Start Finish

Site Construction 149 149 0 21-Dec-10 15-Jul-11

Mobilize to Site 5 5 0 21-Dec-10 27-Dec-10

Install Utilities 40 40 78 22-Dec-10 15-Feb-11

Install Electrical Ductbanks 8 8 0 22-Dec-10 31-Dec-10*

Relocate Trees & Modify Irrigation 8 8 0 22-Dec-10 31-Dec-10*

Install Propane Tanks 8 8 0 22-Dec-10 31-Dec-10*

Complete Earthwork 50 50 68 22-Dec-10 01-Mar-11

Site Improvements 30 30 0 06-Jun-11* 15-Jul-11

Administration Renovation 68 68 4 22-Dec-10 25-Mar-11

Complete Selective Demolition 5 5 4 22-Dec-10 28-Dec-10

Construct Interior Partitions 30 30 4 27-Dec-10 04-Feb-11

Renovate and Build New Bathrooms 40 40 24 27-Dec-10 18-Feb-11

Install New MEP Rough & Trim 50 50 9 03-Jan-11 11-Mar-11

Install New Interior Finishes 35 35 4 31-Jan-11 18-Mar-11

Final Inspections 5 5 4 21-Mar-11 25-Mar-11*

New Kitchen Addition 151 151 0 10-Jan-11 08-Aug-11

Prepare Building Pad 10 10 0 10-Jan-11* 21-Jan-11

Construct Foundations & Structure 40 40 0 24-Jan-11 18-Mar-11

Build Interior Partitions 15 15 0 14-Mar-11 01-Apr-11

Install Wall & Ceiling MEP Rough 40 40 0 14-Mar-11 06-May-11

Complete Roofing 20 20 76 21-Mar-11 15-Apr-11

Install Exterior Finishes 70 70 26 21-Mar-11 24-Jun-11

Hang Drywall & Tile on Walls 40 40 0 25-Apr-11 17-Jun-11

Install Interior Ceilings & Flooring 35 35 0 06-Jun-11 22-Jul-11

Deliver Kitchen Equipment & Connect 10 10 0 19-Jul-11 01-Aug-11

Final Inspections 5 5 0 02-Aug-11 08-Aug-11*

Dining/Multi-Purpose Renovation 47 47 0 03-Jun-11 08-Aug-11

Complete Old Kitchen Demolition 10 10 0 03-Jun-11* 16-Jun-11

Install New Interior Finishes 30 30 0 17-Jun-11 28-Jul-11

Renovate Bathrooms 30 30 4 17-Jun-11 28-Jul-11

Complete Misc Renovations 15 15 0 14-Jul-11 03-Aug-11

Final Inspections 3 3 0 04-Aug-11 08-Aug-11*

Media Center Renovation 47 47 0 03-Jun-11 08-Aug-11

Complete Selective Demolition 5 5 0 03-Jun-11* 09-Jun-11

Install New Interior Finishes 35 35 0 10-Jun-11 28-Jul-11

Renovate Bathrooms 25 25 14 10-Jun-11 14-Jul-11

Complete Misc Renovations 15 15 0 14-Jul-11 03-Aug-11

Final Inspections 3 3 0 04-Aug-11 08-Aug-11*

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

0 2011 2012

Mobilize to Site

Install Utilities

Install Electrical Ductbanks

Relocate Trees & Modify Irrigation

Install Propane Tanks

Complete Earthwork

Site Improvements

Complete Selective Demolition

Construct Interior Partitions

Renovate and Build New Bathrooms

Install New MEP Rough & Trim

Install New Interior Finishes

Final Inspections

Prepare Building Pad

Construct Foundations & Structure

Build Interior Partitions

Install Wall & Ceiling MEP Rough

Complete Roofing

Install Exterior Finishes

Hang Drywall & Tile on Walls

Install Interior Ceilings & Flooring

Deliver Kitchen Equipment & Connect

Final Inspections

Complete Old Kitchen Demolition

Install New Interior Finishes

Renovate Bathrooms

Complete Misc Renovations

Final Inspections

Complete Selective Demolition

Install New Interior Finishes

Renovate Bathrooms

Complete Misc Renovations

Final Inspections

Actual Work

Remaining Work

Critical Remaining ...

Milestone

GMP Schedule

11/2/10

Whispering Pines Elementary School

Page 2 of 3

Activity Name OD RD TotalFloat

Start Finish

PROJECT COMPLETION 93 93 0 09-Aug-11 15-Dec-11

Punch List & Project Completion 92 92 0 09-Aug-11 14-Dec-11

Final Completion 1 1 0 15-Dec-11 15-Dec-11

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

0 2011 2012

Punch List & Project Co

Final Completion

Actual Work

Remaining Work

Critical Remaining ...

Milestone

GMP Schedule

11/2/10

Whispering Pines Elementary School

Page 3 of 3

PBSD 1526 (Rev. 8/31/2010)

THE SCHOOL DISTRICT OF PALM BEACH COUNTY 2. PROJECT NUMBER1. PROJECT NAME 3. PHASE (Precon, Demo, Const) 4. TOTAL BID OR CM SERVICES* AMT. (Required)

* GMP SUMMARY AMOUNTS (Pre-construction phase fee + Construction phase fee + CM Fee only) Subject to Agreement with the Construction Manager, the Subcontractor firms (minority & non-minority) listed below will participate in this project for the Contract (Trade) Items and the dollar amounts shown.

Subcontractors represented as Certified MWBEs/SBEs are certified according to requirements established in the Proposal & Contract documents. A copy of the certification and signed Letter of Intent must be attached for each MWBE/SBE. List must also include non-minority firms.CM's Firm Name

Name/Position

Signature/Date

TOTAL SBE/MWBE Services Participation

TOTAL Percentage of Total Bid (Alternates & Change Orders)

TOTAL Non-MWBE/SBE Participation

Page 1 of 3

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

PERCENTAGE %AMOUNT

MWBE or SBE (Yes or No )DESCRIPTION

CONTRACT AMOUNT

BUDGET (Est. Cost)

SUBCONTRACTOR / SUBCONSULTANT / VENDOR NAME

Div. No.

Subconsultant Subcontractor VendorCheck One:

Subconsultant, Subcontractor & Vendor Participation Services

SUBTOTAL (this page only)>

MWBE SBE Check One:

(Do not exceed 100%)

James B. Pirtle Construction Co., Inc. d/b/a Pirtle Construction Company

Kristina Kidder, Senior Project Coordinator

1 James B. Pirtle Construction Co., Inc d/b/a Pirtle Construction $151,227.00 $151,227.00 General Requirements $151,227.00 4.429813178

2 BG Group $43,060.00 $43,060.00 Building Demolition $43,060.00 1.26133399

2 Devland Site, Inc $86,985.00 $86,985.00 Earthwork & Paving $86,985.00 2.548005973

2 Devland Site, Inc $113,554.00 $113,554.00 Water, Sewer & Drainage $113,554.00 3.326277752

2 Carlson Fence Company $28,150.00 $28,150.00 Chain Link Fencing $28,150.00 0.824583182

2 Dixie Landscaping $13,000.00 $13,000.00 Irrigation $13,000.00 0.380802180

2 Dixie Landscaping $27,635.00 $27,635.00 Landscaping, Sod & Tree Relocation $27,635.00 0.809497557

3 Ron Kendall Masonry $138,215.00 $138,215.00 Concrete Shell $138,215.00 4.048659488

4 Ron Kendall Masonry $67,370.00 $67,370.00 Masonr $67,370.00 1.973434068

5 Suncor, Inc $173,000.00 $173,000.00 Structural & Misc Steel $173,000.00 5.067598245

6 Institutional Products $42,650.00 $42,650.00 Casework $42,650.00 1.249324076

7 Bowers Roofing $108,000.00 $108,000.00 Roofing $108,000.00 3.163587344

7 CoMan Caulking $3,140.00 $3,140.00 Caulking $3,140.00 0.091978372

$995,986.00 29.1748954

92.25222

$764,109.00 22.38264409

$2,385,240.00 69.86958404

Whispering Pines Core Reno. & Classroom Addition Sitework 1781-8434 Const $3,413,846.00

PBSD 1526 (Rev. 8/31/2010)

SUBTOTAL (this page only)>Page 2 of 3

TOTAL BID OR CM SERVICES* AMT. (Required) PHASE (Precon, Demo, Const) PROJECT NUMBERPROJECT NAMESubconsultant, Subcontractor & Vendor Participation Services

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

No.MWBE/SBE (Yes or No )

MWBE ONLY AMOUNT

PERCENTAGE %

SUBCONTRACTOR / SUBCONSULTANT / VENDOR NAME DESCRIPTION

CONTRACT AMOUNT

BUDGET (Est. Cost)

Door & Hardware Supply8 Next Door Distribution

Door & Hardware Install8 Hurricane Resistant

Coiling Doors & grilles8 Un-purchased Scope

Aluminum Windows8 Superior Windows

Metal Framing & Gypsum Board9 Applegate Interiors

Ceramic & Quarry Tile9 Zaharion Tile

Acoustical Tile Ceiling9 Acousti Engineering

Resilient Tile Flooring & Carpet9 United Flooring

Painting9 Stephens & Sons

Visual Display Boards & Cases10 Multiline Building

Signage10 Environmental Graphics

Toilet Partitions & Accessories10 Multiline Building

Fire Extinguishers & Cabinets10 Multiline Building

Metal Shelving & Lockers10 Multiline Building

Aluminum Walkway Covers10 Peachtree

Residential Appliances/Misc Equipment11 Un-purchased Scope

Food Service Equipment11 Design, Furnishings & Equipment

Projection Screens11 All Specialty Sales

$3,413,846.00Const1781-8434Whispering Pines Core Reno. & Classroom Addition Sitework

$77,435.00 2.268262833

$9,100.00 0.266561526

$2,000.00 0.058584950

$16,372.00 0.479576407

$146,600.00 4.294276894

$74,115.00 2.171011814

$41,405.00 1.212854944

$30,990.00 0.907773812

$38,870.00 1.138598519

$8,093.00 0.237064003

$8,612.00 0.25226679

$7,885.00 0.23097116

$1,822.00 0.053370890

$14,904.00 0.436575053

$90,146.00 2.64059948

$5,000.00 0.146462377

$312,105.00 9.142328037

$6,903.00 0.202205957

26.13934547$892,357.00

$77,435.00 $77,435.00

$9,100.00 $9,100.00

$2,000.00 $2,000.00

$16,372.00 $16,372.00

$146,600.00 $146,600.00

$74,115.00 $74,115.00

$41,405.00 $41,405.00

$30,900.00 $30,900.00

$38,870.00 $38,870.00

$8,093.00 $8,093.00

$8,612.00 $8,612.00

$7,885.00 $7,885.00

$1,822.00 $1,822.00

$14,904.00 $14,904.00

$90,146.00 $90,146.00

$5,000.00 $5,000.00

$312,105.00 $312,105.00

$6,903.00 $6,903.00

PBSD 1526 (Rev. 8/31/2010)

SUBTOTAL (this page only) >

TOTAL BID OR CM SERVICES* AMT. (Required) PHASE (Precon, Demo, Const) PROJECT NUMBERPROJECT NAME

Page 3 of 3

Subconsultant, Subcontractor & Vendor Participation Services

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

PERCENTAGE %

MWBE ONLY AMOUNT

MWBE/SBE (Yes or No )No.

SUBCONTRACTOR / SUBCONSULTANT / VENDOR NAME DESCRIPTION

CONTRACT AMOUNT

BUDGET (Est. Cost)

Fire Suppression System15 Arfran II

Plumbing Systems15 Al Hill Plumbing

HVAC Systems15 Quantum Mechanical

Electrical16 Fastrac

Window Blinds, Cubicle and CCTV 12 National Stage & Windows

$3,413,846.00Const1781-8434Whispering Pines Core Reno. & Classroom Addition Sitework

$6,736.00 0.197314114

$33,900.00 0.99301491

$194,152.00 5.68719268

$369,418.00 10.8211676

$656,800.00 19.23929784

36.93798724$1,261,006.00

$33,900.00 $33,900.00

$194,152.00 $194,152.00

$369,418.00 $369,418.00

$656,800.00 $656,800.00

$6,736.00 $6,736.00

PBSD 1526 (Rev. 8/31/2010)

THE SCHOOL DISTRICT OF PALM BEACH COUNTY 2. PROJECT NUMBER1. PROJECT NAME 3. PHASE (Precon, Demo, Const) 4. TOTAL BID OR CM SERVICES* AMT. (Required)

* GMP SUMMARY AMOUNTS (Pre-construction phase fee + Construction phase fee + CM Fee only) Subject to Agreement with the Construction Manager, the Subcontractor firms (minority & non-minority) listed below will participate in this project for the Contract (Trade) Items and the dollar amounts shown.

Subcontractors represented as Certified MWBEs/SBEs are certified according to requirements established in the Proposal & Contract documents. A copy of the certification and signed Letter of Intent must be attached for each MWBE/SBE. List must also include non-minority firms.CM's Firm Name

Name/Position

Signature/Date

TOTAL SBE/MWBE Services Participation

TOTAL Percentage of Total Bid (Alternates & Change Orders)

TOTAL Non-MWBE/SBE Participation

Page 1 of 3

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

PERCENTAGE %AMOUNT

MWBE or SBE (Yes or No )DESCRIPTION

CONTRACT AMOUNT

BUDGET (Est. Cost)

SUBCONTRACTOR / SUBCONSULTANT / VENDOR NAME

Div. No.

Subconsultant Subcontractor VendorCheck One:

Subconsultant, Subcontractor & Vendor Participation Services

SUBTOTAL (this page only)>

MWBE SBE Check One:

(Do not exceed 100%)

James B. Pirtle Construction d/b/a Pirtle Construction Company

Kristina Kidder, Senior Project Coordinator

0 Asset Builders LLC $55,112.00 $55,221.00 Partnership (Construction Phase Fee) $55,112.00 11.30460824

0 Asset Builders LLC $28,224.00 $28,224.00 Partnership (Construction Manager Fee) $28,224.00 5.78932470

$83,336.00 17.09393294

17.093932

$83,336.00 17.09393294

Whispering Pines Core Reno. & Classroom Addition Sitework 1781-8434 Const $487,518.00

Subcontractor Participation Good Faith Effort

THE SCHOOL DISTRICT OF PALM BEACH COUNTY CONSTRUCTION - PURCHASING DEPARTMENT

3300 Forest Hill Boulevard, A-106, West Palm Beach, FL 33406-5813 • (561) 434-8508

Project Number

Project Name

The following Certified M/WBE or SBE Subcontractors were invited to submit a proposal and declined to participate in the above project for the following work.

1. Firm did not agree to participate2. Unable to reach accommodation with price3. Firm did not submit proposal4. Firm indicated that its current work program precluded them form participating

* REASON NUMBERS

CERTIFICATION I certify the preceding statements are true.

5. Price submitted by firm in excess of estimated market value6. Unable to contact firm7. Other (explain)

Name and Position (print or type)

Name of Contracting Firm

Signature Date

INTERNAL USE ONLY ROUTING DISPOSITION

All executed originals of this form must be submitted to the Office of Diversity in Business Practices, 3300 Forest Hill Blvd., A-106, West Palm Beach, FL 33406-5813 Phone (561) 434-8508 for questions

PBSD 1527 (REV. 8/31/2010)

Item Number

Division Number M/WBE or SBE Contractor (Trade) Items

Date Contacted Who Contacted Reason

Number

Small Business Enterprise (SBE)Minority/Women Business Enterprise (M/WBE)

11/04/2010

Whispering Pines Core Renovation and Classroom Addition Sitework

1781-8434

1 02 Building Demolition 10/1/2010 Asset Builders 3

2 02 Earthwork and Paving / Site Utilities 10/1/2010 Edens Construction 4

3 02 Earthwork and Paving / Site Utilities 10/1/2010 Stanford & Sons 5

4 02 Earthwork and Paving / Site Utilities 10/1/2010 Stone Circle Underground 5

5 02 Irrigation / Landscaping 10/1/2010 Rolling Oaks Landscaping 1

6 02 Irrigation / Landscaping 10/1/2010 Landscape Service Prof 5

7 02 Fencing 10/1/2010 Reel Fence 3

8 02 Landscape & Sod 10/1/2010 Odums 1

9 03 Concrete Shell & Site Concrete 10/1/2010 Trinity Management 1

10 03 Concrete Shell & Site Concrete 10/1/2010 Bullnose Construction 3

11 03 Concrete Shell & Site Concrete 10/1/2010 Built Right Construction 3

12 03 Concrete Shell & Site Concrete 10/1/2010 Build-Tech Construction 1

13 03 Concrete Shell & Site Concrete 10/1/2010 Hatcher Construction 5

14 03 Concrete Shell & Site Concrete 10/1/2010 Asset Builders 3

15 04 Masonry 10/1/2010 Bullnose Construction 3

16 04 Masonry 10/1/2010 Built Right Construction 3

17 04 Masonry 10/1/2010 Built-Tech Construction 1

18 04 Masonry 10/1/2010 Drawdy Brothers 5

Kristina Kidder, Senior Project Coordinator

James B. Pirtle Construction dba Pirtle Construction Co

Subcontractor Participation Good Faith Effort

THE SCHOOL DISTRICT OF PALM BEACH COUNTY CONSTRUCTION - PURCHASING DEPARTMENT

3300 Forest Hill Boulevard, A-106, West Palm Beach, FL 33406-5813 • (561) 434-8508

Project Number

Project Name

The following Certified M/WBE or SBE Subcontractors were invited to submit a proposal and declined to participate in the above project for the following work.

1. Firm did not agree to participate2. Unable to reach accommodation with price3. Firm did not submit proposal4. Firm indicated that its current work program precluded them form participating

* REASON NUMBERS

CERTIFICATION I certify the preceding statements are true.

5. Price submitted by firm in excess of estimated market value6. Unable to contact firm7. Other (explain)

Name and Position (print or type)

Name of Contracting Firm

Signature Date

INTERNAL USE ONLY ROUTING DISPOSITION

All executed originals of this form must be submitted to the Office of Diversity in Business Practices, 3300 Forest Hill Blvd., A-106, West Palm Beach, FL 33406-5813 Phone (561) 434-8508 for questions

PBSD 1527 (REV. 8/31/2010)

Item Number

Division Number M/WBE or SBE Contractor (Trade) Items

Date Contacted Who Contacted Reason

Number

Small Business Enterprise (SBE)Minority/Women Business Enterprise (M/WBE)

-Did Not CompletePrequalification

11/04/2010

Whispering Pines Core Renovation and Classroom Addition Sitework

1781-8434

19 04 Masonry 10/1/2010 Smiley Corp 3

20 06 Casework 10/1/2010 Asset Builders 2

21 06 Casework 10/20/10 Star Quality 7

22 06 Casework 10/1/2010 Designer's Specialty Mill 5

23 07 Roofing Systems 10/1/2010 L&W Roofing 5

24 07 Roofing Systems 10/1/2010 Built Right 3

25 08 Aluminum Windows and Glazing 10/1/2010 The Window Guys of FL 1

26 09 Drywall Framing & Stucco 10/1/2010 M.B. Brown Construction 1

27 09 Drywall Framing & Stucco 10/1/2010 D. Stephenson Construction 4

28 09 Drywall Framing & Stucco 10/1/2010 Grey Construction 1

29 09 Drywall Framing & Stucco 10/1/2010 PWZ Green Building 1

30 09 Drywall Framing & Stucco 10/1/2010 Asset Builders 3

31 09 Ceramic & Quarry Tile 10/1/2010 Grey Construction 1

32 09 Ceramic & Quarry Tile 10/1/2010 PWZ Green Building 1

33 09 Ceramic & Quarry Tile 10/1/2010 M.B. Brown Construction 1

34 09 Ceramic & Quarry Tile 10/1/2010 RKM Interiors 3

35 09 Acoustical Ceilings and Wall Panels 10/1/2010 Grey Construction 1

36 09 Acoustical Ceilings and Wall Panels 10/1/2010 PWZ Green Building 1

Kristina Kidder, Senior Project Coordinator

James B. Pirtle Construction dba Pirtle Construction Co

Subcontractor Participation Good Faith Effort

THE SCHOOL DISTRICT OF PALM BEACH COUNTY CONSTRUCTION - PURCHASING DEPARTMENT

3300 Forest Hill Boulevard, A-106, West Palm Beach, FL 33406-5813 • (561) 434-8508

Project Number

Project Name

The following Certified M/WBE or SBE Subcontractors were invited to submit a proposal and declined to participate in the above project for the following work.

1. Firm did not agree to participate2. Unable to reach accommodation with price3. Firm did not submit proposal4. Firm indicated that its current work program precluded them form participating

* REASON NUMBERS

CERTIFICATION I certify the preceding statements are true.

5. Price submitted by firm in excess of estimated market value6. Unable to contact firm7. Other (explain)

Name and Position (print or type)

Name of Contracting Firm

Signature Date

INTERNAL USE ONLY ROUTING DISPOSITION

All executed originals of this form must be submitted to the Office of Diversity in Business Practices, 3300 Forest Hill Blvd., A-106, West Palm Beach, FL 33406-5813 Phone (561) 434-8508 for questions

PBSD 1527 (REV. 8/31/2010)

Item Number

Division Number M/WBE or SBE Contractor (Trade) Items

Date Contacted Who Contacted Reason

Number

Small Business Enterprise (SBE)Minority/Women Business Enterprise (M/WBE)

11/4/2010

Whispering Pines Core Renovation and Classroom Addition Sitework

1781-8434

37 09 Acoustical Ceilings and Wall Panels 10/1/2010 M.B. Brown Construction 1

38 09 Acoustical Ceilings and Wall Panels 10/1/2010 Asset Builders 3

39 09 Resilient Flooring and Carpet 10/1/2010 Grey Construction 1

40 09 Resilient Flooring and Carpet 10/1/2010 RKM Interiors, Inc 3

41 09 Resilient Flooring and Carpet 10/1/2010 PWZ Green Building 1

42 09 Resilient Flooring and Carpet 10/1/2010 M.B. Brown Construction 1

43 09 Resilient Flooring and Carpet 10/1/2010 United Flooring Systems 5

44 09 Resilient Flooring and Carpet 10/1/2010 Zaharion's Flooring 5

45 09 Painting 10/1/2010 Asset Builders 3

46 10 Visual Display Boards & Cases 10/1/2010 All Specialty Sales 5

47 10 Toilet Partitions & Accessories 10/1/2010 All Specialty Sales 5

48 10 Signage 10/1/2010 Gold Coast Signs & Designs 1

49 10 Signage 10/1/2010 Baron Sign Manufacturing 1

50 10 Aluminum Walkway Covers 10/1/2010 Built Right Construction 3

51 11 Projection Screens 10/1/2010 All Specialty Sales 5

52 15 Fire Sprinkler System 10/1/2010 Harpers Fire Sprinkler 5

53 15 Fire Sprinkler System 10/1/2010 Francis Engineering 1

54 15 Plumbing Systems 10/1/2010 Hammond & Associates 1

Kristina Kidder, Senior Project Coordinator

James B. Pirtle Construction dba Pirtle Construction Co

Subcontractor Participation Good Faith Effort

THE SCHOOL DISTRICT OF PALM BEACH COUNTY CONSTRUCTION - PURCHASING DEPARTMENT

3300 Forest Hill Boulevard, A-106, West Palm Beach, FL 33406-5813 • (561) 434-8508

Project Number

Project Name

The following Certified M/WBE or SBE Subcontractors were invited to submit a proposal and declined to participate in the above project for the following work.

1. Firm did not agree to participate2. Unable to reach accommodation with price3. Firm did not submit proposal4. Firm indicated that its current work program precluded them form participating

* REASON NUMBERS

CERTIFICATION I certify the preceding statements are true.

5. Price submitted by firm in excess of estimated market value6. Unable to contact firm7. Other (explain)

Name and Position (print or type)

Name of Contracting Firm

Signature Date

INTERNAL USE ONLY ROUTING DISPOSITION

All executed originals of this form must be submitted to the Office of Diversity in Business Practices, 3300 Forest Hill Blvd., A-106, West Palm Beach, FL 33406-5813 Phone (561) 434-8508 for questions

PBSD 1527 (REV. 8/31/2010)

Item Number

Division Number M/WBE or SBE Contractor (Trade) Items

Date Contacted Who Contacted Reason

Number

Small Business Enterprise (SBE)Minority/Women Business Enterprise (M/WBE)

11/4/2010

Whispering Pines Core Renovation and Classroom Addition Sitework

1781-8434

55 15 HVAC Systems 10/1/2010 Horizon Air Conditioning 5

56 15 HVAC Systems 10/1/2010 Hammond & Associates 1

57 15 Electrical Systems 10/1/2010 Haliburton Electric 1

Kristina Kidder, Senior Project Coordinator

James B. Pirtle Construction dba Pirtle Construction Co

01 - Pirtle Construction Company

Project PB10-0010 - Whispering Pines Core Expansion and Renovations

PROJECT MANAGEMENT - DRAWINGS AND SPECIFICATIONS LOG

111/02/2010

02:58 PMTime:Date:Page: of 9

011100

012600

012976

013100

013300

013516

014000

014100

014500

015000

015600

015700

016000

017229

017500

017770

017823

017836

019100

024113

024116

031100

032000

033000

033500

033600

040513

042000

042010

051200

052100

053100

054000

055000

061000

064100

070150

071113

Number

Summary of Work/Contractor Conduct on Camp

Contract Modifications Procedures

Procedures for Payment

Project Management and Coordination

Submittals Procedures

Alteration Project Procedures

Quality Control

Regulatory Requirements

Testing Laboratory Services

Temporary Construction Facilities

Security Barriers and Enclosures

Temporary Controls

Material Equipment and Approved Equals

Cutting and Patching

Starting and Adjusting System

Contract Closeout

Operation and Maintenance Data

Warranties

Commissioning

Selective Demolition

Building Demolition

Concrete Formwork

Concrete Reinforcement

Cast-In-Place Concrete

Concrete Floor Finishing

Polished Concrete Floor Finishing

Masonry Mortar & Grout

Masonry Unit

Reinforced Masonry Unit

Structural Steel

Steel Joist & Steel Girders

Steel Deck

Cold Formed Metal Framing

Metal Fabrications

Rough Carpentry

Custom Casework

Preparation for Re-Roofing

Bituminous Dampproofing

Title

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Revision

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

Rev Date Copies Status Discipline Drawing - Specif

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

Business Partne

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

Group

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

Bulletin

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Sort #

01 - Pirtle Construction Company

Project PB10-0010 - Whispering Pines Core Expansion and Renovations

PROJECT MANAGEMENT - DRAWINGS AND SPECIFICATIONS LOG

211/02/2010

02:58 PMTime:Date:Page: of 9

071900

072114

072116

073113

074213

076200

078116

078400

079200

081100

081400

083100

083313

085113

087100

088000

089119

092214

092216

092900

093013

095100

096500

096813

099113

099123

101100

101200

101400

101416

102100

102123

102213

102600

102800

104400

105100

105613

Number

Water Repellent Penetrant

Extruded Polystrene Board Insulation

Batt Insulation

Asphalt Shingles

Metal Wall Panels

Flashing Gutters, Downspouts & Others

Cementitious Fireproofing

Firestop Systems

Joint Sealants

Metal Doors & Frames

Wood Doors

Access Doors and Frames

Coiling Counter Doors

Aluminum Windows

Door Hardware

Glazing

Fixed Louvers

Metal Furring & Lathing

Non-Structural Metal Stud Framing

Gypsum Board System

Ceramic Tile and Quarry Tile

Acoustical Ceilings

Resilient Flooring

Tile Carpet

Exterior Painting

Interior Painting

Marker Boards & Tack Boards

Display Cases

Signage

Plaque

Toilet Compartments and Cubicles

Cubicle Curtains

Wire Mesh Partitions

Door And Wall Protection

Toilet & Bath Accessories

Fire Protection Specialties

General Corridor Lockers

Metal Shelving

Title

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Revision

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

Rev Date Copies Status Discipline Drawing - Specif

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

Business Partne

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

Group

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

Bulletin

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Sort #

01 - Pirtle Construction Company

Project PB10-0010 - Whispering Pines Core Expansion and Renovations

PROJECT MANAGEMENT - DRAWINGS AND SPECIFICATIONS LOG

311/02/2010

02:58 PMTime:Date:Page: of 9

107326

113100

114000

115213

122116

210000

220510

220529

220593

220719

221000

221100

221300

222000

223000

224000

230500

230510

230513

230519

230529

230548

230553

230593

230594

230713

230716

230719

230800

230900

232113

232116

232300

232923

233100

233300

233423

233613

Number

Walkway Covers

Residential Appliances

Food Service Equipment

Projection Screens

Vertical Louver Blinds

Fire Suppression

Minor Plumbing Demolition

Hangers and Supports For Plumbing Piping

Tests - Plumbing Piping Systems

Plumbing Pipe Insulation

Plumbing Piping

Facility Water Distribution

Facility Sanitary Distribution

Plumbing Specialties

Plumbing Equipment

Plumbing Fixtures

Basic Mechanical Requirements

Minor HVAC Demolition

Motor Requirements for HVAC Piping

Meters, Gauges and Thermometers

Hangers and Supports for HVAC Piping

HVAC Vibration Control

ID For HVAC Piping and Equipment

HVAC Tab

Tests - HVAC Piping Systems

Ductwork Insulation

HVAC Equipment Insulation

HVAC Pipe Insulation

Commissioning of HVAC Systems

Energy Management and Control Systems

Hydronic Piping

Hydronic Specialties

Refrigeration Piping

Variable Frequency Motor Controls

Ductwork

Air Duct Accessories

HVAC Power Ventilators

Variable Air Volume Units

Title

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Revision

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

Rev Date Copies Status Discipline Drawing - Specif

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

Business Partne

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

Group

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

Bulletin

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Sort #

01 - Pirtle Construction Company

Project PB10-0010 - Whispering Pines Core Expansion and Renovations

PROJECT MANAGEMENT - DRAWINGS AND SPECIFICATIONS LOG

411/02/2010

02:58 PMTime:Date:Page: of 9

233713

234000

236313

237000

238219

255000

260000

260500

260513

260519

260526

260529

260533

260553

260800

260900

262310

262416

262716

262726

262813

262816

262839

262910

263513

263600

265100

265200

271000

272410

274100

275116

275123

275310

275313

281310

281600

283100

Number

Grilles, Registers, Diffusers

HVAC Air Filters

Air Cooled Air Refrigerant Condensers

Air Handling Units

Electric Resistance Duct Heaters

Energy Management and Control Systems

Electrical Requirements

Electrical Materials and Methods

Electrical Wire and Cable

Electrical Wiring System

Grounding Bonding of Electrical Systems

Hangers and Supports for Electrical Systems

Electrical Raceway and Boxes

Electrical Identification

Work Included

Electrical Instrumentation Control

Disconnect Switches

Panelboards

Electrical Cabinets and Enclosures

Wiring Devices

Fuses (600 Volts and Below)

Enclosed Switches and Circuit Breakers

Motor Control

Electric Controls and Relays

Gas Engine Drive Generator Assembly

Transfer Switches

Interior Lighting

Emergency Lighting

Communication System

Ceiling Projector System

Master Television Antenna System

Public Address System

Intercom Systems

Emergency Radio Communications Systems

GPS Clock System

Access System

Intrusion Detection

Fire Alarm and Smoke Detection Systems

Title

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Revision

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

Rev Date Copies Status Discipline Drawing - Specif

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

Business Partne

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

Group

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

Bulletin

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Sort #

01 - Pirtle Construction Company

Project PB10-0010 - Whispering Pines Core Expansion and Renovations

PROJECT MANAGEMENT - DRAWINGS AND SPECIFICATIONS LOG

511/02/2010

02:58 PMTime:Date:Page: of 9

283300

311000

312000

321216

321313

321713

321723

323000

323113

328423

329223

329300

331100

333000

334000

335616

A-1.0

A-1.1

A-1.2

A-1.3

A-1.4

A-10.0

A-10.1

A-10.2

A-10.3

A-10.4

A-11.0

A-11.1

A-12.0

A-13.0

A-14.0

A-2.0

A-2.1

A-2.2

A-3.0

A-3.1

A-3.2

A-3.3

Number

Video Surveillance System

Site Clearing

Earth Moving

Asphalt Paving

Concrete Paving

Parking Bumpers

Pavement Marking

Site Improvements

Chain Link Fencing & Gates

Irrigation Underground

Sodding

Tree, Plants & Ground Cover

Water Distribution System

Sanitary Sewerage Utilities

Storm Drainage Utilities

Underground LP Storage & Distribution

Site Plan

Site Details

Site Details

Site Details

Site Details

Interior Elevations

Interior Elevations

Interior Elevations

Cabinetry Sections

Cabinetry Sections

Door Schedule and Types

Door Frame Details

Window Schedule and Window Details

Finish Schedule

Fire Caulking Details

Demolition Plan-Building 1

Demolition Plan-Building 2

Demolition Plan-Building 4

Floor Plan - Overall

Floor Plan - Building 1

Floor Plan - Building 2

Floor Plan - Building 4

Title

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Revision

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/01/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

Rev Date Copies Status Discipline

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

Drawing - Specif

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

SPEC

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

Business Partne

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

Group

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

Bulletin

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Sort #

01 - Pirtle Construction Company

Project PB10-0010 - Whispering Pines Core Expansion and Renovations

PROJECT MANAGEMENT - DRAWINGS AND SPECIFICATIONS LOG

611/02/2010

02:58 PMTime:Date:Page: of 9

A-3.4

A-3.5

A-3.6

A-3.7

A-4.0

A-4.1

A-4.2

A-5.0

A-6.0

A-6.1

A-6.2

A-6.3

A-6.4

A-7.0

A-8.0

A-8.1

A-9.0

A-9.1

C-1.0

C-2.0

C-3.0

C-4.0

C-5.0

C-6.0

C-7.0

C-8.0

C-9.0

E-0.1

E-1.1

E-2.1

E-2.2

E-2.3

E-2.4

E-2.5

E-2.6

E-2.7

E-2.8

E-2.9

Number

Furniture - Equipment Plan - Building 1

Furniture - Equipment Plan - Building 2

Enlarged Equipment Plan - Building 2

Furniture - Equipment Plan - Building 4

Reflected Ceiling Plan - Building 1

Reflected Ceiling Plan - Building 2

Reflected Ceiling Plan - Building 4

Building Elevations

Building Sections

Building Sections

Wall Sections

Wall Sections

Wall Sections

Roof Plan

Restroom Plans, Elevations & Details

Restroom Plans, Elevations & Details

Partition Type Details

Partition Type Details

General Notes & Specifications

Horizontal Plan

Paving, Grading, and Drainage Plan

Water and Sanitary Sewer Plan

Pavement, Marking and Signage Plan

Pavng, Grading and Drainage Details

Water and Sanitary Sewer Details

Sanitary Sewer Profile

Pollution Prevention Plan

Electrical Sheet Index

Electrical Site Plan

Lighting Floor Plan

Power Floor Plan

Systems Floor Plan

Lighting Floor Plan

Power Floor Plan

Systems Floor Plan

Lighting Floor Plan

Power Floor Plan

Systems Floor Plan

Title

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Revision

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

Rev Date Copies Status Discipline

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

C

C

C

C

C

C

C

C

C

E

E

E

E

E

E

E

E

E

E

E

Drawing - Specif

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

Business Partne

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

Group

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

Bulletin

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Sort #

01 - Pirtle Construction Company

Project PB10-0010 - Whispering Pines Core Expansion and Renovations

PROJECT MANAGEMENT - DRAWINGS AND SPECIFICATIONS LOG

711/02/2010

02:58 PMTime:Date:Page: of 9

E-3.1

E-3.2

E-3.3

E-3.4

E-4.1

E-4.2

E-5.1

E-5.2

E-5.3

E-5.4

E-6.1

E-6.2

E-6.3

E-6.4

E-6.5

E-6.6

E-6.7

FP-0.1

FP-1.1

FP-2.1

FS-1.0

FS-2.0

FS-3.0

FS-4.0

G-0.0

G-0.1

IR-1

L-1

L-2

LS-0.0

LS-1.0

LS-2.0

LS-3.0

M-0.1

M-0.2

M-0.3

M-0.4

M-1.1

Number

Enlarged Kitchen Plan

Kitchen Schedule

Enlarged Electrical Rooms

Enlarged Electrical Rooms

Riser Diagrams

Riser Diagrams

Notes, Legends & Fixture Schedule

Miscellaneous Schedules

Panelboard Schedule

Panelboard Schedule

Miscellaneous Details

Miscellaneous Details

Miscellaneous Details

Miscellaneous Details

Miscellaneous Details

Miscellaneous Details

Miscellaneous Details

Fire Protection Legend, Notes and Details

Fire Protection Floor Plans

Fire Protection Details

Food Service Equipment Layout

Food Service Electrical Layout

Food Service Plumbing Layout

Food Service Mech & Special Conditions

Cover Sheet

Abbreviations, Symbols and Legend

Irrigation Plan

Landscape Plan

Plant List and Details

Life Safety Data

Life Safety - Building 1

Life Safety - Building 2

Life Safety - Building 4

Legend and General Notes

Mechanical Schedules

Mechanical Schedules

Mechanical Schedules

Partial Building 2 Demolition

Title

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Revision

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

Rev Date Copies Status Discipline

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

FP

FP

FP

FS

FS

FS

FS

A

A

I

L

L

LS

LS

LS

LS

M

M

M

M

M

Drawing - Specif

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

Business Partne

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

Group

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

Bulletin

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Sort #

01 - Pirtle Construction Company

Project PB10-0010 - Whispering Pines Core Expansion and Renovations

PROJECT MANAGEMENT - DRAWINGS AND SPECIFICATIONS LOG

811/02/2010

02:58 PMTime:Date:Page: of 9

M-1.2

M-1.3

M-1.4

M-1.5

M-2.1

M-3.1

M-3.2

M-3.3

M-4.1

M-4.2

M-4.3

M-5.1

P-0.1

P-0.2

P-0.3

P-2.1

P-2.2

P-2.3

P-2.4

P-2.5

P-3.1

P-3.2

S-1.1

S-1.2

S-2.1

S-2.2

S-3.1

S-3.2

SS-1.0

SS-1.1

SS-2.0

SS-2.1

SS-2.2

Number

Partial Building 4 Demolition

Partial Building 2 New Work

Partial Building 2 New Work

Partial Building 4 New Work

Mechanical Room Demolition Plan

Mechanical Details

Mechanical Details

Mechanical Details

Mechanical Controls

Mechanical Controls

Mechanical Controls

Chilled Water Piping

Plumbing Schedules, Legends and Notes

Plumbing Details

Plumbing Site Plan

Plumbing Floor Plan - Demo

Bldg 1 & 4 Plumbing - Underground

Bldg 2 Plumbing - Underground

Bldg 1 & 4 Plumbing - Above Ground

Bldg 2 Plumbing - Above Ground

Plumbing Riser Diagrams

Plumbing Riser Diagrams

Foundation Plan

Roof Framing Plan

Structural Notes

Schedules and Typical Details

Sections

Sections

Building 1 & 4 Signage Plans

Building 2 Signage Plan

Signage Details

Signage Details

Signage Details

Title

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Revision

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

11/02/2010

Rev Date Copies Status Discipline

M

M

M

M

M

M

M

M

M

M

M

M

P

P

P

P

P

P

P

P

P

P

S

S

S

S

S

S

A

A

A

A

A

Drawing - Specif

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

Business Partne

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

CJSA01

Group

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

100CD

Bulletin

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Base

Sort #

01 - Pirtle Construction Company

Project PB10-0010 - Whispering Pines Core Expansion and Renovations

PROJECT MANAGEMENT - DRAWINGS AND SPECIFICATIONS LOG

911/02/2010

02:58 PMTime:Date:Page: of 9

Project: PB10-0010

Operator:Run Time:Run Date:

Report Code:

11/02/201002:58 PMKRISTINAPM3031

Report Parameters

END OF REPORT

Group By Package:

From Package:To Package:Show History:

EXHIBIT G

James B. Pirtle Construction Company, Inc. d/b/a Pirtle Construction Company will comply with the change order rate schedule as shown below:

CHANGE ORDER RATE SCHEDULE

Craft Rate/Hour Overtime Rate/Hour

Laborer $30.00 $38.00 Laborer Foreman $32.00 $40.65 Carpenter $35.00 $40.45 Lather $35.00 $40.45 Plasterer $38.00 $48.60 Carpenter Foreman $40.00 $50.80 Mason $38.00 $48.60 Heavy Equipment Operator $35.00 $40.45 Site Foreman $40.00 $50.80 Pipe fitter/ Plumber $40.00 $50.80 Sheet metal worker $40.00 $50.80 Glazier $36.00 $45.70 Electrician $42.00 $53.35 Electrician (controls) $44.00 $55.90 Electrician Foreman $45.00 $57.15 Sprinkler worker $40.00 $50.80 Tile/ Flooring Layer $33.00 $41.90 Painter $30.00 $38.10 Roofer $34.00 $43.20 Ironworker (red) $45.00 $57.15 Ironworker (rebar) $35.00 $40.45

CERTIFICATION OF COMPLIANCE WITH FLORIDA TRENCH SAFETY ACT

James B. Pirtle Construction Company, Inc. d/b/a/ Pirtle Construction Company acknowledges that they are solely responsible for complying with the Florida Trench Safety Act (Act) and Occupational Safety and Health Administrations excavation safety standard 29 CRF 1926.650 (Suppart P as mended). James B. Pirtle Construction Company, Inc. d/b/a Pirtle Construction Company further acknowledges that included in the various items of the Proposal and in the Total computed Base Bid proce are costs for complying with the Florida Trench Safety Act (90-96, Laws of Florida)

_______________________________________ AUTHORIZED SIGNATURE BY: ___________Gary N. Pirtle_____________ TITLE: _________Vice President____________