gsfc eee parts standards activities darryl lakins head, parts, packaging and assembly office, gsfc,...

22
GSFC EEE Parts Standards Activities Darryl Lakins Head, Parts, Packaging and Assembly Office, GSFC, Code 562

Upload: david-potter

Post on 23-Dec-2015

224 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: GSFC EEE Parts Standards Activities Darryl Lakins Head, Parts, Packaging and Assembly Office, GSFC, Code 562

GSFC EEE Parts Standards Activities

Darryl LakinsHead, Parts, Packaging and Assembly Office,

GSFC, Code 562

Page 2: GSFC EEE Parts Standards Activities Darryl Lakins Head, Parts, Packaging and Assembly Office, GSFC, Code 562

3/3/2003 2

Outline• EEE Parts

Engineering Process• EEE Parts Standards

– EEE Parts Documents– EEE Parts

Manufacturers– EEE Parts Selection

• EEE Parts Databases• Challenges

Page 3: GSFC EEE Parts Standards Activities Darryl Lakins Head, Parts, Packaging and Assembly Office, GSFC, Code 562

3/3/2003 3

Organization

Parts Engineering Advanced Component Technologies Space Flight ManufacturingL. Pack, Staff Engineer

Components & Radiation EffectsDarryl Lakins, Branch Head

Harry Shaw,Chief TechnologistHenning Leidecker, Chief Engineer

P r o j e c t P a r t s E n g i n e e r sE E E P a r t s L a b o r a t o r i e sF a i l u r e A n a l y s i s

F i b e r O p t i c s / P h o t o n i c s D e v e l o p m e n tA d v a n c e d P a c k a g i n g L a b o r a t o r i e sN a n o t e c h n o l o g yM a t e r i a l S c i e n c e

A p p r o x i m a t e l y 4 0 s c i e n t i s t s , e n g i n e e r s , t e c h n i c i a n s , a n d s t u d e n t s

S M T A s s e m b l yR a p i d R e s p o n s e r e w o r kB o a r d / B o x D e s i g n

Page 4: GSFC EEE Parts Standards Activities Darryl Lakins Head, Parts, Packaging and Assembly Office, GSFC, Code 562

3/3/2003 4

Parts Engineering Process

Mission Success

Parts “need”

MissionSystemDesign

MissionSystemDesign

Design, Build,Assemble,

Test

Design, Build,Assemble,

Test

Verify,Integrate,

Validate, Operate

Verify,Integrate,

Validate, Operate

Concept Develop I&T/Ops

Standards (Customer, Requirements, Procurement,

Test, etc.)

Knowledge Management (EPIMS, Research Inventory,

Alerts)

Parts Facilities (FA Lab, Logistics)

People

•Space Environment Analysis•Mission

Requirements•Risk Management

•Technology Alternatives/Trades

•Packaging •Parts Selection/Reliability

•Parts List•Parts Acquisition

•Manufacturer Surveillance•Parts Test (e.g., Radiation,

Environment,etc.)•GIDEP/Alert Monitoring

•Logistics

•Post Delivery Support (I.e., failure

analysis)

Page 5: GSFC EEE Parts Standards Activities Darryl Lakins Head, Parts, Packaging and Assembly Office, GSFC, Code 562

3/3/2003 5

Parts Engineering Process-Issues

1. Vishay Resistor –by manufacturer (procurement process) found in I&T2. ATC Capacitors-by manufacturer (procurement process) found in I&T3. Optocoupler- by designers (parts selection-space environment) in I&T4. DC/DC Converter- by designers (parts selection-space environment) in I&T5. DC/DC Converter (MFL)-by designers (application of part) found in I&T6. LM 136-by manufacturer (procurement process-screening) found in I&T7. FPGA-by designers (application of part) found in I&T8. GPS Receiver-by designers (parts selection) found before I&T9. Digitizer Boards-by designers (parts selection) found before I&T

MissionSystemDesign

MissionSystemDesign

Design, Build,Assemble,

Test

Design, Build,Assemble,

Test

Verify,Integrate,

Validate, Operate

Verify,Integrate,

Validate, Operate

Concept I&T/Ops

$

Time

100

1,000

10,000PER HOUR

The goal is to catch the EEE parts issues here

(I.e., Design in Quality)

Not here

Page 6: GSFC EEE Parts Standards Activities Darryl Lakins Head, Parts, Packaging and Assembly Office, GSFC, Code 562

3/3/2003 6

EEE Parts Standards• The existing specifications, of which, there are

more than 700, are either stored in filing cabinets, websites or internal filing systems. – The Standards System comprises of guidelines,

procurement and screening specifications: • The Guidelines provide the requirements for screening, lot

acceptance testing and qualification testing for individual families of EEE parts. Based on three grade levels (i.e. Grade 1,2 and 3)

– The grade levels establish reliability levels for the mission type. Grade 1 is the highest and Grade 3 is the lowest.

– New guidelines for selection, screening and qualification established. Old system used as basis guidelines. The new document consist of new technical information, project experiences and new ISO format.

Page 7: GSFC EEE Parts Standards Activities Darryl Lakins Head, Parts, Packaging and Assembly Office, GSFC, Code 562

3/3/2003 7

EEE Parts Standards• Procurement specifications for thermostats, connectors, relays and

heaters are very popular.– The procurement specifications are being converted to electronic format

and will eventually be placed into our database.• Screening specifications are obsolete. Most datasheets have been

updated and test facilities have incorporated new test procedures and methods that have outdated the existing specifications. – Our plans are to discontinue the obsolete screening specifications.– As new projects are developed, new specifications will be incorporated

into our QMS or master catalog. All specifications are approved by the GSFC standards committee.

• Test methods (i.e., burn-in, DPA, PIND, etc.) that are used in the GSFC EEE Parts Analysis Laboratory are being converted to work instructions (IAW ISO). – We also consider adoption of “NASA approved” standards from other

Centers or external bodies.

Page 8: GSFC EEE Parts Standards Activities Darryl Lakins Head, Parts, Packaging and Assembly Office, GSFC, Code 562

3/3/2003 8

Old System to New (ISO)• Carbon copy of the previous Code

311 system except that we are using QMS process to document the procedures and guidelines.

– Described in Code 562-PG-8700.2.7– Examples of the records that are

associated with the overall system includes:

• 562-WI….Procurement Specifications• 562-PG….Guidelines• G562PXXX….Part Identification

Number

• As time/resources are available the old documents will be converted.

Page 9: GSFC EEE Parts Standards Activities Darryl Lakins Head, Parts, Packaging and Assembly Office, GSFC, Code 562

3/3/2003 9

New Capabilities

• As new capabilities are added to the Office, such as the Fiberoptics/Photonics Laboratory, new procedures and specifications will be established, posted and maintained by the Office.

Page 10: GSFC EEE Parts Standards Activities Darryl Lakins Head, Parts, Packaging and Assembly Office, GSFC, Code 562

3/3/2003 10

COTS Challenges• Manufacturers of commercial and

military or aerospace graded components employ different ideologies regarding quality and reliability issues of their products, which can be described as “produce-it-right” and “produce-it-to-rules plus test-it-right” approaches.

• Most PEM manufacturers rely on built-in reliability design and thorough process control, leaving testing and verification of quality and reliability of their product to the end users.

• For these reasons, use of PEMs in high reliability systems is always a risk, and the purpose of qualification and testing of PEMs is to mitigate these risks against known failure mechanisms in project-specific conditions.

Page 11: GSFC EEE Parts Standards Activities Darryl Lakins Head, Parts, Packaging and Assembly Office, GSFC, Code 562

3/3/2003 11

Manufacturer’s Assessment• Presently using DSCC listing

of qualified vendors, the NASA Preferred Parts Selection List (NPSL) and the GSFC Procurement Specification Qualified Parts List Directory for information regarding our suppliers.

• Plan to augment the mentioned repositories using information and assessments provided by Supplier Audit Contract (SAC) and project related audits. The information will be inserted into a database.

Page 12: GSFC EEE Parts Standards Activities Darryl Lakins Head, Parts, Packaging and Assembly Office, GSFC, Code 562

3/3/2003 12

Manufacturer’s Information

Page 13: GSFC EEE Parts Standards Activities Darryl Lakins Head, Parts, Packaging and Assembly Office, GSFC, Code 562

3/3/2003 13

Page 14: GSFC EEE Parts Standards Activities Darryl Lakins Head, Parts, Packaging and Assembly Office, GSFC, Code 562

3/3/2003 14

Parts Selection Info• Parts are selected by the design engineers.

They may use standard parts from NSPL or the preferred parts list (i.e., PPL21).

• Code 562 assigns a Parts Engineer to work with each project and advise on parts issues, develop plans, and provide procurement support including scheduling of parts deliveries and other tasks (screening, qualification, etc.).

• The Parts Engineer meets with the designers, instrument managers and system assurance managers on a regular basis.

• Goddard Space Flight Center 311-PEM instructions (soon to be 562-PG-8700) provides guidance to projects regarding parts selection and is the document most used by Code 562 parts engineers.

– Three most important elements are screening, environmental stress testing (or qualification), and DPA.

• The major elements of screening are electrical testing and burning-in (BI).

• The major elements of environmental stress testing (EST) are multiple temperature cycling, radiation testing, high temperature operational life test (HTOL), and highly accelerated stress test (HAST) in moisture environments.

Page 15: GSFC EEE Parts Standards Activities Darryl Lakins Head, Parts, Packaging and Assembly Office, GSFC, Code 562

3/3/2003 15

Database

• Parts Library- that provides information regarding parts use, testing and lessons learned.

• EEE Parts Research-that provides information associated with emerging technologies so that NASA engineers are given a sneak preview of the reliability of new “sweet” parts.

Page 16: GSFC EEE Parts Standards Activities Darryl Lakins Head, Parts, Packaging and Assembly Office, GSFC, Code 562

3/3/2003 16

Page 17: GSFC EEE Parts Standards Activities Darryl Lakins Head, Parts, Packaging and Assembly Office, GSFC, Code 562

3/3/2003 17

Page 18: GSFC EEE Parts Standards Activities Darryl Lakins Head, Parts, Packaging and Assembly Office, GSFC, Code 562

3/3/2003 18

Related Websites

Related Documents

Experts associated with PEMs

Page 19: GSFC EEE Parts Standards Activities Darryl Lakins Head, Parts, Packaging and Assembly Office, GSFC, Code 562

3/3/2003 19

Database• System (portal) search is

capable of searching multiple databases, filing systems and websites simultaneously. The results are arranged so that the user can view related information regarding a EEE parts.

• Example:– “RF connectors” was the

search term.– The system provided the user

project related information, specific standards and guidelines, research documents and specific part information.

Project Related

Specs and Guidelines

NPSL Specific parts

Page 20: GSFC EEE Parts Standards Activities Darryl Lakins Head, Parts, Packaging and Assembly Office, GSFC, Code 562

3/3/2003 20

Requested Information• Google search

statistics indicate that NASA specifications and MILSPECs are very popular.

• The NEPP portal receives a lot of hits and referrals that pertain to specifications.

Activity by Search Engines with Search Phrases Detail

Engines Phrases Referrals %

1.google mil-c-27500 123 0.44%

  tin whiskers 103 0.37%

  electronic parts 77 0.28%

  d38999 66 0.24%

  m38510 59 0.21%

  rlr07 56 0.20%

  m83513 56 0.20%

  resistor manufacturer 53 0.19%

  m39014 50 0.18%

  rwr81 48 0.17%

  tin whisker 46 0.17%

  cwr09 44 0.16%

  cuinterconnect_evalreport.htm semspec

1 0.00%

  nepp 41 0.15%

  intel 8 0.03%

  mil-dtl-38999 38 0.14%

  rlr05 38 0.14%

  understanding whisker phenomenon

37 0.13%

  stereo parts 35 0.13%

  inductor manufacturer 35 0.13%

Page 21: GSFC EEE Parts Standards Activities Darryl Lakins Head, Parts, Packaging and Assembly Office, GSFC, Code 562

3/3/2003 21

Visits

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

18,000

JanFeb

MarApr

MayJun

JulAug

SepOct

NovDec

Visitors TrendVisitors Trend

United States [US] J apan [J P] United Kingdom [UK] Canada [CA] World-Wide [*]

0

10,000

20,000

30,000

40,000

50,000

60,000

12

34

5

Top Countries by VisitsTop Countries by Visits

Visit Summary

Visits 88,254

Average per Day 416

Average Visit Length 00:18:13

Median Visit Time 00:03:44

International Visits 34.38%

Visits of Unknown Origin 0.02%

Visits from Your Country: United States (US) 65.59%

Page 22: GSFC EEE Parts Standards Activities Darryl Lakins Head, Parts, Packaging and Assembly Office, GSFC, Code 562

3/3/2003 22

Challenges

• Review, Sort and Conversion of hardcopies to electronic documents.

• Insertion of documents into database that is linked with Standards website to ensure all documents are accessible from the either the standards website, GSFC GDMS and the NEPP portal.

• Establishment of new standards as new capabilities come online.

• Staying abreast of the changes that industry is making to facilitate adoption of new standards.

• Monitoring our suppliers and understanding the complete supply chain from forecasting and obsolescence; to procurement and handling.