group presetnation 4th semesster group
TRANSCRIPT
Project No. INT04S2015
Group #3
Adinna ValentinaGeorgi DimovSven EinarssonVladislav Nedelev
G:\F2015_Semester_4\J\Group 3\EXAM\
Concept
Time planning
Location
Materials
Analyzes
Floor plans
Elevations
Load bearing system
Documents
BudgetTime plan
Design Development
We are
Assignment
Section
Documents
We are…
Adinna Valentina
Georgi Dimov Sven Einarsson
Vladislav Nedelev
Goal Vision
Deliver good and professional work to our clients.
To be a leading architecture firm in design of office and commercial buildings
Group contract
Minutes of meeting 1Minutes of meeting 2
Minutes of meeting 3Minutes of meeting 4
Office manual
2
Concept
Time planning
Location
Materials
Analyzes
Floor plans
Elevations
Load bearing system
Documents
BudgetTime plan
Design Development
We are
Assignment
Section
Documents
Group time planning
Calendar GenieBelt
Go to http://geniebelt.com/ Use this user name and password: USER/Email: [email protected]: #letmeinplease!
Stakeholders map
7 keys report
Risk and issue log
3
ConceptDesign
Concept
Time planning
Location
Materials
Analyzes
Floor plans
Elevations
Load bearing system
Documents
BudgetTime plan
Design Development
We are
Assignment
Section
Documents
4
Concept
Time planning
Location
Materials
Analyzes
Floor plans
Elevations
Load bearing system
Documents
BudgetTime plan
Design Development
We are
Assignment
Section
Documents
Assignment
• Office building in London • Ground floor
• Restaurant • Shops
• Thermal envelope • Auditorium• Sustainable
5
Concept
Time planning
Location
Materials
Analyzes
Floor plans
Elevations
Load bearing system
Documents
BudgetTime plan
Design Development
We are
Assignment
Section
Documents
United Kingdom
Europe
London
SE16 5GX
590 Rotherhithe Street
Location
6
Concept
Time planning
Location
Materials
Analyzes
Floor plans
Elevations
Load bearing system
Documents
BudgetTime plan
Design Development
We are
Assignment
Section
Documents
3d
7
Concept
Time planning
Location
Materials
Analyzes
Floor plans
Elevations
Load bearing system
Documents
BudgetTime plan
Design Development
We are
Assignment
Section
Documents
Materials
Floors Finish
Bricks
Concrete
RAL 3011 - Brown red
RAL 7030 – Stone grey
Low-E Windows
RAL 9018 – Papyrus White(for the upper sides of the arch windows)
8
Concept
Time planning
Location
Materials
Analyzes
Floor plans
Elevations
Load bearing system
Documents
BudgetTime plan
Design Development
We are
Assignment
Section
Documents
Sun and weather analyzesFunctional Diagram
Analyzes
Room requirements
Plot analysis
9
Concept
Time planning
Location
Materials
Analyzes
Floor plans
Elevations
Load bearing system
Documents
BudgetTime plan
Design Development
We are
Assignment
Section
Documents
Basement Floor
10
Concept
Time planning
Location
Materials
Analyzes
Floor plans
Elevations
Load bearing system
Documents
BudgetTime plan
Design Development
We are
Assignment
Section
Documents
Ground Floor Plan
11
Concept
Time planning
Location
Materials
Analyzes
Floor plans
Elevations
Load bearing system
Documents
BudgetTime plan
Design Development
We are
Assignment
Section
Documents
Split Level Plan
12
Concept
Time planning
Location
Materials
Analyzes
Floor plans
Elevations
Load bearing system
Documents
BudgetTime plan
Design Development
We are
Assignment
Section
Documents
First Floor Plan
13
Concept
Time planning
Location
Materials
Analyzes
Floor plans
Elevations
Load bearing system
Documents
BudgetTime plan
Design Development
We are
Assignment
Section
Documents
Second Floor Plan
14
Concept
Time planning
Location
Materials
Analyzes
Floor plans
Elevations
Load bearing system
Documents
BudgetTime plan
Design Development
We are
Assignment
Section
Documents
Roof terrace plan
15
Concept
Time planning
Location
Materials
Analyzes
Floor plans
Elevations
Load bearing system
Documents
BudgetTime plan
Design Development
We are
Assignment
Section
Documents
Elevations
East
South
16
Concept
Time planning
Location
Materials
Analyzes
Floor plans
Elevations
Load bearing system
Documents
BudgetTime plan
Design Development
We are
Assignment
Section
Documents
Elevations
West
North
17
Concept
Time planning
Location
Materials
Analyzes
Floor plans
Elevations
Load bearing system
Documents
BudgetTime plan
Design Development
We are
Assignment
Section
Documents
Section
18
Concept
Time planning
Location
Materials
Analyzes
Floor plans
Elevations
Load bearing system
Documents
BudgetTime plan
Design Development
We are
Assignment
Section
Documents
Load bearing system
19
Concept
Time planning
Location
Materials
Analyzes
Floor plans
Elevations
Load bearing system
Documents
BudgetTime plan
Design Development
We are
Assignment
Section
Documents
Documents
Environmental program
Site waste management plan
Eco-friendly building checklist
Tendering procedure
Early invitation for tendering
Building Technique
20
Concept
Time planning
Location
Materials
Analyzes
Floor plans
Elevations
Load bearing system
Documents
BudgetTime plan
Design Development
We are
Assignment
Section
Documents
Documents
Power of AttorneyICT Contract
Project Organization Chart
Contract For Consulting Service
21
Concept
Time planning
Location
Materials
Analyzes
Floor plans
Elevations
Load bearing system
Documents
BudgetTime plan
Design Development
We are
Assignment
Section
Documents
Budget: Concept
Cost excl vat: 17.846.795 £Cost including vat: 21.416.154 £
+ - 20%
2.278 £/m²
Cost including vat: 222.289.889 dkk
23.644 £/m²
Time plan
Construction 250 Working Days
22
Design Development
23
Concept
Design Development
We are
Drawings
Utilities
Fire analysis
Budget
Time plan
Energy calculation
Technical Design
Drawings
Ceiling systems
Utilities
Furnishing plans
24
Concept
Design Development
We are
Drawings
Utilities
Fire analysis
Budget
Time plan
Energy calculation
Technical Design
Drawings
Ceiling systems
Utilities
Ventilation
(57)3.01
(57)3.02(57)3.03
Supply Unit specification 1Supply Unit specification 2
Ducts specification Auditorium diffuser
Fire damperPlain diffuser
(57)3.04
Ventilation calculations25
Concept
Design Development
We are
Drawings
Utilities
Fire analysis
Budget
Time plan
Energy calculation
Technical Design
Drawings
Ceiling systems
Utilities
list of requirement
Building part note
Property analysis
(12) Foundation (21) External wall
(21) Basement wall
(22) Internal wall
(13)5.01Standard
Construction (21)5.01(21)5.01 (22)5.01
26
Concept
Design Development
We are
Drawings
Utilities
Fire analysis
Budget
Time plan
Energy calculation
Technical Design
Drawings
Ceiling systems
Utilities
list of requirement
Building part note
Property analysis
(23) Ground floor slab (24) Stairs (27) Roof (35) Celling
(23)5.01Standard
Construction (23)5.02 (24)5.01 (27)5.01 (35)5.01
(23) 1-2 floor slab
27
Concept
Design Development
We are
Drawings
Utilities
Fire analysis
Budget
Time plan
Energy calculation
Technical Design
Drawings
Ceiling systems
Utilities
Fire plans
Fire analysis (72)2.01 (99)1.01
The longest escape route is 64.0 m
28
Concept
Design Development
We are
Drawings
Utilities
Fire analysis
Budget
Time plan
Energy calculation
Technical Design
Drawings
Ceiling systems
Utilities
Accomodation Staircase
(24) 4.02 Section 29
TechnicalDesign
30
Concept
Design Development
We are
B10
Fire analysis
Budget Time frameDocuments
Energy calculation
Technical Design
Section
Ceiling systemsUtilities
Other
The end!
Part section
31
Concept
Design Development
We are
B10
Fire analysis
Budget Time frameDocuments
Energy calculation
Technical Design
Section
Ceiling systemsUtilities
Other
The end!
Ceiling systems
32
Concept
Design Development
We are
B10
Fire analysis
Budget Time frameDocuments
Energy calculation
Technical Design
Section
Ceiling systemsUtilities
Other
The end!
Sewage and water supply
(58) 3-02 - Sewage
(58) 3-01 - Sewage (53) 3-01 - Water supply
(53) 3-02 - Water supply
Sewage calculation
33
Concept
Design Development
We are
B10
Fire analysis
Budget Time frameDocuments
Energy calculation
Technical Design
Section
Ceiling systemsUtilities
Other
The end!
(27)5.03(27)5.01
(27)5.04
(35)5.01
(23)5.01
(12)5.01
(23)5.02
34
Concept
Design Development
We are
B10
Fire analysis
Budget Time frameDocuments
Energy calculation
Technical Design
Section
Ceiling systemsUtilities
Other
The end!
(27)5.05
(27)5.02
(27)5.06 (22)5.01 (35)5.01
(23)5.02
(27)5.01
(23)5.01
(12)5.07
(12)5.08 (12)5.03(12)5.01
(12)5.06
(21)5.01
(24)5.02
(24)5.01
35
Concept
Design Development
We are
B10
Fire analysis
Budget Time frameDocuments
Energy calculation
Technical Design
Section
Ceiling systemsUtilities
Other
The end!
B10
36
Concept
Design Development
We are
B10
Fire analysis
Budget Time frameDocuments
Energy calculation
Technical Design
Section
Ceiling systemsUtilities
Other
The end!
Budget
+ - 5%
Cost including vat: 252.891.935 dkk
Cost including vat: 24.660.814 £
Price estimate.pdf
37
Concept
Design Development
We are
B10
Fire analysis
Budget Time frameDocuments
Energy calculation
Technical Design
Section
Ceiling systemsUtilities
Other
The end!
Time Frame
Construction Time: 358 Working Day
Start: Monday 18-05-15
Finish: Wednesday 28-9-16
After Handover and Close Out of the Project Moving Date: Thursday 13-10-16
38
Concept
Design Development
We are
B10
Fire analysis
Budget Time frameDocuments
Energy calculation
Technical Design
Section
Ceiling systemsUtilities
Other
The end!
Documents
Building permit
Health and safety plan Building specification
39
Concept
Design Development
We are
B10
Fire analysis
Budget Time frameDocuments
Energy calculation
Technical Design
Section
Ceiling systemsUtilities
Other
The end!
Other
DSP exerciseBPL exercise AdinnaBPL exercise GeorgiBPL exercise SvenBPL exercise VladBAD presentation RIBAPBM presentation GlassPBM presentation Sealants and AdheisivesPBM Flooring
40
Thank you for your attention!41