Grifols International Logistics Centre

June 2016 Grifols International Logistics Centre Dublin, Ireland 01

Location Dublin, Ireland

Wall Products LongspanLouvreOptimoUltraTemp Versatile Top Hats Flashings Preformed CornersRoof ProductsTopdek

Page 2: Grifols International Logistics Centre Project Showreel

Located on an 11 hectare site, this development is designed around a landscaped courtyard that links the buildings and is viewed from all occupied areas. The office has a sleek façade with blue glazed fins breaking the elevational treatment and casting differing shadows internally and externally. They reflect the landscape which was carefully considered to ensure that the building settled into its context.

PM Group

Location Dublin, Ireland

Wall Products Longspan Louvre Optimo UltraTemp Versatile Top Hats Flashings Preformed Corners

Roof Products Topdek

June 2016 Grifols International Logistics Centre Dublin, Ireland 02

Page 3: Grifols International Logistics Centre Project Showreel

Personnel and Property Protection

Compliance with Building Regulations and insurance stipulations required the chosen building envelope material to meet the most stringent testing requirements.

Kingspan’s range of LPCB and FM approved FIREsafe panels were chosen to meet these requirements whilst our newly FM approved Topdek flat roof system was installed for the first time in Ireland.

June 2016 Grifols International Logistics Centre Dublin, Ireland 03

Page 4: Grifols International Logistics Centre Project Showreel

Faster Construction

The construction time for this entire project was 18 months. The installation of the single component ‘frame to frame’ Longspan insulated wall panel system achieved faster on site build time when compared to the use of heavier systems.

Install rates of up to 140m2 per day brought an immediate improvement on programme whilst providing excellent thermal performance and an aesthetically pleasing finish.

June 2016 Grifols International Logistics Centre Dublin, Ireland 04

Page 5: Grifols International Logistics Centre Project Showreel

Design Solutions

Changes to the Irish Building Control Regulations and the introduction of S.I.9 have imposed a significant body of work on construction teams. Our Technical Services department and team of Field Service Engineers were able to assist with the management of this process by implementing a clear and reportable inspection regime during the course of building envelope construction.

June 2016 Grifols International Logistics Centre Dublin, Ireland 05

Page 6: Grifols International Logistics Centre Project Showreel

Protection Against the Elements

Our Ultimate Panel Guarantee offers a unique single source guarantee; covering walls, roof and cold storage facilities to offer a broad coverage that is rarely available within the industry.

June 2016 Grifols International Logistics Centre Dublin, Ireland 06

Page 7: Grifols International Logistics Centre Project Showreel