greenway heights project narrative

12
Greenway Heights Project Narrative PRG and Phoenix Development are partnering for the development of the Greenway Heights family housing project to be located on the northeast corner of Bloomington Avenue South and the Midtown Greenway. This project, located adjacent to a city-designated “Growth Center” and along a major recreational amenity, arose from a land use plan developed by the East Phillips Improvement Coalition in response to the need for larger-unit, affordable, family housing. Greenway Heights will include 42 two-, three- and four-bedroom units affordable to households earning less than 50% AMI. This project is responsive to market demand, particularly in light of the loss of affordable rental units to the foreclosure crisis, and will address the housing needs created by the growth of larger families within the neighborhood. Financed with bonds and 4% tax credits, CPED’s support of this project will enable PRG and Phoenix Development to move forward in a timely fashion and provide much needed affordable housing in this transit and jobs rich neighborhood. The building will be 4-stories or 47 feet in height. Parking will be provided at a ratio of .9 stalls per dwelling unit and will be accessed from a curb cut on Bloomington Avenue. Bike racks will be provided within the parking garage as well as near the main building entrance at grade. Throughout the site, rain gardens will be incorporated to help infiltrate stormwater and provide color. A screen hedge of miniature willow will buffer the north property line. New maple trees will be added to the existing mature maples to fill out the street tree canopy on both street frontages. A children’s play area will be located adjacent to the first floor community space and raised garden beds will be provided for resident use. Along the south property, the project will incorporate a promenade that will run parallel to the Midtown Greenway. The design of the promenade will include a mixture of barberries and roses adjacent to a short retaining wall. The wall and plantings will help buffer the private residential patios and green space from the public promenade. Pre-fabricated gateway arbors will be located at each end of the property and in the center, creating a sensation of enclosure for the promenade. The building itself is designed to respond both contextually and culturally to the unique characteristics of the East Phillips neighborhood. The site is uniquely located at the northern edge of the Midtown Greenway, Minneapolis’s own green path that serves to thread the urban nodes and neighborhoods throughout the city. The design of the building aims to incorporate the traditional design elements of the neighborhood while responding in a contemporary manner to both the site and the culture of the people. The long south façade responds to the notion of movement and connectivity with insertions of vertical ‘color’, creating a rhythm as one view’s the building from the Greenway. As these insertions of color move around the building’s façade, they also serve to respond to the strong cultural ties of the neighborhood. The bold and warm colors serve to welcome the people and community that will inhabit the building. The primary materials of the façade will be a mix of cement board panels, lap siding and metal siding, articulated to reflect the neighborhood context and culture. In plan, the west end of the building shifts north to ‘open up’ at the intersection of Bloomington Avenue South and the Midtown Greenway. This shift allows a greater use of the outdoor space on the south side of the building, responding to the physical characteristics of the site. The building’s main entrance is also celebrated at the southwest corner of the site - encouraging a shared view of the community space and outdoor area to those passing by. Again, this gesture reinforces the notion of integrating the building and the inhabitants into the neighborhood. The design of the main entrance will include a cedar post and trellis feature that helps to link the entrance and the outdoor space of the site.

Upload: others

Post on 12-Feb-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Greenway Heights Project Narrative PRG and Phoenix Development are partnering for the development of the Greenway Heights family housing project to be located on the northeast corner of Bloomington Avenue South and the Midtown Greenway. This project, located adjacent to a city-designated “Growth Center” and along a major recreational amenity, arose from a land use plan developed by the East Phillips Improvement Coalition in response to the need for larger-unit, affordable, family housing. Greenway Heights will include 42 two-, three- and four-bedroom units affordable to households earning less than 50% AMI. This project is responsive to market demand, particularly in light of the loss of affordable rental units to the foreclosure crisis, and will address the housing needs created by the growth of larger families within the neighborhood. Financed with bonds and 4% tax credits, CPED’s support of this project will enable PRG and Phoenix Development to move forward in a timely fashion and provide much needed affordable housing in this transit and jobs rich neighborhood. The building will be 4-stories or 47 feet in height. Parking will be provided at a ratio of .9 stalls per dwelling unit and will be accessed from a curb cut on Bloomington Avenue. Bike racks will be provided within the parking garage as well as near the main building entrance at grade. Throughout the site, rain gardens will be incorporated to help infiltrate stormwater and provide color. A screen hedge of miniature willow will buffer the north property line. New maple trees will be added to the existing mature maples to fill out the street tree canopy on both street frontages. A children’s play area will be located adjacent to the first floor community space and raised garden beds will be provided for resident use. Along the south property, the project will incorporate a promenade that will run parallel to the Midtown Greenway. The design of the promenade will include a mixture of barberries and roses adjacent to a short retaining wall. The wall and plantings will help buffer the private residential patios and green space from the public promenade. Pre-fabricated gateway arbors will be located at each end of the property and in the center, creating a sensation of enclosure for the promenade. The building itself is designed to respond both contextually and culturally to the unique characteristics of the East Phillips neighborhood. The site is uniquely located at the northern edge of the Midtown Greenway, Minneapolis’s own green path that serves to thread the urban nodes and neighborhoods throughout the city. The design of the building aims to incorporate the traditional design elements of the neighborhood while responding in a contemporary manner to both the site and the culture of the people. The long south façade responds to the notion of movement and connectivity with insertions of vertical ‘color’, creating a rhythm as one view’s the building from the Greenway. As these insertions of color move around the building’s façade, they also serve to respond to the strong cultural ties of the neighborhood. The bold and warm colors serve to welcome the people and community that will inhabit the building. The primary materials of the façade will be a mix of cement board panels, lap siding and metal siding, articulated to reflect the neighborhood context and culture. In plan, the west end of the building shifts north to ‘open up’ at the intersection of Bloomington Avenue South and the Midtown Greenway. This shift allows a greater use of the outdoor space on the south side of the building, responding to the physical characteristics of the site. The building’s main entrance is also celebrated at the southwest corner of the site - encouraging a shared view of the community space and outdoor area to those passing by. Again, this gesture reinforces the notion of integrating the building and the inhabitants into the neighborhood. The design of the main entrance will include a cedar post and trellis feature that helps to link the entrance and the outdoor space of the site.

GREENWAY HEIGHTS

PERSPECTIVE VIEW FROM BLOOMINGTON AVENUE

Preliminary Plan - Subject to change

Preliminary Plan - Subject to change

CHILDREN'S PLAY AREA

BLO

OM

ING

TO

N A

VE

S

SLOPE 4%63.75

64.5

60.5SLOPE 10%

SLOPE 12%

56.00

SLOPE 4%

56.8

BIKE RACK

EXISTITO RE

EXISTING TREE TO SAVE

CITY EASEMENT FORSNOW STORAGE

CITY EASEMENT FORSNOW STORAGE

METAL TRELLISFEATURE

SETBACK

PRIVATE PATIO

NT

PRIVATE PATIO

NEW STREETTREE

PUBLIC PROMENADE ME

PARKING GARAGEENTRANCE

PRIMARY RESIDENTIALENTRANCE

16th

AV

EN

UE

S

PR

OP

ER

TY

LIN

E

PR

OP

ER

TY

LIN

E

PROPERTY LINE

BLOCK RETAININGWALL, T.O.W. 867'

RETAINING WALL,SEE CIVIL

NEW PROPERTY LINEAFTER LAND DEDICATIONTO CITY

PEDESTRIAN POLESECURITY LIGHITNG ATPROMENADE AND PLAY

AREA

20'-0"

31'-0"

20'-0" 35'-0"

15'-0"

SE

TB

AC

K

11'-0 "

SETBACK

15'-0"

SE

TB

AC

K

1 1'- 0"

18'-0

"

10'-0"

CHILDREN'S PLAY AREA

BLO

OM

ING

TO

N A

VE

S

SLOPE 4%63.75

64.5

LEVEL 1 @ 867'-0"

60.5SLOPE 10%

20'-0"

31'-0"

20'-0" 35'-0" SLOPE 12%

56.00

SLOPE 4%

56.8

BIKE RACK

15'-0"

SE

TB

AC

K

11'-0 "

SETBACK

15'-0"

SE

TB

AC

K

1 1'- 0"

SE

TB

AC

K

11'-0

"

EXISTING TREETO REMAIN

EXISTING TREE TO SAVE

CITY EASEMENT FORSNOW STORAGE

CITY EASEMENT FORSNOW STORAGE

SNOWMELT ALONGPARKING RAMP ENTRY

METAL TRELLISFEATURE

EXISTING RESIDENTIAL USE

EXISTINGGARAGE

ALL

EY

SETBACK

PRIVATE PATIO

NEW STREETTREE

PRIVATE PATIO

GREENWAY HEIGHTS2845 BLOOMINGTON AVE S

NEW STREETTREE

PUBLIC PROMENADE METAL TRELLISELEMENT

EXISTING RESIDENTIAL USE

EXISTINGGARAGE

PARKING GARAGEENTRANCE

18'-0

"

PRIMARY RESIDENTIALENTRANCE

16th

AV

EN

UE

S

PR

OP

ER

TY

LIN

E

PR

OP

ER

TY

LIN

E

PROPERTY LINE

BLOCK RETAININGWALL, T.O.W. 867'

SNOWSTORAGE

AREA

RETAINING WALL,SEE CIVIL

NEW PROPERTY LINEAFTER LAND DEDICATIONTO CITY

PEDESTRIAN POLESECURITY LIGHITNG ATPROMENADE AND PLAY

AREA

10'-0"

DATE

DRAWN BY

CHECKED BY

COMMISSION NO.

CERTIFICATION

License Number

2009 BKV Group, Inc. EOEC

I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional underthe laws of the State of Minnesota.

Date

SHEET NUMBER

CONSULTANTS

KEY PLAN

SH

EE

T B

IND

ING

AR

EA

- D

O N

OT

US

E

PROJECT TITLE

NORTH ARROW

SHEET TITLE

BK

VT

B-3

0x42

C:\U

sers

\sm

eyer

\Doc

umen

ts\1

8360

1-G

reen

way

Hei

ghts

-Sch

emat

icD

esig

n_C

entr

al_s

mey

er.rv

t

2/25

/201

3 9:

49:1

2 A

M

GREENWAYHEIGHTS

ARCHITECTURALSITE PLAN

A010

1836.01

GC

SM

02-25-2013

COW SUBMITTAL

1" = 10'-0"A0101 A010 ARCHITECTURAL SITE PLAN

N

REVISION DATE

SITE PLAN NOTES:1. NO BUILDING SIGNAGE PROPOSED AT THIS TIME.

2. TRASH/RECYCLING WILL BE COLLECTED WITHIN THE BUILDING AT LEVEL 1. A TRASH PAD IS LOCATED ADJACENT TOTHE DRIVEWAY FOR BINS TO BE LOCATED TEMPORARILY ON TRASH DAY. COLLECTION WILL BE BY PRIVATE VENDORS.

3. SNOW WILL BE REMOVED FROM SIDEWALKS. A LIMITED AMOUNT OF SNOW STORAGE IS AVAILABLE ALONG THE STREETBOULEVARDS AND WITHIN THE FRONT YARDS ON BLOOMINGTON AND 16TH AVENUES. THE DRIVEWAY WILLINCORPORATE A SNOW MELT SYSTEM AND A TRENCH DRAIN FOR SNOW REMOVAL.

Preliminary Plan - Subject to change

gcamp
Text Box

A

D

A.1

D.1

1

3

B

C

5 6 7 8 9

B.1

C.1

3.1

2

AA

AA.1

4.5

LEVEL P1 @ 856'-0"

3

4

6 7 8 10

16-0" OVERHEAD DOOR

11 12 13 14 15 16

1819202122232425262728293031

32

3536

37

33

34

38

39

2

1

INTEGRAL CMUWALL PILASTER

STRUCTURAL NOTES: PARKING FLOOR 4" SLAB ON GRADE, 12" CMUBASEMENT WALLS, 16"X16" PRE-CAST COLUMNS, 8" PRE-CASTPLANK FROM GRID A TO GRID AA, 16" PRE-CAST PLANK FROM GRIDAA TO GRID D. EXPECT SOLID SLABS OR SHALLOW BEAMS ATPARTY WALL GRIDS.12" CAST IN PLACE RETAINING WALL AT PARKING ENTRY.

PARKING STALLS: 39 STALLS CURRENTLY SHOWN BELOW GRADE:FINAL NUMBER COULD BE 1-2 LESS AS PROJECT SYSTEMSDEVELOP*38 STALLS=90% OF 42 UNITS (NO VARIANCE NEEDED AT THIS TIME)

5

17

9

27'-0

"

6'-0

"

11'-0

"

16'-0

"

60'-0

"

9'-2"

9'-0"

42'-8"

60'-10"

20'-0

"

60'-0

"

27'-0

"6'

-0"

11'-0

"16

'-0"

146'-9"

27'-0" 32'-6" 41'-11" 8'-6" 36'-10"

19'-0

"

24'-4" 28'-3 1/2" 27'-3 1/2" 27'-7" 22'-11 1/2"

19'-0"

18'-4"

23'-10"

GENERATOR SHOWNFOR EMERGENCYEGRESS AT ELEVATOR

23'

18'-0

"18

'-0"

TYPICAL

8'-6"

TYPICAL

8'-6"

18'

23'

90.00°

90.00°

90.00°

110.00°

90.00°

90.00°

90.0

90.00°

TYPICAL

8'-0"

DATE

DRAWN BY

CHECKED BY

COMMISSION NO.

CERTIFICATION

License Number

2009 BKV Group, Inc. EOEC

I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional underthe laws of the State of Minnesota.

Date

SHEET NUMBER

CONSULTANTS

KEY PLAN

SH

EE

T B

IND

ING

AR

EA

- D

O N

OT

US

E

PROJECT TITLE

NORTH ARROW

SHEET TITLE

BK

VT

B-3

0x42

C:\U

sers

\sm

eyer

\Doc

umen

ts\1

8360

1-G

reen

way

Hei

ghts

-Sch

emat

icD

esig

n_C

entr

al_s

mey

er.rv

t

2/25

/201

3 9:

50:0

0 A

M

GREENWAYHEIGHTS

LEVEL P1 FLOORPLAN

A100

1836.01

GC

SM

02-25-2013

COW SUBMITTAL

1/8" = 1'-0"A1001 LEVEL P1

N

REVISION DATE

Preliminary Plan - Subject to change

gcamp
Text Box

AA

D

A.1

D.1

1

1

3

3

B

C

5

5

6

6

7

7

8

8

9

9

B.1

C.1

3.1

3.1

2

2

AAAA

AA.1

4.5

4.5

4.94.9

4.104.10

1.1

60'-0

"

27'-0

"

6'-0

"

11'-0

"

16'-0

" 60'-10"

146'-9"

27'-0 1/4" 32'-6" 41'-11 1/4" 8'-6" 36'-10"

COMMUNITY ROOM

FITNESS SPACE

TRASHREMOVAL/MECH

MANAGEROFFICE

TRASH ROOM

TRASH CHUTE

KITCHENETTE

DATE

DRAWN BY

CHECKED BY

COMMISSION NO.

CERTIFICATION

License Number

2009 BKV Group, Inc. EOEC

I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional underthe laws of the State of Minnesota.

Date

SHEET NUMBER

CONSULTANTS

KEY PLAN

SH

EE

T B

IND

ING

AR

EA

- D

O N

OT

US

E

PROJECT TITLE

NORTH ARROW

SHEET TITLE

BK

VT

B-3

0x42

C:\U

sers

\sm

eyer

\Doc

umen

ts\1

8360

1-G

reen

way

Hei

ghts

-Sch

emat

icD

esig

n_C

entr

al_s

mey

er.rv

t

2/25

/201

3 8:

59:3

1 A

M

GREENWAYHEIGHTS

LEVEL 1 FLOORPLAN

A110

1836.01

GC

SM

02-25-2013

COW SUBMITTAL

1/8" = 1'-0"A1101 LEVEL 1

N

REVISION DATE

Preliminary Plan - Subject to change

AA

DD

A.1

D.1

1

1

3

3

B

C

5

5

6

6

7

7

8

8

9

9

B.1

C.1

3.1

3.1

2

2

AAAA

AA.1

4.5

4.5

27'-0

"

6'-0

"

27'-0

"

27'-0" 32'-6" 41'-11" 8'-6" 36'-10"

ELEC

C-1104.94.9

4.104.10

60'-0

"

60'-0

"

27'-0

"6'

-0"

11'-0

"16

'-0"

9'-2"

9'-0"

42'-8"

60'-10"

146'-9"

DATE

DRAWN BY

CHECKED BY

COMMISSION NO.

CERTIFICATION

License Number

2009 BKV Group, Inc. EOEC

I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional underthe laws of the State of Minnesota.

Date

SHEET NUMBER

CONSULTANTS

KEY PLAN

SH

EE

T B

IND

ING

AR

EA

- D

O N

OT

US

E

PROJECT TITLE

NORTH ARROW

SHEET TITLE

BK

VT

B-3

0x42

C:\U

sers

\sm

eyer

\Doc

umen

ts\1

8360

1-G

reen

way

Hei

ghts

-Sch

emat

icD

esig

n_C

entr

al_s

mey

er.rv

t

2/25

/201

3 8:

57:5

0 A

M

GREENWAYHEIGHTS

LEVEL 2 FLOORPLAN

A120

1836.01

Checker

Author

02-25-2013

COW SUBMITTAL

1/8" = 1'-0"A1201 LEVEL 2

N

REVISION DATE

Preliminary Plan - Subject to change

gcamp
Text Box
gcamp
Text Box
TYPICAL UPPER FLOOR PLAN
gcamp
Text Box
TYPICAL UPPER PLAN

LEVEL 1100' - 0"

LEVEL 2110' - 6"

LEVEL 4131' - 6"

LEVEL 3121' - 0"

ROOF142' - 0"

5 6 7 8 94.5

PROMENADE97' - 0"

SDG-1

SDG-2 SDG-1 SDG-2 SDG-3 SDG-2

PAINTED METALBALCONIESWITH RAILS

4'-6

"10

'-6"

10'-6

"10

'-6"

10'-6

"3'

-0"

SINGLE HUNGVINYL WINDOWS

ASF-1

LEVEL 1100' - 0"

LEVEL 2110' - 6"

LEVEL 4131' - 6"

LEVEL 3121' - 0"

ROOF142' - 0"

PROMENADE97' - 0"

4'-5

1/2

"10

'-6"

10'-6

"10

'-6"

10'-6

"3'

-0"

SDG-2

PAINTED METALBALCONIESWITH RAILS

SINGLE HUNGVINYL WINDOWS

SDG-1

AFS-1

LEVEL 1100' - 0"

LEVEL 2110' - 6"

LEVEL 4131' - 6"

LEVEL 3121' - 0"

ROOF142' - 0"

A.1 D.1B.1 C.1AA.1

PROMENADE97' - 0"

2'-0

"10

'-6"

10'-6

"10

'-6"

10'-6

"

SDG-2 PAINTED METALBALCONIESWITH RAILS

SINGLE HUNGVINYL WINDOWS

SDG-1

CEDAR COLUMNAND TRELLIS ATMAIN ENTRANCE

AFS-1

RESIDENT MAIN ENTRY

DATE

DRAWN BY

CHECKED BY

COMMISSION NO.

CERTIFICATION

License Number

2009 BKV Group, Inc. EOEC

I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional underthe laws of the State of Minnesota.

Date

SHEET NUMBER

CONSULTANTS

KEY PLAN

SH

EE

T B

IND

ING

AR

EA

- D

O N

OT

US

E

PROJECT TITLE

NORTH ARROW

SHEET TITLE

BK

VT

B-3

0x42

C:\U

sers

\sm

eyer

\Doc

umen

ts\1

8360

1-G

reen

way

Hei

ghts

-Sch

emat

icD

esig

n_C

entr

al_s

mey

er.rv

t

2/25

/201

3 8:

43:3

3 A

M

GREENWAYHEIGHTS

ELEVATIONS-SOUTH+ WEST

A500

1836.01

GC

SM

02-25-2013

COW SUBMITTAL

1/8" = 1'-0"A5001 SOUTH ELEVATION

1/8" = 1'-0"A5002 SOUTH WEST ELEVATION

1/8" = 1'-0"A5003 WEST ELEVATION

REVISION DATE

NOTES:SDG 1-HARDI PANEL SIDINGSDG 2-HARDI PANEL HORIZONTAL LAP SIDINGSDG 3-PAINTED FLATLOCK METAL PANELAFS 1-ALUMINUM STOREFRONT GLASSPreliminary Plan - Subject to change

LEVEL 1100' - 0"

LEVEL 2110' - 6"

LEVEL 4131' - 6"

LEVEL 3121' - 0"

ROOF142' - 0"

56789 4.5

10'-6

"10

'-6"

10'-6

"10

'-6"

3'-0

"

SDG-2

PAINTED METALBALCONIESWITH RAILS

SINGLE HUNGVINYL WINDOWS

SDG-1 SDG-1

AFS-1

PAINTED METALBALCONIESWITH RAILS

LEVEL 1100' - 0"

LEVEL 2110' - 6"

LEVEL 4131' - 6"

LEVEL 3121' - 0"

ROOF142' - 0"

33.1 2

PROMENADE97' - 0"

1'-0

"2'

-0"

10'-6

"10

'-6"

10'-6

"10

'-6"

3'-0

"

SDG-2

PAINTED METALBALCONIESWITH RAILS

LEVEL 1100' - 0"

LEVEL 2110' - 6"

LEVEL 4131' - 6"

LEVEL 3121' - 0"

ROOF142' - 0"

AD BC AA

PROMENADE97' - 0"

10'-6

"10

'-6"

10'-6

"10

'-6"

3'-0

"

SDG-2

PAINTED METALBALCONIESWITH RAILS

SDG-1

DATE

DRAWN BY

CHECKED BY

COMMISSION NO.

CERTIFICATION

License Number

2009 BKV Group, Inc. EOEC

I hereby certify that this plan, specificationor report was prepared by me or under mydirect supervision and that I am a dulyLicensed Professional underthe laws of the State of Minnesota.

Date

SHEET NUMBER

CONSULTANTS

KEY PLAN

SH

EE

T B

IND

ING

AR

EA

- D

O N

OT

US

E

PROJECT TITLE

NORTH ARROW

SHEET TITLE

BK

VT

B-3

0x42

C:\U

sers

\sm

eyer

\Doc

umen

ts\1

8360

1-G

reen

way

Hei

ghts

-Sch

emat

icD

esig

n_C

entr

al_s

mey

er.rv

t

2/25

/201

3 8:

40:4

6 A

M

GREENWAYHEIGHTS

ELEVATIONS-NORTH+ EAST

A501

1836.01

GC

SM

02-25-2013

COW SUBMITTAL

1/8" = 1'-0"A5011 NORTH ELEVATION

1/8" = 1'-0"A5012 NORTH WEST ELEVATION

1/8" = 1'-0"A5013 EAST ELEVATION

REVISION DATE

NOTES:SDG 1-HARDI PANEL SIDINGSDG 2-HARDI PANEL HORIZONTAL LAP SIDINGSDG 3-PAINTED FLATLOCK METAL PANELAFS 1-ALUMINUM STOREFRONT GLASSPreliminary Plan - Subject to change

GREENWAY HEIGHTS EXTERIOR ELEVATIONS

SOUTH ELEVATION (MIDTOWN GREENWAY)

WEST ELEVATION (BLOOMINGTON AVENUE)

Preliminary Plan - Subject to change

GREENWAY HEIGHTS

PERSPECTIVE VIEW ALONG GREENWAY PROMENADE

Preliminary Plan - Subject to change

GREENWAY HEIGHTS

SECTION AT MIDTOWN GREENWAY PROPERTY LINE

Preliminary Plan - Subject to change