green fuel technologies
TRANSCRIPT
![Page 1: Green fuel technologies](https://reader031.vdocuments.us/reader031/viewer/2022030210/58a46d9b1a28aba34c8b47cb/html5/thumbnails/1.jpg)
Green Fuel TechnologiesSolar Power
![Page 2: Green fuel technologies](https://reader031.vdocuments.us/reader031/viewer/2022030210/58a46d9b1a28aba34c8b47cb/html5/thumbnails/2.jpg)
An Introduction
![Page 3: Green fuel technologies](https://reader031.vdocuments.us/reader031/viewer/2022030210/58a46d9b1a28aba34c8b47cb/html5/thumbnails/3.jpg)
Why we need Green Fuels
![Page 4: Green fuel technologies](https://reader031.vdocuments.us/reader031/viewer/2022030210/58a46d9b1a28aba34c8b47cb/html5/thumbnails/4.jpg)
Prominent Green Fuels
![Page 5: Green fuel technologies](https://reader031.vdocuments.us/reader031/viewer/2022030210/58a46d9b1a28aba34c8b47cb/html5/thumbnails/5.jpg)
Solar Power Systems
![Page 6: Green fuel technologies](https://reader031.vdocuments.us/reader031/viewer/2022030210/58a46d9b1a28aba34c8b47cb/html5/thumbnails/6.jpg)
RequirementsThe techno-economic considerations are as detailed below:
• Availability of free roof top space• Availability of sun
Space Requirements :
The space required for accommodating the 10 kW Solar Power Plant is about 120 Sq M
![Page 7: Green fuel technologies](https://reader031.vdocuments.us/reader031/viewer/2022030210/58a46d9b1a28aba34c8b47cb/html5/thumbnails/7.jpg)
Solar Power Systems
• On Grid System• Off Grid System
![Page 8: Green fuel technologies](https://reader031.vdocuments.us/reader031/viewer/2022030210/58a46d9b1a28aba34c8b47cb/html5/thumbnails/8.jpg)
On Grid System
![Page 9: Green fuel technologies](https://reader031.vdocuments.us/reader031/viewer/2022030210/58a46d9b1a28aba34c8b47cb/html5/thumbnails/9.jpg)
Off Grid Solar Systems
![Page 10: Green fuel technologies](https://reader031.vdocuments.us/reader031/viewer/2022030210/58a46d9b1a28aba34c8b47cb/html5/thumbnails/10.jpg)
Power Generation
![Page 11: Green fuel technologies](https://reader031.vdocuments.us/reader031/viewer/2022030210/58a46d9b1a28aba34c8b47cb/html5/thumbnails/11.jpg)
Power Generation Calculations
• Considering 300 Sunny Days and 65 Non Sunny Days 1 Kwp produces 1200-1400 units in an year with ROI in 6-7 years
• Life of Solar plant is 25 years • Minimal maintenance and no running cost
![Page 12: Green fuel technologies](https://reader031.vdocuments.us/reader031/viewer/2022030210/58a46d9b1a28aba34c8b47cb/html5/thumbnails/12.jpg)
Net Metering Net metering is a billing mechanism that credits solar energy system
owners for the electricity they add to the grid. For example, if a residential customer has a PV system on the home's rooftop, it may generate more electricity than the home uses during daylight hours
If at any moment of time, if solar energy generation (kWh) is more than the load requirement at that time, the excess solar energy is fed back to the main grid and the meter now runs backward. In this case, the system owner gets credit for the units (kWh) fed back to the main grid. Eg. During peak sunshine hours
![Page 13: Green fuel technologies](https://reader031.vdocuments.us/reader031/viewer/2022030210/58a46d9b1a28aba34c8b47cb/html5/thumbnails/13.jpg)
Gross Metering Under gross metering arrangements, all electricity you generate is
exported to the grid. A 'gross' meter measures the total amount of electricity generated by a renewable energy generator.
![Page 14: Green fuel technologies](https://reader031.vdocuments.us/reader031/viewer/2022030210/58a46d9b1a28aba34c8b47cb/html5/thumbnails/14.jpg)
Subsidies & Benefits• 15% Subsidy on Residential Projects• 80% income Tax Depreciation in 1st year on Commercial Projects
![Page 15: Green fuel technologies](https://reader031.vdocuments.us/reader031/viewer/2022030210/58a46d9b1a28aba34c8b47cb/html5/thumbnails/15.jpg)
Lending Facilities
• All Major PSU’s are providing loan facilities for installing rooftop Solar Plant
![Page 16: Green fuel technologies](https://reader031.vdocuments.us/reader031/viewer/2022030210/58a46d9b1a28aba34c8b47cb/html5/thumbnails/16.jpg)
Thank you