gradual re-start of the accelerator complex and main ......resume gradually, starting with ls2,...

12
Gradual re-start of the accelerator complex and main accelerator projects Online information meeting: Plan for CERN’s gradual re-start Frédérick Bordry 5 th May 2020

Upload: others

Post on 10-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Gradual re-start of the accelerator complex and main ......Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work. ... EN-EL 1 1 16 14

Gradual re-start of the accelerator complex

and main accelerator projects

Online information meeting: Plan for CERN’s gradual re-start

Frédérick Bordry

5th May 2020

Page 2: Gradual re-start of the accelerator complex and main ......Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work. ... EN-EL 1 1 16 14

2

Gradual re-start of the accelerator complex and main accelerator projects

Online information meeting: Plan for CERN’s gradual re-start

Frédérick Bordry

5th May 2020

LS2 schedule: 13th March 2020

Master Schedule (v.2.4)

Page 3: Gradual re-start of the accelerator complex and main ......Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work. ... EN-EL 1 1 16 14

3

Gradual re-start of the accelerator complex and main accelerator projects

Online information meeting: Plan for CERN’s gradual re-start

Frédérick Bordry

5th May 2020

Phase 0

Safe Mode

Safe-mode and other

urgent activities

Week of 13 March: safe stop

all maintenance,

consolidation and upgrading

work in progress.

CERN open

in virtual mode

Massive telework

Preparation of

gradual re-start plans

From LS2 activities to safe-mode

Page 4: Gradual re-start of the accelerator complex and main ......Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work. ... EN-EL 1 1 16 14

4

Gradual re-start of the accelerator complex and main accelerator projects

Online information meeting: Plan for CERN’s gradual re-start

Frédérick Bordry

5th May 2020

Phase 0 Phase 1 Phase 2

Today 18th

May+ ~16 weeks

+ ~500 people

on site per week

Safe-mode and other

urgent activities

Up to 600

persons on site

Ramp-up to unlimited

access may be completed

by mid-September

“Unlimited”

access to

sites

to

Gradual and cautious re-start plan

Resume gradually, starting

with LS2, accelerator and

detector upgrades, urgent site

and building work.

- Number of people on sites include CERN’s personnel as well as contractors.

- Personnel involved in LS2, accelerator and detector upgrades, urgent site and building work

will come back gradually as of 18th May.

- The rest of personnel will come back gradually as of 2nd week of June.

- Personnel will be called by supervisors

Page 5: Gradual re-start of the accelerator complex and main ......Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work. ... EN-EL 1 1 16 14

5

Gradual re-start of the accelerator complex and main accelerator projects

Online information meeting: Plan for CERN’s gradual re-start

Frédérick Bordry

5th May 2020

LS2 and Projects structures are maintained

- Using an identical scheme as for Safety coordination since have

demonstrated efficiency.

- All meetings will continue as before the partial CERN closure, remote

connection will be systematically proposed.

WITH, additional measures linked to COVID-19

- Health & Safety protection of workers according to COVID-19 directives.

- To be taken as an additional hazard managed by line management.

- LS2 Committee to indicate eligible activities which could resume.

- Based on indications by the LS2 Coordination, projects priorities and

requests from Groups and Subcontractors.

Re-start under LS2 Coordination

Page 6: Gradual re-start of the accelerator complex and main ......Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work. ... EN-EL 1 1 16 14

6

Gradual re-start of the accelerator complex and main accelerator projects

Online information meeting: Plan for CERN’s gradual re-start

Frédérick Bordry

5th May 2020

Phase 0: evaluating CERN readiness for re-start after Safe-mode and urgent activities

Selection of activities based on priority for the Organisation

Resume the technical services/workshops to nominal performance where needed.

Cap the number of persons permanently at CERN to 600 during Phase 0.

Limit the working places to allow best Safety follow-up: sites inspections, (mini)VICs,

logistics, etc.

Avoid whenever possible to recall personnel from Contractors before Host States

deconfinement.

Management of activities by line management in the departments in

collaboration with LS2 coordination.

Phase 1: Resume gradually. Guidelines for personnel ramping-up ~+500 every week

LS2 rules & guidelines stay valid: new activities announced at LS2C with

relevant PLAN item for validation.

QA efforts be maintained particularly configuration management, integrations, ECRs,

layout database, etc.

Resuming activities going on before going on Safe mode.

Starting new activities shall be discussed with LS2C after checks with line

management of the departments.

Set a priority list of activities needed for LS2 Stage 2 period, including all

experimental areas and projects.

Evaluation of resources from support groups to define their ramping-up schemes.

Compatibility with Groups activities, solving coactivity issues and prioritisation.

Page 7: Gradual re-start of the accelerator complex and main ......Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work. ... EN-EL 1 1 16 14

7

Gradual re-start of the accelerator complex and main accelerator projects

Online information meeting: Plan for CERN’s gradual re-start

Frédérick Bordry

5th May 2020

► 68 x BE department with 53 with interpersonal distancing► ABP (4), BI (11), CO (5), OP(1), RF (29), ICS (18)

► 28 x EN department, all with full distancing► CV (8), EA (4), EL (5), HE (3), MME (4), SMM (4)

► 129 x TE department with 80 with interpersonal distancing.► ABT (12), CRG (9), EPC (15), MPE (4), MSC (45), VSC (44)

included DISMAC (14), HL-LHC (22)

Staff

CERN

[FTE]

Staff

Contractor

[FTE]

Staff

CERN

[FTE]

Staff

Contractor

[FTE]

L3 3 1

L4 8 2 5

PSB 25 19 8 8

PS 29 17 12 3

SPS 29 16 11 9

LHC 29 15 25 13

EXP 25 13 15 10

HL-LHC 46 29 43 28

INFRAS 21 16 19 14

SUPPORT 2 1 3 2

Grand Total 217 128 142 87

On-site AM On-site PM

36% Injectors/LIU

14% LHC

11% Host Lab

25% HL-LHC

14% Dept Infras

Phase 0: activities before to

Courtesy Miguel Jimenez

Page 8: Gradual re-start of the accelerator complex and main ......Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work. ... EN-EL 1 1 16 14

8

Gradual re-start of the accelerator complex and main accelerator projects

Online information meeting: Plan for CERN’s gradual re-start

Frédérick Bordry

5th May 2020

L3 L4 PS PSB SPS LHC Grand Total

BE-ABP 14 1 15

BE-ASR 1 1 1 3

BE-BI 4 7 6 15 118 150

BE-BI-TE-MSC 4 4

BE-CO 1 2 3

BE-ICS 1 1

BE-ICS 1 5 1 13 188 208

BE-OP 52 52

BE-RF 1 1

BE-RF 8 9 5 18 8 48

Total BE 20 11 23 15 50 366 485

EN-ACE 3 3

EN-CV 5 12 2 20 58 97

EN-EA 3 3 6

EN-EL 1 1 16 14 90 122

EN-EL-EPM 16 16

EN-EL-FC 14 14

EN-EL-FC-EPM 4 4

EN-HE 2 3 2 74 81

EN-SMM 1 2 15 13 149 180

EN-STI 2 2

EN-STI 1 3 1 8 51 64

Total BE 11 4 52 3 60 459 589

TE-ABT 6 11 15 20 52

TE-CRG 2 196 198

TE-EPC 1 1

TE-EPC 1 9 1 8 48 67

TE-EPC EN-CV 2 2

TE-EPC TE-MPE 1 1

TE-MPE 1 1

TE-MPE 2 2 2 85 91

TE-MSC 1 1

TE-MSC 1 1 12 10 13 47 84

TE-VSC 1 3 6 15 280 305

Total TE 8 1 32 33 53 676 803

SMB-SE 1 1

SMB-SE 11 7 18

SMB-SE 33 33

SMB-SIS 1 6 7

Total TE 1 1 11 0 13 33 59

HSE-HH 1 1

HSE-OHS 1 1

HSE-OHS, BE-BI 2 2

HSE-RP 1 1

Total HSE 2 3 0 0 0 0 5

IR-ECO 1 1

IT-CS 1 1 4 6

Grand Total 42 22 119 51 180 1534 1948

~1950 activities

planned during LS2

Number of declared activities in LS2 PLAN tool

Activities after to

Courtesy Miguel Jimenez

Page 9: Gradual re-start of the accelerator complex and main ......Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work. ... EN-EL 1 1 16 14

9

Gradual re-start of the accelerator complex and main accelerator projects

Online information meeting: Plan for CERN’s gradual re-start

Frédérick Bordry

5th May 2020

~17,000 days of work

still for the LS2 !

Working days declared in LS2 PLAN toolGroups L3 L4 LHC PS PSB SPS Grand TotalBE-ICS 2 2

BE-RF 5 5

BE-ABP 240 25 265

BE-ASR 2 2 2 6

BE-BI 13 357 44 6 64 484

BE-BI 41 41

BE-CO 125 88 213

BE-ICS 2 222 13 2 425 664

BE-OP 400 400

BE-RF 6 135 515 245 548 1,449

EN-STI 7 7

EN-ACE 330 330

EN-CV 14 778 2 0 200 994

EN-EA 80 25 105

EN-EL 2 0 393 205 265 865

EN-EL-EPM 4 4

EN-EL-FC 65 65

EN-EL-FC-EPM 8 8

EN-HE 3 175 10 110 298

EN-SMM 2 0 719 11 55 787

EN-STI 0 797 0 0 157 954

SMB-SE 3 3

SMB-SE 52 155 207

SMB-SE 171 171

SMB-SIS 3 60 63

TE-EPC 1 1

TE-MPE 1 1

TE-MSC 5 5

TE-ABT 545 0 0 322 867

TE-CRG 3,101 70 3,171

TE-EPC 2 200 9 0 300 511

TE-EPC 0 0

TE-EPC 0 0

TE-MPE 11 475 0 0 486

TE-MSC 2 0 453 10 10 65 540

TE-VSC 1 2,359 15 0 476 2,850

Other Dpts 3 1 0 0 0 25 29

Grand Total 313 38 11,435 1,038 353 3,643 16,819

Activities after to

Courtesy Miguel Jimenez

Page 10: Gradual re-start of the accelerator complex and main ......Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work. ... EN-EL 1 1 16 14

10

Gradual re-start of the accelerator complex and main accelerator projects

Online information meeting: Plan for CERN’s gradual re-start

Frédérick Bordry

5th May 2020

St art of Linac3 Source

LH C P R OB E beam ready fo r LH C

Start B eam

C o mmissio ning

# ## # # # # ## # # # # ## #

APR M AY JUNE JULYOCT NOV DEC JAN FEB M ARAPR M AY JUNE JULY AUG SEPTOCT NOV DEC JAN FEB M ARAPR M AY JUNE JULY AUG SEPT

# # # #

OCT NOV DEC JAN FEB M AR

# # # # # ## # # # # #9 # # # # #3 4 5 6 7 8# # # # 1 2# # # # # ## # # # # ## # # # # ## # # # # ## # # # # ## # # # # #8 9 # # # #2 3 4 5 6 7# # # # # 1# # # # # ## # # # # ## # # # # ## # # # # ## # # # # ## # # # # #6 7 8 9 # ## 1 2 3 4 5# # # # # #

LHC 3, 7, IT

SM 18

# # # # # #

LEIR

Linac2

Linac4

P SB

P S

T T 2

SP S

LH C

# # # #

OP

EN

DA

YS

Linac3

# # # # # ## # # # # #9 # # # # #3 4 5 6 7 8# # # # 1 2# # # # # ## # # # # ## # # # # ## # # # # ## # # # # ## # # # # #8 9 # # # #2 3 4 5 6 7# # # # # 1# # # # # ## # # # # ## # # # # ## # # # # ## # # # # ## # # # # #6 7 8 9 # ## 1 2 3 4 5# # # # # ## # # # # #

LEIR Shutdown

Linac3 Shutdown

COVID-19 Safe Mode

COVID-19 Safe Mode

PS&TT2 HT12

weeks

Co

ntr

ol M

ain

t.

Co

ntr

ol M

ain

t.

PS&TT2 Surface work

PS&TT2 Shutdown

RP

RP cooling

Linac4 connection - Linac2 Underground

RP cooling

Linac2 Surface work

PSB Surface work

RP cooling

Beam commissi

oning6 weeks

Beamcommission

ing6 weeks

Ions to LHC

L4

Main

Du

mp

Cold check-out1 month

SPS Hardware

tests2 months

PSB Shutdown

Linac4 Connection - Linac4 Transfer tunnel

HT

Linac4 ShutdownNO WORKNew LBE line - PS Switch Yard

RP cooling

Modification on LBS line - PS Switch

Start of work in the high radiological risk areas

PSB Hardware tests

4 months

PS Switch Yard CLOSED

PS Switch YardCLOSED

SPS Surface work

LHC Surface work

SPS Shutdown

LHC Shutdown

LHC Cool-downwhole machine

LHC Hardware CommissioningPowering tests + Magnet trainingLHC Cool-down

Coldcheck-

out6 weeks

Linac4 Beam Tests to LBE

line8 weeks

PSB

Ions to NA

and EA

Xm

as b

reak 2

01

8-2

01

9

Xm

as b

reak 2

01

9-2

02

0

SPS tests3 wks

PS tests

LHC Tests + Warm-Up4 months + 2 weeks of xmas break

2018-2019

IST

BA1 7 weeks

3M

eV

HT

2w

Stop for infras.

HT

IS

IS

ISTs Period10 weeks

Cold check-out

4wksISTs Period6 weeks

IST Linac3 Beam testing

( ITFSTP12)

HWC

IST HW

CLEIR Beam commissioning

Linac3 Beam

testing (Transfer lines)

IST

tra

ns

fer

lin

es

Xm

as b

reak 2

02

0-2

02

1

HW

C Linac3 Beam commissioning

Co

ld c

he

ck-

ou

t

Co

ntr

ol

IST 1

w

Start of ISTs

Start of ISTs

Start of ISTs

Start of ISTs

Start of ISTs

Start of ISTs POPS-B

POP

PO

PS

LEB

T(3

MeV

)

Ch

eck-o

ut

BA2 7 weeks

BA4 7 weeks

BA6 7 weeks

BA3 20 weeks

BA5 7 weeks

COVID-19 Safe Mode

ISTs Period

5 weeks

PSB Beam commissioning

2.5 months

COVID-19 Safe Mode

COVID-19 Safe Mode

COVID-19 Safe Mode

COVID-19 Safe Mode

Linac4 Beam Setup(LBE dump)

2.5 months

Prospective new LS2 schedule

3 months

Special LS2 Committee (8th May): prioritization review of Phase 1 re-start

LHC accelerator and experiments Meeting (8th June) : L2 status and Run 3

LS2 Day (12th June): Consolidate the LHC Experiments timeline and LS2 Master schedules.

Update on resources availabilities including Support’s group and General Services.

LHC workshop (“Chamonix”, 28th Sept to 1st Oct) to review and optimize the LS2 schedule and the Run 3

Page 11: Gradual re-start of the accelerator complex and main ......Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work. ... EN-EL 1 1 16 14

11

Gradual re-start of the accelerator complex and main accelerator projects

Online information meeting: Plan for CERN’s gradual re-start

Frédérick Bordry

5th May 2020

Safety first

- To respond to all safety hazards and maintain

the highest standards of safety as demonstrated

since the start of the LS2.

- COVID-19 will be addressed as an additional

hazard with all the necessary adjustments that

may be needed following feedback and

recommendations by experts and the Host States.

Page 12: Gradual re-start of the accelerator complex and main ......Resume gradually, starting with LS2, accelerator and detector upgrades, urgent site and building work. ... EN-EL 1 1 16 14

12

Gradual re-start of the accelerator complex and main accelerator projects

Online information meeting: Plan for CERN’s gradual re-start

Frédérick Bordry

5th May 2020

CERN now has a better vision of the situation, thank you all for your contribution

to the development of this plan.

A gradual re-start is possible, providing a strict respect of the safety rules

and the sanitary measures in place by HSE and the local authorities.

We have to be patient as we are all recovering from an unexpected period and a

unique long safe-mode

Take care and don’t forget our successful slogan:

Safety first, Quality second and Schedule third

Work on the CERN sites will resumegradually. The presence on site of everymember should be limited to the timerequired to carry out the approvedactivity/ies.