GNSS PROJECT (PHASE-I)
With the completion of the above packages, an Irrigation Potential 35,000 Ac will be created in Kadapa District in Phase-I.
GORAKALLU RESERVIORCapacity: 10.29 TMC FRL : +261 MPackage: Open Category
PO
TH
IRE
DD
YP
AD
U H
EA
D R
EG
ULA
TO
RS
ill :
+84
1’
BA
NA
KA
CH
ER
LA
CR
OS
S R
EG
ULA
TO
ROWK
RESERVOIR4.31TMC
GANDIKOTA RESERVOIRFRL + 209 MCAP: 11.943 TMC(Live) 16.840 TMC (Gross)
KM
0.0
0
KM
32.
64
SRMC SRBC
VA
MIK
ON
DA
S
AG
AR
(3.2
49 T
MC
)
SA
RV
AR
AJA
SA
GA
R(3
.059
TM
C)
KM
24.
33
KM
52.
875
KM
34.
80
KM
16.
50
PKG 89
PK
G 4
7
PKG 1 PKG 2
PK
G 4
8
PK
G 4
9
SRBC Bypass canal (5 M dia)
16.225 KM 56.775 KM 57.700 KM
GNSS Flood Flow Canal GNSS FFC
Tunnel 5.25 Km
Completed
Work in Progress
Tender Stage
LEGEND
1 PROJECT PROFILELocation of Head works : Pothireddypadu Head regulator, foreshore of Srisailam Reservoir
2 Admn. Sanction : G. O. Ms. No. 53, Dt: 1-6-04 for Rs. 560.00 Crs.G. O. Ms. No. 5, Dt: 11-1-05 for Rs. 271.00 Crs.G. O. Ms. No. 108, Dt: 2-3-05 for Rs. 340.00 Crs.
3 No. of Packages (EPC) : 6
4 Agreement value of packages
: Rs. 1055.84 Crs.
5 Budget Provision :
Rs. 330.00 Crs.
6 Expenditure
2004-05 : Rs. 67.09 Crs.
2005-06 : Rs. 222.57 Crs.
Cum. Exp. : Rs. 289.66 Crs.
7 Utilisation : 38 TMC
8 Ayacut Ultimate : 2.6 Lakh acres (Cuddapah: 1,55,000 Acres, Chittoor: 1,03,500 Acres, Nellore: 1500 Acres)
Phase-I : 35,000 Acres in Kadapa District
GNSS PROJECT (PHASE-I)
9 Land Acquisition (Ultimate)
Required : 26,284 acres
Requisitioned : 22,223 acres
Acquired : 4,082 acres
10 Mob. Advance. Paid Recovered
2004-05 : Rs. 67.09 Crs. --
2005-06 : Rs. 11.26 Crs. Rs. 30.64 Crs
Total : Rs. 78.35 Crs. Rs. 30.64 Crs.
11 Target Date : 3/2008
GNSS PROJECT (PHASE-I)
PKG No.
DescriptionName of
Contractor
Bid /Agreement
AmountRs in Crs.
Agreement
concluded date
Mobilisation Advanace Rs. in Crs.
1
Construction of Gandikota Reservoir across river Pennar and Head regulator. Excavation of Main canal from KM 0.00 to KM 24.33, including CM & CD works, distributories, field channels etc.,
M/s Mythas – NCC, Hyderabad
250.20 3 / 2005 12.51
2
Excavation of Main canal from KM 24.33 to KM 32.64, formation of Vamikonda and Sarvaraja sagar reservoirs including CM & CD works, distributories, field channels complete
M/s Gammon India Ltd.
294.45 3/2005 13.72
OCGadikota LI Scheme (Gandikota Reservoir to Pulivendula Branch Canal)
M/s KBLM – CCL (JV)
286.00 3/2005 14.30
47
Excavation of GNSS Flood flow canal from Owk Reservoir to Gandikota Reservoir from 0.00 KM to 16.50 KM, including Head regulator, CM & CD works
Engineers & Contractors,
Hyd72.997 28-2-2005 3.65
48
Excavation of GNSS Flood flow canal from Owk Reservoir to Gandikota Reservoir from 16.50 KM to 34.80 KM including Head regulator, CM & CD works
Coramandal Prestcerte
(P) Ltd, Hyd.78.559
28-2-2005 3.927
49
Excavation of GNSS Flood flow canal from Owk Reservoir to Gandikota Reservoir from 34.80 KM to 52.87 KM including Head regulator, CM & CD works
Coramandal Prestcerte(P
)Ltd, Hyd 73.65 28-2-2005 3.682
1055.84
GNSS PROJECT (PHASE-I)
Package No.1 [EPC System]
i. Construction of Gandikota dam across Penna river.
ii. Earth work excavation of main canal from Km. 0.000 to Km.24.330, fabrication and erection of radial crest gates, stop log gates and its accessories, river sluice gates, gantry crane etc.
iii. Construction of Head Regulator.
GALERU NAGARI SUJALA SRAVANTHI
Name of the Contractor : M/s MAYTAS-NCC (JV), Hyd. Agreement Amount : Rs. 250.20 Crs.
Agreement Date : 25-10-2004
Period of Completion : 30 Months
Target date of Completion : 4/2007
Investigation : Completed
Design (Canal) : 12 Km length approved against 24.33 Kms. Completed
Execution (Canal) : 12 Km length completed against 24.33 Kms.
Execution (Dam) : Exploring drilling completed.
Qty. of earth work done : 52,93,972 cum against 81,98,000 cum
Qty. of concrete work done : 2,807 cum against 3,04,000 cum
Expenditure : Rs. 78.21 Crs. (Inc. Mob. Adv. Rs. 12.51 Crs.) against Rs. 250.20 Crs.
2004-05 : Rs. 12.51 Crores (mob. Adv. Only)
2005-06 : Rs. 65.7 Crores.
Land Acquisition : Required 16397 Ac. Acquired 3398 Ac. Requisitioned:16398 Acs
R & R : Estimate under preparation
Package No. 2
i. Excavation of main canal from Km. 24.33 to Km. 32.64.
ii. Formation of Vamikonda Sagar and Sarvaraya Sagar reservoir and leading channels to reservoirs and its distributaries etc.
Name of the Contractor : M/s Gammon India Ltd., Mumbai
Agreement Amount : Rs. 294.45 Crs.
Agreement Date : 25-10-2004
Period of Completion : 30 Months
Target date of completion : 4/2007
Investigation : Completed
Design : 5 Km length approved against 10 Km
Structures : Under Approval
Execution : 6.5 Km length in progress against 10 Km
Qty. of earth work done: 6 T cum against 7.73 T cum
Expenditure : Rs. 43.78 Crs. (inc. mob. adv. Rs. 14.72 Crs)
against Rs. 394.45 Crs.
2004-05 : Rs. 14.72 Crs. (Mob. Adv.)
2005-06 : Rs. 29.06 Crs.
Land Acquisition : Required – 5253 Ac. Requisitioned : 5053 Acres
Acquired : 419 Acres.
R & R : Estimate under preparation
GALERU NAGARI SUJALA SRAVANTHI
Package No.47 / Cat – II
i. Flood Flow Canal from Owk Reservoir to
Gandikota Reservoir including
construction of Head Regulator from
Km.0.000 to Km. 16.500..
Name of the Contractor : Engineers & Contractors, Hyd.
Agreement Amount : Rs. 72.99 Crs.
Agreement Date : 28-2-2005
Period of Completion : 24 Months
Target date of completion : 2/2007
GALERU NAGARI SUJALA SRAVANTHI
Investigation : Length in 17.954 KMs against 17.954 KMs – Completed
a) Designs approved length 17.954 in KMS against 17.954 KMS - Approved
b) Structures approved 17 Nos. against total 17 Nos. of Structures – Approved
a) Execution: Length in 8.00 KM in progress against total length of 17.954 KM
b) Structures approved - Nil - Nos. against total 17 Nos. of Structures
a) Qty. of earth work done : 20,25,000 Cum against 49,36,500 Cum.
b) Qty. of Concrete works done - Nil - Cum against 46,000 cum.
No. of Machinery (Machinery wise) deployed.Excavaters - 11,Tippers-45,Dozers-3,Compressers-8,Wagon Drills -8, Water Tankers-3
Expenditure : Rs 28.97 Crs. (including Mob. Adv. Rs. 7.30 Crs.) against Rs. 72.999 Crores 2004-05 : Rs. 3.65 Crs (Mob. Adv. Only) 2005-06 : Rs. 25.32 Crs. (Inc. Mob. Adv. Rs. 3.65 Crs.) Mob. Adv. Recovered : Rs. 3.63 Crores Land Acquisition : Required : 640 Acres; Acquired : Nil, Requisitioned 640 Acres.
Package No.48 / Cat – II
i. Flood Flow Canal from Owk Reservoir to Gandikota Reservoir including construction of CM & CD works from Km.16.500 to Km. 34.800.
Name of the Contractor : Coramandal Prestcerte(P)Ltd, Hyd.
Agreement Amount : Rs. 78.55 Crs.
Agreement Date : 28-2-2005
Period of Completion : 24 Months
Target date of Completion: 2/2007
GALERU NAGARI SUJALA SRAVANTHI
Investigation : Length in 16.02 KMs against 16.02 KMs – Completed
a) Designs approved length 16.02 in KMS against 16.02 KMS – Approved
b) Structures approved Nil. against total 19 Nos. of Structures
a) Execution: Length in 7 KM in progress against total length of 16.02 KM
b) Structures approved - 9 Nos. against total 19 Nos. of Structures
a)Qty. of earth work done 25,50,000 Cum Against 50,15,000 cum
No of Machinery deployed. (Excavators – 5, Tippers – 15, Dozer – 3, Compressors – 13, Wagon drills -13)
Expenditure: Rs. 48.78 Crs. (inc. mob. Adv. of Rs. 7.86 Crs. against Rs. 78.56
Crs.2004-05 : Rs. 3.93 Crs (Mob. Adv.)2005-06 : Rs. 44.85 Crs. (Inc. Mob. Adv. Rs. 3.93 Crs) Mob. Advance Recovered : Rs. 7.86 Crores Land Acquisition : Required : 576 Acres ; Acquired : Nil, Requisitioned –
576 Acres
Package No.49 / Cat – II
i. Flood Flow Canal from Owk Reservoir to Gandikota Reservoir including construction of CM & CD works from Km.34.800 to Km. 52.300.
Name of Contractor : Coramandal Prestcerte (P)Ltd
Agreement Amount : Rs. 73.658 Crs.
Agreement Date : 28-2-2005
Period of Completion : 24 Months
Target date of Completion: 2/2007
GALERU NAGARI SUJALA SRAVANTHI
1 Investigation : Length in 17.4 KMs against 17.4 KMs - Completed
2 a) Designs approved length 17.4 in KMS against 17.4 KMS – Approved
3 a) Execution: Length in 13 KMs in progress against total length of 17.4 KM
4 a) Qty. of earth work done 43.8 Lakhs Cum against 57.26 Lakhs Cum.
b) Qty. of Concrete works done - Nil - Cum against 13 Nos of Structure Concrete.
5No. of Machinery (Machinery wise) deployed ; Excavators -8,Tippers-12, Dozers-6, Compressors-10, Wagon Drill-10.
6 Expenditure : Rs. 50.60 Crs. (including advances Rs. 7.36 Crs. against Rs. 73.66 Crs.
2004-05 : Rs. 3.68 Crs. (Mob. Adv)2005-06 : Rs. 46.92 Crs. (Inc. Mob. Adv. Rs. 3.68 Crs)Mob. Advance Recovered : Rs. 7.36 Crores
Land Acquisition : Required : 737 Acres ; Acquired : Nil, Acquired – 737 Acres