glove box guide for central ohio road construction€¦ · road construction central ohio road ......
TRANSCRIPT
2014GLOVE BOX GUIDE
for Central Ohio Road Construction
Central Ohio Road Construction Information
facebook.com/PavingTheWayOH
twitter.com/pavingthewayoh
(614) 645-PAVE (7283)www.pavingtheway.org
For more information and the latest updates,contact Paving the Way
On the web:pavingtheway.org
Phone: (614) 645-PAVE (7283)
Every effort has been made to ensure the accuracy of the details included in this brochure. The information was collected directly from the agencies and com-
munities listed. Due to the nature of construction and project budgeting, the information contained in this guide is subject to change. Projects can be delayed by weather or other factors. Please check www.pavingtheway.org or call 645-PAVE (7283) for the most up-to-date information.
Hosted by the City of Columbus Department of Public Service, Paving the Way is a partnership of the Federal Highway Administration, the Ohio Department of Transportation, the Mid-Ohio Regional Planning Commission and Columbus. We have been working together since 1990 to improve the coordination and communication of road construction in Central Ohio.
The printing and distribution of the 2014 Glove Box Guide were made possible through the support of the following partners:
Share the RideBiking, walking, carpooling and using COTA: These are ways to help make central Ohio roads less congested. Some helpful ridesharing resources are listed below:COTA: Read or relax while professionalsdo the driving. Learn more at www.cota.com. Delaware County residents can learn about DATA Busat www.ridedata.com.
Photo courtesy of John Cropper
RideSolutions: A one-stop source for sharing the ride. RideSolutions can help central Ohioans find a partner for a carpool, set up a vanpool or learn more about biking. Guaranteed Ride Home is a RideSolutions program that reimburses 90% of a taxi fare for registered ride sharers who have to get home in an emergency and can’t catch their carpool or bus.
Find A Better Way To Work1 (888) 742-RIDE (7433)
http://www.morpc.org/ridesolutions
CoGo Bike Share is a new network of 300 specially designed bicycles and 30 docking stations located in and near downtown Columbus. Information on renting a CoGo bike is available at www.cogobikeshare.com. Please ride safely. Remember, bicyclists must follow all the same traffic laws that apply to motor vehicles.
(614) 228-1776 • www.cota.com
“Move Over Law”Now Applies to RoadConstruction VehiclesOhio’s “Move Over Law” now requires motorists to slow down and, as conditions permit, move to the next lane, when approaching construction or maintenance vehicles on the roadside with flashing, oscillating or rotating lights. Like the previous law, the new law also applies when approaching police, emergency vehicles and tow trucks.
Be Safe in the Work ZoneKnow before you go. Check pavingtheway.org, Paving the Way’s Facebook and Twitter and OHGO.com to know when to plan for construction delays.
Expect the unexpected. Work zones can change from day to day. Slow down and drive with extra caution when you see orange barrels or signs indicating construction ahead.
Watch for equipment and workers. Work zones can be busy places. Be alert for signs and slow down for equipment, workers and other cars, bikes and pedestrians.
Slow down. Work zones have lower speed limits for a reason. Narrow lanes, unexpected merges and construction activity call for a lower speed. Fines are doubled for speeding in active work zones in Ohio.
Road construction work zone rules apply to pedestrians as well as cyclists and motorists. Don’t bypass a pedestrian detour. It’s dangerous and it’s against the law.
Share the RoadShare the Road is a safety campaign created by Columbus Mayor Michael B. Coleman to encourage more people to ride their bicycles to work and school, and for fun. It is also a reminder that under Ohio law and City Code, cars and bicycles must share the road legally and safely. Columbus, ODOT and others continue to make investments to make roadways safer for motorists, cyclists and pedestrians.
You can find information on the Share the Road campaign at columbus.gov/sharetheroad/
Photo courtesy of John Cropper
Paving the Way WebsiteUpgrades Now in PlaceNew at pavingtheway.org:
Responsive Design: Paving the Way website now adapts easily to desktops, tablets and phones
Interactive Map: See the biggest projects at a glance
Search Function: Type in a road name to check for construction projects
Customizable Alerts: Users can now choose which project updates to receive based on project impact and/or location as follows:
• Highest Impact, Medium Impact, Neighborhood and Local Impact and/or Late Night/Overnight Impact
• Northwest, Southwest, Southeast, Northeast, Central, I-70, I-71, I-670, I-270 and/or SR 315
Feedback on the site is welcome. Click on ‘Contact Us’ to make suggestions or ask a question about a road project.
Printed on a minimum of 30% post consumer recycled paper. Please share this with a friend or recycle it when you no longer need it.
Put it Down
Driving safely means driving without distractions. State of Ohio law and City of Columbus Code prohibit texting while driving. The safest way to drive is phone free.
Put the phone and any other distractions aside when driving. It can be a life or death decision.
Dublin
Worthington
Gahanna
Whitehall
UpperArlington
Columbus
StateCapitol
Bldg
Ohio StateFairgrounds
Anheuser-Busch
Sports Park
Ohio StateUniversity
Airport
Port ColumbusInternational Airport
SHARON WOODSMETRO PARK
BLENDONWOODS
METRO PARK
HOOVERDAM PARK
GAHANNAWOODS
PARK
BIG RUNPARK
LOUBERLINER
PARK
ANTRIMPARKBROADMEADOWSPARK
KENNEYPARK
WHETSTONE& PARK
OF ROSES
Scioto River
Wal
n
HooverReservoir
Scio
to R
iver
Walnut Creek
Alum Cree
k
Rock
y For
k Cre
ek
Olentangy River
Blacklick Creek
Saw
mill
Rd
Sawm
ill Rd
Post RdSnouffer Rd
Dub
lin R
d
Dublin RdDublin-Prospect Rd
Dublin Rd
Hilliard-Cemetery Rd
Fishinger Rd
Zollinger Rd
Tremont Rd
Trabue Rd
Trabue Rd
Fisher Rd
Geo
rges
ville
Rd
Sullivant Ave
Hall Rd
Alkire Rd
Alkire Rd
Clime Rd
Eakin Rd
Briggs Rd
Mound StSullivant Ave
Valleyview Dr
Eureka Ave
Hague AveMcKinley Ave
Dem
orest Rd
Brin
ker A
ve
Wilson R
d
dR notro
N
Roberts Rd
International St
Walcutt R
dHillard-R
ome R
d
Aver
y R
d
Avery Rd
Brand Rd
Muirfield Rd
Glick Rd
Dublin Rd
Wilson Rd
Lane Ave
Eleventh Ave
Second AveThird Ave
Fifth Ave
Goodale Blvd
Neil Ave
Kinnear Rd
Trem
ont R
d
Scioto Darby Rd
Cemetery Rd
Fran
tz R
d
Tuttle Rd
Wilcox R
d
Emerald Pkw
y
Emerald Pkwy
Hayden Run Rd
dR revi
R ygnatnelO
Worthin
gton-G
alena
Rd
Dublin-Granville Rd
Bethel Rd
West Case Rd
God
own
Rd
Henderson Rd
Cle
vela
nd A
ve
Morse Rd
Ham
ilton
Rd
Broadview Rd
Morse Rd
Clark State Rd
Havens Corners RdGranville St
Taylor Rd
Taylo
r Sta
tion
Rd
Cherry Bottom
RdSt
ygle
r Rd
Stel
zer R
d
Innis Rd
Agler Rd
Agler Rd
Hudson St
Weber Rd
McG
uffe
y R
dH
amilt
on A
ve
Seventeenth Ave
Fifth Ave
East Broad St
Livingston Ave Livingston Ave
Year
ling
Rd
Woo
dcre
st R
d
Noe-
Bixb
y Rd
Refugee Rd
Refugee Rd
Shannon Rd
Winchester Pike
Waterloo St
dR thgirbE
Refugee Rd
Whittier St
Pars
ons
Ave
Pars
ons
Ave
evA snosr aPCorr Rd
ekiP noskcaJ
White Rd
Stringtown Rd
Lock
bour
ne R
d
Cha
mpi
on A
veO
hio
Ave
Lock
bour
ne R
dLo
ckbo
urne
Rd
Fairw
ood
Ave
3rd St
evA nomra
H
Frank Rd
dR
nwo
rB
Dyer RdHome Rd
Hoo
ver R
d
Hoo
ver R
d
Hau
ghn
Rd
Columbus StGrove City Rd
Grove City Rd
Dem
ores
t Rd
Hol
t Rd
Big Run
South
Rd
Kingston Ave
Gan
tz R
d
Big Run Rd
Thurman AveHanford St
Greenlawn Ave
Frebis Ave
Courtright Rd
Watkins Rd
Alum
Cre
ek D
r
rD keer
C mul A
Alum Creek Dr
Jam
es R
d
Watkins Rd
Williams Rd
Obetz Rd
Obetz Rd
Span
gler
Rd
Williams Rd
dR nordne
H
dR notli
maH
Groves Rd
dR nethgua
NcM
Bric
e R
d
dR redne
G
Bric
e R
d
dR redne
G
Lithopolis Rd
Noe-Bixby RdRob
inw
ood
Ave
Holt AveWoo
dlan
d Av
e
Joyc
e Av
e
E North Broadway
Clev
elan
d Av
e
Cooke Rd
Mai
ze R
d
Henderson Rd
Kenn
y R
d
Highland Dr
Olentangy River Rd H
igh St
Kenny Rd
Nor
thw
est B
lvd
Nor
th S
tar R
d
Kenny Rd
Cambridge Blvd
McKinley Ave
W North Broadway
Karl
Rd
Berre
llAv
e
Park
woo
dAv
e
Mock Rd
Sunb
ury
Rd
Cas
sady
Ave
McCutcheon Rd
Johnstown Rd
Mai
n R
d
Fifth Ave
Riverside Dr
Ree
d R
d
McCoy Rd
Lane Rd
Postle
waite R
d
Gra
ndvi
ew A
ve
Nelson Rd
Bryden RdMain St
relliM
evA
Hun
tley
Rd
Karl
Rd Central College Rd
dR tidno
C-ynabl A we
N
t S hgiH
dR ynabl A
weN-sdl onye
R
Walnut St
Lee R
d
Harlem
Rd
Ulry
Rd
Lane Ave
Olentangy River Rd
Long StMt Vernon Ave
evA rolyaT
Grove
tS hgiH
W Schrock Rd
Jack Nicklaus Frwy
Dublin-Granville Rd
State St
John
stown R
d
Mill
St
Wes
terv
ille P
ike
Jack
Nic
klau
s Fr
wy
Clev
eland
AveSu
mm
it St
Four
th S
t
Fourth St
Ham
ilton
Rd
Jack Nicklaus Frw
y
Morse Rd
Riverside Dr
West Broad St
Broad St
Spring StLong St
Town StRich St
Central Ave
Main St
Ham
ilton
Rd
Jack
Nick
laus F
rwy
Columbus-Lancaster Rd
tS hgiH
Jack Nicklaus Frwy
Harri
sbur
g Pike
Harri
sbur
g Pi
ke
Linworth Rd
Bixby Rd
Bixby Rd
Bixb
y R
d
Groveport Rd
Rohr
Rd
Lond
on-G
rovep
ort R
dRohr Rd
Rohr Rd
Rathmell Rd
Orders Rd
Shoo
k R
d
London-Groveport Rd
London-Groveport Rd
London-Groveport Rd
Ebright Rd
Wilson Bridge Rd
Park Rd
Lazelle Rd
S O
ld S
tate
Rd
PolarisPkwy
Flint
Rd
Sunb
ury
Rd
port Rd
161
161315
315
750
25733
161 161
710
3
605
23
23
62
62315
33
62
62
33
33
1662
33
33
40
317
317
317
674
104
104
3
40
23
23
3
270
270
71
270
270
670
270
67067070
270
71
71
7070
70 70
270
270
71
Franklin
3
Westerville
Grove City
New Albany
Hilliard
Delaware County
Franklin County
2
29
32
37 48 38
23
35
13
36
18
49
3
20
11
12
17
15
219
43
25
46
14
24
1
41
50
1019
16
33
3439
40
47
5
7
Marion Rd
8
42
3031
22
4451
45
26
28
26
48
27 46
Note: Weather and other factors can affect the construction schedules of the projects listed below
1Goodale Boulevard will be reconstructed between Lincoln Avenue and Broadview Avenue. Sewers, street lights and a multi-use path will be installed as part of this
project. Expect various closures. Spring 2014 to Fall 2014 (Grandview Heights)
2Sidewalk and streetscape construction will occur on Gay Street between Normandy Avenue and North Sixth Street. Expect parking restrictions during
construction. July 2014 to May 2015 (Columbus)
3New water lines will be installed on Johnstown Road, North Cassady Avenue and Stelzer Road near Port Columbus. Expect lane closures and mid-day flagging
operations. Spring 2014 to December 2014 (Columbus)
4New water lines will be installed on East Cooke Road at and near the intersection with Indianola Avenue. Expect various lane closures. May 2014 to May 2015
(Columbus)
5Widening and reconstruction continues on Alum Creek Drive between Williams and Refugee roads. One lane of traffic is maintained in each direction. July
2012 to Fall 2014 (City of Columbus)
6New water lines will be installed at and near the intersection of Cleveland Avenue and Ferris Road. Expect lane and turn restrictions. June 2014 to April 2015
(Columbus)
7Storm sewers and sidewalks will be constructed on Lockbourne Road between Frebis Avenue and SR 104. One lane of two-way traffic will be maintained by
flaggers on Lockbourne Road. Expect some closures of side streets. June 2014 to June 2015 (Columbus)
8Storm sewers and sidewalks will be constructed on Marion Road between Parsons Avenue and Lock-bourne Road. Traffic will be detoured during construc-
tion. June 2014 to June 2015 (Columbus)
9Bridge reconstruction will take place on Grandview Avenue over McKinley Avenue. One lane of traffic will be maintained in each direction. May 2014 to Fall 2014
(Columbus)
10South 18th Street will be reconstructed between Livingston Avenue and Mooberry Street. Expect lane restrictions. Northbound South 18th Street will be closed
during construction. Summer 2014 to Fall 2014 (Columbus)
11Improvements will be made to Joyce Avenue between East 12th Avenue and immediately north of East 17th Avenue, and on East 17th Avenue between Billiter
Boulevard and Brentnell Avenue. Expect various restrictions and closures. Spring 2014 to Fall 2015 (Columbus)
12Improvements will be made to East 5th Avenue between North 4th Street and I-71, and on Cleveland Avenue between Starr and New York avenues. Expect
various lane restrictions. Spring 2014 to Summer 2015 (Columbus)
13Morse Road will be widened between Trellis Lane and Johnstown Road. Sewers, street lights and a shared-use path will be installed as a part of this project. Expect
various closures and lane restrictions. Fall 2014 to Fall 2015 (Columbus)
14Sidewalks will be built on Godown Road between Kenny Road and Bethel Road. Expect various lane restrictions. Summer 2014 to Fall 2014 (Columbus)
15A shared use path will be installed on Olentangy River Road between John Herrick Drive and West North Broadway. Expect lane closures and some non-rush hour
flagging operations. Summer 2014 to Fall 2014 (Columbus)
16Expect lane restrictions at various locations on Sullivant Avenue between Georgesville Road and S.R. 315 including some side street closures as crews work on
a bikeway, traffic calming and resurfacing project. June 2014 to early Fall 2014 (Columbus)
17Expect various restrictions including weekend closures and non-rush hour flagging operations as crews place traffic calming on Indianola Avenue near
East 17th Avenue. June 2014 to August 2014 (Columbus)
18West Nationwide Boulevard will have various lane restrictions in place between North Front and North 4th streets for a streetscaping project. April 2014 to August
2014 (Columbus)
19West Rich and West Town streets will have lane restrictions as crews work on a streetscaping project between S.R. 315 and Lucas Street. August 2014 to
October 2014 (Columbus)
20Agler Road will be widened at Clubhouse Drive. Traffic will be maintained in both directions. Expect lane restrictions from Sunbury Road west to Perdue Avenue.
Spring 2014 to Summer 2014 (Columbus)
21A shared-use path will be installed on Valleyview Drive between Valleyview Elementary School and Westmoor Middle School and Hague Avenue, and a
shared-use path on Hague Avenue between Valleyview and Carol avenues. Work includes a culvert replacement and a railroad crossing. Expect a closure of Valleyview Drive followed by a closure of Hague Avenue. Spring 2014 to Summer 2014. (Columbus/Franklin County/ODOT)
22Sidewalks will be built on Chatterton Road between Dunloe and Reynard roads. Work includes road widening and sidewalk construction. Traffic will be
maintained. July 2014 to October 2014. (Columbus/Franklin County)
23The bridge deck will be replaced on Central College Road over Blacklick Creek. The road will be closed and detoured during construction. June 2014 to October 2014
(Franklin County Engineer)
24Bridge deck replacement will take place on Cosgray Road over Clover Groff Run (north of Scioto and Darby Creek Road). Cosgray Road will be closed and detoured
during construction. June 2014 to September 2014 (Franklin County Engineer)
25Turn lanes will be added to Dublin and Fishinger roads at their intersection. Traffic will be maintained. September 2014 to November 2014 (Franklin County
Engineer)
26Bridge replacement will take place on Eakin Road over Early Run (west of Hilltonia Park). Traffic will be detoured. June 2014 to September 2014 (Franklin County Engineer)
27Work continues at the intersection of Fisher Road and Hague Avenue. Traffic will be maintained. July 2013 to August 2014 (Franklin County Engineer)
28The intersection improvement at Refugee Road/Chatterton Road and Noe Bixby Road continues. Expect lane and turn restrictions. May 2013 to September 2014
(Franklin County Engineer)
29Turn lanes will be constructed at the intersection of Africa Road, Lewis Center Road and Big Walnut Road. The north leg of the intersection will be closed for 35 days.
June 2014 to October 2014 (Delaware County)
30Roundabouts will be constructed at the intersections of Home Road and Section Line Road and Home Road and Riverside Drive (S.R. 257). The intersection of Home Road
and Section Line Road will be closed for 80 days. June 2014 to October 2014 (Delaware County)
31A roundabout will be constructed at the intersection of Harriott and Concord roads. Expect a 60-day intersection closure. July 2014 to October 2014 (Delaware County)
32Emerald Parkway is being extended from Riverside Drive to north of Bright Road. A roundabout will be construct-ed on Bright Road to connect with the new Emerald
Parkway extension. Bright Road will be closed to through traffic. Expect some delays on the Bright Road detour. June 2014 to Novem-ber 2014 (Dublin)
33Improvements will be made to Broadway (US 62) between Grove City Road and Columbus Street. Expect short-term side street closures. March 2014 to June 2014
(Grove City)
34White Road will be reconstructed between Hoover Road and west of McDowell Road. White Road will be closed to through traffic. Spring 2014 to Fall 2014 (Franklin County/
Grove City/Jackson Township)
35A roundabout will be constructed at the intersection of Main Street (US 62) and Market Street in New Albany. Expect a 90 day road closure of East Main Street at Market
Street. Spring 2014 to Summer 2014 (New Albany)
36The bridge deck replacement at Big Run South Road over I-270 (west of US 62/Broadway) continues. Expect a 60-day closure of Big Run Road and lane restrictions on
I-270. October 2013 to October 2014 (ODOT)
37Intersection improvement continues at the intersection of Powell Road (S.R. 750) and S.R. 315. A full closure of the west leg of the intersection is in place for 60 days.
August 2013 to Spring 2014 (ODOT)
38Bridge replacement will take place on S.R. 605 over Duncan Run (immediately north of Duncan Run Road). S.R. 605 and Duncan Run will both be closed for approxi-
mately 50 days. April 2014 to August 2014 (ODOT)
39Widening continues on I-270 between I-71 and US 23 on the south side. Expect lane restrictions and ramp closures. August 2013 to September 2014 (ODOT)
40Alum Creek Drive will be widened between East Howard Road and the I-270 eastbound ramp. Expect various lane restrictions. April 2014 to July 2015 (ODOT)
41Construction continues on the Mound Street Connector project, including a new ramp from westbound I-70 to East Mound Street and the replacement of the South 18th
Street bridge over I-70. Expect nighttime lane and ramp closures on I-70 and restrictions on East Mound Street and South 18th Street. After the new ramp opens, the ramp from I-70 west to South 4th Street will close permanently. September 2013 to September 2014 (ODOT)
42Construction continues on the I-270/US 23 North Side Fix project, which includes reconfiguring the ramps at the interchange and widening North High Street (US 23)
between I-270 and Lazelle Road. Two northbound express lanes will be added on North High Street beginning immediately north of I-270 and ending south of Northwoods Boulevard. Expect lane closures on North High Street, and various lane and ramp closures on I-270 during non-rush hours. July 2013 to June 2016 (ODOT)
43The I-70/Hilliard-Rome Road interchange will be realigned. Expect various lane closures beginning in October 2014. May 2014 to October 2015. (ODOT)
44The bridge deck will be replaced on the ramp from westbound I-70 to northbound S.R. 315. Expect a 21-day ramp closure. August 2014 to October 2014 (ODOT)
45S.R. 104 will be resurfaced from Frank Road to just west of US 33. Expect lane closures during restricted hours. April 2014 to October 2014 (ODOT)
46I-670 will be resurfaced between I-70 and just east of US 23. Expect short term lane closures and nighttime ramp closures. August 2014 to November 2014 (ODOT)
47Rickenbacker Parkway continues to be widened and reconstructed between Second Street and S.R. 317 (London-Groveport Road). A shared-use path is also
included in this project. June 2013 to December 2014 (Columbus Regional Airport Authority)
48Work continues on the resurfacing and addition of a third lane on I-71 between north of US 36 in Delaware County and S.R. 61 in Morrow County. Two lanes of traffic
will be maintained in each direction with additional lane closures at night. July 2012 to October 2014 (ODOT)
49I-70 bridge replacement project at Canal Road (near Buckeye Lake) continues. Two lanes of traffic will be maintained at all times. April 2013 to August 2014 (ODOT)
50Some final work remains on the Columbus Crossroads rebuilding of the I-71/I-670 interchange. Two lanes of traffic are maintained in each direction. Expect various
lane and ramp closures. June 2011 to Summer 2014 (ODOT)
51Construction of the Scioto Greenways project continues. Several closures and detours are posted for the Scioto Trail. The major trail closures are between North Bank Park and
Broad Street, and between Bicentennial Park and the Scioto Audubon Metro Park, on the east side of the Scioto, as well as between Veterans Memorial and Dodge Park on the west side of the Scioto. Fall 2013 to Fall 2015 (Columbus)
52ODOT, Columbus, Franklin County and many other jurisdictions have significant resurfacing programs planned for the 2014 construction season. Check
pavingtheway.org for details as they are available. Traffic is normally maintained for resurfacing projects. Watch for equipment, flaggers and lane restrictions. April 2014 to late November 2014 (Various)
2014 Project OverviewNote: Weather and other factors can affect the construction schedules of the projects listed below.
Park and RideLocations
Help reduce congestion. Look for a COTA Park and Ride Location near you.
Continued on next page
Dublin
Worthington
Gahanna
Whitehall
UpperArlington
Columbus
StateCapitol
Bldg
Ohio StateFairgrounds
Anheuser-Busch
Sports Park
Ohio StateUniversity
Airport
Port ColumbusInternational Airport
SHARON WOODSMETRO PARK
BLENDONWOODS
METRO PARK
HOOVERDAM PARK
GAHANNAWOODS
PARK
BIG RUNPARK
LOUBERLINER
PARK
ANTRIMPARKBROADMEADOWSPARK
KENNEYPARK
WHETSTONE& PARK
OF ROSES
Scioto River
Wal
n
HooverReservoir
Scio
to R
iver
Walnut Creek
Alum Cree
k
Rock
y For
k Cre
ek
Olentangy River
Blacklick Creek
Saw
mill
Rd
Sawm
ill Rd
Post RdSnouffer Rd
Dub
lin R
d
Dublin RdDublin-Prospect Rd
Dublin Rd
Hilliard-Cemetery Rd
Fishinger Rd
Zollinger Rd
Tremont Rd
Trabue Rd
Trabue Rd
Fisher Rd
Geo
rges
ville
Rd
Sullivant Ave
Hall Rd
Alkire Rd
Alkire Rd
Clime Rd
Eakin Rd
Briggs Rd
Mound StSullivant Ave
Valleyview Dr
Eureka Ave
Hague Ave
McKinley Ave
Dem
orest Rd
Brin
ker A
ve
Wilson R
d
dR notro
N
Roberts Rd
International St
Walcutt R
dHillard-R
ome R
d
Aver
y R
d
Avery Rd
Brand Rd
Muirfield Rd
Glick Rd
Dublin Rd
Wilson Rd
Lane Ave
Eleventh Ave
Second AveThird Ave
Fifth Ave
Goodale Blvd
Neil Ave
Kinnear Rd
Trem
ont R
d
Scioto Darby Rd
Cemetery Rd
Fran
tz R
d
Tuttle Rd
Wilcox R
d
Emerald Pkw
y
Emerald Pkwy
Hayden Run Rd
dR revi
R ygnatnelO
Worthin
gton-G
alena
Rd
Dublin-Granville Rd
Bethel Rd
West Case Rd
God
own
Rd
Henderson Rd
Cle
vela
nd A
ve
Morse Rd
Ham
ilton
Rd
Broadview Rd
Morse Rd
Clark State Rd
Havens Corners RdGranville St
Taylor Rd
Taylo
r Sta
tion
Rd
Cherry Bottom
RdSt
ygle
r Rd
Stel
zer R
d
Innis Rd
Agler Rd
Agler Rd
Hudson St
Weber Rd
McG
uffe
y R
dH
amilt
on A
ve
Seventeenth Ave
Fifth Ave
East Broad St
Livingston Ave Livingston Ave
Year
ling
Rd
Woo
dcre
st R
d
Noe-
Bixb
y Rd
Refugee Rd
Refugee Rd
Shannon Rd
Winchester Pike
Waterloo St
dR thgirbE
Refugee Rd
Whittier St
Pars
ons
Ave
Pars
ons
Ave
evA snosr aPCorr Rd
ekiP noskcaJ
White Rd
Stringtown Rd
Lock
bour
ne R
d
Cha
mpi
on A
veO
hio
Ave
Lock
bour
ne R
dLo
ckbo
urne
Rd
Fairw
ood
Ave
3rd St
evA nomra
H
Frank Rd
dR
nwo
rB
Dyer RdHome Rd
Hoo
ver R
d
Hoo
ver R
d
Hau
ghn
Rd
Columbus StGrove City Rd
Grove City Rd
Dem
ores
t Rd
Hol
t Rd
Big Run
South
Rd
Kingston Ave
Gan
tz R
d
Big Run Rd
Thurman AveHanford St
Greenlawn Ave
Frebis Ave
Courtright Rd
Watkins Rd
Alum
Cre
ek D
r
rD keer
C mul A
Alum Creek Dr
Jam
es R
d
Watkins Rd
Williams Rd
Obetz Rd
Obetz Rd
Span
gler
Rd
Williams Rd
dR nordne
H
dR notli
maH
Groves Rd
dR nethgua
NcM
Bric
e R
d
dR redne
G
Bric
e R
d
dR redne
G
Lithopolis Rd
Noe-Bixby RdRob
inw
ood
Ave
Holt AveWoo
dlan
d Av
e
Joyc
e Av
e
E North Broadway
Clev
elan
d Av
e
Cooke Rd
Mai
ze R
d
Henderson Rd
Kenn
y R
d
Highland Dr
Olentangy River Rd H
igh St
Kenny Rd
Nor
thw
est B
lvd
Nor
th S
tar R
d
Kenny Rd
Cambridge Blvd
McKinley Ave
W North Broadway
Karl
Rd
Berre
llAv
e
Park
woo
dAv
e
Mock Rd
Sunb
ury
Rd
Cas
sady
Ave
McCutcheon Rd
Johnstown Rd
Mai
n R
d
Fifth Ave
Riverside Dr
Ree
d R
d
McCoy Rd
Lane Rd
Postle
waite R
d
Gra
ndvi
ew A
ve
Nelson Rd
Bryden RdMain St
relliM
evA
Hun
tley
Rd
Karl
Rd Central College Rd
dR tidno
C-ynabl A we
N
t S hgiH
dR ynabl A
weN-sdl onye
R
Walnut St
Lee R
d
Harlem
Rd
Ulry
Rd
Lane Ave Olentangy River Rd
Long StMt Vernon Ave
evA rolyaT
Grove
tS hgiH
W Schrock Rd
Jack Nicklaus Frwy
Dublin-Granville RdState St
John
stown R
d
Mill
St
Wes
terv
ille P
ike
Jack
Nic
klau
s Fr
wy
Clev
eland
AveSu
mm
it St
Four
th S
t
Fourth St
Ham
ilton
Rd
Jack Nicklaus Frw
y
Morse Rd
Riverside Dr
West Broad St
Broad St
Spring StLong St
Town StRich St
Central Ave
Main St
Ham
ilton
Rd
Jack
Nick
laus F
rwy
Columbus-Lancaster Rd
tS hgiH
Jack Nicklaus Frwy
Harri
sbur
g Pike
Harri
sbur
g Pi
ke
Linworth Rd
Bixby Rd
Bixby Rd
Bixb
y R
d
Groveport Rd
Rohr
Rd
Lond
on-G
rovep
ort R
d
Rohr Rd
Rohr Rd
Rathmell Rd
Orders Rd
Shoo
k R
d
London-Groveport Rd
London-Groveport Rd
London-Groveport Rd
Ebright Rd
Wilson Bridge Rd
Park Rd
Lazelle Rd
S O
ld S
tate
Rd
PolarisPkwy
Flint
Rd
Sunb
ury
Rd
port Rd
161
161315
315
750
25733
161 161
710
3
605
23
23
62
62315
33
62
62
33
33
1662
33
33
40
317
317
317
674
104
104
3
40
23
23
3
270
270
71
270
270
670
270
67067070
270
71
71
7070
70 70
270
270
71
Franklin
3
Westerville
Grove City
New Albany
Hilliard
Delaware County
Franklin County
2
29
32
37 48 38
23
35
13
36
18
49
3
20
11
12
17
15
219
43
25
46
14
24
1
41
50
1019
16
33
3439
40
47
5
7
Marion Rd
8
42
3031
22
4451
45
26
28
26
48
27 46
Note: Weather and other factors can affect the construction schedules of the projects listed below
1Goodale Boulevard will be reconstructed between Lincoln Avenue and Broadview Avenue. Sewers, street lights and a multi-use path will be installed as part of this
project. Expect various closures. Spring 2014 to Fall 2014 (Grandview Heights)
2Sidewalk and streetscape construction will occur on Gay Street between Normandy Avenue and North Sixth Street. Expect parking restrictions during
construction. July 2014 to May 2015 (Columbus)
3New water lines will be installed on Johnstown Road, North Cassady Avenue and Stelzer Road near Port Columbus. Expect lane closures and mid-day flagging
operations. Spring 2014 to December 2014 (Columbus)
4New water lines will be installed on East Cooke Road at and near the intersection with Indianola Avenue. Expect various lane closures. May 2014 to May 2015
(Columbus)
5Widening and reconstruction continues on Alum Creek Drive between Williams and Refugee roads. One lane of traffic is maintained in each direction. July
2012 to Fall 2014 (City of Columbus)
6New water lines will be installed at and near the intersection of Cleveland Avenue and Ferris Road. Expect lane and turn restrictions. June 2014 to April 2015
(Columbus)
7Storm sewers and sidewalks will be constructed on Lockbourne Road between Frebis Avenue and SR 104. One lane of two-way traffic will be maintained by
flaggers on Lockbourne Road. Expect some closures of side streets. June 2014 to June 2015 (Columbus)
8Storm sewers and sidewalks will be constructed on Marion Road between Parsons Avenue and Lock-bourne Road. Traffic will be detoured during construc-
tion. June 2014 to June 2015 (Columbus)
9Bridge reconstruction will take place on Grandview Avenue over McKinley Avenue. One lane of traffic will be maintained in each direction. May 2014 to Fall 2014
(Columbus)
10South 18th Street will be reconstructed between Livingston Avenue and Mooberry Street. Expect lane restrictions. Northbound South 18th Street will be closed
during construction. Summer 2014 to Fall 2014 (Columbus)
11Improvements will be made to Joyce Avenue between East 12th Avenue and immediately north of East 17th Avenue, and on East 17th Avenue between Billiter
Boulevard and Brentnell Avenue. Expect various restrictions and closures. Spring 2014 to Fall 2015 (Columbus)
12Improvements will be made to East 5th Avenue between North 4th Street and I-71, and on Cleveland Avenue between Starr and New York avenues. Expect
various lane restrictions. Spring 2014 to Summer 2015 (Columbus)
13Morse Road will be widened between Trellis Lane and Johnstown Road. Sewers, street lights and a shared-use path will be installed as a part of this project. Expect
various closures and lane restrictions. Fall 2014 to Fall 2015 (Columbus)
14Sidewalks will be built on Godown Road between Kenny Road and Bethel Road. Expect various lane restrictions. Summer 2014 to Fall 2014 (Columbus)
15A shared use path will be installed on Olentangy River Road between John Herrick Drive and West North Broadway. Expect lane closures and some non-rush hour
flagging operations. Summer 2014 to Fall 2014 (Columbus)
16Expect lane restrictions at various locations on Sullivant Avenue between Georgesville Road and S.R. 315 including some side street closures as crews work on
a bikeway, traffic calming and resurfacing project. June 2014 to early Fall 2014 (Columbus)
17Expect various restrictions including weekend closures and non-rush hour flagging operations as crews place traffic calming on Indianola Avenue near
East 17th Avenue. June 2014 to August 2014 (Columbus)
18West Nationwide Boulevard will have various lane restrictions in place between North Front and North 4th streets for a streetscaping project. April 2014 to August
2014 (Columbus)
19West Rich and West Town streets will have lane restrictions as crews work on a streetscaping project between S.R. 315 and Lucas Street. August 2014 to
October 2014 (Columbus)
20Agler Road will be widened at Clubhouse Drive. Traffic will be maintained in both directions. Expect lane restrictions from Sunbury Road west to Perdue Avenue.
Spring 2014 to Summer 2014 (Columbus)
21A shared-use path will be installed on Valleyview Drive between Valleyview Elementary School and Westmoor Middle School and Hague Avenue, and a
shared-use path on Hague Avenue between Valleyview and Carol avenues. Work includes a culvert replacement and a railroad crossing. Expect a closure of Valleyview Drive followed by a closure of Hague Avenue. Spring 2014 to Summer 2014. (Columbus/Franklin County/ODOT)
22Sidewalks will be built on Chatterton Road between Dunloe and Reynard roads. Work includes road widening and sidewalk construction. Traffic will be
maintained. July 2014 to October 2014. (Columbus/Franklin County)
23The bridge deck will be replaced on Central College Road over Blacklick Creek. The road will be closed and detoured during construction. June 2014 to October 2014
(Franklin County Engineer)
24Bridge deck replacement will take place on Cosgray Road over Clover Groff Run (north of Scioto and Darby Creek Road). Cosgray Road will be closed and detoured
during construction. June 2014 to September 2014 (Franklin County Engineer)
25Turn lanes will be added to Dublin and Fishinger roads at their intersection. Traffic will be maintained. September 2014 to November 2014 (Franklin County
Engineer)
26Bridge replacement will take place on Eakin Road over Early Run (west of Hilltonia Park). Traffic will be detoured. June 2014 to September 2014 (Franklin County Engineer)
27Work continues at the intersection of Fisher Road and Hague Avenue. Traffic will be maintained. July 2013 to August 2014 (Franklin County Engineer)
28The intersection improvement at Refugee Road/Chatterton Road and Noe Bixby Road continues. Expect lane and turn restrictions. May 2013 to September 2014
(Franklin County Engineer)
29Turn lanes will be constructed at the intersection of Africa Road, Lewis Center Road and Big Walnut Road. The north leg of the intersection will be closed for 35 days.
June 2014 to October 2014 (Delaware County)
30Roundabouts will be constructed at the intersections of Home Road and Section Line Road and Home Road and Riverside Drive (S.R. 257). The intersection of Home Road
and Section Line Road will be closed for 80 days. June 2014 to October 2014 (Delaware County)
31A roundabout will be constructed at the intersection of Harriott and Concord roads. Expect a 60-day intersection closure. July 2014 to October 2014 (Delaware County)
32Emerald Parkway is being extended from Riverside Drive to north of Bright Road. A roundabout will be construct-ed on Bright Road to connect with the new Emerald
Parkway extension. Bright Road will be closed to through traffic. Expect some delays on the Bright Road detour. June 2014 to Novem-ber 2014 (Dublin)
33Improvements will be made to Broadway (US 62) between Grove City Road and Columbus Street. Expect short-term side street closures. March 2014 to June 2014
(Grove City)
34White Road will be reconstructed between Hoover Road and west of McDowell Road. White Road will be closed to through traffic. Spring 2014 to Fall 2014 (Franklin County/
Grove City/Jackson Township)
35A roundabout will be constructed at the intersection of Main Street (US 62) and Market Street in New Albany. Expect a 90 day road closure of East Main Street at Market
Street. Spring 2014 to Summer 2014 (New Albany)
36The bridge deck replacement at Big Run South Road over I-270 (west of US 62/Broadway) continues. Expect a 60-day closure of Big Run Road and lane restrictions on
I-270. October 2013 to October 2014 (ODOT)
37Intersection improvement continues at the intersection of Powell Road (S.R. 750) and S.R. 315. A full closure of the west leg of the intersection is in place for 60 days.
August 2013 to Spring 2014 (ODOT)
38Bridge replacement will take place on S.R. 605 over Duncan Run (immediately north of Duncan Run Road). S.R. 605 and Duncan Run will both be closed for approxi-
mately 50 days. April 2014 to August 2014 (ODOT)
39Widening continues on I-270 between I-71 and US 23 on the south side. Expect lane restrictions and ramp closures. August 2013 to September 2014 (ODOT)
40Alum Creek Drive will be widened between East Howard Road and the I-270 eastbound ramp. Expect various lane restrictions. April 2014 to July 2015 (ODOT)
41Construction continues on the Mound Street Connector project, including a new ramp from westbound I-70 to East Mound Street and the replacement of the South 18th
Street bridge over I-70. Expect nighttime lane and ramp closures on I-70 and restrictions on East Mound Street and South 18th Street. After the new ramp opens, the ramp from I-70 west to South 4th Street will close permanently. September 2013 to September 2014 (ODOT)
42Construction continues on the I-270/US 23 North Side Fix project, which includes reconfiguring the ramps at the interchange and widening North High Street (US 23)
between I-270 and Lazelle Road. Two northbound express lanes will be added on North High Street beginning immediately north of I-270 and ending south of Northwoods Boulevard. Expect lane closures on North High Street, and various lane and ramp closures on I-270 during non-rush hours. July 2013 to June 2016 (ODOT)
43The I-70/Hilliard-Rome Road interchange will be realigned. Expect various lane closures beginning in October 2014. May 2014 to October 2015. (ODOT)
44The bridge deck will be replaced on the ramp from westbound I-70 to northbound S.R. 315. Expect a 21-day ramp closure. August 2014 to October 2014 (ODOT)
45S.R. 104 will be resurfaced from Frank Road to just west of US 33. Expect lane closures during restricted hours. April 2014 to October 2014 (ODOT)
46I-670 will be resurfaced between I-70 and just east of US 23. Expect short term lane closures and nighttime ramp closures. August 2014 to November 2014 (ODOT)
47Rickenbacker Parkway continues to be widened and reconstructed between Second Street and S.R. 317 (London-Groveport Road). A shared-use path is also
included in this project. June 2013 to December 2014 (Columbus Regional Airport Authority)
48Work continues on the resurfacing and addition of a third lane on I-71 between north of US 36 in Delaware County and S.R. 61 in Morrow County. Two lanes of traffic
will be maintained in each direction with additional lane closures at night. July 2012 to October 2014 (ODOT)
49I-70 bridge replacement project at Canal Road (near Buckeye Lake) continues. Two lanes of traffic will be maintained at all times. April 2013 to August 2014 (ODOT)
50Some final work remains on the Columbus Crossroads rebuilding of the I-71/I-670 interchange. Two lanes of traffic are maintained in each direction. Expect various
lane and ramp closures. June 2011 to Summer 2014 (ODOT)
51Construction of the Scioto Greenways project continues. Several closures and detours are posted for the Scioto Trail. The major trail closures are between North Bank Park and
Broad Street, and between Bicentennial Park and the Scioto Audubon Metro Park, on the east side of the Scioto, as well as between Veterans Memorial and Dodge Park on the west side of the Scioto. Fall 2013 to Fall 2015 (Columbus)
52ODOT, Columbus, Franklin County and many other jurisdictions have significant resurfacing programs planned for the 2014 construction season. Check
pavingtheway.org for details as they are available. Traffic is normally maintained for resurfacing projects. Watch for equipment, flaggers and lane restrictions. April 2014 to late November 2014 (Various)
2014 Project OverviewNote: Weather and other factors can affect the construction schedules of the projects listed below.
Park and RideLocations
Help reduce congestion. Look for a COTA Park and Ride Location near you.
Dublin
Worthington
Gahanna
Whitehall
UpperArlington
Columbus
StateCapitol
Bldg
Ohio StateFairgrounds
Anheuser-Busch
Sports Park
Ohio StateUniversity
Airport
Port ColumbusInternational Airport
SHARON WOODSMETRO PARK
BLENDONWOODS
METRO PARK
HOOVERDAM PARK
GAHANNAWOODS
PARK
BIG RUNPARK
LOUBERLINER
PARK
ANTRIMPARKBROADMEADOWSPARK
KENNEYPARK
WHETSTONE& PARK
OF ROSES
Scioto River
Wal
n
HooverReservoir
Scio
to R
iver
Walnut Creek
Alum Cree
k
Rock
y For
k Cre
ek
Olentangy River
Blacklick Creek
Saw
mill
Rd
Sawm
ill Rd
Post RdSnouffer Rd
Dub
lin R
d
Dublin RdDublin-Prospect Rd
Dublin Rd
Hilliard-Cemetery Rd
Fishinger Rd
Zollinger Rd
Tremont Rd
Trabue Rd
Trabue Rd
Fisher Rd
Geo
rges
ville
Rd
Sullivant Ave
Hall Rd
Alkire Rd
Alkire Rd
Clime Rd
Eakin Rd
Briggs Rd
Mound StSullivant Ave
Valleyview Dr
Eureka Ave
Hague Ave
McKinley Ave
Dem
orest Rd
Brin
ker A
ve
Wilson R
d
dR notro
N
Roberts Rd
International St
Walcutt R
dHillard-R
ome R
d
Aver
y R
d
Avery Rd
Brand Rd
Muirfield Rd
Glick Rd
Dublin Rd
Wilson Rd
Lane Ave
Eleventh Ave
Second AveThird Ave
Fifth Ave
Goodale Blvd
Neil Ave
Kinnear Rd
Trem
ont R
d
Scioto Darby Rd
Cemetery Rd
Fran
tz R
d
Tuttle Rd
Wilcox R
d
Emerald Pkw
y
Emerald Pkwy
Hayden Run Rd
dR revi
R ygnatnelO
Worthin
gton-G
alena
Rd
Dublin-Granville Rd
Bethel Rd
West Case Rd
God
own
Rd
Henderson Rd
Cle
vela
nd A
ve
Morse Rd
Ham
ilton
Rd
Broadview Rd
Morse Rd
Clark State Rd
Havens Corners RdGranville St
Taylor Rd
Taylo
r Sta
tion
Rd
Cherry Bottom
RdSt
ygle
r Rd
Stel
zer R
d
Innis Rd
Agler Rd
Agler Rd
Hudson St
Weber Rd
McG
uffe
y R
dH
amilt
on A
ve
Seventeenth Ave
Fifth Ave
East Broad St
Livingston Ave Livingston Ave
Year
ling
Rd
Woo
dcre
st R
d
Noe-
Bixb
y Rd
Refugee Rd
Refugee Rd
Shannon Rd
Winchester Pike
Waterloo St
dR thgirbE
Refugee Rd
Whittier St
Pars
ons
Ave
Pars
ons
Ave
evA snosr aP
Corr Rd
ekiP noskcaJ
White Rd
Stringtown Rd
Lock
bour
ne R
d
Cha
mpi
on A
veO
hio
Ave
Lock
bour
ne R
dLo
ckbo
urne
Rd
Fairw
ood
Ave
3rd St
evA nomra
H
Frank Rd
dR
nwo
rB
Dyer RdHome Rd
Hoo
ver R
d
Hoo
ver R
d
Hau
ghn
Rd
Columbus StGrove City Rd
Grove City Rd
Dem
ores
t Rd
Hol
t Rd
Big Run
South
Rd
Kingston Ave
Gan
tz R
d
Big Run Rd
Thurman AveHanford St
Greenlawn Ave
Frebis Ave
Courtright Rd
Watkins Rd
Alum
Cre
ek D
r
rD keer
C mul A
Alum Creek Dr
Jam
es R
d
Watkins Rd
Williams Rd
Obetz Rd
Obetz Rd
Span
gler
Rd
Williams Rd
dR nordne
H
dR notli
maH
Groves Rd
dR nethgua
NcM
Bric
e R
d
dR redne
G
Bric
e R
d
dR redne
G
Lithopolis Rd
Noe-Bixby RdRob
inw
ood
Ave
Holt AveWoo
dlan
d Av
e
Joyc
e Av
e
E North Broadway
Clev
elan
d Av
e
Cooke Rd
Mai
ze R
d
Henderson Rd
Kenn
y R
d
Highland Dr
Olentangy River Rd H
igh St
Kenny Rd
Nor
thw
est B
lvd
Nor
th S
tar R
d
Kenny Rd
Cambridge Blvd
McKinley Ave
W North Broadway
Karl
Rd
Berre
llAv
e
Park
woo
dAv
e
Mock Rd
Sunb
ury
Rd
Cas
sady
Ave
McCutcheon Rd
Johnstown Rd
Mai
n R
d
Fifth Ave
Riverside Dr
Ree
d R
d
McCoy Rd
Lane Rd
Postle
waite R
d
Gra
ndvi
ew A
ve
Nelson Rd
Bryden RdMain St
relliM
evA
Hun
tley
Rd
Karl
Rd Central College Rd
dR tidno
C-ynabl A we
N
t S hgiH
dR ynabl A
weN-sdl onye
R
Walnut St
Lee R
d
Harlem
Rd
Ulry
Rd
Lane Ave
Olentangy River Rd
Long StMt Vernon Ave
evA rolyaT
Grove
tS hgiH
W Schrock Rd
Jack Nicklaus Frwy
Dublin-Granville Rd
State St
John
stown R
d
Mill
St
Wes
terv
ille P
ike
Jack
Nic
klau
s Fr
wy
Clev
eland
AveSu
mm
it St
Four
th S
t
Fourth St
Ham
ilton
Rd
Jack Nicklaus Frw
y
Morse Rd
Riverside Dr
West Broad St
Broad St
Spring StLong St
Town StRich St
Central Ave
Main St
Ham
ilton
Rd
Jack
Nick
laus F
rwy
Columbus-Lancaster Rd
tS hgiH
Jack Nicklaus Frwy
Harri
sbur
g Pike
Harri
sbur
g Pi
ke
Linworth Rd
Bixby Rd
Bixby Rd
Bixb
y R
d
Groveport Rd
Rohr
Rd
Lond
on-G
rovep
ort R
d
Rohr Rd
Rohr Rd
Rathmell Rd
Orders Rd
Shoo
k R
d
London-Groveport Rd
London-Groveport Rd
London-Groveport Rd
Ebright Rd
Wilson Bridge Rd
Park Rd
Lazelle Rd
S O
ld S
tate
Rd
PolarisPkwy
Flint
Rd
Sunb
ury
Rd
port Rd
161
161315
315
750
25733
161 161
710
3
605
23
23
62
62315
33
62
62
33
33
1662
33
33
40
317
317
317
674
104
104
3
40
23
23
3
270
270
71
270
270
670
270
67067070
270
71
71
7070
70 70
270
270
71
Franklin
3
Westerville
Grove City
New Albany
Hilliard
Delaware County
Franklin County
2
29
32
37 48 38
23
35
13
36
18
49
3
20
11
12
17
15
219
43
25
46
14
24
1
41
50
1019
16
33
3439
40
47
5
7
Marion Rd
8
42
3031
22
4451
45
26
28
26
48
27 46
Note: Weather and other factors can affect the construction schedules of the projects listed below
1Goodale Boulevard will be reconstructed between Lincoln Avenue and Broadview Avenue. Sewers, street lights and a multi-use path will be installed as part of this
project. Expect various closures. Spring 2014 to Fall 2014 (Grandview Heights)
2Sidewalk and streetscape construction will occur on Gay Street between Normandy Avenue and North Sixth Street. Expect parking restrictions during
construction. July 2014 to May 2015 (Columbus)
3New water lines will be installed on Johnstown Road, North Cassady Avenue and Stelzer Road near Port Columbus. Expect lane closures and mid-day flagging
operations. Spring 2014 to December 2014 (Columbus)
4New water lines will be installed on East Cooke Road at and near the intersection with Indianola Avenue. Expect various lane closures. May 2014 to May 2015
(Columbus)
5Widening and reconstruction continues on Alum Creek Drive between Williams and Refugee roads. One lane of traffic is maintained in each direction. July
2012 to Fall 2014 (City of Columbus)
6New water lines will be installed at and near the intersection of Cleveland Avenue and Ferris Road. Expect lane and turn restrictions. June 2014 to April 2015
(Columbus)
7Storm sewers and sidewalks will be constructed on Lockbourne Road between Frebis Avenue and SR 104. One lane of two-way traffic will be maintained by
flaggers on Lockbourne Road. Expect some closures of side streets. June 2014 to June 2015 (Columbus)
8Storm sewers and sidewalks will be constructed on Marion Road between Parsons Avenue and Lock-bourne Road. Traffic will be detoured during construc-
tion. June 2014 to June 2015 (Columbus)
9Bridge reconstruction will take place on Grandview Avenue over McKinley Avenue. One lane of traffic will be maintained in each direction. May 2014 to Fall 2014
(Columbus)
10South 18th Street will be reconstructed between Livingston Avenue and Mooberry Street. Expect lane restrictions. Northbound South 18th Street will be closed
during construction. Summer 2014 to Fall 2014 (Columbus)
11Improvements will be made to Joyce Avenue between East 12th Avenue and immediately north of East 17th Avenue, and on East 17th Avenue between Billiter
Boulevard and Brentnell Avenue. Expect various restrictions and closures. Spring 2014 to Fall 2015 (Columbus)
12Improvements will be made to East 5th Avenue between North 4th Street and I-71, and on Cleveland Avenue between Starr and New York avenues. Expect
various lane restrictions. Spring 2014 to Summer 2015 (Columbus)
13Morse Road will be widened between Trellis Lane and Johnstown Road. Sewers, street lights and a shared-use path will be installed as a part of this project. Expect
various closures and lane restrictions. Fall 2014 to Fall 2015 (Columbus)
14Sidewalks will be built on Godown Road between Kenny Road and Bethel Road. Expect various lane restrictions. Summer 2014 to Fall 2014 (Columbus)
15A shared use path will be installed on Olentangy River Road between John Herrick Drive and West North Broadway. Expect lane closures and some non-rush hour
flagging operations. Summer 2014 to Fall 2014 (Columbus)
16Expect lane restrictions at various locations on Sullivant Avenue between Georgesville Road and S.R. 315 including some side street closures as crews work on
a bikeway, traffic calming and resurfacing project. June 2014 to early Fall 2014 (Columbus)
17Expect various restrictions including weekend closures and non-rush hour flagging operations as crews place traffic calming on Indianola Avenue near
East 17th Avenue. June 2014 to August 2014 (Columbus)
18West Nationwide Boulevard will have various lane restrictions in place between North Front and North 4th streets for a streetscaping project. April 2014 to August
2014 (Columbus)
19West Rich and West Town streets will have lane restrictions as crews work on a streetscaping project between S.R. 315 and Lucas Street. August 2014 to
October 2014 (Columbus)
20Agler Road will be widened at Clubhouse Drive. Traffic will be maintained in both directions. Expect lane restrictions from Sunbury Road west to Perdue Avenue.
Spring 2014 to Summer 2014 (Columbus)
21A shared-use path will be installed on Valleyview Drive between Valleyview Elementary School and Westmoor Middle School and Hague Avenue, and a
shared-use path on Hague Avenue between Valleyview and Carol avenues. Work includes a culvert replacement and a railroad crossing. Expect a closure of Valleyview Drive followed by a closure of Hague Avenue. Spring 2014 to Summer 2014. (Columbus/Franklin County/ODOT)
22Sidewalks will be built on Chatterton Road between Dunloe and Reynard roads. Work includes road widening and sidewalk construction. Traffic will be
maintained. July 2014 to October 2014. (Columbus/Franklin County)
23The bridge deck will be replaced on Central College Road over Blacklick Creek. The road will be closed and detoured during construction. June 2014 to October 2014
(Franklin County Engineer)
24Bridge deck replacement will take place on Cosgray Road over Clover Groff Run (north of Scioto and Darby Creek Road). Cosgray Road will be closed and detoured
during construction. June 2014 to September 2014 (Franklin County Engineer)
25Turn lanes will be added to Dublin and Fishinger roads at their intersection. Traffic will be maintained. September 2014 to November 2014 (Franklin County
Engineer)
26Bridge replacement will take place on Eakin Road over Early Run (west of Hilltonia Park). Traffic will be detoured. June 2014 to September 2014 (Franklin County Engineer)
27Work continues at the intersection of Fisher Road and Hague Avenue. Traffic will be maintained. July 2013 to August 2014 (Franklin County Engineer)
28The intersection improvement at Refugee Road/Chatterton Road and Noe Bixby Road continues. Expect lane and turn restrictions. May 2013 to September 2014
(Franklin County Engineer)
29Turn lanes will be constructed at the intersection of Africa Road, Lewis Center Road and Big Walnut Road. The north leg of the intersection will be closed for 35 days.
June 2014 to October 2014 (Delaware County)
30Roundabouts will be constructed at the intersections of Home Road and Section Line Road and Home Road and Riverside Drive (S.R. 257). The intersection of Home Road
and Section Line Road will be closed for 80 days. June 2014 to October 2014 (Delaware County)
31A roundabout will be constructed at the intersection of Harriott and Concord roads. Expect a 60-day intersection closure. July 2014 to October 2014 (Delaware County)
32Emerald Parkway is being extended from Riverside Drive to north of Bright Road. A roundabout will be construct-ed on Bright Road to connect with the new Emerald
Parkway extension. Bright Road will be closed to through traffic. Expect some delays on the Bright Road detour. June 2014 to Novem-ber 2014 (Dublin)
33Improvements will be made to Broadway (US 62) between Grove City Road and Columbus Street. Expect short-term side street closures. March 2014 to June 2014
(Grove City)
34White Road will be reconstructed between Hoover Road and west of McDowell Road. White Road will be closed to through traffic. Spring 2014 to Fall 2014 (Franklin County/
Grove City/Jackson Township)
35A roundabout will be constructed at the intersection of Main Street (US 62) and Market Street in New Albany. Expect a 90 day road closure of East Main Street at Market
Street. Spring 2014 to Summer 2014 (New Albany)
36The bridge deck replacement at Big Run South Road over I-270 (west of US 62/Broadway) continues. Expect a 60-day closure of Big Run Road and lane restrictions on
I-270. October 2013 to October 2014 (ODOT)
37Intersection improvement continues at the intersection of Powell Road (S.R. 750) and S.R. 315. A full closure of the west leg of the intersection is in place for 60 days.
August 2013 to Spring 2014 (ODOT)
38Bridge replacement will take place on S.R. 605 over Duncan Run (immediately north of Duncan Run Road). S.R. 605 and Duncan Run will both be closed for approxi-
mately 50 days. April 2014 to August 2014 (ODOT)
39Widening continues on I-270 between I-71 and US 23 on the south side. Expect lane restrictions and ramp closures. August 2013 to September 2014 (ODOT)
40Alum Creek Drive will be widened between East Howard Road and the I-270 eastbound ramp. Expect various lane restrictions. April 2014 to July 2015 (ODOT)
41Construction continues on the Mound Street Connector project, including a new ramp from westbound I-70 to East Mound Street and the replacement of the South 18th
Street bridge over I-70. Expect nighttime lane and ramp closures on I-70 and restrictions on East Mound Street and South 18th Street. After the new ramp opens, the ramp from I-70 west to South 4th Street will close permanently. September 2013 to September 2014 (ODOT)
42Construction continues on the I-270/US 23 North Side Fix project, which includes reconfiguring the ramps at the interchange and widening North High Street (US 23)
between I-270 and Lazelle Road. Two northbound express lanes will be added on North High Street beginning immediately north of I-270 and ending south of Northwoods Boulevard. Expect lane closures on North High Street, and various lane and ramp closures on I-270 during non-rush hours. July 2013 to June 2016 (ODOT)
43The I-70/Hilliard-Rome Road interchange will be realigned. Expect various lane closures beginning in October 2014. May 2014 to October 2015. (ODOT)
44The bridge deck will be replaced on the ramp from westbound I-70 to northbound S.R. 315. Expect a 21-day ramp closure. August 2014 to October 2014 (ODOT)
45S.R. 104 will be resurfaced from Frank Road to just west of US 33. Expect lane closures during restricted hours. April 2014 to October 2014 (ODOT)
46I-670 will be resurfaced between I-70 and just east of US 23. Expect short term lane closures and nighttime ramp closures. August 2014 to November 2014 (ODOT)
47Rickenbacker Parkway continues to be widened and reconstructed between Second Street and S.R. 317 (London-Groveport Road). A shared-use path is also
included in this project. June 2013 to December 2014 (Columbus Regional Airport Authority)
48Work continues on the resurfacing and addition of a third lane on I-71 between north of US 36 in Delaware County and S.R. 61 in Morrow County. Two lanes of traffic
will be maintained in each direction with additional lane closures at night. July 2012 to October 2014 (ODOT)
49I-70 bridge replacement project at Canal Road (near Buckeye Lake) continues. Two lanes of traffic will be maintained at all times. April 2013 to August 2014 (ODOT)
50Some final work remains on the Columbus Crossroads rebuilding of the I-71/I-670 interchange. Two lanes of traffic are maintained in each direction. Expect various
lane and ramp closures. June 2011 to Summer 2014 (ODOT)
51Construction of the Scioto Greenways project continues. Several closures and detours are posted for the Scioto Trail. The major trail closures are between North Bank Park and
Broad Street, and between Bicentennial Park and the Scioto Audubon Metro Park, on the east side of the Scioto, as well as between Veterans Memorial and Dodge Park on the west side of the Scioto. Fall 2013 to Fall 2015 (Columbus)
52ODOT, Columbus, Franklin County and many other jurisdictions have significant resurfacing programs planned for the 2014 construction season. Check
pavingtheway.org for details as they are available. Traffic is normally maintained for resurfacing projects. Watch for equipment, flaggers and lane restrictions. April 2014 to late November 2014 (Various)
2014 Project OverviewNote: Weather and other factors can affect the construction schedules of the projects listed below.
Park and RideLocations
Help reduce congestion. Look for a COTA Park and Ride Location near you.
Road Project list continued from previous page