global summit 2012 - draft iii

6
Global Summit on Changing Bihar  Forging Partnerships for Development 17-19 FEBRUARY 2012 PATNA, BIHAR, INDIA 

Upload: mansingh

Post on 06-Apr-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Global Summit 2012 - Draft III

8/3/2019 Global Summit 2012 - Draft III

http://slidepdf.com/reader/full/global-summit-2012-draft-iii 1/5

Global Summion Changing BihaForging Partnerships for Developme

17-19 FEBRUARY 20PATNA, BIHAR, IND

Page 2: Global Summit 2012 - Draft III

8/3/2019 Global Summit 2012 - Draft III

http://slidepdf.com/reader/full/global-summit-2012-draft-iii 2/5

Page 3: Global Summit 2012 - Draft III

8/3/2019 Global Summit 2012 - Draft III

http://slidepdf.com/reader/full/global-summit-2012-draft-iii 3/5

g lo amee t oB i ha r

be t te r  b i  h a  r,  be t te r  i d ea s

as   wi tnessed  a  series  o 

  ini tia ti ves  and  concer te

aimed a t pu l ling i t ou t o  i ts q

uagmire.  T here is a ne w 

nd en t husiasm in  various se

c tions o   t he peop le o   t he

 

bou t  t heir  be t ter  u ture.  T h

is  has  broug h t a percep ti b

 le 

e in  t he image o  t he s ta te.

the second mos t densely p

opula ted s ta te and also amo

ng 

oores t in  the coun tr y, Bihar

 ’s  trans orma tion is  vi tal in  t

erms 

signifcance  or  the  o verall

  de velopmen t  o   the  coun

 tr y. 

ever,  the  his torical  burde

n  no t wi ths tanding,  the  s ta te

  aces 

mous  challenges  -  economic  ( fnancial  and  in ra

s truc tural ), 

u tional and social.

cess  o   an y de velopmen t

  s tra teg y  depends  on  a  se

rious 

agemen t among  all  s tak eho

lders  in order  to  iden ti  y  is

sues, 

priori tise  and  de velop  s tra

 tegies  or  ac tion.  The  s tren

g ths 

he s ta te need  to be ma xim

ised  while  ocussing on s tra

 tegies 

o vercome   the  bo t tleneck 

s,   orging  par tnerships   w

i th  all 

k eholders andbene f ting  ro

m  technical k no w-ho w, idea

s and 

periences  ormcri tical ingred

ien ts or success ul implemen

 ta tion 

de velopmen t s tra tegies.

 B r i d g i  n g  t h e ga  p  i  n   i  n  f  ra s t r u c t

 u  re 

d e ve l o p me n  t:  po we r a  n d   t ra  n s po r t

 De v i s i  n g a  n  a  p p ro p r i a  te s t ra 

 teg y  f o r 

 i  n d  u s t r i a  l  i za  t i o n  a  n d   u  r ba  n  d e

 ve l o p me n  t

 S t re n g t h e n  i  n g  i  n s t i  t u  t i o n s  f o r

  i  n c l  u  -

s i  ve a  n d  eq u  i  ta  b l e d e ve l o p m

e n  t

 S t re n g t h e n  i  n g ed  u ca  t i o n a  l  a  n d   t ra  i  n  i  n g  i  n 

s t i  t u  t i o n s

 De ve l o p i  n g  B i  h a  r a s a  n  

a  t t ra c t i  ve  to u  r i s t d es t i  n a  t i o n 

erco m i  n g  t h e co n s t ra  i  n  ts o n  

e r a g r i c u  l  t u  ra  l  g ro w t h 

C rea  t i  n g a   mo re e f  f ec t i  ve 

 h ea  l  t h ca  re s ys te m

 Us h e r i  n g  i  n  a  soc i o -c u  l  t u

 re n a  i ssa  n ce

 E x te n d  i  n g soc i o -eco 

 po l  i  t i ca  l   ro l es o f   wo m

[email protected]

www.biharfoundation.in 

call us on 0612-2521374

T h e mes S u  m m i  t

Page 4: Global Summit 2012 - Draft III

8/3/2019 Global Summit 2012 - Draft III

http://slidepdf.com/reader/full/global-summit-2012-draft-iii 4/5

Page 5: Global Summit 2012 - Draft III

8/3/2019 Global Summit 2012 - Draft III

http://slidepdf.com/reader/full/global-summit-2012-draft-iii 5/5

e t sta l k

 ta  l  k ! L e t’s

Bihar Foundation 

call us on 0612-2521371

[email protected] 

 www.biharfoundation.in 

6th Floor, Indira Bhawan,

 R.C.S. Path, Patna - 800 001.