GLAST LAT Tracker Tower7/9 Pre-Ship Review. [email protected] INFN-Pisa. Tower 7 - Assembly and test highlights. tray17 replacement. June 14 - July 4, 2005 (INFN-Pisa) : assembly of complete tray stack incomplete cable set (C0,C1,C2,C3,C4,C7) Sidewalls, alignment - PowerPoint PPT PresentationTRANSCRIPT
Tracker Subsystem 1
GLAST LAT Project FM7/9 PSR, Sept. 9, 2005
GLAST LAT TrackerGLAST LAT Tracker
Tower7/9 Pre-Ship ReviewTower7/9 Pre-Ship Review
INFN-Pisa
Tracker Subsystem 2
GLAST LAT Project FM7/9 PSR, Sept. 9, 2005
Tower 7 - Assembly and test highlightsTower 7 - Assembly and test highlights
• June 14 - July 4, 2005 (INFN-Pisa) : – assembly of complete tray stack
– incomplete cable set (C0,C1,C2,C3,C4,C7)
– Sidewalls, alignment
• July 7-15, 2005 (Alenia-Roma) : – VIB, TVAC test RUN I
• NCR 544 layerX17 noise anomaly
• July 25-26, 2005 (INFN-Pisa) : – Tray 17 replacement
– C5 installation
• July 28 – August 31, 2005 (Alenia-Roma)– TVAC (7/28-8/4) RUN II
– VIB (8/31) RUN II (Z axis only)
• September 1-5, 2005 (INFN-Pisa) : – C6 installation
– Solithane, EMI taping
– Alignment verification, final CPT
• Full EIDP details (soon) at: – http://glast.pi.infn.it
Aluminum service sidewall
tray17 replacement
tray to be replaced
Tracker Subsystem 3
GLAST LAT Project FM7/9 PSR, Sept. 9, 2005
Tower 7 – Environmental test runs configurationsTower 7 – Environmental test runs configurations
Tracker Subsystem 4
GLAST LAT Project FM7/9 PSR, Sept. 9, 2005
Tower 7 Tower 7 Delivery configurationDelivery configuration
Tower PN: LAT-DS-00722 (rev3)Tower SN: 7Details on NCR 530
Tracker Subsystem 5
GLAST LAT Project FM7/9 PSR, Sept. 9, 2005
Tower 7 – Configuration and mechanical verificationsTower 7 – Configuration and mechanical verifications
Alignment, Mass, COG:
• Tower 7 well aligned and inside stayclear
• Mass (32.705Kg) and CG near estimated values (when used real masses)
• Full data available from EIDP and INFN-PISA web site
Configuration:• Kapton tape and foam applied on the flex
cables as per LAT-DS-00722• 4 layers of Poron foam 0.037 THK used on
Bottom and Top Tray (–X) side (in place of 5 layers)
• Base Plate assembly:•Torque of nuts 5.3 Nm, spec is (5.08 +0.56/-0 Nm)
Tracker Subsystem 6
GLAST LAT Project FM7/9 PSR, Sept. 9, 2005
Tower 7 – Open NCRsTower 7 – Open NCRs
• INFN/PI-530: environmental test in non-flight configuration– both environmental test runs were performed with missing cables, as agreed by an MRB– As a consequence of the missing solithane, 4 screws loss nominal torque and 1 was halfway
unscrewed on one sidewall after Z-axis vibrations: the screws were re-torqued to spec and the following X and Y axis vibrations did not show any torque loss
– the NCR can be closedthe NCR can be closed
• INFN/PI-543: layer X7 not read out (TVAC RUN I)– X7 could not be readout at power up after vib test. X7 was properly read at the following and
first switch on during TVAC– The problem is due to a known and documented issue with resetting MCM (NCR 417) with
missing cables– To avoid the many and unknown number of power cycle needed to re-establish a good
configuration with as many readable layers as possible, hot/cold switch on and off were not performed
– the NCR can be closedthe NCR can be closed
• INFN/PI-544: layer X17 noisy at hot soak (TVAC RUN I)– As per MRB decision, tray 17 (MID010) was replaced with a new tray, and tower7 retested– the NCR can be closedthe NCR can be closed
• INFN/PI-570: cold/hot power off/on not performed (TVAC RUN II)– Same as NCR 543 – the NCR can be closedthe NCR can be closed
• INFN/PI-547: Vacuum level out of specification (TVAC RUN I)– The situation is similar to earlier TVAC tests and the proposal is to accept the test as for
previous MRBs. Tower 6 was tested with tower 7 RUN I and the same NCR was closed
Tracker Subsystem 7
GLAST LAT Project FM7/9 PSR, Sept. 9, 2005
TKR Tower 7 Bad channels (noisy + dead + disconnected)
0
5
10
15
20
25
CP
T N
o C
able 56
CP
T R
T
LP
T at 25 fro
m 1st h
ot to
1st cold
LP
T at 0 fro
m 1st h
ot to
1st cold
CP
T at 2n
d h
ot so
ak
CP
T @
3rd H
ot S
oak
LP
T @
0C fro
m 3rd
ho
t to 3rd
cold
TW
R7 L
PT
@ ~
0 C fro
m 3rd
cold
to 4th
ho
t
TW
R7 L
PT
@ 0C
from
4th h
ot to
4th co
ld
TW
R7 C
PT
RT
in vacu
um
TW
R7 R
e-Test: C
PT
at RT
in vacu
um
TW
R7 R
e-Test: C
PT
1st Ho
t So
ak
TW
R7 R
e-Test L
PT
at 30C
TW
R7 R
e-Test L
PT
at 0C fro
m 1st h
ot to
1st cold
TW
R7 R
e-Test L
PT
at 0C fro
m 1st co
ld to
2nd
ho
t
TW
R7 R
e-Test L
PT
at 30C fro
m 1st co
ld to
2nd
ho
t
TW
R7 R
e-Test L
PT
at 30C fro
m 2n
d h
ot to
2nd
cold
TW
R7 R
e-Test L
PT
at 0C fro
m 2n
d h
ot to
2nd
cold
TW
R7 R
e-Test L
PT
at 0C fro
m 2n
d co
ld to
3rd h
ot
TW
R7 R
e-Test L
PT
at 30C fro
m 2n
d co
ld to
3rd h
ot
TW
R7 R
e-Test L
PT
at 30C fro
m 3rd
ho
t to 3rd
cold
soak
TW
R7 R
e-Test L
PT
at 0C fro
m 3rd
ho
t to 3rd
cold
soak
TW
R7 R
e-Test L
PT
at 0C 3rd
cold
--> 4th
ho
t soak
TW
R7 R
e-Test L
PT
at 30C 3rd
cold
--> 4th
ho
t soak
TW
R7 R
e-Test L
PT
at 30C 4th
ho
t --> 4th
cold
soak
TW
R7 R
e-Test L
PT
at 0C 4th
ho
t --> 4th
cold
soak
TW
R7 R
e-Test L
PT
at 0 from
4th co
ld to
RT
TW
R7 R
e-Test C
PT
at RT
in vacu
um
Y17
X5
Y2
16ch Level
X17
Y1RUN I RUN II
• NCR 534: 2 layers (Y2, X5) sometimes out of spec due to fluctuations in noisy channels; the NCR can be closed
• X17 fixed after tray M010 replacement• X5 showed 1 noisy ladder when ramping from 3rd cold to 4th hot soak: similar isolated anomalies,
appearing randomly and only once were observed in other towers and are very likely caused by noise pickup dependent on the setup and/or the readout system (remember NCR 461 on the interference between the 2 towers DAQ causing test failures)
Tower 7 – Bad channelsTower 7 – Bad channels
Tracker Subsystem 8
GLAST LAT Project FM7/9 PSR, Sept. 9, 2005
Tower 7 - EfficiencyTower 7 - Efficiency
•All layers well within spec (eff > 98%)•Differences correlated to bad channels•No change after z-axis vib retest
taken in Alenia after 2nd TVAC
Tracker Subsystem 9
GLAST LAT Project FM7/9 PSR, Sept. 9, 2005
Tower 7 TVAC – vacuum out of spec RUN ITower 7 TVAC – vacuum out of spec RUN I
-70
-60
-50
-40
-30
-20
-10
0
10
20
30
40
50
60
70
80
90
08/07/200500.00.00
08/07/200512.00.00
09/07/200500.00.00
09/07/200512.00.00
10/07/200500.00.00
10/07/200512.00.00
11/07/200500.00.00
11/07/200512.00.00
12/07/200500.00.00
12/07/200512.00.00
13/07/200500.00.00
13/07/200512.00.00
14/07/200500.00.00
14/07/200512.00.00
15/07/200500.00.00
15/07/200512.00.00
16/07/200500.00.00
Date
Tem
per
atu
re (
°C)
1.00E-06
1.00E-05
1.00E-04
1.00E-03
1.00E-02
101 Cold Plate 102 Cold Plate +X
103 Cold Plate +Y 105 Cold Plate -Y
01 TWR7 center top 02 TWR7 top C-O -X
04 TWR7 swall -X n.1 10 TWR7 center bot
12 TWR7 bot C-O +X 32 TWR6 center top Tray
33 TWR6 top c-o -X 37 TWR6 swall -X n.1
40 TWR6 swall +X n.9 43 TWR6 bot c-o +X
Pressurre
Same behaviour as previous tests – proposal is to accept the test:
•Vacuum slightly higher than spec (~> 10-4 vs 5x10-5 Torr) during hot soaks•Vacuum level improving with time•same pressure behaviour in dry run with MGSE
Same behaviour as tower6 TVAC, accepted during preship review (corresponding NCR 546 was closed)
Tracker Subsystem 10
GLAST LAT Project FM7/9 PSR, Sept. 9, 2005
Tower 9 - Assembly and test highlightsTower 9 - Assembly and test highlights
• July 8-15, 2005 (INFN-Pisa) : – assembly of complete tray stack
– incomplete cable set (C0-non-flight,C3 missing,C7-non-flight)
– Sidewalls, alignment
• July 25 – august 4, 2005 (Alenia-Roma) : – VIB, TVAC
• September 5-7, 2005 (INFN-Pisa) : – C0, C7 replacement with flight cables
– C3 installation
– Solithane, EMI taping
– Alignment verification, final CPT
• Full EIDP details (soon) at: – http://glast.pi.infn.it
tray to be replaced
Tracker Subsystem 11
GLAST LAT Project FM7/9 PSR, Sept. 9, 2005
Tower 9 – Configuration and mechanical verificationsTower 9 – Configuration and mechanical verifications
Alignment, Mass, COG:
• Tower 9 well aligned and inside stayclear
• Mass (32.840Kg) and CG near estimated values (when used real masses)
• Full data available from EIDP and INFN-PISA web site
Configuration:• Kapton tape and foam applied on the flex
cables as per LAT-DS-00722• 4 layers of Poron foam 0.037 THK used on
Bottom and Top Tray (–X) side (in place of 5 layers)
• Base Plate assembly:•Torque of nuts 5.4 Nm, spec is (5.08 +0.56/-0 Nm)
Tracker Subsystem 12
GLAST LAT Project FM7/9 PSR, Sept. 9, 2005
Tower 9 – Open NCRsTower 9 – Open NCRs
• INFN/PI-541: environmental test in non-flight configuration– environmental test were performed with missing cables, as agreed by an MRB
– Missing cables are the consequence of the following NCRs
– the NCR can be closedthe NCR can be closed
• INFN/PI-560: cold/hot power off/on not performed – To avoid the many and unknown number of power cycle needed to re-establish a good
configuration with as many readable layers as possible, hot/cold switch on and off were not performed after a satisfactory running condition was found
– the NCR can be closedthe NCR can be closed
• INFN/PI-559: layers X2 and X12 not read out– Despite the many power cycles it was never possible to reset the tower as to read these
layers; when a practical configuration was found with all layers readable but these 2, TVAC was run with such two layers disabled
– Post environmental test show no problem in the performance of these two layers (see next slide)
– the NCR can be closedthe NCR can be closed
Tracker Subsystem 13
GLAST LAT Project FM7/9 PSR, Sept. 9, 2005
Tower 9 - EfficiencyTower 9 - Efficiency
•All layers well within spec (eff > 98%)•X2 @99.8%, [email protected]%•Total bad channels in tower ~50
97
98
99
100
Y17X17X16 Y16Y15X15X14 Y14Y13X13X12 Y12Y11X11X10 Y10 Y9 X9 X8 Y8 Y7 X7 X6 Y6 Y5 X5 X4 Y4 Y3 X3 X2 Y2 Y1 X1 X0 Y0
Layer
Eff
icie
ncy
Efficiency (%)100% efficiency98% requirement
Tower 9 - run 306001303