GLAST LAT Tracker Tower15 Pre-Ship Review. [email protected] INFN-Pisa. Tower 15 - Assembly and test highlights. tray17 replacement. September 19-21, 2005 (INFN-Pisa) : assembly of complete tray stack incomplete cable set (C5 missing, C2 non-flight) Sidewalls, alignment - PowerPoint PPT PresentationTRANSCRIPT
Tracker Subsystem 1
GLAST LAT Project FM15 PSR, Oct. 14, 2005
GLAST LAT TrackerGLAST LAT Tracker
Tower15 Pre-Ship ReviewTower15 Pre-Ship Review
INFN-Pisa
Tracker Subsystem 2
GLAST LAT Project FM15 PSR, Oct. 14, 2005
Tower 15 - Assembly and test highlightsTower 15 - Assembly and test highlights
• September 19-21, 2005 (INFN-Pisa) : – assembly of complete tray stack
– incomplete cable set (C5 missing, C2 non-flight)
– Sidewalls, alignment
• September 29 – Oct. 3, 2005 (Alenia-Roma)– TVAC (9/26-29)
– VIB (9/29-10/3)
• October 5-11, 2005 (INFN-Pisa) : – C5 installation
– C2 replacement
– Solithane, EMI taping
– Alignment verification, final CPT
• Full EIDP details at: – http://glast.pi.infn.it
tray17 replacement
tray to be replaced
Tracker Subsystem 3
GLAST LAT Project FM15 PSR, Oct. 14, 2005
Tower 15 – configurationTower 15 – configuration
Tower PN: LAT-DS-00722 (rev3)Tower SN: 15
Environmental test performed with following configuration variations:• C5 missing• C2-008 non-flight installed in place of C2-020
Delivery configuration notes:• Kapton and poron foam as per LAT-DS-00722
• 4 layers of Poron foam 0.037 THK used on Bottom and Top Tray (–X) side (in place of 5 layers)
Alignment well within stay-clear
Measured mass 32.920 Kg
Tracker Subsystem 4
GLAST LAT Project FM15 PSR, Oct. 14, 2005
Tower 15 – Open NCRsTower 15 – Open NCRs
• INFN/PI-589: environmental test in non-flight configuration– the environmental tests were performed with a missing cable (C5) and 1 non-flight cables
(C2), as agreed by an MRB
– Full flight set provided after environmental test and installed before delivery
– the NCR can be closedthe NCR can be closed
• INFN/PI-590: cold/hot power off/on not performed– The problem is due to a known and documented issue with resetting MCM (NCR 417) with
missing cables– To avoid the many and unknown number of power cycle needed to re-establish a good
configuration with as many readable layers as possible, hot/cold switch on and off were not performed
– Update SLAC waiver LAT-XR-07340 to include tower 15?
– the NCR can be closedthe NCR can be closed
• INFN/PI-586: Vacuum level out of specification– The situation is similar to earlier TVAC tests and the proposal is to accept the test as for
previous MRBs
– Tower 8 performed TVAC test together with tower 15 and its relative NCR was closed during tower 8 preship review on 10/5
– the NCR can be closedthe NCR can be closed
Tracker Subsystem 5
GLAST LAT Project FM15 PSR, Oct. 14, 2005
Tower 15 - EfficiencyTower 15 - Efficiency
taken in Alenia after TVAC
•All layers well within spec (eff > 98%)• no changes in bad channels during env test
• pre-ship data analysis underway – results will be included in EIDP
98
98.5
99
99.5
100
Y0
X1
Y2
X3
Y4
X5
Y6
X7
Y8
X9
Y10
X11
Y12
X13
Y14
X15
Y16
X17
Layer
Eff
icie
ncy
run 306001376before env-test
Tracker Subsystem 6
GLAST LAT Project FM15 PSR, Oct. 14, 2005
Tower 15 - Bad channels behaviourTower 15 - Bad channels behaviour
TKR Tower 15 Total bad channels vs time
0
2
4
6
8
10
12
14
16
18
20
TV
CP
T p
re T
V t
est
- N
o C
able
5
TV
CP
T v
acu
um
RT
- N
o C
able
2-5
TW
R15
: 30
C L
PT
fro
m R
T t
o f
irst
ho
t so
ak
TW
R15
: fi
rst
ho
t so
ak C
PT
TW
R15
: L
PT
30C
fir
st r
um
p d
ow
n
TW
R15
: L
PT
15C
fir
st r
um
p d
ow
n
TW
R15
: L
PT
0C
fir
st r
um
p d
ow
n
TW
R15
: C
PT
at
1st
cold
so
ak
TW
R15
: L
PT
at
0C
TW
R15
: L
PT
at
15C
TW
R15
: L
PT
at
30C
TW
R15
: C
PT
at
2nd
ho
t so
ak
TW
R15
: L
PT
at
30C
TW
R15
: L
PT
at
15C
TW
R15
: L
PT
at
0C
TW
R15
: C
PT
2n
d C
old
So
ak
LP
T a
t 0C
fro
m 2
nd
co
ld s
oak
to
3rd
ho
t.
LP
T a
t 15
C f
rom
2n
d c
old
so
ak t
o 3
rd h
ot.
LP
T a
t 30
C f
rom
2n
d c
old
so
ak t
o 3
rd h
ot.
CP
T a
t 3r
d h
ot
soak
.
LP
T a
t 30
C f
rom
th
ird
ho
t to
th
ird
co
ld s
oak
LP
T a
t 15
C f
rom
th
ird
ho
t to
th
ird
co
ld s
oak
LP
T a
t 0C
fro
m t
hir
d h
ot
to t
hir
d c
old
so
ak
3rd
Co
ld S
oak
3rd
ru
mp
up
LP
T a
t 0C
3rd
ru
mp
up
LP
T a
t 15
C
3rd
ru
mp
up
LP
T a
t 30
C
CP
T a
t 4t
h h
ot
soak
.
4th
ru
mp
do
wn
LP
T a
t 30
C
4th
ru
mp
do
wn
LP
T a
t 15
C
4th
ru
mp
do
wn
LP
T a
t 0C
4th
Co
ld S
oak
LP
Tat
0 C
fro
m 4
th C
old
So
ak t
o R
T
CP
T i
n v
acu
um
ro
om
T
CP
T a
t S
TP
Nu
mb
er o
f D
isco
nn
ecte
d c
han
nel
s
spec Y17 X0 Y12
X0 and Y17 slightly exceed 16 during hot soaks
Tracker Subsystem 7
GLAST LAT Project FM15 PSR, Oct. 14, 2005
TKR Tower 15 Noisy channels vs time
0
1
2
3
4
5
6
7
8
TV
CP
T p
re T
V t
est
- N
o C
able
5
TV
CP
T v
acu
um
RT
- N
o C
able
2-5
TW
R15
: 30
C L
PT
fro
m R
T t
o f
irst
ho
t so
ak
TW
R15
: fi
rst
ho
t so
ak C
PT
TW
R15
: L
PT
30C
fir
st r
um
p d
ow
n
TW
R15
: L
PT
15C
fir
st r
um
p d
ow
n
TW
R15
: L
PT
0C
fir
st r
um
p d
ow
n
TW
R15
: C
PT
at
1st
cold
so
ak
TW
R15
: L
PT
at
0C
TW
R15
: L
PT
at
15C
TW
R15
: L
PT
at
30C
TW
R15
: C
PT
at
2nd
ho
t so
ak
TW
R15
: L
PT
at
30C
TW
R15
: L
PT
at
15C
TW
R15
: L
PT
at
0C
TW
R15
: C
PT
2n
d C
old
So
ak
LP
T a
t 0C
fro
m 2
nd
co
ld s
oak
to
3rd
ho
t.
LP
T a
t 15
C f
rom
2n
d c
old
so
ak t
o 3
rd h
ot.
LP
T a
t 30
C f
rom
2n
d c
old
so
ak t
o 3
rd h
ot.
CP
T a
t 3r
d h
ot
soak
.
LP
T a
t 30
C f
rom
th
ird
ho
t to
th
ird
co
ld s
oak
LP
T a
t 15
C f
rom
th
ird
ho
t to
th
ird
co
ld s
oak
LP
T a
t 0C
fro
m t
hir
d h
ot
to t
hir
d c
old
so
ak
3rd
Co
ld S
oak
3rd
ru
mp
up
LP
T a
t 0C
3rd
ru
mp
up
LP
T a
t 15
C
3rd
ru
mp
up
LP
T a
t 30
C
CP
T a
t 4t
h h
ot
soak
.
4th
ru
mp
do
wn
LP
T a
t 30
C
4th
ru
mp
do
wn
LP
T a
t 15
C
4th
ru
mp
do
wn
LP
T a
t 0C
4th
Co
ld S
oak
LP
Tat
0 C
fro
m 4
th C
old
So
ak t
o R
T
CP
T i
n v
acu
um
ro
om
T
CP
T a
t S
TP
Nu
mb
er o
f D
isco
nn
ecte
d c
han
nel
s
Y17 X0
Tower 15 - noisy channels behaviourTower 15 - noisy channels behaviour
Fluctuation are due to noisy channels