GL: Highway Bridge Program (TIP ID – VAR170012)
Last updated with TIP Revision 2019-30
2018/19-2023/24 Highway Bridge Program
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
Note id: 24
1) This is the FTIP lump sum “backup” list for HBP funded projects. Please see the Local Assistance web site for the most current listings:
http://www.dot.ca.gov/hq/LocalPrograms/hbrr99/HBP_FSTIP.html
2) The purpose of this list is to show which projects being advanced by local agencies have met the eligibility requirements of thefederal Highway Bridge Program and have been prioritized for funding by the Department in cooperation with local agencies forfunding.
3) Contractual funding levels are determined at time of federal authorization/obligation for given phase of work. For details seeChapter 3 of the Local Assistance Procedures Manual.
4) For FTIP/FSTIP purposes, Federal Highway Bridge Program (HBP) funding constraint is managed by Caltrans.
5) Prop 1B bond funds for the Local Seismic Safety Retrofit Program (LSSRP) used for matching federal funds are also managed byCaltrans.
6) Financial constraint of LOCAL matching funds (including regional STIP funds) and LOCAL Advance Construction (AC) is theresponsibility of the MPOs and their local agencies.
7) Some projects show that they are programmed using State STP funds. These funds are HBP funds transferred to the STP forbridge work that is not ordinarily eligible for HBP funds. See the HB Program Guidelines for details. Do not confuse these STPfunds with Regional STP funds.
8) Corrections to this report should be addressed to the District Local Assistance Engineer:
http://www.dot.ca.gov/hq/LocalPrograms/dlae.htm
Notes:
3/31/2020, 1:07 PM
Caltrans, Division of Local Assistance Page 13/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Alameda
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Alameda County BRIDGE NO. 33C0025, CASTLEWOOD DRIVE OVER ARROYO DE LA LAGUNA, 0.1 MI E/O FOOTHILL RD. Replace existing two-lanebridge with a new two-lane bridge. Chien Wu, 9/9/2016 2:44:45 PM.
Fund Source Summary:
PER/W
Total
CON
Total
4,608,800
570,000 570,000
200,000 200,000
570,000 200,000 5,378,8004,608,8004,608,800
Phase Summary:
Fed $
Local AC
Local Match
Total
LSSRP Bond
Total504,621 177,060 4,761,852
65,379 22,940 616,948
570,000 200,000 5,378,800
4,080,171
528,629
4,608,800
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4420
5933(159)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total504,621 504,621
65,379 65,379
570,000 570,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total177,060 177,060
22,940 22,940
200,000 200,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total4,080,171
528,629
4,608,800
4,080,171
528,629
4,608,800
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 23/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Alameda
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Alameda County BRIDGE NO. 33C0448, ARROYO ROAD OVER DRY CREEK, 1 MILE SW OF WETMORE. Replace existing two-lane bridge with a newtwo-lane bridge. 10/1/2015: Toll Credits programmed for PE, R/W, & CON.
Fund Source Summary:
PER/W
Total 430,000
CON
Total
1,272,600
430,000
100,000 100,000
100,000 1,802,600
430,000
1,272,6001,272,600
Phase Summary:
Fed $
Local AC
Local Match
Total 430,000
LSSRP Bond
Total100,000 1,802,600
100,000 1,802,600
430,000 1,272,600
1,272,600
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4301
5933(138)Project #:
PE Summary:Fed $
Local AC
Local Match
Total 430,000
LSSRP Bond
Total430,000
430,000
430,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total100,000 100,000
100,000 100,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total1,272,600
1,272,600
1,272,600
1,272,600
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 33/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Alameda
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Albany BRIDGE NO. 33C0184, BUCHANAN ST OVER UP RR, BNSF RY, & AMTRAK, NEAR I-80. Bridge preventive maintenance project.
Fund Source Summary:
PER/W
Total
CON
Total
291,300
40,000 40,000
4,000
40,000 335,300291,300
4,000
295,300
Phase Summary:
Fed $
Local AC
Local Match
Total
LSSRP Bond
Total35,412 296,841
4,588 38,459
40,000 335,300
261,429
33,871
295,300
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4157
5178(017)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total35,412 35,412
4,588 4,588
40,000 40,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total3,541
459
4,000
3,541
459
4,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total257,888
33,412
291,300
257,888
33,412
291,300
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 43/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Alameda
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.
HBP-ID Project Description
Oakland BRIDGE NO. 33C0028, ADELINE ST, OVER UP RR,BNSF,AMTRAK,EMBARC, JUST S OF 3RD ST. Voluntary Seismic retrofit only, no lanesbeing added.
Fund Source Summary:
PER/W
Total
80,000
712,000
CON
Total
2,120,000 2,120,000
632,000
80,000
2,120,000 2,832,000
632,000
Phase Summary:
Fed $
Local AC
Local Match
Total
81,666
712,000
LSSRP Bond
Total1,876,836 2,507,170
243,164 324,830
2,120,000 2,832,000
630,334
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
3413
5012(103)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
72,490
632,000
LSSRP Bond
Total559,510
72,490
632,000
559,510
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
9,176
80,000
LSSRP Bond
Total70,824
9,176
80,000
70,824
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total1,876,836 1,876,836
243,164 243,164
2,120,000 2,120,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 53/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Alameda
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Oakland BRIDGE NO. 33C0215, LEIMERT BLVD, OVER SAUSAL CREEK, 0.1 MI E OF PARK BLVD. LSSRP Seismic Retrofit
Fund Source Summary:
PER/W
Total 1,473,000
CON
Total
7,553,466
1,473,000
115,000 115,000
115,000 9,141,466
1,473,000
7,553,4667,553,466
Phase Summary:
Fed $
Local AC
Local Match
Total
168,953
1,473,000
LSSRP Bond
Total
13,191 879,573
101,810 8,092,940
168,953
115,000 9,141,466
1,304,047
866,383
6,687,083
7,553,466
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
2130
5012(025)5012(124)
Project #:
PE Summary:Fed $
Local AC
Local Match
Total
168,953
1,473,000
LSSRP Bond
Total1,304,047
168,953
1,473,000
1,304,047
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total
13,191 13,191
101,810 101,810
115,000 115,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total
866,383
6,687,083
7,553,466
866,383
6,687,083
7,553,466
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 63/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Alameda
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.
HBP-ID Project Description
Oakland BRIDGE NO. 33C0373L, EDGEWATER DRIVE SB OVER ELMHURST CANAL, 0.2 MI N/W ROLAND WAY. Replace existing two-lane bridgewith a new two-lane bridge , Chien Wu, 9/29/2016 9:47:53 AM.
Fund Source Summary:
PER/W
Total
CON
Total
4,480,000
800,000 800,000
100,000 100,000
800,000 100,000 5,380,0004,480,0004,480,000
Phase Summary:
Fed $
Local AC
Local Match
Total
LSSRP Bond
Total708,240 88,530 4,762,914
91,760 11,470 617,086
800,000 100,000 5,380,000
3,966,144
513,856
4,480,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4457
5012(161)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total708,240 708,240
91,760 91,760
800,000 800,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total88,530 88,530
11,470 11,470
100,000 100,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total3,966,144
513,856
4,480,000
3,966,144
513,856
4,480,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 73/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Alameda
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Oakland BRIDGE NO. 33C0373R, EDGEWATER DRIVE NB OVER ELMHURST CANAL, 0.2 MI N/W ROLAND WAY. Replace existing two-lane bridgewith a new two-lane bridge, Chien Wu, 9/29/2016 10:36:18 AM.
Fund Source Summary:
PER/W
Total
CON
Total
4,480,000
800,000 800,000
100,000 100,000
800,000 100,000 5,380,0004,480,0004,480,000
Phase Summary:
Fed $
Local AC
Local Match
Total
LSSRP Bond
Total708,240 88,530 4,762,914
91,760 11,470 617,086
800,000 100,000 5,380,000
3,966,144
513,856
4,480,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4458
5012(160)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total708,240 708,240
91,760 91,760
800,000 800,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total88,530 88,530
11,470 11,470
100,000 100,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total3,966,144
513,856
4,480,000
3,966,144
513,856
4,480,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 83/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Alameda
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Oakland PM00002, Bridge Preventive Maintenance Program (BPMP), various bridges in the City of Oakland. See Caltrans Local Assistance HBP website for backup list of bridges.
Fund Source Summary:
PER/W
Total 4,676,335
CON
Total
2,970,335 1,183,341 5,234,991
1,706,000
1,183,341 6,940,991
1,706,000
1,081,3151,081,315
Phase Summary:
Fed $
Local AC
Local Match
Total
536,376
4,676,335
LSSRP Bond
Total1,047,612 6,144,859
-0 135,729 796,132
1,183,341 6,940,991
4,139,959 957,288
124,027
1,081,315
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
3304
5012(083)5012(108)5012(109)5012(111)5012(112)5012(121)5012(137)
Project #:
PE Summary:Fed $
Local AC
Local Match
Total
195,678
1,706,000
LSSRP Bond
Total1,510,322
195,678
1,706,000
1,510,322
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
340,697
2,970,335
LSSRP Bond
Total1,047,612 4,634,538
-0 135,729 600,453
1,183,341 5,234,991
2,629,638 957,288
124,027
1,081,315
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 93/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Alameda
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.
HBP-ID Project Description
Pleasanton BRIDGE NO. PM00119, Bridge Preventive Maintenance Program (BPMP), various bridges in the City of Pleasanton. See Caltrans LocalAssistance HBP web site for backup list of bridges
Fund Source Summary:
PER/W
Total 151,962
CON
Total
1,291,520 1,291,520
151,962
1,291,520 1,443,482
151,962
Phase Summary:
Fed $
Local AC
Local Match
Total
17,430
151,962
LSSRP Bond
Total1,143,383 1,277,915
148,137 165,567
1,143,383 -1,143,3831,291,520 1,443,482
134,532
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4256
5101(029)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
17,430
151,962
LSSRP Bond
Total134,532
17,430
151,962
134,532
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
0
LSSRP Bond
Total1,143,383 1,143,383
148,137 148,137
1,143,383 -1,143,383
1,291,520 1,291,520
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 103/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Contra Costa
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Concord PM00023, Bridge Preventive Maintenance Program, various locations. See Caltrans Local Assistance HBP web site for backup list of bridges.
Fund Source Summary:
PER/W
Total 4,021,366
CON
Total
3,211,141 924,427 4,135,568
20,107 830,332
944,534 4,965,900
810,225
Phase Summary:
Fed $
Local AC
Local Match
Total
461,251
4,021,366
LSSRP Bond
Total836,196 4,396,311
108,338 569,589
944,534 4,965,900
3,560,115
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
3392
5135(039)5135(048)5135(049)
Project #:
PE Summary:Fed $
Local AC
Local Match
Total
92,933
810,225
LSSRP Bond
Total17,801 735,093
2,306 95,239
20,107 830,332
717,292
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
TotalPrior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
368,318
3,211,141
LSSRP Bond
Total818,395 3,661,218
106,032 474,350
924,427 4,135,568
2,842,823
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 113/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Contra Costa
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.
HBP-ID Project Description
Contra Costa County BRIDGE NO. 28C0024, ORWOOD ROAD, OVER INDIAN SLOUGH, 2 MI E BYRON HIGHWAY. Replace 2 lane bridge with new 2 lanebridge. 4/5/2010: Toll Credits programmed for R/W & Con.
Fund Source Summary:
PER/W
Total
100,000
9,497,700
CON
Total
8,372,700 1,558,708 1,030,059 10,961,467
387,200 1,412,200
291,781 391,781
2,237,689 1,030,059 12,765,448
1,025,000
Phase Summary:
Fed $
Local AC
Local Match
Total
205,000
9,497,700
LSSRP Bond
Total2,160,249 1,030,059 12,483,008
77,440 282,440
2,237,689 1,030,059 12,765,448
9,292,700
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
1175
5928(045)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
205,000
1,025,000
LSSRP Bond
Total309,760 1,129,760
77,440 282,440
387,200 1,412,200
820,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total 100,000
LSSRP Bond
Total291,781 391,781
291,781 391,781
100,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total 8,372,700
LSSRP Bond
Total1,558,708 1,030,059 10,961,467
1,558,708 1,030,059 10,961,467
8,372,700
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 123/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Contra Costa
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Contra Costa County BRIDGE NO. 28C0121, BYRON HWY, OVER CALIFORNIA AQUEDUCT, 1.4 MI NW ALA C.L.. Replace existing 2 lane bridge with new 2 lanebridge
Fund Source Summary:
PER/W
Total 675,000
CON
Total
16,515,000 16,515,000
1,525,000 2,200,000
200,000 200,000
1,725,000 16,515,000 18,915,000
675,000
Phase Summary:
Fed $
Local AC
Local Match
Total
77,423
675,000
LSSRP Bond
Total1,527,143 14,620,730 16,745,450
0 197,858 1,894,271 2,169,551
1,725,000 16,515,000 18,915,000
597,578
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
1677
5928(104)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
77,423
675,000
LSSRP Bond
Total1,350,083 1,947,660
174,918 252,340
1,525,000 2,200,000
597,578
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total177,060 177,060
0 22,940 22,940
200,000 200,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total14,620,730 14,620,730
1,894,271 1,894,271
16,515,000 16,515,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 133/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Contra Costa
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Contra Costa County BRIDGE NO. 28C0141, MARSH CREEK RD OVER MARSH CREEK, 1.8 MI E MORGAN TERITY RD. Replace existing two lane bridge withtwo lane bridge,
Fund Source Summary:
PER/W
Total
146,000
6,845,417
CON
Total
5,699,417 120,869 5,820,286
65,000 1,065,000
43,000 189,000
228,869 7,074,286
1,000,000
Phase Summary:
Fed $
Local AC
Local Match
Total5,045,694
785,169
6,845,417
LSSRP Bond
Total5,248,312 6,262,865
26,251 811,421
-5,045,694228,869 7,074,286
1,014,554
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
3727
5928(107)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
114,700
1,000,000
LSSRP Bond
Total57,545 942,845
7,456 122,156
65,000 1,065,000
885,300
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
16,746
146,000
LSSRP Bond
Total38,068 167,322
4,932 21,678
43,000 189,000
129,254
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
5,045,694
653,723
5,699,417
LSSRP Bond
Total5,152,699 5,152,699
13,864 667,587
-5,045,694
120,869 5,820,286
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 143/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Contra Costa
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Contra Costa County BRIDGE NO. 28C0143, MARSH CREEK RD, OVER MARSH CREEK, 7.3 MI E MORGAN TERITY RD combined with BRIDGE NO. 28C0145,MARSH CREEK RD, OVER MARSH CREEK, 3 MI E DEER VALLEY ROAD . Replace two existing 2-lane bridges with two new 2-lane bridges.
Fund Source Summary:
PER/W
Total 1,040,500
CON
Total
10,600,000
500,000 1,540,500
300,000 300,000
300,000 500,000 12,440,500
1,040,500
10,600,00010,600,000
Phase Summary:
Fed $
Local AC
Local Match
Total
119,345
1,040,500
LSSRP Bond
Total265,590 442,650 11,013,575
34,410 57,350 1,426,925
300,000 500,000 12,440,500
921,155 9,384,180
1,215,820
10,600,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
3957
5928(125)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
119,345
1,040,500
LSSRP Bond
Total442,650 1,363,805
57,350 176,695
500,000 1,540,500
921,155
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total265,590 265,590
34,410 34,410
300,000 300,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total9,384,180
1,215,820
10,600,000
9,384,180
1,215,820
10,600,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 153/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Contra Costa
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Contra Costa County BRIDGE NO. 28C0154, PLEASANT HILL RD OVER TAYLOR BLVD, 0.6 MI E OF GEARY ROAD. Rehabilitate existing bridge. Deckreplacement and sliver widening for standard shoulders, no added capacity.
Fund Source Summary:
PER/W
Total
CON
Total
1,756,310
313,627 313,627
25,000
313,627 2,094,9371,756,310
25,000
1,781,310
Phase Summary:
Fed $
Local AC
Local Match
Total
LSSRP Bond
Total277,654 1,854,648
35,973 240,289
277,654 -277,654313,627 2,094,937
1,576,994
204,316
1,781,310
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4527
5928(154)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total277,654 277,654
35,973 35,973
277,654 -277,654
313,627 313,627
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total22,133
2,868
25,000
22,133
2,868
25,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total1,554,861
201,449
1,756,310
1,554,861
201,449
1,756,310
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 163/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Contra Costa
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.
HBP-ID Project Description
Contra Costa County BRIDGE NO. 28C0376, CANAL RD, OVER CONTRA COSTA CANAL, 0.5 MI W OF BAILEY RD. Replace existing two lane bridge with two lanebridge. 4/1/2010: Toll Credits programmed for PE, R/W, & Con.
Fund Source Summary:
PER/W
Total
112,400
2,281,775
CON
Total
1,724,900 97,100 1,822,000
444,475
43,100 155,500
140,200 2,421,975
444,475
Phase Summary:
Fed $
Local AC
Local Match
Total 2,281,775
LSSRP Bond
Total140,200 2,421,975
140,200 2,421,975
2,281,775
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
829
5928(108)Project #:
PE Summary:Fed $
Local AC
Local Match
Total 444,475
LSSRP Bond
Total444,475
444,475
444,475
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total 112,400
LSSRP Bond
Total43,100 155,500
43,100 155,500
112,400
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total 1,724,900
LSSRP Bond
Total97,100 1,822,000
97,100 1,822,000
1,724,900
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 173/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Contra Costa
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.
HBP-ID Project Description
Contra Costa County BRIDGE NO. 28C0442, MARSH DRIVE OVER WALNUT CREEK, 0.2 MI W OF SOLANO WAY. Replace existing two-lane bridge with a newtwo-lane bridge, Minor seismic contribution.
Fund Source Summary:
PER/W
Total 1,180,000
CON
Total
14,648,850
400,000 1,580,000
240,000 240,000
640,000 16,468,850
1,180,000
14,648,85014,648,850
Phase Summary:
Fed $
Local AC
Local Match
Total
135,346
1,180,000
LSSRP Bond
Total
229,400
566,592 14,579,873
73,408 1,659,577
640,000 16,468,850
1,044,654
229,400
12,968,627
1,450,823
14,648,850
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4299
5928(128)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
135,346
1,180,000
LSSRP Bond
Total354,120 1,398,774
45,880 181,226
400,000 1,580,000
1,044,654
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total212,472 212,472
27,528 27,528
240,000 240,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total
229,400
12,968,627
1,450,823
14,648,850
229,400
12,968,627
1,450,823
14,648,850
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 183/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Contra Costa
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Contra Costa County BRIDGE NO. PM00159,Bridge Preventive Maintenance Program (BPMP) various bridges in Contra Costa County. See Caltrans LocalAssistance HBP website for backup list of projects.
Fund Source Summary:
PER/W
Total
CON
Total
805,778
180,370 180,370
60,000
180,370 1,046,148805,778
60,000
865,778
Phase Summary:
Fed $
Local AC
Local Match
Total
LSSRP Bond
Total159,682 926,155
20,688 119,993
180,370 1,046,148
766,473
99,305
865,778
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4513
5928(155)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total159,682 159,682
20,688 20,688
180,370 180,370
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total53,118
6,882
60,000
53,118
6,882
60,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total713,355
92,423
805,778
713,355
92,423
805,778
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 193/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Contra Costa
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Danville BRIDGE NO. 28C0335, LA GONDA WAY, OVER SAN RAMON CREEK, AT DANVILLE BLVD. Widen existing two-lane bridge to includestandard lane width, shoulder and sidewalk. (No added capacity)
Fund Source Summary:
PER/W
Total 600,000
CON
Total
6,420,400
603,807 1,203,807
221,000 221,000
824,807 7,845,207
600,000
6,420,4006,420,400
Phase Summary:
Fed $
Local AC
Local Match
Total
68,820
600,000
LSSRP Bond
Total730,202 6,945,362
94,605 899,845
824,807 7,845,207
531,180 5,683,980
736,420
6,420,400
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4288
5434(024)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
68,820
600,000
LSSRP Bond
Total534,550 1,065,730
69,257 138,077
603,807 1,203,807
531,180
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total195,651 195,651
25,349 25,349
221,000 221,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total5,683,980
736,420
6,420,400
5,683,980
736,420
6,420,400
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 203/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Contra Costa
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Lafayette BRIDGE NO. PM00174, Bridge Preventive Maintenance Program (BPMP) various bridges in the City of Lafayette. See Caltrans LocalAssistance HBP website for backup list of projects.
Fund Source Summary:
PER/W
Total
CON
Total
334,000
115,000 115,000
115,000 449,000334,000334,000
Phase Summary:
Fed $
Local AC
Local Match
Total
LSSRP Bond
Total101,810 397,500
13,191 51,500
115,000 449,000
295,690
38,310
334,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4593
Project #:
PE Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total101,810 101,810
13,191 13,191
115,000 115,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total295,690
38,310
334,000
295,690
38,310
334,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 213/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Contra Costa
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Moraga BRIDGE NO. 28C0137, CANYON RD OVER W BRANCH SAN LEANDRO CR, 2.4 MI N ALA C.L.. Replace existing 2-lane bridge with new2-lane bridge.
Fund Source Summary:
PER/W
Total
150,000
1,115,875
CON
Total
7,938,750 180,000 8,118,750
624,125 33,000 1,623,000
25,000 175,000
8,587,875 213,000 9,916,750
965,875
Phase Summary:
Fed $
Local AC
Local Match
Total
127,991
1,115,875
LSSRP Bond
Total7,602,846 188,569 8,779,299
985,029 24,431 1,137,451
8,587,875 213,000 9,916,750
987,884
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4070
5415(011)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
110,786
965,875
LSSRP Bond
Total552,538 29,215 1,436,842
71,587 3,785 186,158
624,125 33,000 1,623,000
855,089
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
17,205
150,000
LSSRP Bond
Total22,133 154,928
2,868 20,073
25,000 175,000
132,795
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total7,028,175 159,354 7,187,529
910,575 20,646 931,221
7,938,750 180,000 8,118,750
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 223/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Contra Costa
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Oakley BRIDGE NO. 28C0270, MAIN STREET OVER CONTRA COSTA CANAL, .01 MI SE/O OAKLEY RD. Rehabilitate existing bridge (no added capacity), Chien Wu, 10/5/2016 10:20:29 AM.
Fund Source Summary:
PER/W
Total
CON
Total
248,402
88,715 88,715
50,000
88,715 387,117248,402
50,000
298,402
Phase Summary:
Fed $
Local AC
Local Match
Total
LSSRP Bond
Total78,539 342,715
10,176 44,402
88,715 387,117
264,175
34,227
298,402
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4472
Project #:
PE Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total78,539 78,539
10,176 10,176
88,715 88,715
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total44,265
5,735
50,000
44,265
5,735
50,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total219,910
28,492
248,402
219,910
28,492
248,402
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 233/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Contra Costa
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Orinda BRIDGE NO. 28C0330, MINER RD, OVER SAN PABLO CREEK, AT CAMINO PABLO. LSSRP Seismic Retrofit
Fund Source Summary:
PER/W
Total 195,000
CON
Total
957,500
175,900 370,900
50,000 50,000
175,900 50,000 1,378,400
195,000
957,500957,500
Phase Summary:
Fed $
Local AC
Local Match
Total
22,367
195,000
LSSRP Bond
Total
5,735 115,560
155,724 44,265 1,220,298
20,176 42,542
175,900 50,000 1,378,400
172,634
109,825
847,675
957,500
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
2073
5444(010)5444(019)
Project #:
PE Summary:Fed $
Local AC
Local Match
Total
22,367
195,000
LSSRP Bond
Total155,724 328,358
20,176 42,542
175,900 370,900
172,634
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total
5,735 5,735
44,265 44,265
50,000 50,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total
109,825
847,675
957,500
109,825
847,675
957,500
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 243/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Contra Costa
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Orinda BRIDGE NO. 28C0331, BEAR CREEK RD, OVER SAN PABLO CREEK, 0.2 MI E CAMINO PABLO. LSSRP Seismic Retrofit
Fund Source Summary:
PER/W
Total 737,000
CON
Total
1,003,156
737,000
50,000 50,000
50,000 1,790,156
737,000
1,003,1561,003,156
Phase Summary:
Fed $
Local AC
Local Match
Total652,466
84,534
737,000
LSSRP Bond
Total
5,735 120,797
652,466 44,265 1,584,825
84,534
-652,46650,000 1,790,156
115,062
888,094
1,003,156
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
2074
5444(007)5444(018)
Project #:
PE Summary:Fed $
Local AC
Local Match
Total
652,466
84,534
737,000
LSSRP Bond
Total652,466 652,466
84,534
-652,466
737,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total
5,735 5,735
44,265 44,265
50,000 50,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total
115,062
888,094
1,003,156
115,062
888,094
1,003,156
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 253/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Contra Costa
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Pinole BRIDGE NO. 28C0062, SAN PABLO AVE, OVER BNSF RY AND AMTRAK, JUST W/O HERCULES AVE. Replace existing four-lane bridgewith a new four-lane bridge, Chien Wu, 12/24/2015 9:57:52 AM.
Fund Source Summary:
PER/W
Total 893,000
CON
Total
15,773,800
893,000
100,000 100,000
100,000 16,766,800
893,000
15,773,80015,773,800
Phase Summary:
Fed $
Local AC
Local Match
Total
102,427
893,000
LSSRP Bond
Total88,530 14,843,648
11,470 1,923,152
100,000 16,766,800
790,573 13,964,545
1,809,255
15,773,800
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4318
5126(015)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
102,427
893,000
LSSRP Bond
Total790,573
102,427
893,000
790,573
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total88,530 88,530
11,470 11,470
100,000 100,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total13,964,545
1,809,255
15,773,800
13,964,545
1,809,255
15,773,800
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 263/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Contra Costa
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.
HBP-ID Project Description
Pittsburg BRIDGE NO. 28C0165, NORTH PARKSIDE DR, OVER WILLOW PASS ROAD, OVER WILLOW PASS RD.. LSSRP Seismic Retrofit andBridge Preventive Maintenance work.
Fund Source Summary:
PER/W
Total 568,703
CON
Total
339,503 168,382 507,885
229,200
168,382 737,085
229,200
Phase Summary:
Fed $
Local AC
Local Match
Total
32,541
568,703
LSSRP Bond
Total
32,690 13,411 46,100
149,069 652,541
5,903 38,444
168,382 737,085
503,473
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
2061
5127(005)5127(024)
Project #:
PE Summary:Fed $
Local AC
Local Match
Total
26,289
229,200
LSSRP Bond
Total202,911
26,289
229,200
202,911
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
6,251
339,503
LSSRP Bond
Total
32,690 13,411 46,100
149,069 449,631
5,903 12,154
168,382 507,885
300,562
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 273/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Contra Costa
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Pleasant Hill BRIDGE NO. PM00141, Bridge Preventive Maintenance Program (BPMP) various bridges in the City of Pleasant Hill. See Caltrans LocalAssistance HBP website for backup list of projects.
Fund Source Summary:
PER/W
Total 60,000
CON
Total
166,800 166,800
60,000
166,800 226,800
60,000
Phase Summary:
Fed $
Local AC
Local Match
Total
6,882
60,000
LSSRP Bond
Total147,668 200,786
19,132 26,014
147,668 -147,668166,800 226,800
53,118
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4336
5375(033)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
6,882
60,000
LSSRP Bond
Total53,118
6,882
60,000
53,118
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total147,668 147,668
19,132 19,132
147,668 -147,668
166,800 166,800
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 283/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Contra Costa
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Richmond BRIDGE NO. PM00093, Bridge Preventive Maintenance Program (BPMP) various bridges in the City of Richmond. See Caltrans LocalAssistance HBP website for backup list of projects.
Fund Source Summary:
PER/W
Total
CON
Total
2,100,000
50,000 50,000
50,000 2,150,0002,100,0002,100,000
Phase Summary:
Fed $
Local AC
Local Match
Total
LSSRP Bond
Total44,265 1,903,395
5,735 246,605
50,000 2,150,000
1,859,130
240,870
2,100,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4057
5137(046)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total44,265 44,265
5,735 5,735
50,000 50,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total1,859,130
240,870
2,100,000
1,859,130
240,870
2,100,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 293/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Contra Costa
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
San Pablo BRIDGE NO. 28C0057, SAN PABLO AVE OVER SAN PABLO CREEK, AT ROAD 20. Replace existing 6-lane bridge with a new 6-lane bridge,Chien Wu, 3/3/2016 10:07:10 AM.
Fund Source Summary:
PER/W
Total
CON
Total
8,312,920
940,000 940,000
200,000
940,000 9,452,9208,312,920
200,000
8,512,920
Phase Summary:
Fed $
Local AC
Local Match
Total
LSSRP Bond
Total832,182 8,368,670
107,818 1,084,250
940,000 9,452,920
7,536,488
976,432
8,512,920
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4337
5303(021)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total832,182 832,182
107,818 107,818
940,000 940,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total177,060
22,940
200,000
177,060
22,940
200,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total7,359,428
953,492
8,312,920
7,359,428
953,492
8,312,920
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 303/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Contra Costa
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
San Pablo BRIDGE NO. 28C0326, GIANT HWY OVER SAN PABLO CREEK, AT PARR BLVD. Preventive maintenance to include deck methacrylate andjoint replacement work, Chien Wu, 3/22/2016 10:16:46 AM.
Fund Source Summary:
PER/W
Total 50,000
CON
Total
389,620
50,000
439,620
50,000
389,620389,620
Phase Summary:
Fed $
Local AC
Local Match
Total
5,735
50,000
LSSRP Bond
Total389,196
50,424
439,620
44,265 344,931
44,689
389,620
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4353
5303(019)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
5,735
50,000
LSSRP Bond
Total44,265
5,735
50,000
44,265
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total344,931
44,689
389,620
344,931
44,689
389,620
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 313/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Contra Costa
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Walnut Creek BRIDGE NO. 28C0052, BANCROFT RD, OVER WALNUT CREEK, 0.1 MI N DAVID ST. Bridge Rehabilitation. Widen existing two-lane bridgeto two-lane bridge.
Fund Source Summary:
PER/W
Total 485,000
CON
Total
1,557,403
440,000 925,000
100,000 100,000
540,000 2,582,403
485,000
1,557,4031,557,403
Phase Summary:
Fed $
Local AC
Local Match
Total
55,630
485,000
LSSRP Bond
Total478,062 2,286,201
61,938 296,202
540,000 2,582,403
429,371 1,378,769
178,634
1,557,403
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4233
5225(027)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
55,630
485,000
LSSRP Bond
Total389,532 818,903
50,468 106,098
440,000 925,000
429,371
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total88,530 88,530
11,470 11,470
100,000 100,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total1,378,769
178,634
1,557,403
1,378,769
178,634
1,557,403
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 323/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Contra Costa
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.
HBP-ID Project Description
Walnut Creek BRIDGE NO. 28C0075, SOUTH MAIN ST, OVER LAS TRAMPAS CREEK, 0.1 MI S OLYMPIC BLVD. Replace existing 5-lane bridge with anew 5-lane bridge.
Fund Source Summary:
PER/W
Total 615,000
CON
Total
11,222,000
1,200,000 1,815,000
750,000 750,000
1,950,000 13,787,000
615,000
11,222,00011,222,000
Phase Summary:
Fed $
Local AC
Local Match
Total
70,541
615,000
LSSRP Bond
Total1,726,335 12,205,631
223,665 1,581,369
1,950,000 13,787,000
544,460 9,934,837
1,287,163
11,222,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4234
5225(026)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
70,541
615,000
LSSRP Bond
Total1,062,360 1,606,820
137,640 208,181
1,200,000 1,815,000
544,460
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total663,975 663,975
86,025 86,025
750,000 750,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total9,934,837
1,287,163
11,222,000
9,934,837
1,287,163
11,222,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 333/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Marin
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Fairfax BRIDGE NO. 27C0008, MEADOW WAY, OVER SAN ANSELMO CREEK, IN FAIRFAX. Replace FO 1 lane timber bridge with wider 1 lanebridge. 4/5/2010: Toll Credits programmed for Con. 3/8/2019: Toll credits used for R/W.
Fund Source Summary:
PER/W
Total 932,238
CON
Total
4,585,000
105,562 619,800 1,657,600
216,100 216,100
105,562 835,900 6,458,700
932,238
4,585,0004,585,000
Phase Summary:
Fed $
Local AC
Local Match
Total
106,928
932,238
LSSRP Bond
Total93,454 764,809 6,268,573
12,108 71,091 190,127
105,562 835,900 6,458,700
825,310 4,585,000
4,585,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
662
5277(025)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
106,928
932,238
LSSRP Bond
Total93,454 548,709 1,467,473
12,108 71,091 190,127
105,562 619,800 1,657,600
825,310
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total216,100 216,100
216,100 216,100
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total4,585,000
4,585,000
4,585,000
4,585,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 343/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Marin
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Fairfax BRIDGE NO. 27C0142, AZALEA AVE OVER FAIRFAX CREEK, IN FAIRFAX. Replace existing 2-lane bridge with new 2-lane bridge.3/6/2013: Toll credits used for PE. Toll credits used for CON.
Fund Source Summary:
PER/W
Total 854,121
CON
Total
4,000,000
350,000 1,204,121
200,000 200,000
550,000 5,404,121
854,121
4,000,0004,000,000
Phase Summary:
Fed $
Local AC
Local Match
Total 854,121
LSSRP Bond
Total527,060 5,381,181
22,940 22,940
550,000 5,404,121
854,121 4,000,000
4,000,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4062
5277(028)Project #:
PE Summary:Fed $
Local AC
Local Match
Total 854,121
LSSRP Bond
Total350,000 1,204,121
350,000 1,204,121
854,121
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total177,060 177,060
22,940 22,940
200,000 200,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total4,000,000
4,000,000
4,000,000
4,000,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 353/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Marin
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Fairfax BRIDGE NO. 27C0144, CREEK ROAD, OVER SAN ANSELMO CREEK, IN FAIRFAX. LSSRP Seismic Retrofit 7/8/2013 and PreventiveMaintenence: Toll credits used for PE. 12/3/2014: Toll credits used for R/W and CON.
Fund Source Summary:
PER/W
Total 795,994
CON
Total
1,594,600
336,156 1,132,150
13,000 13,000
349,156 2,739,750
795,994
1,594,6001,594,600
Phase Summary:
Fed $
Local AC
Local Match
Total 795,994
LSSRP Bond
Total349,156 2,739,750
349,156 2,739,750
795,994 1,594,600
1,594,600
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
2052
5277(027)Project #:
PE Summary:Fed $
Local AC
Local Match
Total 795,994
LSSRP Bond
Total336,156 1,132,150
336,156 1,132,150
795,994
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total13,000 13,000
13,000 13,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total1,594,600
1,594,600
1,594,600
1,594,600
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 363/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Marin
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Fairfax BRIDGE NO. PM00083, Bridge Preventive Maintenance Program (BPMP) various bridges in the Town of Fairfax. See Caltrans Local AssistanceHBP website for backup list of projects.
Fund Source Summary:
PER/W
Total 425,420
CON
Total
625,086
366,108 791,528
12,500 12,500
378,608 1,429,114
425,420
625,086625,086
Phase Summary:
Fed $
Local AC
Local Match
Total
48,796
425,420
LSSRP Bond
Total335,182 1,265,195
43,426 163,919
378,608 1,429,114
376,624 553,389
71,697
625,086
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4019
5277(026)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
48,796
425,420
LSSRP Bond
Total324,115 700,740
41,993 90,788
366,108 791,528
376,624
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total11,066 11,066
1,434 1,434
12,500 12,500
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total553,389
71,697
625,086
553,389
71,697
625,086
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 373/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Marin
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Larkspur BRIDGE NO. 27C0028, BON AIR RD, OVER CORTE MADERA CREEK, .5 MI SW SR FRANCIS DRK B. Replace 2 lane bridge with new 2lane bridge with class 1 bikeway.
Fund Source Summary:
PER/W
Total 41,193,750
CON
Total
36,708,750 36,708,750
200,000 4,685,000
200,000 41,393,750
4,485,000
Phase Summary:
Fed $
Local AC
Local Match
Total23,866,581
5,107,494
41,193,750
LSSRP Bond
Total6,609,474 8,791,675 8,625,433 36,246,256
40,000 5,147,494
-6,609,474 -8,631,675 -8,625,433200,000 41,393,750
12,219,675
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
1480
5166(015)5166(025)
Project #:
PE Summary:Fed $
Local AC
Local Match
Total
897,000
4,485,000
LSSRP Bond
Total160,000 3,748,000
40,000 937,000
200,000 4,685,000
3,588,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
23,866,581
4,210,494
36,708,750
LSSRP Bond
Total6,609,474 8,631,675 8,625,433 32,498,256
4,210,494
-6,609,474 -8,631,675 -8,625,433
36,708,750
8,631,675
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 383/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Marin
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Marin County BRIDGE NO. 27C0016, LUCAS VALLEY ROAD OVER MILLER CREEK, 1.8 MI N OF SR 101. Replace existing 2-lane bridge with 2-lanebridge.
Fund Source Summary:
PER/W
Total
CON
Total
7,546,000
1,347,500 1,347,500
1,347,500 8,893,5007,546,0007,546,000
Phase Summary:
Fed $
Local AC
Local Match
Total
LSSRP Bond
Total1,192,942 7,873,416
154,558 1,020,084
1,347,500 8,893,500
6,680,474
865,526
7,546,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4558
Project #:
PE Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total1,192,942 1,192,942
154,558 154,558
1,347,500 1,347,500
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total6,680,474
865,526
7,546,000
6,680,474
865,526
7,546,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 393/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Marin
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Marin County BRIDGE NO. 27C0051, SAN ANTONIO RD OVER SOUTH SAN ANTONIO CREEK, 0.6 MI N OF S.H. 101. Replace existing two lane bridgewith two lane bridge. 1/3/2012: Toll Credits programmed for PE, R/W & CON.
Fund Source Summary:
PER/W
Total 821,000
CON
Total
6,539,155
389,710 1,210,710
448,500 448,500
448,500 389,710 8,198,365
821,000
6,539,1556,539,155
Phase Summary:
Fed $
Local AC
Local Match
Total 821,000
LSSRP Bond
Total448,500 389,710 8,198,365
448,500 389,710 8,198,365
821,000 6,539,155
6,539,155
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
3891
5927(104)Project #:
PE Summary:Fed $
Local AC
Local Match
Total 821,000
LSSRP Bond
Total389,710 1,210,710
389,710 1,210,710
821,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total448,500 448,500
448,500 448,500
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total6,539,155
6,539,155
6,539,155
6,539,155
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 403/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Marin
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.
HBP-ID Project Description
Marin County BRIDGE NO. 27C0098, NICASIO VAL RD, OVER ARROYO NICASIO, NEAR LUCAS VALLEY RD. Replace existing two-lane bridge with newtwo-lane bridge.
Fund Source Summary:
PER/W
Total 556,300
CON
Total
4,389,000
227,450 783,750
225,000 225,000
452,450 5,397,750
556,300
4,389,0004,389,000
Phase Summary:
Fed $
Local AC
Local Match
Total
63,808
556,300
LSSRP Bond
Total400,554 4,778,628
51,896 619,122
452,450 5,397,750
492,492 3,885,582
503,418
4,389,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
3998
5927(097)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
63,808
556,300
LSSRP Bond
Total201,361 693,854
26,089 89,896
227,450 783,750
492,492
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total199,193 199,193
25,808 25,808
225,000 225,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total3,885,582
503,418
4,389,000
3,885,582
503,418
4,389,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 413/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Marin
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Marin County BRIDGE NO. 27C0104, SIR FRANCIS DRAKE OVER OLEMA CREEK, 0.32 MI W SH 1. Replace existing two-lane bridge with new two-lane bridge.
Fund Source Summary:
PER/W
Total 610,000
CON
Total
2,618,000
610,000
250,000 250,000
250,000 3,478,000
610,000
2,618,0002,618,000
Phase Summary:
Fed $
Local AC
Local Match
Total
69,967
610,000
LSSRP Bond
Total221,325 3,079,073
28,675 398,927
250,000 3,478,000
540,033 2,317,715
300,285
2,618,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
3996
5927(099)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
69,967
610,000
LSSRP Bond
Total540,033
69,967
610,000
540,033
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total221,325 221,325
28,675 28,675
250,000 250,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total2,317,715
300,285
2,618,000
2,317,715
300,285
2,618,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 423/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Marin
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Marin County BRIDGE NO. 27C0107, MUIR WOODS RD OVER REDWOOD CREEK, 2.0 MI N OF SR 1. Replace existing two-lane bridge with newtwo-lane bridge.
Fund Source Summary:
PER/W
Total 496,079
CON
Total
1,974,500
182,921 679,000
159,485 159,485
182,921 159,485 2,812,985
496,079
1,974,5001,974,500
Phase Summary:
Fed $
Local AC
Local Match
Total
56,900
496,079
LSSRP Bond
Total161,940 141,192 2,490,336
20,981 18,293 322,649
182,921 159,485 2,812,985
439,179 1,748,025
226,475
1,974,500
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
3995
5927(098)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
56,900
496,079
LSSRP Bond
Total161,940 601,119
20,981 77,881
182,921 679,000
439,179
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total141,192 141,192
18,293 18,293
159,485 159,485
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total1,748,025
226,475
1,974,500
1,748,025
226,475
1,974,500
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 433/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Marin
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Marin County BRIDGE NO. 27C0111, MARSHALL PETALUMA RD, OVER SALMON CREEK, 3.0MI W OF HICKSVALLEY RD. Replace existing 2-lane bridgewith a 2-lane bridge.
Fund Source Summary:
PER/W
Total
CON
Total
2,818,200
503,250 503,250
503,250 3,321,4502,818,2002,818,200
Phase Summary:
Fed $
Local AC
Local Match
Total
LSSRP Bond
Total445,527 2,940,480
57,723 380,970
503,250 3,321,450
2,494,952
323,248
2,818,200
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4557
Project #:
PE Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total445,527 445,527
57,723 57,723
503,250 503,250
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total2,494,952
323,248
2,818,200
2,494,952
323,248
2,818,200
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 443/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Marin
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.
HBP-ID Project Description
Marin County BRIDGE NO. 27C0135, MOUNT LASSEN DR OVER MILLER CREEK, 0.06 MI N LUCAS VALLEY RD. Bridge Preventive MaintenanceProgram project to correct soil erosion. 1/4/2012: Toll Credits programmed for PE & CON. 9/28/2015: Toll credits used for R/W.
Fund Source Summary:
PER/W
Total 350,000
CON
Total
354,200
350,000
81,252 81,252
81,252 785,452
350,000
354,200354,200
Phase Summary:
Fed $
Local AC
Local Match
Total 350,000
LSSRP Bond
Total81,252 785,452
81,252 785,452
350,000 354,200
354,200
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
3892
5927(100)Project #:
PE Summary:Fed $
Local AC
Local Match
Total 350,000
LSSRP Bond
Total350,000
350,000
350,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total81,252 81,252
81,252 81,252
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total354,200
354,200
354,200
354,200
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 453/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Marin
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Novato BRIDGE NO. 27C0021, GRANT AVE OVER NOVATO CREEK, IN NOVATO. Bridge rehabilitation no additional lanes added.
Fund Source Summary:
PER/W
Total 705,424
CON
Total
3,568,320 3,568,320
705,424
3,568,320 4,273,744
705,424
Phase Summary:
Fed $
Local AC
Local Match
Total
80,912
705,424
LSSRP Bond
Total3,159,034 3,783,546
409,286 490,198
3,568,320 4,273,744
624,512
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
3524
5361(023)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
80,912
705,424
LSSRP Bond
Total624,512
80,912
705,424
624,512
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total3,159,034 3,159,034
409,286 409,286
3,568,320 3,568,320
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 463/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Marin
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.
HBP-ID Project Description
Ross BRIDGE NO. 27C0074, WINSHIP ROAD OVER CORTE MADERA CREEK, IN THE CITY OF ROSS. Replace existing two-lane bridge withnew two-lane bridge. 3/25/2014: Toll credits used for PE, R/W and CON.
Fund Source Summary:
PER/W
Total 655,700
CON
Total
1,613,640
100,000 755,700
60,000 60,000
160,000 2,429,340
655,700
1,613,6401,613,640
Phase Summary:
Fed $
Local AC
Local Match
Total 655,700
LSSRP Bond
Total160,000 2,429,340
160,000 2,429,340
655,700 1,613,640
1,613,640
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
3997
5176(008)Project #:
PE Summary:Fed $
Local AC
Local Match
Total 655,700
LSSRP Bond
Total100,000 755,700
100,000 755,700
655,700
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total60,000 60,000
60,000 60,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total1,613,640
1,613,640
1,613,640
1,613,640
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 473/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Marin
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.
HBP-ID Project Description
San Anselmo BRIDGE NO. 27C0080, MADRONE AVE OVER SAN ANSELMO CR, IN SAN ANSELMO. Bridge replacement. Replace existing two lane bridge with two lane bridge widened to accommodate standard lanes, shoulders and sidewalks.
Fund Source Summary:
PER/W
Total 664,000
CON
Total
5,756,800
583,500 1,247,500
724,900 724,900
1,308,400 7,729,200
664,000
5,756,8005,756,800
Phase Summary:
Fed $
Local AC
Local Match
Total
76,161
664,000
LSSRP Bond
Total1,158,327 6,842,661
150,073 886,539
1,308,400 7,729,200
587,839 5,096,495
660,305
5,756,800
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
3906
5159(018)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
76,161
664,000
LSSRP Bond
Total516,573 1,104,412
66,927 143,088
583,500 1,247,500
587,839
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total641,754 641,754
83,146 83,146
724,900 724,900
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total5,096,495
660,305
5,756,800
5,096,495
660,305
5,756,800
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 483/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Marin
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
San Anselmo BRIDGE NO. 27C0100, BRIDGE AVE OVER SAN ANSELMO CREEK, 80M SW OF SIR FRANCIS DRK. Replace 2-lane bridge with 2-lanebridge.
Fund Source Summary:
PER/W
Total
CON
Total
4,760,000
833,600 833,600
833,600 5,593,6004,760,0004,760,000
Phase Summary:
Fed $
Local AC
Local Match
Total
LSSRP Bond
Total737,986 4,952,014
95,614 641,586
833,600 5,593,600
4,214,028
545,972
4,760,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4640
Project #:
PE Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total737,986 737,986
95,614 95,614
833,600 833,600
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total4,214,028
545,972
4,760,000
4,214,028
545,972
4,760,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 493/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Marin
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
San Anselmo BRIDGE NO. 27C0153, NOKOMIS AVE OVER SAN ANSELMO CREEK, 300 N MADRONE AVE. Bridge Replacement. Replace existing twolane bridge with two lane bridge to accommodate standard lanes, shoulders and sidewalks. 2/15/2012: Toll Credits programmed for PE & CON.
Fund Source Summary:
PER/W
Total 670,000
CON
Total
5,553,800
545,600 1,215,600
682,400 682,400
1,228,000 7,451,800
670,000
5,553,8005,553,800
Phase Summary:
Fed $
Local AC
Local Match
Total 670,000
LSSRP Bond
Total1,149,729 7,373,529
78,271 78,271
1,228,000 7,451,800
670,000 5,553,800
5,553,800
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
3905
5159(017)Project #:
PE Summary:Fed $
Local AC
Local Match
Total 670,000
LSSRP Bond
Total545,600 1,215,600
545,600 1,215,600
670,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total604,129 604,129
78,271 78,271
682,400 682,400
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total5,553,800
5,553,800
5,553,800
5,553,800
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 503/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Marin
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
San Anselmo BRIDGE NO. PM00090, Bridge Preventive Maintenance Program (BPMP) various bridges in the Town of San Anselmo. See Caltrans LocalAssistance HBP website for backup list of projects.
Fund Source Summary:
PER/W
Total 637,426
CON
Total
1,136,441
637,426
1,773,867
637,426
1,136,4411,136,441
Phase Summary:
Fed $
Local AC
Local Match
Total
73,113
637,426
LSSRP Bond
Total1,570,404
-0 203,463
1,773,867
564,313 1,006,091
130,350
1,136,441
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4044
5159(022)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
73,113
637,426
LSSRP Bond
Total564,313
73,113
637,426
564,313
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total1,006,091
-0 130,350
1,136,441
1,006,091
130,350
1,136,441
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 513/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Marin
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.
HBP-ID Project Description
San Rafael BRIDGE NO. 27C0148, SOUTHRN HEIGHTS BL, OVER HILLSIDE, JCT MEYER RD IN SAN RAFEL. Replace existing one-lane bridge with anew one-lane bridge. 3/4/2015: Toll Credits programmed for PE, R/W, & CON.
Fund Source Summary:
PER/W
Total
180,000
675,000
CON
Total
4,185,000 4,185,000
105,000 600,000
45,000 125,000 350,000
150,000 125,000 4,185,000 5,135,000
495,000
Phase Summary:
Fed $
Local AC
Local Match
Total 675,000
LSSRP Bond
Total150,000 125,000 4,185,000 5,135,000
150,000 125,000 4,185,000 5,135,000
675,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4272
5043(038)Project #:
PE Summary:Fed $
Local AC
Local Match
Total 495,000
LSSRP Bond
Total105,000 600,000
105,000 600,000
495,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total 180,000
LSSRP Bond
Total45,000 125,000 350,000
45,000 125,000 350,000
180,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total4,185,000 4,185,000
4,185,000 4,185,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 523/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Napa
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Calistoga BRIDGE NO. 21C0115, BERRY ST OVER NAPA RIVER, CALISTOGA. Replace two-lane bridge with new two-lane bridge. 9/26/2012: TollCredits programmed for PE & CON. 9/27/2012: Toll credits used for R/W.
Fund Source Summary:
PER/W
Total
364,000
5,826,402
CON
Total
4,918,402 245,392 5,163,794
50,614 594,614
364,000
296,006 6,122,408
544,000
Phase Summary:
Fed $
Local AC
Local Match
Total 5,826,402
LSSRP Bond
Total296,006 6,122,408
296,006 6,122,408
5,826,402
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
3986
5061(007)Project #:
PE Summary:Fed $
Local AC
Local Match
Total 544,000
LSSRP Bond
Total50,614 594,614
50,614 594,614
544,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total 364,000
LSSRP Bond
Total364,000
364,000
364,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total 4,918,402
LSSRP Bond
Total245,392 5,163,794
245,392 5,163,794
4,918,402
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 533/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Napa
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Napa BRIDGE NO. PM00111, Bridge Preventive Maintenance Program (BPMP) for various bridges in the City of Napa. See Caltrans LocalAssistance HBP website for backup list of projects.
Fund Source Summary:
PER/W
Total 40,375
CON
Total
510,221 13,926 524,147
40,375
510,221 13,926 564,522
40,375
Phase Summary:
Fed $
Local AC
Local Match
Total
4,631
40,375
LSSRP Bond
Total451,699 12,329 499,771
58,522 1,597 64,751
510,221 13,926 564,522
35,744
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4210
5042(059)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
4,631
40,375
LSSRP Bond
Total35,744
4,631
40,375
35,744
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total451,699 12,329 464,027
58,522 1,597 60,120
510,221 13,926 524,147
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 543/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Napa
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Napa County BRIDGE NO. 21C0042, GREENWOOD AVE, OVER GARNETT CREEK, .2 MI NE/O MYRTLEDALE RD. Replace existing one-lane bridge withnew two-lane bridge. Toll credits used for PE. Toll credits used for CON. 9/28/2015: Toll credits used for R/W. This is not a capacityenhancing project, changed to lump sum programming.
Fund Source Summary:
PER/W
Total 1,142,282
CON
Total
5,778,920 5,778,920
1,142,282
200,000 200,000
200,000 5,778,920 7,121,202
1,142,282
Phase Summary:
Fed $
Local AC
Local Match
Total 1,142,282
LSSRP Bond
Total200,000 5,778,920 7,121,202
200,000 5,778,920 7,121,202
1,142,282
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4239
5921(068)Project #:
PE Summary:Fed $
Local AC
Local Match
Total 1,142,282
LSSRP Bond
Total1,142,282
1,142,282
1,142,282
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total200,000 200,000
200,000 200,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total5,778,920 5,778,920
5,778,920 5,778,920
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 553/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Napa
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Napa County BRIDGE NO. 21C0056, DRY CR RD OVER DRY CREEK, 0.8 MI W MT VEEDER RD. Replace existing 2-lane bridge with new 2-lane bridge plus realignment of roadway. 3/6/2013: Toll Credits programmed for PE, R/W, & CON.
Fund Source Summary:
PER/W
Total 899,260
CON
Total
4,762,380
899,260
400,000 400,000
400,000 6,061,640
899,260
4,762,3804,762,380
Phase Summary:
Fed $
Local AC
Local Match
Total 899,260
LSSRP Bond
Total400,000 6,061,640
400,000 6,061,640
899,260 4,762,380
4,762,380
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4063
5921(061)Project #:
PE Summary:Fed $
Local AC
Local Match
Total 899,260
LSSRP Bond
Total899,260
899,260
899,260
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total400,000 400,000
400,000 400,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total4,762,380
4,762,380
4,762,380
4,762,380
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 563/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Napa
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Napa County BRIDGE NO. 21C0074, BERRYESSA-KNOXVLLE OVER ETICUERA CREEK, 7.8 MI N/O POPE CYN ROAD. Replace existing 2-lane bridgewith new 2-lane bridge. 3/6/2013: Toll Credits programmed for PE, R/W, & CON.
Fund Source Summary:
PER/W
Total
CON
Total
5,000,000
900,000 900,000
200,000
900,000 6,100,0005,000,000
200,000
5,200,000
Phase Summary:
Fed $
Local AC
Local Match
Total
LSSRP Bond
Total900,000 6,100,000
900,000 6,100,000
5,200,000
5,200,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4066
Project #:
PE Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total900,000 900,000
900,000 900,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total200,000
200,000
200,000
200,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total5,000,000
5,000,000
5,000,000
5,000,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 573/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Napa
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Napa County BRIDGE NO. 21C0075, CHILES-POPE VLY RD OVER CHILES CREEK, 2.1 MI N OF S.R. 128. Replace existing 2-lane bridge with new2-lane bridge.
Fund Source Summary:
PER/W
Total 842,260
CON
Total
4,477,000
842,260
150,000 150,000
150,000 5,469,260
842,260
4,477,0004,477,000
Phase Summary:
Fed $
Local AC
Local Match
Total
96,607
842,260
LSSRP Bond
Total132,795 4,841,936
17,205 627,324
150,000 5,469,260
745,653 3,963,488
513,512
4,477,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4068
5921(060)5921(074)
Project #:
PE Summary:Fed $
Local AC
Local Match
Total
96,607
842,260
LSSRP Bond
Total745,653
96,607
842,260
745,653
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total132,795 132,795
17,205 17,205
150,000 150,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total3,963,488
513,512
4,477,000
3,963,488
513,512
4,477,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 583/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Napa
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Napa County BRIDGE NO. 21C0077, CONN VALLEY RD OVER CONN CREEK, 4.1 MI E SILVERADO TRAIL. Replace existing 2-lane bridge with new2-lane bridge. 3/6/2013: Toll Credits programmed for PE, R/W, & CON.
Fund Source Summary:
PER/W
Total
CON
Total
5,000,000
900,000 900,000
200,000
900,000 6,100,0005,000,000
200,000
5,200,000
Phase Summary:
Fed $
Local AC
Local Match
Total
LSSRP Bond
Total900,000 6,100,000
900,000 6,100,000
5,200,000
5,200,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4067
Project #:
PE Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total900,000 900,000
900,000 900,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total200,000
200,000
200,000
200,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total5,000,000
5,000,000
5,000,000
5,000,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 593/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Napa
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Napa County BRIDGE NO. 21C0088, SODA CYN RD OVER SODA CREEK, 3.1 MI N SILVERADO TRAIL. Replace existing 2-lane bridge with new 2-lanebridge. 3/6/2013: Toll Credits programmed for PE, R/W, & CON.
Fund Source Summary:
PER/W
Total
CON
Total
5,000,000
900,000 900,000
200,000
900,000 6,100,0005,000,000
200,000
5,200,000
Phase Summary:
Fed $
Local AC
Local Match
Total
LSSRP Bond
Total900,000 6,100,000
900,000 6,100,000
5,200,000
5,200,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4064
Project #:
PE Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total900,000 900,000
900,000 900,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total200,000
200,000
200,000
200,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total5,000,000
5,000,000
5,000,000
5,000,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 603/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 San Francisco
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.
HBP-ID Project Description
San Francisco BRIDGE NO. 34C0024, THIRD STREET OVER ISLAIS CREEK, JUST N/O CARGO WAY. Rehabilitate bridge. No added lane capacity. (HighCost Project agreement required)
Fund Source Summary:
PER/W
Total 5,400,000
CON
Total
84,000,000 84,000,000
1,000,000 1,600,000 8,000,000
1,000,000 84,000,000 1,600,000 92,000,000
5,400,000
Phase Summary:
Fed $
Local AC
Local Match
Total
619,380
5,400,000
LSSRP Bond
Total885,300 1,416,480 81,447,600
114,700 9,634,800 183,520 10,552,400
74,365,2001,000,000 84,000,000 1,600,000 92,000,000
4,780,620 74,365,200
-74,365,200
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4004
5934(168)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
619,380
5,400,000
LSSRP Bond
Total885,300 1,416,480 7,082,400
114,700 183,520 917,600
1,000,000 1,600,000 8,000,000
4,780,620
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total74,365,200
9,634,800 9,634,800
74,365,200
84,000,000 84,000,000
74,365,200
-74,365,200
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 613/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 San Francisco
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
San Francisco County BRIDGE NO. 34C0025, THIRD ST OVER CHINA BASIN, S OF BERRY ST. Rehabilitate existing bridge, Work includes rehabilitating bridgedeck and corroded members, painting, counterweight and fender pile repairs. (No added lane capacity). High Cost Project agreement needed forthis project for construction to be moved into the FTIP.
Fund Source Summary:
PER/W
Total
350,000
36,214,015
CON
Total
31,040,890 31,040,890
4,823,125
350,000
36,214,015
4,823,125
Phase Summary:
Fed $
Local AC
Local Match
Total15,315,823
4,153,748
36,214,015
LSSRP Bond
Total15,315,823 32,060,267
4,153,748
-15,315,82336,214,015
16,744,445
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4282
5934(177)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
553,212
4,823,125
LSSRP Bond
Total4,269,913
553,212
4,823,125
4,269,913
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
40,145
350,000
LSSRP Bond
Total309,855
40,145
350,000
309,855
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
15,315,823
3,560,390
31,040,890
LSSRP Bond
Total15,315,823 27,480,500
3,560,390
-15,315,823
31,040,890
12,164,677
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 623/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 San Mateo
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Department of Parks and Recreation BRIDGE NO. PM00190, Bridge Preventive Maintenance Program (BPMP) various bridges in District 4. See Caltrans Local Assistance HBPwebsite for backup list of projects.
Fund Source Summary:
PER/W
Total
CON
Total
694,908
232,000 232,000
232,000 926,908694,908694,908
Phase Summary:
Fed $
Local AC
Local Match
Total
LSSRP Bond
Total205,390 820,592
26,610 106,316
232,000 926,908
615,202
79,706
694,908
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4628
Project #:
PE Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total205,390 205,390
26,610 26,610
232,000 232,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total615,202
79,706
694,908
615,202
79,706
694,908
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 633/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 San Mateo
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Half Moon Bay BRIDGE NO. 35C0025, MAIN ST OVER PILARCITOS CREEK, 0.25 MI S/O S.H. 92. Rehabilitate existing historic bridge. No added capacity.Chien Wu, 10/12/2016 9:30:31 AM.
Fund Source Summary:
PER/W
Total 1,291,000
CON
Total
7,230,579 7,230,579
1,291,000
5,000 5,000
5,000 7,230,579 8,526,579
1,291,000
Phase Summary:
Fed $
Local AC
Local Match
Total
148,078
1,291,000
LSSRP Bond
Total4,427 6,401,232 7,548,580
574 829,347 977,999
5,000 7,230,579 8,526,579
1,142,922
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4501
5357(010)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
148,078
1,291,000
LSSRP Bond
Total1,142,922
148,078
1,291,000
1,142,922
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total4,427 4,427
574 574
5,000 5,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total6,401,232 6,401,232
829,347 829,347
7,230,579 7,230,579
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 643/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 San Mateo
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Redwood City BRIDGE NO. 35C0074L, BRIDGE DR PARKWAY OVER MARINE WORLD LAGOON, EAST OF MARINE WORLD PKWY. PreventiveMaintenance.
Fund Source Summary:
PER/W
Total 75,000
CON
Total
518,000 518,000
20,000 95,000
518,000 20,000 613,000
75,000
Phase Summary:
Fed $
Local AC
Local Match
Total
8,603
75,000
LSSRP Bond
Total458,585 17,706 542,689
59,415 2,294 70,311
518,000 20,000 613,000
66,398
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
3617
5029(024)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
8,603
75,000
LSSRP Bond
Total17,706 84,104
2,294 10,897
20,000 95,000
66,398
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total458,585 458,585
59,415 59,415
518,000 518,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 653/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 San Mateo
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Redwood City BRIDGE NO. 35C0074R, BRIDGE DR PARKWAY OVER MARINE WORLD LAGOON, EAST OF MARINE WORLD PKWY. Preventive Maintenance.
Fund Source Summary:
PER/W
Total 75,000
CON
Total
518,000 518,000
20,000 95,000
518,000 20,000 613,000
75,000
Phase Summary:
Fed $
Local AC
Local Match
Total
8,603
75,000
LSSRP Bond
Total458,585 17,706 542,689
59,415 2,294 70,311
518,000 20,000 613,000
66,398
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
3618
5029(025)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
8,603
75,000
LSSRP Bond
Total17,706 84,104
2,294 10,897
20,000 95,000
66,398
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total458,585 458,585
59,415 59,415
518,000 518,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 663/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 San Mateo
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Redwood City BRIDGE NO. PM00082, Bridge Preventive Maintenance Program (BPMP) various bridges in the City of Redwood City. See Caltrans LocalAssistance HBP website for backup list of projects.
Fund Source Summary:
PER/W
Total 26,250
CON
Total
78,750
26,250
105,000
26,250
78,75078,750
Phase Summary:
Fed $
Local AC
Local Match
Total
3,011
26,250
LSSRP Bond
Total92,957
12,044
105,000
23,239 69,717
9,033
78,750
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4018
5029(032)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
3,011
26,250
LSSRP Bond
Total23,239
3,011
26,250
23,239
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total69,717
9,033
78,750
69,717
9,033
78,750
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 673/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 San Mateo
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
San Mateo BRIDGE NO. 35C0077, BERMUDA DR, OVER FIESTA CHANNEL, SOUTH OF FIESTA DRIVE. Bridge Replacement. Replace existing two-lane bridge with a new two-lane bridge.
Fund Source Summary:
PER/W
Total 1,232,539
CON
Total
3,670,000
1,232,539
4,902,539
1,232,539
3,670,0003,670,000
Phase Summary:
Fed $
Local AC
Local Match
Total
141,372
1,232,539
LSSRP Bond
Total4,340,218
562,321
4,902,539
1,091,167 3,249,051
420,949
3,670,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
3428
5102(033)5102(049)
Project #:
PE Summary:Fed $
Local AC
Local Match
Total
141,372
1,232,539
LSSRP Bond
Total1,091,167
141,372
1,232,539
1,091,167
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total3,249,051
420,949
3,670,000
3,249,051
420,949
3,670,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 683/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 San Mateo
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
San Mateo County BRIDGE NO. 35C0041, CLOVERDALE RD OVER BUTANO CREEK, NORTH BUTANO PARK ROAD. Scour countermeasure and treat deck with methacrylate, Chien Wu, 10/4/2016 1:27:52 PM. 5/7/2018: Toll Credits programmed for PE & CON.
Fund Source Summary:
PER/W
Total
CON
Total
2,025,000
150,000 75,000 225,000
50,000 50,000
150,000 125,000 2,300,0002,025,0002,025,000
Phase Summary:
Fed $
Local AC
Local Match
Total
LSSRP Bond
Total150,000 119,265 2,294,265
5,735 5,735
150,000 125,000 2,300,000
2,025,000
2,025,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4469
5935(079)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total150,000 75,000 225,000
150,000 75,000 225,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total44,265 44,265
5,735 5,735
50,000 50,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total2,025,000
2,025,000
2,025,000
2,025,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 693/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 San Mateo
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
San Mateo County PM00041, Bridge Preventive Maintenance Program, various locations within the County of San Mateo. See Caltrans Local Assistance HBPwebsite for backup list of bridges.
Fund Source Summary:
PER/W
Total 873,520
CON
Total
712,500 1,103,420
161,020
1,264,440
161,020
390,920390,920
Phase Summary:
Fed $
Local AC
Local Match
Total
100,193
873,520
LSSRP Bond
Total1,119,409
145,031
1,264,440
773,327 346,081
44,839
390,920
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
3466
5935(062)5935(069)
Project #:
PE Summary:Fed $
Local AC
Local Match
Total
18,469
161,020
LSSRP Bond
Total142,551
18,469
161,020
142,551
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
81,724
712,500
LSSRP Bond
Total976,858
126,562
1,103,420
630,776 346,081
44,839
390,920
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 703/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 San Mateo
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
San Mateo County BRIDGE NO. PM00067, Bridge Preventive Maintenance Program, various locations in San Mateo County. See Caltrans Local Assistance HBPweb site for backup list of bridges.
Fund Source Summary:
PER/W
Total 119,000
CON
Total
391,000
119,000
510,000
119,000
391,000391,000
Phase Summary:
Fed $
Local AC
Local Match
Total
13,649
119,000
LSSRP Bond
Total451,503
58,497
510,000
105,351 346,152
44,848
391,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
3921
5935(064)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
13,649
119,000
LSSRP Bond
Total105,351
13,649
119,000
105,351
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total346,152
44,848
391,000
346,152
44,848
391,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 713/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 San Mateo
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.
HBP-ID Project Description
South San Francisco BRIDGE NO. 35C0148L, GRAND AVENUE WB OVER CALTRAIN UPRR INDUSTRIAL, 0.1 MI E OF US 101. Rehabilitate existing bridge.Structural steel painting and deck treatment, (no added capacity).
Fund Source Summary:
PER/W
Total
CON
Total
4,560,000
320,000 320,000
320,000 4,880,0004,560,0004,560,000
Phase Summary:
Fed $
Local AC
Local Match
Total
LSSRP Bond
Total283,296 4,320,264
36,704 559,736
320,000 4,880,000
4,036,968
523,032
4,560,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4525
Project #:
PE Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total283,296 283,296
36,704 36,704
320,000 320,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total4,036,968
523,032
4,560,000
4,036,968
523,032
4,560,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 723/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 San Mateo
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
South San Francisco BRIDGE NO. 35C0148R, GRAND AVENUE WB OVER CALTRAIN UPRR INDUSTRIAL, 0.1 MI E OF US 101. Rehabilitate existing bridge -Structural steel painting and deck treatment (no added capacity).
Fund Source Summary:
PER/W
Total
CON
Total
3,960,000
320,000 320,000
320,000 4,280,0003,960,0003,960,000
Phase Summary:
Fed $
Local AC
Local Match
Total
LSSRP Bond
Total283,296 3,789,084
36,704 490,916
320,000 4,280,000
3,505,788
454,212
3,960,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4526
Project #:
PE Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total283,296 283,296
36,704 36,704
320,000 320,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total3,505,788
454,212
3,960,000
3,505,788
454,212
3,960,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 733/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 San Mateo
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
South San Francisco BRIDGE NO. PM00153, Bridge Preventive Maintenance Program (BPMP) various bridges in the City of South San Francisco. See CaltransLocal Assistance HBP website for backup list of projects.
Fund Source Summary:
PER/W
Total
CON
Total
389,000
130,000 130,000
130,000 519,000389,000389,000
Phase Summary:
Fed $
Local AC
Local Match
Total
LSSRP Bond
Total115,089 459,471
14,911 59,529
130,000 519,000
344,382
44,618
389,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4459
5177(039)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total115,089 115,089
14,911 14,911
130,000 130,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total344,382
44,618
389,000
344,382
44,618
389,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 743/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 San Mateo
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Woodside BRIDGE NO. 35C0055, PORTOLA RD OVER ALEMBIQUE CR, 0.25 MI E OF SH 84. Replace existing two lane bridge with two lane bridge toaccommodate standard lanes and shoulders.
Fund Source Summary:
PER/W
Total 570,136
CON
Total
1,105,838
570,136
30,000 30,000
30,000 1,705,974
570,136
1,105,8381,105,838
Phase Summary:
Fed $
Local AC
Local Match
Total
65,395
570,136
LSSRP Bond
Total26,559 1,510,299
3,441 195,675
30,000 1,705,974
504,741 978,998
126,840
1,105,838
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
3790
5333(012)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
65,395
570,136
LSSRP Bond
Total504,741
65,395
570,136
504,741
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total26,559 26,559
3,441 3,441
30,000 30,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total978,998
126,840
1,105,838
978,998
126,840
1,105,838
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 753/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 San Mateo
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Woodside BRIDGE NO. 35C0122, MOUNTAIN HOME RD OVER BEAR CREEK, 0.3 MI S OF S.H. 84. Rehabilitate bridge, widen to accommodatestandard lanes and shoulders. No added lane capacity.
Fund Source Summary:
PER/W
Total 107,428
CON
Total
696,004
200,000 307,428
25,000 25,000
225,000 1,028,432
107,428
696,004696,004
Phase Summary:
Fed $
Local AC
Local Match
Total
12,322
107,428
LSSRP Bond
Total199,193 910,471
25,808 117,961
225,000 1,028,432
95,106 616,172
79,832
696,004
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
3793
5333(013)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
12,322
107,428
LSSRP Bond
Total177,060 272,166
22,940 35,262
200,000 307,428
95,106
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total22,133 22,133
2,868 2,868
25,000 25,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total616,172
79,832
696,004
616,172
79,832
696,004
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 763/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 San Mateo
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.
HBP-ID Project Description
Woodside BRIDGE NO. 35C0123, KINGS MOUNTAIN RD OVER WEST UNION CREEK, 0.05 MI E TRIPP RD. Rehabilitate bridge, widen toaccommodate standard lanes, shoulders and bike lane. No added lane capacity
Fund Source Summary:
PER/W
Total 135,090
CON
Total
831,290
200,000 335,090
25,000 25,000
225,000 1,191,380
135,090
831,290831,290
Phase Summary:
Fed $
Local AC
Local Match
Total
15,495
135,090
LSSRP Bond
Total199,193 1,054,729
25,808 136,651
225,000 1,191,380
119,595 735,941
95,349
831,290
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
3791
5333(014)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
15,495
135,090
LSSRP Bond
Total177,060 296,655
22,940 38,435
200,000 335,090
119,595
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total22,133 22,133
2,868 2,868
25,000 25,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total735,941
95,349
831,290
735,941
95,349
831,290
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 773/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 San Mateo
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.
HBP-ID Project Description
Woodside BRIDGE NO. 35C0190, OLD LA HONDA ROAD OVER DRAINAGE SWALE, 0.1 MI. W. OF PORTOLA RD.Bridge rehabilitation. Rehabilitate existing bridge to function as a culvert (no added capacity.)
Fund Source Summary:
PER/W
Total 305,445
CON
Total
817,700 817,700
305,445
817,700 1,123,145
305,445
Phase Summary:
Fed $
Local AC
Local Match
Total
35,035
305,445
LSSRP Bond
Total723,910 994,320
93,790 128,825
723,910 -723,910817,700 1,123,145
270,410
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4291
5333(017)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
35,035
305,445
LSSRP Bond
Total270,410
35,035
305,445
270,410
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
-0
LSSRP Bond
Total
-0
-0
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total723,910 723,910
93,790 93,790
723,910 -723,910
817,700 817,700
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 783/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Santa Clara
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Cupertino BRIDGE NO. 37C0011, STEVENS CR BLVD OVER STEVENS CREEK, 0.2 MI E/O STEVENS CYN RD. Scour Countermeasures.
Fund Source Summary:
PER/W
Total
CON
Total
630,000
230,000 230,000
230,000 860,000630,000630,000
Phase Summary:
Fed $
Local AC
Local Match
Total
LSSRP Bond
Total203,619 761,358
26,381 98,642
230,000 860,000
557,739
72,261
630,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4563
Project #:
PE Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total203,619 203,619
26,381 26,381
230,000 230,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total557,739
72,261
630,000
557,739
72,261
630,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 793/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Santa Clara
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Cupertino BRIDGE NO. PM00132, Bridge Preventive Maintenance Program (BPMP), various bridges in the City of Cupertino. See Caltrans LocalAssistance HBP web site for backup list of bridges.
Fund Source Summary:
PER/W
Total 161,500
CON
Total
483,650 483,650
161,500
483,650 645,150
161,500
Phase Summary:
Fed $
Local AC
Local Match
Total
18,524
161,500
LSSRP Bond
Total428,175 571,151
55,475 73,999
483,650 645,150
142,976
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4309
5318(029)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
18,524
161,500
LSSRP Bond
Total142,976
18,524
161,500
142,976
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total428,175 428,175
55,475 55,475
483,650 483,650
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 803/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Santa Clara
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Gilroy BRIDGE NO. PM00109, Bridge Preventive Maintenance Program (BPMP) for various bridges in the City of Gilroy. See Caltrans LocalAssistance HBP website for backup list of projects.
Fund Source Summary:
PER/W
Total
CON
Total
227,909 110,000 337,909227,909 110,000 337,909
Phase Summary:
Fed $
Local AC
Local Match
Total
LSSRP Bond
Total201,768 97,383 299,151
26,141 12,617 38,758
227,909 110,000 337,909
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4200
5034(026)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
TotalPrior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total201,768 97,383 299,151
26,141 12,617 38,758
227,909 110,000 337,909
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 813/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Santa Clara
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Palo Alto BRIDGE NO. 37C0223, NEWELL RD OVER SAN FRANCISQUITO CR, NEAR WOODLAND AVE. Replace existing two-lane bridge with anew two-lane bridge conforming to current standards.
Fund Source Summary:
PER/W
Total 1,174,809
CON
Total
10,389,600
574,146 1,748,955
113,000 113,000
687,146 12,251,555
1,174,809
10,389,60010,389,600
Phase Summary:
Fed $
Local AC
Local Match
Total
134,751
1,174,809
LSSRP Bond
Total608,330 10,846,302
78,816 1,405,253
687,146 12,251,555
1,040,058 9,197,913
1,191,687
10,389,600
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
3722
5100(017)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
134,751
1,174,809
LSSRP Bond
Total508,291 1,548,350
65,855 200,605
574,146 1,748,955
1,040,058
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total100,039 100,039
12,961 12,961
113,000 113,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
0
LSSRP Bond
Total9,197,913
1,191,687
10,389,600
9,197,913
1,191,687
10,389,600
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 823/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Santa Clara
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
San Jose BRIDGE NO. 37C0033, SANTA CLARA ST, OVER COYOTE CREEK, 0.8 MI W OF SH 101. Replace existing 4 lane bridge with new 4 lanebridge
Fund Source Summary:
PER/W
Total 885,000
CON
Total
4,424,000
885,000
5,309,000
885,000
4,424,0004,424,000
Phase Summary:
Fed $
Local AC
Local Match
Total
101,510
885,000
LSSRP Bond
Total4,700,058
608,942
5,309,000
783,491 3,916,567
507,433
4,424,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
3330
5005(089)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
101,510
885,000
LSSRP Bond
Total783,491
101,510
885,000
783,491
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total3,916,567
507,433
4,424,000
3,916,567
507,433
4,424,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 833/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Santa Clara
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
San Jose BRIDGE NO. 37C0757, NOBEL AVE, OVER PENITENCIA CREEK, PENITENCIA CREEK RD. Replace existing 2 lane bridge with new 2 lanebridge 4/5/2010: Toll Credits programmed for PE & Con.
Fund Source Summary:
PER/W
Total
CON
Total
1,856,250
450,000 450,000
450,000 2,306,2501,856,2501,856,250
Phase Summary:
Fed $
Local AC
Local Match
Total
LSSRP Bond
Total450,000 2,306,250
450,000 2,306,250
1,856,250
1,856,250
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
3429
Project #:
PE Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total450,000 450,000
450,000 450,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total1,856,250
1,856,250
1,856,250
1,856,250
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 843/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Santa Clara
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Santa Clara County BRIDGE NO. 37C0094, UVAS RD, OVER UVAS CREEK, 0.6 MI S/O CROY RD. Replace 2 lane bridge with new 2 lane bridge.
Fund Source Summary:
PER/W
Total
300,000
1,700,000
CON
Total
6,000,000
1,400,000
300,000
7,700,000
1,400,000
6,000,0006,000,000
Phase Summary:
Fed $
Local AC
Local Match
Total
194,990
1,700,000
LSSRP Bond
Total6,816,810
883,190
7,700,000
1,505,010 5,311,800
688,200
6,000,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
1710
5937(123)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
160,580
1,400,000
LSSRP Bond
Total1,239,420
160,580
1,400,000
1,239,420
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
34,410
300,000
LSSRP Bond
Total265,590
34,410
300,000
265,590
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total5,311,800
688,200
6,000,000
5,311,800
688,200
6,000,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 853/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Santa Clara
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Santa Clara County BRIDGE NO. 37C0095, UVAS RD, OVER LITTLE UVAS CREEK, 0.2 MI N/O CROY RD. Replace 2 lane bridge with new 2 lane bridge.
Fund Source Summary:
PER/W
Total
40,000
2,315,000
CON
Total
9,054,602
2,275,000
410,000 450,000
410,000 11,779,602
2,275,000
9,054,6029,054,602
Phase Summary:
Fed $
Local AC
Local Match
Total
265,531
2,315,000
LSSRP Bond
Total362,973 10,428,482
47,027 1,351,120
410,000 11,779,602
2,049,470 8,016,039
1,038,563
9,054,602
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
1711
5937(124)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
260,943
2,275,000
LSSRP Bond
Total2,014,058
260,943
2,275,000
2,014,058
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
4,588
40,000
LSSRP Bond
Total362,973 398,385
47,027 51,615
410,000 450,000
35,412
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total8,016,039
1,038,563
9,054,602
8,016,039
1,038,563
9,054,602
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 863/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Santa Clara
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Santa Clara County BRIDGE NO. 37C0096, UVAS RD, OVER LLAGAS CREEK, 1.0 MI N/O OAK GLEN AV. Replace 2 lane bridge with new 2 lane bridge.
Fund Source Summary:
PER/W
Total
300,000
1,740,000
CON
Total
6,603,328
1,440,000
300,000
8,343,328
1,440,000
6,603,3286,603,328
Phase Summary:
Fed $
Local AC
Local Match
Total
199,578
1,740,000
LSSRP Bond
Total7,386,348
956,980
8,343,328
1,540,422 5,845,926
757,402
6,603,328
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
1709
5937(106)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
165,168
1,440,000
LSSRP Bond
Total1,274,832
165,168
1,440,000
1,274,832
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
34,410
300,000
LSSRP Bond
Total265,590
34,410
300,000
265,590
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total5,845,926
757,402
6,603,328
5,845,926
757,402
6,603,328
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 873/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Santa Clara
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Santa Clara County BRIDGE NO. 37C0159, ALAMITOS RD, OVER ALAMITOS CREEK, 0.8 MI S OF ALMADEN. Replace 2 lane bridge with new 2 lane bridge.4/5/2010: Toll Credits programmed for R/W & Con.
Fund Source Summary:
PER/W
Total 1,053,596
CON
Total
9,000,000 9,000,000
1,053,596
9,000,000 10,053,596
1,053,596
Phase Summary:
Fed $
Local AC
Local Match
Total
210,719
1,053,596
LSSRP Bond
Total9,000,000 9,842,877
210,719
9,000,000 10,053,596
842,877
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
1221
5937(058)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
210,719
1,053,596
LSSRP Bond
Total842,877
210,719
1,053,596
842,877
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
TotalPrior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total9,000,000 9,000,000
9,000,000 9,000,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 883/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Santa Clara
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Santa Clara County BRIDGE NO. 37C0172, NEW AVE, OVER RED FOX CREEK, 1.6 MI N LEAVESLY ROAD. Bridge Replacement 4/5/2010: Toll Creditsprogrammed for PE & Con. 10/3/2011: Toll credits used for R/W. Replace two-lane with two-lane bridge.
Fund Source Summary:
PER/W
Total 500,000
CON
Total
4,749,196
600,000 1,100,000
80,000 420,000 500,000
80,000 1,020,000 6,349,196
500,000
4,749,1964,749,196
Phase Summary:
Fed $
Local AC
Local Match
Total 500,000
LSSRP Bond
Total1,100,000 6,349,196
80,000 -80,00080,000 1,020,000 6,349,196
500,000 4,749,196
4,749,196
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
189
5937(182)Project #:
PE Summary:Fed $
Local AC
Local Match
Total 500,000
LSSRP Bond
Total600,000 1,100,000
600,000 1,100,000
500,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total500,000 500,000
80,000 -80,000
80,000 420,000 500,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total4,749,196
4,749,196
4,749,196
4,749,196
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 893/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Santa Clara
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.
HBP-ID Project Description
Santa Clara County BRIDGE NO. 37C0501, ALAMITOS RD OVER HERBERT CREEK, 0.7 MI W OF HICKS RD. Replace existing one-lane bridge with a newtwo-lane bridge (non-capacity increasing), 9/28/2015: Toll Credits programmed for PE, R/W, & CON.
Fund Source Summary:
PER/W
Total 580,000
CON
Total
3,500,000 3,500,000
200,000 780,000
50,000 50,000
250,000 3,500,000 4,330,000
580,000
Phase Summary:
Fed $
Local AC
Local Match
Total 580,000
LSSRP Bond
Total250,000 3,500,000 4,330,000
250,000 3,500,000 4,330,000
580,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4300
5937(210)Project #:
PE Summary:Fed $
Local AC
Local Match
Total 580,000
LSSRP Bond
Total200,000 780,000
200,000 780,000
580,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total50,000 50,000
50,000 50,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total3,500,000 3,500,000
3,500,000 3,500,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 903/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Santa Clara
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Santa Clara County BRIDGE NO. 37C0502, ALAMITOS RD OVER HERBERT CREEK, 0.9 MI SW OF JCT HICKS RD. Replace existing one-lane bridge with anew two-lane bridge.(non capacity increasing) 10/20/2015: Toll Credits programmed for PE, R/W, & CON.
Fund Source Summary:
PER/W
Total 539,825
CON
Total
3,500,000 3,500,000
200,000 739,825
50,000 50,000
250,000 3,500,000 4,289,825
539,825
Phase Summary:
Fed $
Local AC
Local Match
Total 539,825
LSSRP Bond
Total250,000 3,500,000 4,289,825
250,000 3,500,000 4,289,825
539,825
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4280
5937(211)Project #:
PE Summary:Fed $
Local AC
Local Match
Total 539,825
LSSRP Bond
Total200,000 739,825
200,000 739,825
539,825
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total50,000 50,000
50,000 50,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total3,500,000 3,500,000
3,500,000 3,500,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 913/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Santa Clara
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.
HBP-ID Project Description
Santa Clara County BRIDGE NO. 37C0503, ALAMITOS RD OVER HERBERT CREEK, 1.1 MI SW JET OF HICK RD. Replace existing one-lane bridge with a newtwo-lane bridge, (not capacity increasing) 10/20/2015: Toll Credits programmed for PE, R/W, & CON.
Fund Source Summary:
PER/W
Total 541,825
CON
Total
3,500,000 3,500,000
200,000 741,825
50,000 50,000
250,000 3,500,000 4,291,825
541,825
Phase Summary:
Fed $
Local AC
Local Match
Total 541,825
LSSRP Bond
Total250,000 3,500,000 4,291,825
250,000 3,500,000 4,291,825
541,825
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4281
5937(212)Project #:
PE Summary:Fed $
Local AC
Local Match
Total 541,825
LSSRP Bond
Total200,000 741,825
200,000 741,825
541,825
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total50,000 50,000
50,000 50,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total3,500,000 3,500,000
3,500,000 3,500,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 923/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Santa Clara
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Santa Clara County BRIDGE NO. 37C0506, ALDERCROFT HTS RD OVER HOOKER CREEK, 2.12 MI S LOS GATOS SC RD. Replace existing one-lane bridgewith a new two-lane bridge, (not capacity increasing) 10/20/2015: Toll Credits programmed for PE, R/W, & CON.
Fund Source Summary:
PER/W
Total 600,000
CON
Total
3,181,000
200,000 800,000
300,000 300,000
500,000 4,281,000
600,000
3,181,0003,181,000
Phase Summary:
Fed $
Local AC
Local Match
Total 600,000
LSSRP Bond
Total500,000 4,281,000
500,000 4,281,000
600,000 3,181,000
3,181,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4277
5937(205)Project #:
PE Summary:Fed $
Local AC
Local Match
Total 600,000
LSSRP Bond
Total200,000 800,000
200,000 800,000
600,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total300,000 300,000
300,000 300,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total3,181,000
3,181,000
3,181,000
3,181,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 933/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Santa Clara
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.
HBP-ID Project Description
Santa Clara County BRIDGE NO. 37C0507, ALDERCROFT HTS RD OVER LOS GATOS CREEK, 2.12 MI S LOS GATOS SC RD. Replace existing one-lane bridgeto a new two-lane bridge,(not capacity increasing) 10/20/2015: Toll Credits programmed for PE, R/W, & CON.
Fund Source Summary:
PER/W
Total 600,000
CON
Total
3,645,000 3,645,000
200,000 800,000
300,000 300,000
500,000 3,645,000 4,745,000
600,000
Phase Summary:
Fed $
Local AC
Local Match
Total 600,000
LSSRP Bond
Total500,000 3,645,000 4,745,000
500,000 3,645,000 4,745,000
600,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4276
5937(206)Project #:
PE Summary:Fed $
Local AC
Local Match
Total 600,000
LSSRP Bond
Total200,000 800,000
200,000 800,000
600,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total300,000 300,000
300,000 300,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total3,645,000 3,645,000
3,645,000 3,645,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 943/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Santa Clara
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Santa Clara County BRIDGE NO. 37C0508, ALDERCROFT HTS RD OVER LOS GATOS CREEK, 2.38 MI S LOS GATOS SC RD. Replace existing one-lanebridge with a new two-lane bridge, (not capacity increasing) 10/20/2015: Toll Credits programmed for PE, R/W, & CON.
Fund Source Summary:
PER/W
Total 600,000
CON
Total
4,000,000 4,000,000
200,000 800,000
300,000 300,000
500,000 4,000,000 5,100,000
600,000
Phase Summary:
Fed $
Local AC
Local Match
Total 600,000
LSSRP Bond
Total500,000 4,000,000 5,100,000
500,000 4,000,000 5,100,000
600,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4275
5937(207)Project #:
PE Summary:Fed $
Local AC
Local Match
Total 600,000
LSSRP Bond
Total200,000 800,000
200,000 800,000
600,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total300,000 300,000
300,000 300,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total4,000,000 4,000,000
4,000,000 4,000,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 953/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Santa Clara
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Santa Clara County BRIDGE NO. 37C0574, STEVENS CYN RD, OVER STEVENS CREEK, 2.5 MI SW/O MT EDEN RD. Replace 2 lane bridge with new 2 lanebridge. 4/1/2010: Toll Credits programmed for R/W, & Con.
Fund Source Summary:
PER/W
Total 3,159,600
CON
Total
2,559,600 213,358 2,772,958
600,000
213,358 3,372,958
600,000
Phase Summary:
Fed $
Local AC
Local Match
Total
68,820
3,159,600
LSSRP Bond
Total213,358 3,304,138
68,820
213,358 3,372,958
3,090,780
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
1378
5937(107)5937(208)
Project #:
PE Summary:Fed $
Local AC
Local Match
Total
68,820
600,000
LSSRP Bond
Total531,180
68,820
600,000
531,180
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
TotalPrior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total 2,559,600
LSSRP Bond
Total213,358 2,772,958
213,358 2,772,958
2,559,600
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 963/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Santa Clara
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Santa Clara County BRIDGE NO. 37C0575, STEVENS CYN RD, OVER STEVENS CREEK, 2.7 MI SW/O MT EDEN RD. Replace 2 lane bridge with new 2 lanebridge. 4/1/2010: Toll Credits programmed for R/W, & Con.
Fund Source Summary:
PER/W
Total 3,571,000
CON
Total
2,971,000 141,347 3,112,347
600,000
141,347 3,712,347
600,000
Phase Summary:
Fed $
Local AC
Local Match
Total
68,820
3,571,000
LSSRP Bond
Total141,347 3,643,527
68,820
141,347 3,712,347
3,502,180
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
1377
5937(109)5937(209)
Project #:
PE Summary:Fed $
Local AC
Local Match
Total
68,820
600,000
LSSRP Bond
Total531,180
68,820
600,000
531,180
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
TotalPrior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total 2,971,000
LSSRP Bond
Total141,347 3,112,347
141,347 3,112,347
2,971,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 973/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Santa Clara
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.
HBP-ID Project Description
Saratoga BRIDGE NO. 37C0114 & 37C0113, QUITO RD, OVER SAN TOMAS CREEK, NORTH AND SOUTH OF OLD ADOBE RD. Replace 2 lanebridges with new 2 lane bridges.
Fund Source Summary:
PER/W
Total
400,000
1,239,500
CON
Total
3,490,001 3,490,001
839,500
400,000
3,490,001 4,729,501
839,500
Phase Summary:
Fed $
Local AC
Local Match
Total
213,780
1,239,500
LSSRP Bond
Total3,089,698 4,115,418
400,303 614,083
3,490,001 4,729,501
1,025,720
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
932
5332(004)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
167,900
839,500
LSSRP Bond
Total671,600
167,900
839,500
671,600
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
45,880
400,000
LSSRP Bond
Total354,120
45,880
400,000
354,120
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total3,089,698 3,089,698
400,303 400,303
3,490,001 3,490,001
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 983/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Santa Clara
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Saratoga BRIDGE NO. 37C0294, 4TH ST, OVER SARATOGA CREEK, NEAR BASIN WAY. Replace deck, railings, widen lanes & shoulders, newsidewalks. No added lane capacity.
Fund Source Summary:
PER/W
Total 105,000
CON
Total
435,000
250,000 355,000
10,000 10,000
260,000 800,000
105,000
435,000435,000
Phase Summary:
Fed $
Local AC
Local Match
Total
12,044
105,000
LSSRP Bond
Total230,178 708,240
29,822 91,760
260,000 800,000
92,957 385,106
49,895
435,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
1793
5332(020)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
12,044
105,000
LSSRP Bond
Total221,325 314,282
28,675 40,719
250,000 355,000
92,957
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total8,853 8,853
1,147 1,147
10,000 10,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total385,106
49,895
435,000
385,106
49,895
435,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 993/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Santa Clara
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Sunnyvale BRIDGE NO. 37C0765, FAIROAKS AVE, OVER CALTRAIN,UP RR, HENDY AVE. Bridge rehabilitation. No adding lane capacity.
Fund Source Summary:
PER/W
Total
1,985,000
4,926,000
CON
Total
17,365,000 5,706,436 23,071,436
2,941,000
1,339,505 3,324,505
18,704,505 5,706,436 29,336,941
2,941,000
Phase Summary:
Fed $
Local AC
Local Match
Total
565,012
4,926,000
LSSRP Bond
Total16,559,098 5,051,908 25,971,994
2,145,407 654,528 3,364,947
16,559,098 -16,559,09818,704,505 5,706,436 29,336,941
4,360,988
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
3262
5213(039)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
337,333
2,941,000
LSSRP Bond
Total2,603,667
337,333
2,941,000
2,603,667
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
227,680
1,985,000
LSSRP Bond
Total1,185,864 2,943,184
153,641 381,321
1,185,864 -1,185,864
1,339,505 3,324,505
1,757,321
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total15,373,235 5,051,908 20,425,142
1,991,766 654,528 2,646,294
15,373,235 -15,373,235
17,365,000 5,706,436 23,071,436
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 1003/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Solano
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Solano County BRIDGE NO. 23C0092, STEVENSON BR RD, OVER PUTAH CREEK, SOL/YOL CO LINE. Bridge rehabilitation. No adding lane capacity.
Fund Source Summary:
PER/W
Total
500,000
1,800,000
CON
Total
6,372,000
428,000 1,728,000
500,000
428,000 8,600,000
1,300,000
6,372,0006,372,000
Phase Summary:
Fed $
Local AC
Local Match
Total
317,350
1,800,000
LSSRP Bond
Total342,400 7,466,182
85,600 1,133,818
428,000 8,600,000
1,482,650 5,641,132
730,868
6,372,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
1498
5923(059)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
260,000
1,300,000
LSSRP Bond
Total342,400 1,382,400
85,600 345,600
428,000 1,728,000
1,040,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
57,350
500,000
LSSRP Bond
Total442,650
57,350
500,000
442,650
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total5,641,132
730,868
6,372,000
5,641,132
730,868
6,372,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 1013/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Solano
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Solano County BRIDGE NO. 23C0118, MAIN PRAIRIE RD OVER ULATIS CREEK, 0.3 MI E OF RTE 113. Replace existing 2-lane bridge with a new 2-lanebridge. Chien Wu, 3/3/2017 10:09:01 AM.
Fund Source Summary:
PER/W
Total
CON
Total
3,873,800
691,750 691,750
100,000
691,750 4,665,5503,873,800
100,000
3,973,800
Phase Summary:
Fed $
Local AC
Local Match
Total
LSSRP Bond
Total612,406 4,130,411
79,344 535,139
691,750 4,665,550
3,518,005
455,795
3,973,800
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4524
Project #:
PE Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total612,406 612,406
79,344 79,344
691,750 691,750
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total88,530
11,470
100,000
88,530
11,470
100,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total3,429,475
444,325
3,873,800
3,429,475
444,325
3,873,800
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 1023/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Solano
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Vacaville BRIDGE NO. 23C0011, BUCK AVE OVER ALAMO CREEK, 0.1 MI E OF ALAMO AVE. Replace existing two-lane bridge with a new two-lanebridge.
Fund Source Summary:
PER/W
Total 716,512
CON
Total
3,926,000 3,926,000
13,560 89,928 820,000
20,000 101,001 15,999 137,000
20,000 4,040,561 105,927 4,883,000
716,512
Phase Summary:
Fed $
Local AC
Local Match
Total
82,184
716,512
LSSRP Bond
Total17,706 101,421 3,569,465 4,322,920
2,294 463,452 12,150 560,080
3,475,688 -3,475,68820,000 4,040,561 105,927 4,883,000
634,328
-0
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
3944
5094(057)5094(066)
Project #:
PE Summary:Fed $
Local AC
Local Match
Total
82,184
716,512
LSSRP Bond
Total12,005 79,613 725,946
1,555 10,315 94,054
13,560 89,928 820,000
634,328
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total17,706 89,416 14,164 121,286
2,294 11,585 1,835 15,714
20,000 101,001 15,999 137,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
0
LSSRP Bond
Total3,475,688 3,475,688
450,312 450,312
3,475,688 -3,475,688
3,926,000 3,926,000
-0
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 1033/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Solano
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Vacaville BRIDGE NO. 23C0236, ALDRIDGE RD OVER PUTAH SOUTH CANAL, 500 W EUBANKS DR . 10/22/2015: Replace existing 2-lane bridge with new 2-lane bridge. No added capacity. 5/9/2012: Toll Credits programmed for PE, R/W, &CON.
Fund Source Summary:
PER/W
Total 671,812
CON
Total
2,291,498
671,812
30,000 30,000
30,000 2,993,310
671,812
2,291,4982,291,498
Phase Summary:
Fed $
Local AC
Local Match
Total 671,812
LSSRP Bond
Total30,000 2,993,310
30,000 2,993,310
671,812 2,291,498
2,291,498
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
3943
5094(058)5094(065)
Project #:
PE Summary:Fed $
Local AC
Local Match
Total 671,812
LSSRP Bond
Total671,812
671,812
671,812
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total30,000 30,000
30,000 30,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total2,291,498
2,291,498
2,291,498
2,291,498
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 1043/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Solano
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Vallejo BRIDGE NO. 23C0152, SACRAMENTO ST, OVER US NAVY RR, BTWN ILLINOIS FARRAGUT ST. Scope changed to replacement. Replaceexisting two-lane bridge with a new two-lane bridge. No added lane capacity. Seismic funds used for portion of the project.
Fund Source Summary:
PER/W
Total
380,000
1,369,000
CON
Total
8,087,000 8,087,000
159,000 1,148,000
175,000 555,000
334,000 8,087,000 9,790,000
989,000
Phase Summary:
Fed $
Local AC
Local Match
Total
157,024
1,369,000
LSSRP Bond
Total
218,504 218,504
295,690 7,159,421 8,667,087
38,310 709,075 904,410
334,000 8,087,000 9,790,000
1,211,976
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
2041
5030(056)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
113,438
989,000
LSSRP Bond
Total140,763 1,016,324
18,237 131,676
159,000 1,148,000
875,562
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
43,586
380,000
LSSRP Bond
Total154,928 491,342
20,073 63,659
175,000 555,000
336,414
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total
218,504 218,504
7,159,421 7,159,421
709,075 709,075
8,087,000 8,087,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 1053/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Solano
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Vallejo BRIDGE NO. 23C0248, G STREET, OVER NAPA RIVER, 1 MILE WEST OF SR 29. Bridge Preventive Maintenance (Painting, applyingMethacrylate, piles and boards of fender system repairs, replacing anodes at Piers 26 and 27).
Fund Source Summary:
PER/W
Total 494,280
CON
Total
10,011,400
701,220 1,195,500
701,220 11,206,900
494,280
10,011,40010,011,400
Phase Summary:
Fed $
Local AC
Local Match
Total
56,694
494,280
LSSRP Bond
Total620,790 9,921,469
80,430 1,285,431
701,220 11,206,900
437,586 8,863,092
1,148,308
10,011,400
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4240
5030(060)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
56,694
494,280
LSSRP Bond
Total620,790 1,058,376
80,430 137,124
701,220 1,195,500
437,586
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total8,863,092
1,148,308
10,011,400
8,863,092
1,148,308
10,011,400
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 1063/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Sonoma
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Petaluma BRIDGE NO. 20C0045, WASHINGTON ST OVER PETALUMA RIVER, NEAR DOWNTOWN PETALUMA. Voluntary seismic retrofit project.
Fund Source Summary:
PER/W
Total 250,000
CON
Total
1,680,000
80,000 546,000 876,000
80,000 546,000 2,556,000
250,000
1,680,0001,680,000
Phase Summary:
Fed $
Local AC
Local Match
Total
28,675
250,000
LSSRP Bond
Total70,824 483,374 2,262,827
9,176 62,626 293,173
80,000 546,000 2,556,000
221,325 1,487,304
192,696
1,680,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
3570
5022(050)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
28,675
250,000
LSSRP Bond
Total70,824 483,374 775,523
9,176 62,626 100,477
80,000 546,000 876,000
221,325
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total1,487,304
192,696
1,680,000
1,487,304
192,696
1,680,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 1073/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Sonoma
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Sonoma BRIDGE NO. 20C0497, CHASE ST OVER NATHANSON CREEK, 0.1 MI E SR 12 SONOMA. Replace existing two lane bridge with two lanebridge widened to accommodate shoulders and sidewalks.
Fund Source Summary:
PER/W
Total
90,000
501,079
CON
Total
1,809,266 1,809,266
411,079
30,000 120,000
1,809,266 30,000 2,340,345
411,079
Phase Summary:
Fed $
Local AC
Local Match
Total
57,474
501,079
LSSRP Bond
Total1,601,743 26,559 2,071,907
207,523 3,441 268,438
1,809,266 30,000 2,340,345
443,605
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
3643
5114(016)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
47,151
411,079
LSSRP Bond
Total363,928
47,151
411,079
363,928
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
10,323
90,000
LSSRP Bond
Total26,559 106,236
3,441 13,764
30,000 120,000
79,677
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total1,601,743 1,601,743
207,523 207,523
1,809,266 1,809,266
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 1083/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Sonoma
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.
HBP-ID Project Description
Sonoma County BRIDGE NO. 20C0005, GEYSERS RD, OVER BIG SULPHUR CREEK, 18.6 MI N OF SH 128. Replace 1 lane bridge with 2 lane bridge.(LSSRP Seismic) 10/11/2011: Toll credits used for R/W. Toll credits used for CON.
Fund Source Summary:
PER/W
Total 1,208,387
CON
Total
6,766,964
1,208,387
100,000 100,000
100,000 8,075,351
1,208,387
6,766,9646,766,964
Phase Summary:
Fed $
Local AC
Local Match
Total
138,602
1,208,387
LSSRP Bond
Total100,000 7,936,749
138,602
100,000 8,075,351
1,069,785 6,766,964
6,766,964
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
1993
5920(111)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
138,602
1,208,387
LSSRP Bond
Total1,069,785
138,602
1,208,387
1,069,785
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total100,000 100,000
100,000 100,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total6,766,964
6,766,964
6,766,964
6,766,964
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 1093/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Sonoma
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Sonoma County BRIDGE NO. 20C0017, WATMAUGH ROAD, OVER SONOMA CREEK, 0.3 MI W HWY 12. Replace 2 lane bridge with new 2 lane bridge.(minor seismic contribution)
Fund Source Summary:
PER/W
Total 900,000
CON
Total
6,812,000 6,812,000
567,000 1,467,000
250,000 250,000
250,000 567,000 6,812,000 8,529,000
900,000
Phase Summary:
Fed $
Local AC
Local Match
Total
103,230
900,000
LSSRP Bond
Total
50,529 50,529
221,325 501,965 6,030,664 7,550,724
28,675 65,035 730,808 927,748
250,000 567,000 6,812,000 8,529,000
796,770
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
1160
5920(092)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
103,230
900,000
LSSRP Bond
Total501,965 1,298,735
65,035 168,265
567,000 1,467,000
796,770
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
0
LSSRP Bond
Total221,325 221,325
28,675 28,675
250,000 250,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total
50,529 50,529
6,030,664 6,030,664
730,808 730,808
6,812,000 6,812,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 1103/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Sonoma
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Sonoma County BRIDGE NO. 20C0018, BOHEMIAN HWY, OVER RUSSIAN RIVER, AT MONTE RIO. Replace the two lane bridge with a new two lane bridgeas LSSRP Seismic Retrofit strategy.
Fund Source Summary:
PER/W
Total 2,977,500
CON
Total
16,674,000
1,000,000 3,977,500
400,000 400,000
1,000,000 400,000 21,051,500
2,977,500
16,674,00016,674,000
Phase Summary:
Fed $
Local AC
Local Match
Total
341,519
2,977,500
LSSRP Bond
Total
45,880 1,958,388
885,300 354,120 18,636,893
114,700 456,219
1,000,000 400,000 21,051,500
2,635,981
1,912,508
14,761,492
16,674,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
1999
5920(135)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
341,519
2,977,500
LSSRP Bond
Total885,300 3,521,281
114,700 456,219
1,000,000 3,977,500
2,635,981
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total
45,880 45,880
354,120 354,120
400,000 400,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total
1,912,508
14,761,492
16,674,000
1,912,508
14,761,492
16,674,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 1113/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Sonoma
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Sonoma County BRIDGE NO. 20C0139, WOHLER RD, OVER MARK WEST CREEK, NEAR RIVER RD. Bridge Replacement, no added lane capacity 4/5/2010:Toll Credits programmed for R/W & Con. LSSRP
Fund Source Summary:
PER/W
Total
100,000
865,000
CON
Total
6,659,000 6,659,000
609,161 1,374,161
220,458 320,458
7,488,619 8,353,619
765,000
Phase Summary:
Fed $
Local AC
Local Match
Total
153,000
865,000
LSSRP Bond
Total707,787 6,659,000 8,078,787
121,832 274,832
6,659,000 -6,659,0007,488,619 8,353,619
712,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
2007
5920(056)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
153,000
765,000
LSSRP Bond
Total487,329 1,099,329
121,832 274,832
609,161 1,374,161
612,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total 100,000
LSSRP Bond
Total220,458 320,458
220,458 320,458
100,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total6,659,000 6,659,000
6,659,000 -6,659,000
6,659,000 6,659,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 1123/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Sonoma
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Sonoma County BRIDGE NO. 20C0155, WOHLER RD, OVER RUSSIAN RIVER, 1.5 MI FROM RIVER RD. LSSRP Seismic Retrofit. 11/13/2012: Toll creditsused for PE. 10/18/2017: Toll credits used for R/W.
Fund Source Summary:
PER/W
Total 1,650,000
CON
Total
13,875,880 13,875,880
1,650,000
100,000 150,000 250,000
100,000 150,000 13,875,880 15,775,880
1,650,000
Phase Summary:
Fed $
Local AC
Local Match
Total 1,650,000
LSSRP Bond
Total
1,591,563 1,591,563
250,000 12,284,317 14,184,317
100,000 -100,000100,000 150,000 13,875,880 15,775,880
1,650,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
2011
5920(137)Project #:
PE Summary:Fed $
Local AC
Local Match
Total 1,650,000
LSSRP Bond
Total1,650,000
1,650,000
1,650,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total250,000 250,000
100,000 -100,000
100,000 150,000 250,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total
1,591,563 1,591,563
12,284,317 12,284,317
13,875,880 13,875,880
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 1133/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Sonoma
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Sonoma County BRIDGE NO. 20C0227, GEYSERS RD, OVER FRASIER CREEK, 20.4 MI N OF ST HWY 128. Replace deficient 2-lane bridge with new 2-lanebridge meeting current geometrics standards. 9/14/2010: Toll credits for all phases.
Fund Source Summary:
PER/W
Total 811,250
CON
Total
4,543,000
350,000 1,161,250
80,000 80,000
430,000 5,784,250
811,250
4,543,0004,543,000
Phase Summary:
Fed $
Local AC
Local Match
Total 811,250
LSSRP Bond
Total430,000 5,784,250
430,000 5,784,250
811,250 4,543,000
4,543,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
3626
5920(129)Project #:
PE Summary:Fed $
Local AC
Local Match
Total 811,250
LSSRP Bond
Total350,000 1,161,250
350,000 1,161,250
811,250
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total80,000 80,000
80,000 80,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total4,543,000
4,543,000
4,543,000
4,543,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 1143/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Sonoma
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Sonoma County BRIDGE NO. 20C0242, CHALK HILL RD, OVER MAACAMA CREEK, 1 MI S OF ST HWY 128. Replace one-lane bridge with two-lane bridge.11/10/2010: Toll credits used for PE, R/W, and CON.
Fund Source Summary:
PER/W
Total 1,289,180
CON
Total
12,936,000
1,510,820 2,800,000
250,000 250,000
1,510,820 250,000 15,986,000
1,289,180
12,936,00012,936,000
Phase Summary:
Fed $
Local AC
Local Match
Total 1,289,180
LSSRP Bond
Total1,510,820 250,000 15,986,000
1,510,820 250,000 15,986,000
1,289,180 12,936,000
12,936,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
2016
5920(049)5920(118)
Project #:
PE Summary:Fed $
Local AC
Local Match
Total 1,289,180
LSSRP Bond
Total1,510,820 2,800,000
1,510,820 2,800,000
1,289,180
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total250,000 250,000
250,000 250,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total12,936,000
12,936,000
12,936,000
12,936,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 1153/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Sonoma
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Sonoma County BRIDGE NO. 20C0248, LAMBERT BRIDGE RD, OVER DRY CREEK, 0.4 MI W OF DRY CREEK RD. Replace one-lane bridge with two-lanebridge. Formerly LSSRP Seismic Retrofit 11/10/2010: Toll credits used for PE, R/W, & CON.
Fund Source Summary:
PER/W
Total 1,068,750
CON
Total
5,985,000
1,068,750
250,000 250,000
250,000 7,303,750
1,068,750
5,985,0005,985,000
Phase Summary:
Fed $
Local AC
Local Match
Total 1,068,750
LSSRP Bond
Total250,000 7,303,750
250,000 7,303,750
1,068,750 5,985,000
5,985,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
2017
5920(050)5920(138)
Project #:
PE Summary:Fed $
Local AC
Local Match
Total 1,068,750
LSSRP Bond
Total1,068,750
1,068,750
1,068,750
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total250,000 250,000
250,000 250,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total5,985,000
5,985,000
5,985,000
5,985,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 1163/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Sonoma
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Sonoma County BRIDGE NO. 20C0262, BOYES BLVD, OVER SONOMA CREEK, JUST EAST OF RIVERSIDE DR. Replace 2 lane bridge with 2 lane bridgewith LBSRP contribution.
Fund Source Summary:
PER/W
Total
550,000
1,537,369
CON
Total
5,672,353 5,672,353
719,529 1,706,898
255,915 805,915
6,647,797 8,185,166
987,369
Phase Summary:
Fed $
Local AC
Local Match
Total
260,559
1,537,369
LSSRP Bond
Total
73,809 73,809
802,185 5,021,734 7,100,729
823,878 -73,809 0 1,010,627
5,021,734 -5,021,7346,647,797 8,185,166
1,276,810
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
1827
5920(059)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
197,474
987,369
LSSRP Bond
Total575,623 1,365,518
143,906 341,380
719,529 1,706,898
789,895
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
63,085
550,000
LSSRP Bond
Total226,562 713,477
29,353 92,438
255,915 805,915
486,915
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total
73,809 73,809
5,021,734 5,021,734
650,619 -73,809 0 576,809
5,021,734 -5,021,734
5,672,353 5,672,353
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 1173/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Sonoma
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Sonoma County BRIDGE NO. 20C0326, FRANZ VALLEY SCH RD, OVER FRANZ CREEK, JUST N/O FRANZ RD. Replace existing 2-lane bridge with new2-lane bridge. Toll Credits programmed for PE, R/W, & CON.
Fund Source Summary:
PER/W
Total 500,750
CON
Total
3,000,000
250,000 750,750
100,000 100,000
350,000 3,850,750
500,750
3,000,0003,000,000
Phase Summary:
Fed $
Local AC
Local Match
Total 500,750
LSSRP Bond
Total350,000 3,850,750
350,000 3,850,750
500,750 3,000,000
3,000,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4237
5920(149)Project #:
PE Summary:Fed $
Local AC
Local Match
Total 500,750
LSSRP Bond
Total250,000 750,750
250,000 750,750
500,750
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total100,000 100,000
100,000 100,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total3,000,000
3,000,000
3,000,000
3,000,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 1183/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Sonoma
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Sonoma County BRIDGE NO. 20C0406, RIVER ROAD OVER GILL CREEK, 2.0 MI NW OF SR 128. Replace existing two-lane bridge with new two-lane bridge.Chien Wu, 3/14/2014 2:55:46 PM. 3/20/2014: Toll Credits programmed for PE, R/W, & CON.
Fund Source Summary:
PER/W
Total 868,250
CON
Total
4,862,220
200,000 1,068,250
120,000 120,000
320,000 6,050,470
868,250
4,862,2204,862,220
Phase Summary:
Fed $
Local AC
Local Match
Total 868,250
LSSRP Bond
Total320,000 6,050,470
320,000 6,050,470
868,250 4,862,220
4,862,220
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4197
5920(144)Project #:
PE Summary:Fed $
Local AC
Local Match
Total 868,250
LSSRP Bond
Total200,000 1,068,250
200,000 1,068,250
868,250
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total120,000 120,000
120,000 120,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total4,862,220
4,862,220
4,862,220
4,862,220
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 1193/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Sonoma
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Sonoma County BRIDGE NO. 20C0407, WEST DRY CREEK RD, OVER PENA CREEK, 0.7 MI NW YOAKIM BR RD. Replace one-lane bridge with two-lanebridge. Formerly LSSRP Seismic Retrofit 4/26/2010: Toll Credits programmed for PE, R/W & Con.
Fund Source Summary:
PER/W
Total 540,000
CON
Total
4,000,000
300,000 840,000
250,000 250,000
550,000 5,090,000
540,000
4,000,0004,000,000
Phase Summary:
Fed $
Local AC
Local Match
Total 540,000
LSSRP Bond
Total550,000 5,090,000
550,000 5,090,000
540,000 4,000,000
4,000,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
2020
5920(139)Project #:
PE Summary:Fed $
Local AC
Local Match
Total 540,000
LSSRP Bond
Total300,000 840,000
300,000 840,000
540,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total250,000 250,000
250,000 250,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total4,000,000
4,000,000
4,000,000
4,000,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 1203/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Sonoma
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Sonoma County BRIDGE NO. 20C0433, KING RIDGE RD, OVER BIG AUSTIN CREEK, 2.3 MI N FORT ROSS RD. Replace one lane bridge to two-lane bridge4/1/2010: Toll Credits programmed for PE, R/W, & Con.
Fund Source Summary:
PER/W
Total 628,000
CON
Total
5,000,000
200,000 828,000
150,000 150,000
350,000 5,978,000
628,000
5,000,0005,000,000
Phase Summary:
Fed $
Local AC
Local Match
Total 628,000
LSSRP Bond
Total350,000 5,978,000
350,000 5,978,000
628,000 5,000,000
5,000,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
3319
5920(106)5920(146)
Project #:
PE Summary:Fed $
Local AC
Local Match
Total 628,000
LSSRP Bond
Total200,000 828,000
200,000 828,000
628,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total150,000 150,000
150,000 150,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total5,000,000
5,000,000
5,000,000
5,000,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 1213/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Sonoma
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Sonoma County BRIDGE NO. 20C0440, FREESTONE FLAT RD OVER SALMON CREEK, 0.2 MI E BOHEMIAN HWY. Replace existing one-lane bridge withnew two-lane bridge. 10/4/2010: Toll credits used for PE.
Fund Source Summary:
PER/W
Total 562,500
CON
Total
3,150,000
478,000 1,040,500
400,000 400,000
878,000 4,590,500
562,500
3,150,0003,150,000
Phase Summary:
Fed $
Local AC
Local Match
Total 562,500
LSSRP Bond
Total878,000 4,590,500
878,000 4,590,500
562,500 3,150,000
3,150,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
3707
5920(127)Project #:
PE Summary:Fed $
Local AC
Local Match
Total 562,500
LSSRP Bond
Total478,000 1,040,500
478,000 1,040,500
562,500
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
R/W Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total400,000 400,000
400,000 400,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total3,150,000
3,150,000
3,150,000
3,150,000
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 1223/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Sonoma
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Sonoma County BRIDGE NO. PM00101, Bridge Preventive Maintenance Program (BPMP) for various bridges in the County of Sonoma. See Caltrans LocalAssistance HBP website for backup list of projects.
Fund Source Summary:
PER/W
Total 182,642
CON
Total
547,925
182,642
730,567
182,642
547,925547,925
Phase Summary:
Fed $
Local AC
Local Match
Total
20,949
182,642
LSSRP Bond
Total646,771
83,796
730,567
161,693 485,078
62,847
547,925
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
4165
5920(163)Project #:
PE Summary:Fed $
Local AC
Local Match
Total
20,949
182,642
LSSRP Bond
Total161,693
20,949
182,642
161,693
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
CON Summary:Fed $
Local AC
Local Match
Total
LSSRP Bond
Total485,078
62,847
547,925
485,078
62,847
547,925
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
Caltrans, Division of Local Assistance Page 1233/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
2018/19-2023/24 Highway Bridge Program
District: County:Responsible Agency
04 Sonoma
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.
HBP-ID Project Description
Number of Projects:
MPO Summary:
Fed $
Local AC
Local Match
Total for all Phases
44,880,564
18,046,960
191,907,003
LSSRP Bond
Total
32,690 13,411 305,503 11,470 1,637,443 50,529 5,284,223
26,850,372 67,510,043 31,350,886 31,524,002 20,388,437 58,725,276 752,287,241
4,498,104 11,723,228 1,450,088 2,529,403 4,264,015 65,502,299
16,259,867 27,470,836 -12,825,030 -1,421,037
47,621,754 107,009,610 19,975,944 32,643,838 22,025,880 63,039,820 823,073,764
128,946,790
3,233,178
386,991,436
22,990,501
-74,365,200
338,849,915
Totals:
Metropolitan Transportation Commission
Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond
122
Caltrans, Division of Local Assistance Page 1243/31/2020, 1:07 PM Det2 FL4 SmlTxt brf
Modifications Made to Programming Totals
Source Prior FY17 FY18 FY19 FY20 FY21 FY22 Beyond TotalFed $ $78,133,378 $28,566,694 $44,585,820 $26,850,372 $67,510,043 $31,350,886 $31,524,002 $466,105,149 $774,626,344Local Match $9,897,730 $2,445,962 $5,632,522 $4,498,104 $11,723,228 $1,450,088 $2,529,403 $27,254,516 $65,431,553LSSRP Bond $108,965 $1,182,557 $13,411 $305,503 $11,470 $4,921,150 $6,543,056Local AC $15,521,149 $12,102,308 $16,259,867 $27,470,836 -$12,825,030 -$1,421,037 -$74,365,200 -$17,257,107Total for all Phases $103,661,222 $31,012,656 $63,503,207 $47,621,754 $107,009,610 $19,975,944 $32,643,838 $423,915,615 $829,343,846
Source Prior FY17 FY18 FY19 FY20 Beyond TotalFed $ -$78,133,378 -$78,133,378Local Match -$9,897,730 -$9,897,730LSSRP Bond -$108,965 -$108,965Local AC -$15,521,149 $12,825,030 $1,421,037 $74,365,200 $73,090,118Total for all Phases -$103,661,222 $12,825,030 $74,365,200 -$15,049,955
Source Prior FY17 FY18 FY19 FY20 FY21 FY22 Beyond TotalFed $ $28,566,694 $44,585,820 $26,850,372 $67,510,043 $31,350,886 $31,524,002 $466,105,149 $696,492,966Local Match $2,445,962 $5,632,522 $4,498,104 $11,723,228 $1,450,088 $2,529,403 $27,254,516 $55,533,823LSSRP Bond $1,182,557 $13,411 $305,503 $11,470 $4,921,150 $6,434,091Local AC $12,102,308 $16,259,867 $27,470,836 $55,833,011
Total for all Phases $31,012,656 $63,503,207 $47,621,754 $107,009,610 $32,800,974 $34,064,875 $498,280,815 $814,293,891
Back-up Listing Total
Total Funding for VAR170012
Project Listing Adjustments
Note: Negative amounts not programmed in FMS; Funding for prior years is programmed on VAR110045