girado vs marco-2011

2
(EN NUEVOS SOLES) ENE FEB MAR ABR MAY JUL AGO SET OCT NOV DIC JUN M E N S U A L I Z A D O PIM SALDO DEL MES DE ENERO A DICIEMBRE Sistema Integrado de Administración Financiera Release 14.02.01 Rep0015 21/07/2014 1 de 2 10:02:13 Fecha Hora Pag. : : : 02 10 ANCASH HUARI MUNICIPALIDAD DISTRITAL DE CHAVIN DE HUANTAR [300153] 04 DEPARTAMENTO : PROVINCIA : PLIEGO : FF FUPRGF SPRGF AC/PR COMP PRG ESPECIFICA DET SEC. FUNC CATEGORIA TOTAL GIRADOS EJECUCION GIRADOS Vs MARCO PRESUPUESTAL - 2011 0027 15.036.0074.0000 2.008031 2.005600 CONSTRUCCION DE TERMINAL TERRESTRE - COD.META: 00001 CONSTRUCCION DEL TERMINAL TERRESTRE EN CHAVIN DE HUANTAR, EDIFICACION: 1.000, ANCASH, HUARI, CHAVIN DE HUANTAR CONSTRUCCION DE TERMINAL TERRESTRE 5 RECURSOS DETERMINADOS 2.6 0.00 0.00 709,844.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,110,255 GEN ADQUISICION DE ACTIVOS NO 400,410.92 709,844.08 2.6. 2 0.00 0.00 709,844.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,110,255 CONSTRUCCION DE EDIFICIOS Y 400,410.92 709,844.08 2.6. 2 3 0.00 0.00 709,844.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,110,255 OTRAS ESTRUCTURAS 400,410.92 709,844.08 2.6. 2 3. 2 0.00 0.00 709,844.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,110,255 INFRAESTRUCTURA VIAL 400,410.92 709,844.08 2.6. 2 3. 2 3 0.00 0.00 709,844.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,052,895 COSTO DE CONSTRUCCION POR 343,050.92 709,844.08 2.6. 2 3. 2 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 57,360 COSTO DE CONSTRUCCION POR 57,360.00 0.00 0.00 0.00 709,844.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,110,255 5 PARCIAL FTE 709,844.08 400,410.92 TOTAL META 0.00 0.00 709,844.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,110,255 709,844.08 400,410.92 TOTAL EJECUTORA 0.00 0.00 709,844.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,110,255 709,844.08 400,410.92

Upload: drake

Post on 11-Dec-2015

213 views

Category:

Documents


0 download

DESCRIPTION

FGHBFGHGJH Y JYJYUJ

TRANSCRIPT

Page 1: Girado vs Marco-2011

(EN NUEVOS SOLES)

ENE FEB MAR ABR MAY JUL AGO SET OCT NOV DICJUN

M E N S U A L I Z A D O

PIM SALDO

DEL MES DE ENERO A DICIEMBRE

Sistema Integrado de Administración Financiera

Release 14.02.01Rep0015

21/07/2014

1 de 210:02:13

FechaHoraPag.

::

:

0210

ANCASHHUARIMUNICIPALIDAD DISTRITAL DE CHAVIN DE HUANTAR [300153]04

DEPARTAMENTO :PROVINCIA :

PLIEGO :

FF

FUPRGF SPRGF AC/PR COMPPRG

ESPECIFICA DET

SEC.FUNC

CATEGORIATOTAL

GIRADOS

EJECUCION GIRADOS Vs MARCO PRESUPUESTAL - 2011

0027 15.036.0074.0000 2.008031 2.005600 CONSTRUCCION DE TERMINAL TERRESTRE - COD.META: 00001 CONSTRUCCION DEL TERMINAL TERRESTRE EN CHAVIN DE HUANTAR, EDIFICACION: 1.000, ANCASH, HUARI, CHAVIN DE HUANTAR

CONSTRUCCION DE TERMINAL TERRESTRE

5 RECURSOS DETERMINADOS2.6 0.00 0.00 709,844.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.001,110,255GEN ADQUISICION DE ACTIVOS NO 400,410.92709,844.08

2.6. 2 0.00 0.00 709,844.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.001,110,255CONSTRUCCION DE EDIFICIOS Y 400,410.92709,844.08

2.6. 2 3 0.00 0.00 709,844.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.001,110,255OTRAS ESTRUCTURAS 400,410.92709,844.08

2.6. 2 3. 2 0.00 0.00 709,844.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.001,110,255INFRAESTRUCTURA VIAL 400,410.92709,844.082.6. 2 3. 2 3 0.00 0.00 709,844.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.001,052,895COSTO DE CONSTRUCCION POR 343,050.92709,844.082.6. 2 3. 2 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0057,360COSTO DE CONSTRUCCION POR 57,360.000.00

0.00 0.00 709,844.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.001,110,2555PARCIAL FTE 709,844.08 400,410.92

TOTAL META 0.00 0.00 709,844.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.001,110,255 709,844.08 400,410.92

TOTAL EJECUTORA 0.00 0.00 709,844.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.001,110,255 709,844.08 400,410.92

Page 2: Girado vs Marco-2011

(EN NUEVOS SOLES)

ENE FEB MAR ABR MAY JUL AGO SET OCT NOV DICJUN

M E N S U A L I Z A D O

PIM SALDO

DEL MES DE ENERO A DICIEMBRE

Sistema Integrado de Administración Financiera

Release 14.02.01Rep0015

21/07/2014

2 de 210:02:13

FechaHoraPag.

::

:

0210

ANCASHHUARIMUNICIPALIDAD DISTRITAL DE CHAVIN DE HUANTAR [300153]04

DEPARTAMENTO :PROVINCIA :

PLIEGO :

FF

FUPRGF SPRGF AC/PR COMPPRG

ESPECIFICA DET

SEC.FUNC

CATEGORIATOTAL

GIRADOS

EJECUCION GIRADOS Vs MARCO PRESUPUESTAL - 2011

TOTAL 0.00 0.00 709,844.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 709,844.081,110,255

RESUMEN ...

709,844.080.00 709,844.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00TOTAL FUENTE 5 0.00 0.00 0.001,110,255

400,410.92

400,410.92