Transcript
Page 1: Girado vs Marco-2011

(EN NUEVOS SOLES)

ENE FEB MAR ABR MAY JUL AGO SET OCT NOV DICJUN

M E N S U A L I Z A D O

PIM SALDO

DEL MES DE ENERO A DICIEMBRE

Sistema Integrado de Administración Financiera

Release 14.02.01Rep0015

21/07/2014

1 de 210:02:13

FechaHoraPag.

::

:

0210

ANCASHHUARIMUNICIPALIDAD DISTRITAL DE CHAVIN DE HUANTAR [300153]04

DEPARTAMENTO :PROVINCIA :

PLIEGO :

FF

FUPRGF SPRGF AC/PR COMPPRG

ESPECIFICA DET

SEC.FUNC

CATEGORIATOTAL

GIRADOS

EJECUCION GIRADOS Vs MARCO PRESUPUESTAL - 2011

0027 15.036.0074.0000 2.008031 2.005600 CONSTRUCCION DE TERMINAL TERRESTRE - COD.META: 00001 CONSTRUCCION DEL TERMINAL TERRESTRE EN CHAVIN DE HUANTAR, EDIFICACION: 1.000, ANCASH, HUARI, CHAVIN DE HUANTAR

CONSTRUCCION DE TERMINAL TERRESTRE

5 RECURSOS DETERMINADOS2.6 0.00 0.00 709,844.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.001,110,255GEN ADQUISICION DE ACTIVOS NO 400,410.92709,844.08

2.6. 2 0.00 0.00 709,844.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.001,110,255CONSTRUCCION DE EDIFICIOS Y 400,410.92709,844.08

2.6. 2 3 0.00 0.00 709,844.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.001,110,255OTRAS ESTRUCTURAS 400,410.92709,844.08

2.6. 2 3. 2 0.00 0.00 709,844.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.001,110,255INFRAESTRUCTURA VIAL 400,410.92709,844.082.6. 2 3. 2 3 0.00 0.00 709,844.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.001,052,895COSTO DE CONSTRUCCION POR 343,050.92709,844.082.6. 2 3. 2 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0057,360COSTO DE CONSTRUCCION POR 57,360.000.00

0.00 0.00 709,844.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.001,110,2555PARCIAL FTE 709,844.08 400,410.92

TOTAL META 0.00 0.00 709,844.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.001,110,255 709,844.08 400,410.92

TOTAL EJECUTORA 0.00 0.00 709,844.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.001,110,255 709,844.08 400,410.92

Page 2: Girado vs Marco-2011

(EN NUEVOS SOLES)

ENE FEB MAR ABR MAY JUL AGO SET OCT NOV DICJUN

M E N S U A L I Z A D O

PIM SALDO

DEL MES DE ENERO A DICIEMBRE

Sistema Integrado de Administración Financiera

Release 14.02.01Rep0015

21/07/2014

2 de 210:02:13

FechaHoraPag.

::

:

0210

ANCASHHUARIMUNICIPALIDAD DISTRITAL DE CHAVIN DE HUANTAR [300153]04

DEPARTAMENTO :PROVINCIA :

PLIEGO :

FF

FUPRGF SPRGF AC/PR COMPPRG

ESPECIFICA DET

SEC.FUNC

CATEGORIATOTAL

GIRADOS

EJECUCION GIRADOS Vs MARCO PRESUPUESTAL - 2011

TOTAL 0.00 0.00 709,844.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 709,844.081,110,255

RESUMEN ...

709,844.080.00 709,844.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00TOTAL FUENTE 5 0.00 0.00 0.001,110,255

400,410.92

400,410.92


Top Related