41I09SW0014 2.15835 HENRY

GEOLOGICAL REPORT

ON THE

BUILDING STONE PROJECT

l010

RECEIVED

FEB2 -1995

MINING LANDS

LOUGHRIN AND HENRY TOWNSHIPS

SUDBURY MINING DIVISION

for

JOHN BRADY

by: NORWIN GEOLOGICAL LTD.

EDWARD SAWITZKY

JUNE 3, 1994

TABLE OF

41I09SW0014 2.15835 HENRY 01OC

SUMMARY

1. INTRODUCTION

2. PROPERTY, DESCRIPTION, LOCATION AND ACCESSIBILITY

3. PREVIOUS WORK

4. GEOLOGY

4.1 REGIONAL

4.2 LOCAL

5. MINERAL DEPOSIT

6. PROJECT

6.1 RATIONALE

6.2 METHODOLOGY

6.3 RESULTS

7. TECHNICAL EVALUATIONS

7.1 OBSERVATIONS AND CONCLUSIONS

8. ECONOMIC BENEFITS TO NORTHERN ONTARIO

9. RECOMMENDATIONS

l

l

1

2

2

2

4

5

5

5

6

7

7

11

11

APPENDIX A

APPENDIX B

SUMMARY

Geological evaluation of thy site, finished products and

engineering tests indicate that:

1) the property contains at least out; - a fine-grained pink

granite, and possibly two - a black diabase, large stone deposits

of significant economic potential.

2) the Impalla granite deposit was not ev/dluateil due to poor market

conditions.

3) at least two of the developed faces ate capable of supporting

quarry operations as evidenced by removal of three intact blocks of

+X- 10 tons each.

4) initial industry evaluation based on engineering tests (Trow

Engineering, Sudbury) and appearance \iaV6 been positive in regards

to the pink granite.

5) production will remain dependent on economic and market

conditions.

6) the project has been a successful endeavour and added positively

to Ontario's dimension stone resources.

FR

ALE

CK

- IN

DIC

ATES

WO

RK

AR

EA

HU

TTC

WIS

NE

R

HA

NM

ER

AY

LME

RM

AC

KE

LCA

NMC

CART

HY

NO

RM

AN

Cap

reol

CA

PR

EO

L

MA

CB

ET

H

RA

TH

BU

NK

ELL

YM

CN

ISH

MA

CLE

NN

AN

SC

AD

DIN

GD

AV

ISJA

ME

S

i

BLE

ZA

RD

GA

RS

ON

FA

LCO

NB

RID

GE

9F

alco

nb

rid

ge

ST

RE

ET

LOU

GH

RIN

HE

NR

Y

MCKI

M * Sudbury

NE

ELO

ND

RY

DE

N

Con

isto

nl

FIG

UR

E l

J.

BR

AD

Y

PR

OP

ER

TY

PR

OP

ER

TY L

OC

ATIO

ND

ISTR

ICT

OF

SU

DB

UR

YJU

NE.

1994

1. INTRODUCTION

Heritage Fund Application #7114 by John Brady is a request for

assistance to pre-develop a newly discovered building stone deposit

with a focus on quarry development, block removal, cutting,

polishing, A.S.T.M. testing and industry appraisal.

This report summarizes the field woik carried out by the writer in November, 1993 on the stone projects in Loughrin and

Henry Townships.

2. PROPERTY. DESCRIPTION. LOCATION AND ACCESSIBILITY

The Loughrin deposit is accessed by Highway 535 and is 16 km. due north of the town of Hagar, Ontario. Hagar lies 55 km. east of

Sudbury along Highway 17 (Figures l and 2).

The deposit occurs on four (4) contiguous unpatented mining claims that straddle the north-south boundary line of Loughrin and

Henry townships. Claim numbers are S 1179570 - 1179573 inclusive.

John Brady is the sole proprietor of the property and there

are no contractual obligations or option agreements that apply to

the property.

3. PREVIOUS WORK

There has been no recorded prior work on the claims under

discussion (John Brady, pers. comm.)

The Loughrin deposit was discovered by Mr.Brady in 1992. A

preliminary assessment program of mapping, stripping, trenching and

small block removal was undertaken at an approximate cost of

160,000.

5l6 3000mN

2O

10

5l6 OO 00mN

9O

FIGURE 2 J. BRADY PROPERTY

TRENCHING LOCATIONSITES l. 2 8 3

PIS l RICT OF SUDBURY

JUNE, ( 994

page 2

4. GEOLOGY

4.1 REGIONAL

The deposit lies within the Central Gneiss Belt of the

Grenville Province of the Precambrian Shield. The host rocks are

of mesoproterozoic (0.9 to 1.6 Ga.) age and consist of migmatitic

and gneissic rocks of undetermined protolith (Lumbers, 1973).

These rocks occur as layered biotite gneib^es and mi gnu* t i tes which

locally include quartzofeldspathic yneissess, 01. thogueisses, and

paragneisses (Lumbers, 1973). Minor massive granite pegmatite and

cataclastic metadiabase of late precambrian aye also occur on the

property (Lumbers, 1973). Immediately east of the property lies a

large intrusive body of gabrro\anorthosite composition common to

the River Valley area.

4.2 LOCAL

The topography of the area of the property hosting the

potential building stone is relatively flat with local ridge

development of moderate to low relief. Overburden is generally

very shallow, often less than several inches to two feet in

thickness. Exposed bedrock, however, is less than about 2% by

area .

The property visit was restricted to outcrops from which face

development and block removal was carried out. Three outcrop areas

were examined.

The pink "granite 1 deposit consists of essentially two large

bedrock exposures (sites A and B, described below). The host rock

is an equigranular, fine to medium grained, biotite - amphibole

quartz monzonite. The rock is moderately to weakly foliated and

weakly gneissic. Minor constituents include magnetite and rare

STRO

NG

LY FR

AC

TUR

ED ^

't

^

w-ClAM

AS

SIV

E

(WE

AK

) ' j

GN

EIS

SO

SITY

\

r^* FAC

E H\

fi' x 4.5' - 5'-,

i S1 . 4.5- M 5V

|p

— "

\

10' * 3.5' -r 5'-^

Ji

i

\ '

J^F

AC

Elll

\-^Y

VS

- x 4- x 3.5-\

\

\V SITE A

^V

\ \

i '

i i

i j

\ j

* -T

'/M/

VN v o

/ff\

^/'

i^*'

--'""^^1

7 xofc

^,

^/S^ ^

' S

/^

'"4,i

X^/

( ^

J^^

'^ iS

s^trv

nch

N

XX

^.1

6"T/•/TV

MO

A

t — ?

J ^S

'

11 .

xi~

l

•'xPEG

MATO

OCLOTS

•^t^

Qf*

*m

fJtT

tYtf*

iC^ PEG

MATITIC

*

VEIN

\1 ^SH

ALLO

WO

/B

f~*c*

10ro 10)-^

. •--•y g- 'Rooe- ^;

j' o

' y \

\ 2

j

\ \

' ^

\ i

*- ——

——

"~ [

FACE u

i

\ i

V. -— -** "" *™ -^^ -1 * ^*"

LEGEN

D

1 PIN

K GR

ANITE

Z

DIABASE

ISITE c|1 —

——

——

' -r—

GN

EISSOSITY

. "—

— 4

fff4 O

F STR

IPPING

j ——

FA

CE

EDG

E

^M

DfN

OF M

AT

DM

L NCMO

MED

6* x

4.5

' * S'-tfH

HT

or M

iTD

Mt. M

MO

VC

9

^•OIF

TH

GC M

AT

DM

L MO

MO

VCD

^-^

2'"-'

FIGU

RE 3

J. BRAD

Y PRO

PERTY

2 ,.-;-V

"^r-^

S*s*.o4

2.

GEO

LOG

Y 2

(^C

Em

SITE A

SG

nr *r *vD

ISTRIC

T OF SU

DBU

RY

sotoo

ISO

F

EE

T

page 3

sulphide. Felsic (generally pegmatoid) and mafic veining\stringers

occur in minor amounts at site A arid are more common at site B.

Veins and stringers are often folded and or boudinaged. The colour

of the granite is fairly homogeneous - a pale to moderate pink.

The gneissosity gives the rock a characteristic banded appearance.

Fracturing varies from site to site (discussed below), with site A being generally more massive than site B. A detailed study of the fracture pattern would require a more thorough cleaning of the surface of the outcrops. Sheeting is difficult to determine

because of the lack of exposure in the vertical dimension.

A narrow 3-foot wide diabase dike crosscuts the granite several meters south of the face #2 (Site A) developed area.

Underlying the deposit area east of the latter pink granite is

a diabase dike ( > 80 foot width) which is medium to coarse grained, equigranular, non-foliated and variably magnetite-bearing ( <l% to 4-5*). Colour is uniformly greenish-black. Sulphide content is generally low ( < 0 .5 *). Minor thin ( < 1 \4 inch ) felsic stringers crosscut the diabase locally and trend parallel to fractures (Figures 3 and 4).

In the north exposure the bedrock is well-fractured with tightly spaced fractures (inches to feet).

Fracturing in the southern outcrops is less intense, however, exposure is poor (details below).

l P

INK

GR

AN

ITE

r-

GN

EIS

SO

SIT

Y

"—

AR

EA

O

F S

TRJP

PIN

G

ED

GE

erm

FIG

URE

4 J.

BR

ADY

PRO

PER

TY

GEO

LOG

Y SI

TE B

page 4

5. MINERAL DEPOSIT

Description of mineralization -1ype: Stone

Commodity sought is building alone predominately for

dimensional blocks; some usage for fiuniture and ornamental

purposes is possible.

Two varieties of stone were examined a ) a pink granite

b) u l.lack diabase

Dimensions:

a) Pink granite (sites A&B)

i) Overall dimension of intermittently exposed pink granite at

site A is about 420 feet, (north-south) by 180 feet (east-west).

ii) At site B, approximately 700 feet north along Hwy 535, the

overall dimension of exposed pink granite is about 110 feet by 50

feet.

b) Black diabase (site c.)

i) Overall dimension of site where faces I 4 2 are developed is 130

feet by 75 feet.

ii) At the second site (face III) overall dimension of exposed rock

is 45 feet by 30 feet.

page 5

Reserves

i) Pink Granite (sites A 4 B)

From the exposures at sites A and B and intermittently

stripped areas adjacent to these sites and assuming a vertical

depth of 50 feet; the potential mineral inventory of this pink granite would yield a volume of +X- 32 million cubic feet (assuming

a surface area and depth respectively of 800'x 800' x 50').

ii) Black Diabase

From the exposures at site C and intermittently stripped areas

adjacent to site C and assuming a veil i cal depth of 50 feet; the

potential mineral inventory of this black diabase would yield a

volume of +X- 4 million cubic feet (assuming a surface area and

depth respectively of 1000'x 80' x 50').

6. PROJECT

6.1 Rationale

The objective of this project was to test a newly discovered building stone deposit, in accordance with Schedule "A" ( see File #7114, legal agreement with NOHFC) .

6.2 Methodology

a) Site preparation:

John Deer excavator was employed to prepare quarry sites which involved cleaning, removal of waste jock, stone and site

rehabilitation. Also vised was a wajax pump foi hydraulic stripping

and cleaning.

page 6

b) Face development.:

-air track drill used for drilling off facts

-closely spaced drill holes, with average 1.5 inch separation

-average length of hole was four feet

-core size used was 2.5 inches

c) Block extraction:

After drilling off face, blocks were displaced from face by

blasting as follows: best results were obtained by using 1/4 stick

in two inside corners with double b-line running in each hole.

This shifted the block slightly away from the developed face. The

block was then removed via excavator, boom Ltuck and float.

6.3 Results

a) Site preparation:

Three sites were prepared, two on the pink granite and one on the

black diabase deposits.

b) Face development:

Site A: three developed faces arid four blocks removed each +X- 10

tons

Site B: one developed face and no blocks removed

Site C: two developed faces and foiu blocks removed each + \- 1 0

tons

page 7

c) ASTM testing:

Results from ASTM building stone testing are detailed in the

attached report from Trow Consulting Engineers Ltd. (see Appendix

A). Trow considered the stone supplied by John Brady to be

suitable in all respects for building stone purposes.

d) Cutting and polishing: Trow Engineering commented that the

samples of stone from the Brady deposit polished well and was

attractive. George Khouri of Khouri Granite Ltd. (Sudbury, Ontario) likewise commented that the rock cuts and polishes well

and is a pleasing and attractive stone for decorative purposes. As per conditions of bulk sampling permit and marketing initiatives

samples of both the pink granite and black diabase were given to

the numerous industry representatives (see Appendix B).

In all cases industry comments were very favourable, however,

market conditions limit further exploitation of the resource at

this time.

e) Results of geological mapping is discussed below.

7. TECHNICAL EVALUATIONS

7.1 Observations and Conclusions

Three sites were visited; two sites on the pink granite (sites A and B) and one on the black " granite 1 ( site C) (see Figures 2 and

3).

Pink Granite

This deposit consists of two separate bedrock exposures; site A is accessed by Hwy 535 and lies 50 feet west of the highway.

page 8

Site B also accessed by Hwy 535 lies appi oximal.ul y 300 fcet due

west of the highway and about 700 feel wu l h of site A.

a) Site A

At th.i site three separate localities had faces developed arid

each area will be discussed separately.

i) At the first location (Face I) the following observaLions were

made:

- one west and south face were developed

- dimensions of two exposed sides were 9x3 feet, and 9x4 feet

- fractures developed were:

1) flats (sheeting); one observed

2) vertical; fractures are parallel to the gneissosity

- rock is a fine-grained, equigranular, foliated and weakly

gneissic pink granite, weakly magnetic and devoid of sulphides.

Biotite defines the fabric in the rock. Two thin mafic stringers

and one narrow pegmatite vein cross-cut folia and gneissosity.

Weakly oxidized upper surface of face gives took a slight yellowish

hue.

ii) At the second local, ion (Face TT) l.he following observations

were made:

- two north and one west face were developed

- dimensions were 6 x 4.5 feet, 6x4.5 feet and 10 x 3.5 feet

- fractures developed were:

1) flats (10 dip degrees to the northeast, spacing > 30 inches)

2) fractures parallel to gneissosity (spacing ^ 1 0 feet in general)

3) fractures perpendicular to diabase dike liend ie. 240 degrees/80

degrees dip (narrow spacing inches to feet.)

page 9

4) fractures associated with the intrusion of the dia-base dike (140

degrees\ 80 degrees dip), this fiacturing decreases in intensity

rapidly away from the contact

- rock is fine-grained to medium grained, massive to gneissic, non-

xenolithic and lias minor veins\str.i.ngers (mafic and pegmatoid).

iii) At the third locality (Face III) the following observations

were made:

- one south face was developed

- dimensions were 18 x 4 x 3.5 feet

- fractures developed were:1) subflats (discontinuous, rusty, 15 - 25 degree dips northeast)

2) fractures 40 to 50 degrees\ 75 degree dip

- rock is fine to medium grained, equigranular, foliated and gneissic, weak to moderately magnetic arid pink in colour. Minor

mafic veining is present.

b) Site B

At this location one northerly face was developed. Face

development was parallel to fractured surface and, therefore, face

exposure is poor. Dimensions of exposed sides are 20 x 3 feet and 6x4 feet. Fracturing is fairly strong throughout outcrop and

spacing varies from 0.5 feet to 3 feet with prominent directions

being 260/80-75 dips and 0-20/80 east and west dips. Flats are

irregular in dip (north,east and west). The rock is fine grained,

equigranular, weakly magnetic, gneissic with veining (mafic and

felsic) more prominent than at site A.

page 10

c) Site C

At this location, opposite site A and 70 feet east of Highway

535, in two separate areas face development was attempted.

i) At this locality (Face I) one north face was developed.

- dimensions 10 x 4.5 x 4.5 feet

- fractures developed were:1) flats (numerous, narrow spacing < 3-4 inches)

2) vertical azimuth 320, spacing inches to 4 feet

- rock is medium grained, equigranular, strongly magnetic, non to weakly foliated with very low sulphide content. Colour is uniformly black to dark green.

ii) At this locality (Face III) one north face was developed.

- dimensions were 11 x 6 feet

- fractures developed were:

1) flats (minor)2) 120 degrees dipping 80 (spacing 2 feet)

200 degrees dipping 80 (spacing l to 3 feet)

- rock is coarse grained, equigranular, non-foliated, and black to green in colour. Minor white felsic stringers are parallel to

second fracture set. This section is lower in elevation than the latter area and contains less fractured rock.

page 11

8. ECONOMIC BENEFITS TO NORTHERN ONTARIO

A total of nine people were employed by the project between

July 15 to September 15, 1994 at various times for approximately 40

manweeks of employment. Due to depressed market conditions no

further development/expenditures are warranted at this time.

Nonetheless, the project has confirmed that a very large deposit of

fine-grained pink granite and black diabase which meet both the

ASTM specifications and positive industry response to qualify as an

attractive commercial building stone are potentially available.

With improved economic conditions and available markets these

deposits would' be capable of supporting approximately 10 to 15

workers for 8 months of the year in extraction. An additional 6-8

workers could also be employed in cutting, polishing and marketing

efforts.

9. RECOMMENDATIONS

1) Further development in the vicinity of sites A and B to find

more outcrops of pink granite, especially with a natural ridge face

to facilitate block removal.

2) Further site preparation and hydraulic washing in areas adjacent

to sites A and B to expose additional massive sections of pink

granite.

3) Further block removal at site A to test the depth potential of

this mateiial is warranted. Considering the significant cost of

this proposal, waiting until the market for stone has improved

should be considered.

4) Further development in the vicinity of site C to locate more

massive less fractured black diabase.

5) A diamond drilling program to determine depth of deposit (for

reserve calculations) arid density of fracturing.

APPENDIX A

Trow Consulting Engineers Ltd. 1074 Webbwood Drive Sudbury, Ontario P3C 3B7

— Telephone: (705) 674-9681 HOW Sudbury Branch ____Facsimile: (705) 674-8271

SOO575R April 7, 1994

Mr. John Brady 1227 Holland Road Sudbury, Ontario P3A 3R1

Dear Sirs:

BUILDING STONE TEST RESULTSPINK GRANITE AND BLACK TRAP ROCK

SUDBURY, ONTARIO

Further to your request, we have completed ASTM building stone testing in connection

with the above noted rock and, based on our findings, we provide the following comments

and recommendations.

One, 200 mm block specimen of each rock type was delivered to our office in early

February 1994, together with a polished specimen of each rock. We have described the

rock/building stone as a mottled pink granite and black trap rock (probably diabase),

respectively.

We understand that the rock is derived from a potential quarry property north of Hagar,

Ontario.

Both specimens are attractive, well polished and seem very durable. There are no

apparent sulphides or iron minerals that would affect weathering or staining and both rock

types contain a high percentage of quartz minerals and can be considered granite. Testing

requirements for granite building stone were, therefore, undertaken and the laboratory

results are provided in the attached T^ble l.

SOO575R 2Trow

Both specimens exceed the ASTM compressive strength requirements; however, the black

granite is considerably stronger overall.

We trust the enclosed results are satisfactory. Should you have any questions, please do

not hesitate to contact this office.

Yours very truly,TROW CONSULTING ENGINEERS LTD.

W.G. Hunt/F.Eng. WGH:gmv21b Encl.

Trow Sudbury Branch

Trow Consulting Engineers Ltd. 1074 Webbwood Drive Sudbury, Ontario P3C 3B7 Telephone: (705) 674-9681 Facsimile: (705) 674-8271

S00575R

Mr. John Brady 1227 Holland Road Sudbury, Ontario P3A 3R1

ATTENTION;

Dear Sirs:

September l, 1994

r. John Bradv

BUILDING STONE TESTSGRANITE SAMPLES

SUDBURY, ONTARIO

Further to your request, we conducted additional tests on two specimens retained at our

laboratory. Tests include the determination of the bulk specific gravity and absorption on

a black and pink granite respectively.

The results are as follows:

RESULTS

Absorption by weight

Absorption by Volume:

Bulk Specific Gravity:

Pink Black

Pink Black

Pink Black

0.217960.043896

0.595 960.13896

2.74 963.1496

Both stones exhibited acceptable values with respect to ASTM standards. There are no

accepted ASTM limits for abrasion resistance on granite, and as such we did not attempt

this test. Both samples would, however, likely pass marble abrasion resistance standards.

S0057SR

We trust the above information is satisfactory and should you have any questions, please

do not hesitate to contact our office.

Your truly,

TROW CONSULTING ENGINEERS LTD.

Trow

W.G. Hunt, P.Eng.

WGH:jt60

f*Trow

BLACK GRANITE;(SArt fi*

cHI

269.3 220.4 340.2 270.6 213.0 103.4*

("hairline fntclure noted)

Average UCS * 236.2 MPa

11.613.812.6

Average 12.7 MPa

RED GRANITEPi- Z l)

A I

124.8 121.6 117.8 170.4 134.4

Average UCS = 134.0 MPa

9.0 9.5 9.3

Average 9.3 MPa

Notes:

The minimum ASTM UCS for granite is 131.0 MPa. There is no specified minimum modulus of rupture for granite.

APPENDIX B

Khouri Granite - Elizabeth Street, Sudbury

Trow Engineering - 1074 Webbwood Drive, Sudbury

Deak Resources Ltd., - Virginiatown

Tundra Stone Ltd. - Kirkland Lake (saw samples)

Ontario Quarries Ltd., - F. Villano - Londsdale Avenue, Sudbury

Mineral Development Branch - Daniel le Spechrnan

Resident Geologists Office - Sudbury

Marble Trend Ltd. - Toronto

Ciot Ltd. Granite 4 Marble - Toronto

Positano Granite - Elmvale, Ontario

J. Brady - 1227 Holland Rd., Sudbury - has test samples available

Ministry ofNorthern Developmentand Mines

Ontario

Report of Work Conducted After Recording Claim

Mining Act

Transaction Number

tnwnal information collected on this form Is obtained under the authority of the Mi hie collection should be directed to the Provincial Manager, Mining Lands, Mlnii Sudbury. Ontario. P3E 8AS, telephone (705) 070-7264.

attractions: - Please type or print and submit in duplicate. "'"SWOOM 2YswV- Refer to the Mining Act and Regulations for requirements of filing assessment

Recorder.- A separate, copy of this form must be completed for each Work Group.- Technical reports and maps must accompany this form in duplicate.- A sketch, showing the claims the work is assigned to, must accompany this form.

900

Recorded Holders) Client No.

/ 32*1 tfc I/A ridTelephone No.

Mining DMsion-b

M or Q Plan No.u fc^

S&rr-d H 0 d^tx'jg/ejfforfc Performed (Check One Work Group Only)

WorkGroup

Geotechnical SurveyPhysical Work. Including Drilling

Rehabilitation

Other Authorized Work

Assays

Assignment from Reserve

Type

fet? o k?/ W Rty taf (4.M(Affiki o*J J 'A/A/^y cfatf 1/71510

r pp^Fjvrn ~"c C p V - j •-.' ' -'-.i L u r- ' , . ^ .'

MINING ,AN,DS BRANCH

Total Assessment Work Claimed on the Attached Statement of Costs S ^tftf'Ptote: The Minister may reject for assessment work credit all or part of the assessment work submitted If the recorded

holder cannot verify expenditures claimed in the statement of costs within 30 days of a request for verification.

Persons and Survey Company Who Performed the Work (Give Name and Address of Author of Report)Name Address

(attach a schedule H necessary)

Certification of Beneficial Interest * See Note No. 1 on reverse sidel certify that at the time the work was performed, the claims covered in this work report were recorded In the current holder's name or held under a beneficial Interest by the current recorded hoMer.________________

or Agwit (Signature)

Certification of Work Reportl certify that l have a personal knowledge of the facts set forth in this Work report, having performed the work or witnessed same during and/or after to completion and annexed report Is true.

Name and Address ot Person certifying

Telepone No.

Por Office Use Only

l1,5 3 5

ii •i.

x

ffi f

l

oQ 0000

p HC

6 2. il

' (K.r"

09

Credits you are claiming in this report may be cut back. In order to minimize the adverse effects of such deletions, please Indicate from which claims you wish to priorize the deletion of credits. Please mark (^) one of the following:1. G Credits are to be cut back starting with the claim listed last, working backwards.2. G Credits are to be cut back equally over all claims contained In this report of work.3. G Credits are to be cut back as prtorized on the attached appendix.

In the event that you have not specified your choice of priority, option one will be implemented.

Not* l: Examples of beneficial Interest are unrecorded transfers, option agreements, memorandum of agreements, etc., with respect to the mining claims.

Mote 2: If work has been performed on patented or leased land, please complete the following:

1 certify that the recorded holder had a beneficial interest in the patented or leased land at the time the work was performed.

Signature Date

Ontario

Ministry ofNorthern Developmentand Mines

Mmistere du Developpement du Nord et des mines

Statement of Costs for Assessment Credit

des coOts aux fins du credit devaluation

Mining Act/Loi sur les mines

Transaction No./N 0 de transaction

Personal information collected on this form is obtained under the authority of the Mining Act. This information will be used to maintain a record and ongoing status of the mining claim(s). Questions about this collection should be directed to the Provincial Manager, Minings Unda, Ministry of Northern Development and Mines, 4th Floor, 159 Cedar Street, Sudbury, Ontario P3E 6A5. telephone (705) 670-7264.

da ulelLes renselgnements personnels cqstrecuelllls en vertu de la Loi sur le* mines et •erVTrbrftCtidee concessions mlnlerea. Adresser toute question sur la collece de"cesrenselgnements au chef provincial des terrains minlers, ministers duDeveloppement du Nord et des Mines. 159. rue Cedar, 4* etage, Sudbury(Ontario) P3E 6A5, telephone (705) 670-7264.

1. Direct Costs/Couts directs

Type

WagesSataires

Contractor's and Consultant's Fs*sOrottsde rentrepreneur •t de I'expert- coneell

Supplies Used Foumiturss utlltsees

Equipment RentalLocation de materiel

Description

Labour Main-d'oeuvreField Supervision Supervision sur le terrain

Type . . i G,*j6^.'^fr\

Type

Type

Amount Montant

VW

Total Direct Costs Total des coOts directs

Totals Total global

fffr

*i*?*

2. Indirect Costs/Couts Indirect** * Note: When claiming Rehabilitation work Indirect costs are not

allowable as assessment work. Pour le remboursement des travaux de rehabilitation, les couts indirects ne sont pas admissibles en tant que travaux devaluation.

Type

Transportation Transport

Food and Lodging Nourrlture et hebergementMobilization and Demobilization Mobilisation et demobilisation

DescriptionType

r"p~"--~ ~1 - -...,.. v ,

r E E '~' ~ i 0 1

J^^i^v-oiJH

Amount Montant

a** -

it

Sub Total of Indirect Costs Total psrtlel des coOts Indirects

Amount Allowable (not greater than 20H of Direct Coats) Montant admissible (n'axcMant pas 20 H des coOts directs)YnftBl IfalllA Af AaAAMM^AABtA /^MA^tft \lmA^tlm ln&m

(Total of Direct and Allowable d'evaluatlo Indirect coatai (Total du et

to du credit ntftidlraeti

Totals Total global

-

3*8atki

Note: The recorded holder will be required to verify expenditures claimed in this statement oi costs within 30 days of a request for verification. If verification Is not made, the Minister may reject for assessment work all or part of the assessment work submitted.

Note : Le tltulaire enreglstre sera tenu de verifier les deceases demandees dans le present etat des couts dans les 30 jours suivant une demande a eel effet. SI la verification n'est pas effectuee, le ministre peut rejeter tout ou une partie des travaux d'evaluation presented.

Filing Discounts

1. Work filed within two years of completion is claimed at 1 Mm of the above Total Value of Assessment Credit.

Remises pour depot

1. Les travaux deposes dans les deux ans suivant leur achievement sent rembourses a 100 46 de la valour totale susmentionnee du credit devaluation.

2. Work filed three, four or five years after completion is claimed at SO'Vb of the above Total Value of Assessment Credit. See calculations below:

Total Value of Assessment Credit Total Assessment Claimed

X 0.50 -

2. Les travaux deposes trois, quatre ou cinq ans apres leur achievement sont rembourses a 50 "ft de la valeur totale du credit devaluation susmentlonne. Voir les calculs ci-dessous.

Valeur totale du credit devaluation Evaluation totale demandee

x 0,50 ~

Certification Verifying Statement of Costs

l hereby certify:that the amounts shown are as accurate as possible and these costs were incurred while conducting assessment work on the lands shown on the accompanying Report of Work form.

;hat as (Recorded Holder, Agent, Position in Company)

o make this certification

Attestation de l'etat des couts

J'atteste par la presents :que les montants indiques sont le plus exact possible et que ces depenses ont ete engagees pour effectuer les travaux devaluation sur les terrains indiques dans la formula de rapport de travail ci-joint.

l am authorized Et qu'a titre de ie suis autorise(titulaire enregistre, representant, posts occup* dans la compagnie)

a faire cette attestation.S) '

Signature/ 1 A

y/2•Z^-"/,/

Date 7

J812 (04*11 Nota : Dans cette (ormule, lorsqu'il designe des personnes, le masculin est utilisd au sens neutre.

Ministry'OfNorthern Developmentand Mines

Ontario

Report of Work Conducted After Recording Claim

Mining Act

Transaction Number

Arsenal information collected on this form Is obtained under the authority of the Mining Act. This Information will be used for correspondence. Questions about. Me collection should be directed to the Provincial Manager. Mining Lands, Ministry of Northern Development and Mines. Fourth Floor, 159 Cedar Street, hidbury. Ontario. P3E 6A5. telephone (705) 670-7264.

Detractions: - Please type or print and submit in duplicate.- Refer to the Mining Act and Regulations for requirements of filing

Recorder.- A separate copy of this form must be completed for each Work Group.- Technical reports and maps must accompany this form in duplicate.- A sketch, showing the claims the work is assigned to, must accompany this form

o l SQ 3 e:asseramenfrore orCor&Olt tmVMining

Recorded HoWer(s) ,G. B ftftdv

Client No..///56A

•York Performed (Check One Work Group Only)Work Group

Geotechnical SurveyPhysical Work. Including Drilling

Rehabilitation

Other Authorized Work

Assays

Assignment from Reserve

Type

' \ . , t * S ' \

.-

MVTotal Assessment Work Claimed on the Attached Statement of Costs S -3*Mote: The Minister may reject for assessment work credit all or part of the assessment work submitted if the recorded

holder cannot verify expenditures claimed in the statement of costs within 30 days of a request for verification.

Persons and Survey Company Who Performed the Work (Give Name and Address of Author of Report)Name

.-S r r" A/lWJtV./ .5 *-U*

Address

(Mr! Lf

1

__^

l REOEiVFn j

L- FB r. . . on Ji- LCS ^ :"cj :

MINING uANJG BrUNCH l

{attach a schedule If necessary)

Certification of Beneficial Interest * See Note No. 1 on reverse sidel certify that at the time the work was performed, the claims covered in this work report war* recc/ded In the current hokJer*srwne or heUunoV a b by the current recorded holder. c*

Retarded Holder or Agent (Signature)

Certification of Work Report Xl certify that l have a personal knowledge of the fact* set forth In this Work report, having performed the Ka completion and annexed report Is true.

Rente and Address of *er*on Certifying

or witnessed same during and/or after

POT Office Use Only SUDBURYDIV.

CEIVEDlit C f- 3 J994

NAgcH- R i Vi 5Da'te Notice for Amendments Sent

^

.11 S 0^

l .J

rj

Jiif

0^-K

rv

V

o

T

Value o*ASMMffltntWoctc Done on (Ma CWm

g***tiff

' J

B.

ex.

c\

Credits you are claiming in this report may be cut back. In order to minimize the adverse effects of such deletions, please indicate from which claims you wish to priorize the deletion of credits. Please mark (*-) one of the following:1. D Credits are to be cut back starting with the claim listed last, working backwards.2. D Credits are to be cut back equally over all claims contained in this report of work.3. G Credits are to be cut back as priorized on the attached appendix.

In the event that you have not specified your choice of priority, option one will be implemented.

Note 1: Example* of beneficial Interest are unrecorded transfers, option agreements, memorandum of agreements, etc., wtth respect to the mining claims.

Note 2: If work has been performed on patented or leased land, please complete the following:

l certify that the recorded holder had a beneficial interest In the patented or leased land at the time the work was performed.

Signature Date

Ontario

Ministry ofNorthern Developmentand Mines

Ministers du Developpement du Nord et des mines

Statement of Costs for Assessment Creditttal des coOts aux fins du credit d'evaluation

Mining Act/Lol sur les mines

Transaction No./N 0 de transaction

2.1583 5Personal information collected on this form Is obtained under the authority of the Mining Act. This information will be used to maintain a record and ongoing status of the mining claim(s). Questions about this collection should be directed to the Provincial Manager. Minings Lands. Ministry of Northern Development and Mines, 4th Floor, 159 Cedar Street, Sudbury, Ontario P3E 6A5, telephone (705) 670-7264.

Les renseignements personnels contenus dans la presents formuto sont recueillis en vertu de la Loi aur lea mine* et serviront a tenlr a jour un registre des concessions minieres. Adresser toute quesiton sur la collece de ces renseignements au chef provincial des terrains miniers, ministers du Developpement du Nord et des Mines. 159, rue Cedar, 4* etage. Sudbury (Ontario) P3E 6A5, telephone (705) 670-7264.

1. Direct Costs/Gouts directs

Type

Wages Salalrm

Contractor's and Consultant's FeesDrolls d* •'entrepreneur et de I'eapert- coneaJI

SuppHeeUeed Foumlture* utlllsees

Equipment Rental Location de materiel

Description

Labour Main-d'oeuvreField Supervision Supervision sur le terrain

Typ* , v AxtJe. :Ct x:t^ s*}?t c** Justify

Typ*

Type

Amount Montan!

W&&

Total Direct Costs Total des coOts directs

Totals Total global

WOO

3 if 04

2. Indirect Costs/Gouts Indlrects* * Note: When claiming Rehabilitation work Indirect costs are not

allowable as assessment work. Pour le remboursement des travaux de rehabilitation, les couts indirects ne sont pas admissibtes en tant que travaux d'evaluation.

Type

Transportation Transport

Food and Lodging Nourrtture et hebergementMobilization and Demobilization Mobilisation et demobilisation

DescriptionType

' n c r"- ~c \ i ; r" ij f -' jC '-.^ 'C, i V C S

)' - F B ~; " '^'j - t. L ,- ...

— i —————————— l ^:fi:;iG ^^NJiiBH^

Amount Montant

•" i

J

riCH j

Sub Total of Indirect Costs Total partlel des couts Indlrects

Amount Allowable (not greater than 20* of Direct Costs) Montant admissible (n'excedant pas 20 H des couts directs)Total Value of Assessment Credit Valeur totale du credit (Tew of Direct end Allowable d'evaluation Indirect coot*) (Total dM coott dinel*

Totals Total global

?T^tf

: The recorded holder will be required to verify expenditures claimed in this statement of costs within 30 days of a request for verification. If verification is not made, the Minister may reject for assessment work all or part of the assessment work submitted.

Note : Le trtulaire enregistre sera tenu de verifier les defenses demandees dans le present etat des couts dans les 30 jours suivant une demande a cot effet. Si la verification n'est pas effectuee. le mlnistre peut rejeter tout ou une partie des travaux d'evaluation presentes.

Filing Discounts

1. Work filed within two years of completion is claimed at 10007o of the above Total Value of Assessment Credit.

2. Work filed three, four or five years after completion is claimed at 500xo of the above Total Value of Assessment Credit. See calculations below:

Total Value of Assessment Credit Total Assessment Claimedx 0.50

Remises pour depot

1. Les travaux deposes dans les deux ans suivant leur achievement sont rembourses a 100 'ft de la valeur totale susmentionnee du credit d'evaluation.

2. Les travaux deposes trois, quatre ou cinq ans apres leur achievement sont rembourses a 50 (to de la valeur totale du credit d'evaluation susmentionne. Voir les calculs ci-dessous.

Valeur totale du credit devaluationx 0,50

Evaluation totale demandee

Certification Verifying Statement of Costs

hereby certify:.hat the amounts shown are as accurate as possible and these costs ware incurred while conducting assessment work on the lands shown yn the accompanying Report of Work .form.

hat as f *- ' '~l****4*- (\ i {AJ" *- | am authorized(Recorded Holder. Agent, Position in Company)

.o make this certification

Attestation de I'eUrt des couts

J'atteste par la presente :que les montants indiques sont le plus exact possible et que ces depenses ont et6 engagees pour effectuer les travaux d'evaluation sur les terrains indiques dans la formule de rapport de travail ci-joint.

Et qu'a litre de je suis autorise*(trtulaire enregistre, reprasentant. poste occupe dans la compagnie)

d faire cette attestation.

Date

•212(04/91! Nota : Dans cette formule, lorsqu'il designs des personnes, le masculin est utilise au sens heutre

H h, 5^

Cask-

v

/ jY 5

f

'- :TB ? - -,.j-;,

Ministry ofNorthern Development"and Mine*

Ontario

Report of Work Conducted After Recording Claim

Mining Act

Transaction Number

traonal information collected on this form is obtained under the authority of the Mining Act. This information will be used for correspondence. Questions about hie collection should be directed to the Provincial Manager, Mining Unda, Ministry of Northern Development and Minea, Fourth Floor, 159 Cedar Street, Sudbury. Ontario. P3E 6A5. telephone (705) 670-7264.

Retractions: - Please type or print and submit In duplicate. ^- Refer to the Mining Act and Regulations for requirements of filing assessment

Recorder.- A separate copy of this form must be completed for each Work Group.- Technical reports and maps must accompany this form In duplicate.- A sketch, showing the claims the work is assigned to, must accompany this form.

2.1583 5essment work or consult the Mining

•York Performed (Check One Work Group Only)WorkGroup

Geotechnical Survey

Physical Work, Including Drilling

Rehabilitation

Other Authorized Work

Assays

Assignment from Reserve

Type

u- -y-S/T d tity t&r sn Wf'/y cw* S/79516

l ^ ••"' c ^fck \——————————————— i LTP 2 - w. — i ——

IsiiSiAN^.bMAKCS i

Total Assessment Work Claimed on the Attached Statement of Costs Mote The Minister may reject for assessment work credit all or part of the assessment work submitted if the recorded

holder cannot verify expenditures claimed in the statement of costs within 30 days of a request for verification.

Persons and Survey Company Who Performed the Work (Give Name and Address of Author of Report)Name Address

3 CX-X i^L

(attach a schedule If necessary)

Certification of Beneficial Interest * See Note No. 1 on reverse sidel certify that at the time the work was performed, the claims covered m this work report were recorded in the current holder's name or held under a beneficial interest by the current recorded holder. [

Holder or Agent (Signature)

fCertification of Work Report

l certify that l have a personal knowledge of the facts set forth In this Work report, having performed the work or witnessed same during and/or after Us completion and annexed report la true._______________^^^^ Name and Address of Person Certifying ———~——~——————————————————————————————————

Vetopone No.Jo/)/J 6.

for Office Use Only TTotal Value Cr. Recorded

RECEIVEDDEC ' 5 1994

P.M.

•4

4\-J

if

P

^

iFikj

1s#

1HOW

-,—

H--' SG

f.-|v ~

"i.; ." "i i

C?"1 0

go:-r '---' "*~

JiNiW

.-l

^

Ci\ 2

rCr\

J

T^

V

r

;C(

*JW^

•v ft

LI

value of Ai^a^sjB^BfflaWtf Work Done on this Claim

^fff

fSthisVakM

Assigne from

Lt5JSI

10 bo ed al re Date

Credits you ara claiming in this report may be cut back. In order to minimize the adverse effects of such deletions, please Indicate from which claims you wish to prtorlze the delation of credits. Please mark (^) one of the following:1. D Credits are to be cut back starting with the claim listed last, working backwards.2. QKCredtts are to be cut back equally over all claims contained In thia report of work.3. D Credits are to be cut back as priorlzed on the attached appendix.

In the event that you have not specified your choice of priority, option one will be implemented.

Note 1: Examplaa of beneficial Interest ara unrecorded tranafara, option agreatnanta, memorandum of agreements, etc., with reaped to the mining claims.

Note 2: If work has bean performed on patented or (assad land, plsaas complete the following:

l certify that th* recorded holder had a btnefletal Interest in the patented or teased land at the time the work was performed.

SignatureData

Ministry ofNorthern Developmentnml Minos

l i.i* til. '|*f lf muni tin

el des mines

Statement of Costs for Assessment Creditrial iloo t i tilla aim finndu credit d'evaluation

Mining Act/Lol sur les mines

Transaction No /N" de transaction

2.1583 5Personal information collected on this form is obtained under the authority of the Mining Act. This information will be used to maintain a record and ongoing status of the mining claim(a). Questions about this collection should be directed to the Provincial Manager, Minings Lands. Ministry of Northern Development and Mines. 4th Floor, 159 Cedar Street, Sudbury, Ontario P3E 6A5, telephone (705) 670-7264.

Les renselgnements personnels contenus dans la presents formula sont recueillls en vertu de la Lot aur lea mines et servlront a tenlr a Jour un registre des concessions minieres. Adresser toute queslton sur la collece de cea renselgnements au chef provincial des terrains mlniers, ministers du Developpement du Nord et des Mines. 159, rue Cedar, 4" etage, Sudbury (Ontario) P3E 6A5. telephone (70S) 670-7264.

1. Direct Costs/CoOts directs

Type

Wages Salaires

Contractor's and Consultant's Fees Drolls de ('entrepreneur et de I'expert- consell

Supplies Used Fournltures utilise**

Equipment Rental Location de materiel

Description

Labour Maln-d'oeuvreField Supervision Supervision sur le terrain

Type fl.^C+1 -&W&'1'

Typ*

Type

Amount Montant

; 4 tttt '-

Total Direct Coats Total des coOts directs

Totals Total global

4^*

4iou

2. Indirect Costs/CoQts indirects* * Note: When claiming Rehabilitation work Indirect costs are not

allowable as assessment work. Pour le remboursement des travaux de rehabilitation, les coOts indirects ne sont pas admissibles en tant que travaux devaluation.

Type

Transportation Transport

Food and Lodging NourrHura et hebwgementMobilization and Demobilization Mobilisation et demobilisation

Description

Type

f R r r K?T\7t ~ i"1—.- - ±,s F^J 3 m i1

! ;-FB ;. - - :is——— I.VNi^o L/-.N?.)': l

Amount Montant

sr-rT ~?h U ' t

i

""" -^* - .. ,. ...

Sub Total of Indirect Costs Total partial das couts Indirects

Amount Allowable (not greater than 20H of Direct Costa) Montant admissible (n'excedant pas 20 H des coOts directs)Total Value of Assessment Credit Vsleur totale du credit (Total of Direct ind Allowable devaluation Indirect crate) (Tout du cofa dlraeti

Totals Total global

•t IndcMts •duilwlbtes

Note: The recorded holder will be required to verify expenditures claimed in this statement of costs within 30 days of a request for verification. If verification is not made, the Minister may reject for assessment work all or part of (he assessment work submitted.

Note : Le titulaire enregistre sera tenu de verifier les depenses demandees dans le present etat des couts dans les 30 jours suivant une demanda a cet effet. Si la verification n'est pas effectuAe, le ministre peut rejeter tout ou une partle des travaux devaluation prdsentes.

Filing Discounts Remises pour depot

1. Work filed within two years of completion is claimed at 1000xb of the above Total Value of Assessment Credit.

1. Les travaux deposes dans les deux ans suivant leur achevement sont rembourses a 100 "ft de la valeur totale susmentionnee du credit devaluation.

2. Work filed three, four or five years after completion is claimed at SOo/o of the above Total Value of Assessment Credit. See calculations below:

' Total Value of Assessment Credit Total Assessment Claimed

x 0.50 -

2. Les travaux deposes trois, quatre ou cinq ans apres leur achevement sont rembourses a 50 Vo de la valeur totale du credit devaluation susmentionne. Voir les calculs ci-dessous.

Valeur totale du credit devaluationx 0,50

Evaluation totale demandte

Certification Verifying Statement of Costs

l hereby certify:that the amounts shown are as accurate as possible and these costs were incurred while conducting assessment work on the lands shown an the accompanying Report of Work form.

.hat as (Recorctap Holder. Agent, Position in Company)

o make this certification

Attestation de I'etat des couts

J'atteste par la presente :que les montants indiques sont le plus exact possible et que ces depenses ont et6 engagees pour effectuer les travaux devaluation sur les terrains indiques dans la formule de rapport de travail ci-joint.

am authorized Et qu'a titre de je suis autorise(titulaire enregistre, representant, poste occup* dang la compagnie)

a faire cette attestation.

Date

.212(04^1) Nota : Dans cette formula/ lorsqu'il desigrfe des personnes, le masculin est utilis6 au sens neutre.

*t*nfc*fcjfc.*.i*.-.

*

-^™ \ MinistryW"sJLX Transportation Ontario

^OJECT ;)MTRArT wn

iRK PERFORMED BY

DAILY WORK RECORD

Vi . ......- .rnwTRArrnn ^F* 9

^^ff 07416LT) ACCOUNT NO

^f , -)1 IQ flATF ~^l(fJllJ o/o* l 7*.1 '

REG./DIST. NO.

IF OPERATOR INCLUDED UNDER "EQUIPMENT" DO NOT SHOW IN THIS SECTION ) LABOUR

CLASSIFICATION

PfY^/ntfsl/V; \terOp^r/iTDffs\r)\f\?*(3'f" Q

NUMBER

/

/

1

j

HOURSEACH

JO/o/x/x

TOTAL MAN HOURS

JO/o/xfi

REMARKS

^

EQUIPMENT RENTAL - COMPLETE DETAIL TO BE SHOWNDESCRIPTION

MAKE, MODEL AND YEAR H. P.FUEL0 -HASn nw Bf L

OPERATOR INCL HOURS WQflKFO

/?'// /O

A r r

MATERIAL SUPPLIED BY CONTRACTOR

TYPE QUANITY NEW(, ) USED(, ) REMARKS

iCEIVED

MINING 1 AMo

DESCRIBE TO-DAYS WORK AND LOCATION

DOES THE ABOVE WORK COMPLETE ENTIRE TIME AND MATERIAL ACCOUNT ? YES Q NO Q

HE SIGNATURE OF THE CONTRACT ADMINISTRATOR IS ONLY A VERIFICATION OF THE LABOUR, EQUIPMENT AND MATERIALS USED ON THE WRK AND IS NOT TO BE CONSIDERED AS INVOLVING ANY LIABILITY FOR PAYMENT BY THE MINISTRY.

NVOICE TO BE SUBMITTED WITHIN THIRTY DAYS OF COMLET1ON OF WORK

CONTRACTOR'S REPRESENTATIVE CONTRACT ADMINISTRATOR

ORIGINALC-754 92-11

'ntario

MinistryofTransportation

DAILY WORK RECORD If 07416

OJECT/ NTRACTNO..

PRIME CONTRACTOR

ACCOUNT NO..

DATE.

HK PERFORMED BY. REG ./DIST. NO..

IF OPERATOR INCLUDED UNDER "EQUIPMENT" DO NOT SHOW IN THIS SECTION ) LABOUR

CLASSIFICATION

FrVTenotfyO

Nr.'/lr-A

QpfiTCuroff" ftf(\f\f*ef

o

NUMBER

f

l

l

f

HOURSEACH

/O/oKH

TOTAL MAN HOURS

/O/On/x

REMARKS

j

EQUIPMENT RENTAL - COMPLETE DETAIL TO BE SHOWNDESCRIPTION

TYPE MAKE, MODEL AND YEAR H. P. OPFRATOfl INC L.

/V/// /

\)

MATERIAL SUPPLIED BY CONTRACTOR ^

TYPE OUANITY UNITS NEW(, } USED (, 1 REMARKS

^A

DESCRIBE TO-DAYS WORK AND LOCATION

DOES THE ABOVE WORK COMPLETE ENTIRE TIME AND MATERIAL ACCOUNT ? YES Q NO Q

l HE SIGNATURE OF THE CONTRACT ADMINISTRATOR IS ONLY A VERIFICATION OF THE LABOUR, EQUIPMENT AND MATERIALS USED ON THE WORK AND IS NOT TO BE CONSIDERED AS INVOLVING ANY LIABILITY FOR PAYMENT BY THE MINISTRY.

INVOICE TO BE SUBMITTED WITHIN THIRTY DAYS OF COMLET1ON OF WORK

CONTRACTOR'S REPRESENTATIVE CONTRACT ADMINISTRATOR

ORIGINALCC-754 W-11 ^ Ontario J

ntario

MinistryofTransportation

DAILY WORK RECORD 1-07416ACCOUNT NO..

OJECT l NTRACT NO..

PRIME CONTRACTOR DATE.

)RK PERFORMED BY. REG7DIST. NO.

IF OPERATOR INCLUDED UNDER 'EQUIPMENT DO NOT SHOW IN THIS SECTION ) LABOUR ^

CLASSIFICATION

rf?n?vrVlr\IV, l/rtr

C)n^rn-h)/'t

Lj)hniis-

NUMBER

/

1

f

1

HOURS EACH

/Ojnl/

/f fa

TOTAL MAN HOURS

/O

/O

ft

fr fa

REMARKS

^

EQUIPMENT RENTAL - COMPLETE DETAIL TO BE SHOWN "NDESCRIPTION

TYPE

I-/U draju /i f Ar///fyr/jj/flim^Truck•^GTiJifi "1S(J rA

MAKE, MODEL AND YEAR

Onprn 5uCfrT 33Xfa ~7Dn

3M -rnn

H. P.CAPACITY

OHn v w

FUELa HAS n mr ttFi

OPERATOR INC L.WM. i vrs). i

HOUflS WOWKFD

/nx//r

HOUW9 9 T AMD H Y

^

MATERIAL SUPPLIED BY CONTRACTOR

TYPE OUANITY UNITS NEW(,) USED (, ) REMARKS

DESCRIBE TO-DAYS WORK AND LOCATION

DOES THE ABOVE WORK COMPLETE ENTIRE TIME AND MATERIAL ACCOUNT ? YES Q NO Q

THE SIGNATURE OF THE CONTRACT ADMINISTRATOR IS ONLY A VERIFICATION OF THE LABOUR, EQUIPMENT AND MATERIALS USED ON THE WORK AND IS NOT TO BE CONSIDERED AS INVOLVING ANY LIABILITY FOR PAYMENT BY. THE MINISTRY.

INVOICE TO BE SUBMITTED WITHIN THIRTY DAYS OF COMLETION OF WORK

CONTRACTOR'S REPRESENTATIVE CONTRACT ADMINISTRATOR

ORIGINALCC-754 9J-11

MinistryofTransportation

••"*-ta~1..4-(.r*^,tx.,V,.^H*Jfc.*.,,..-,,;t ..,.*..——^.-.^-r-*^"*" ---~

DAILY WORK RECORD f 07416nlario ACCOUNT NO..

XJECT / NTRACTNO..

PRIME CONTRACTOR DATE.

'IK PERFORMED BY. REG./DIST. NO.

IF OPERATOR INCLUDED UNDER "EQUIPMENT" DO NOT SHOW IN THIS SECTION ) LABOUR "

CLASSIFICATION

nQCf* mn ArtlYilAo^

rS .rn-JfiS

L/ihnuf

NUMBER

1

1

1

(

HOUHS EACH

9/olih

TOTAL MAN HOURS

9(O/f/e

REMARKS

J

EQUIPMENT RENTAL - COMPLETE DETAIL TO BE SHOWN ^DESCRIPTION

TYPE

l-fijrlmj^/i'f A rillLtm\)ni}orTp j rk

^er\ltfjp, ^-ffurk

MAKE, MODEL AND YEAR

Cfi/y/) *57/^

P&T sJ^X

fa 'Tfisi^ -77V7

H. P.™ FUFL

Q-OAS O - Wf RFL

OPERATOR INCLH0|, ) *FR[, )

HOURS WORKED

/O((4-^

HOURS STAND RV

^

MATERIAL SUPPLIED BY CONTRACTOR ^

TYPE OUANITV UNITS NEW (, ) USED!,) REMARKS

DESCRIBE TO-DAYS WORK AND LOCATION "

v

DOES THE ABOVE WORK COMPLETE ENTIRE TIME AND MATERIAL ACCOUNT ? YES Q NO Q

1 Mf: SIGNATURE OF THE CONTRACT ADMINISTRATOR IS ONLY A VERIFICATION OF THE LABOUR, EQUIPMENT AND MATERIALS USED ON THE WORK AND IS NOT TO BE CONSIDERED AS INVOLVING ANY LIABILITY FOR PAYMENT BY THE MINISTRY.

INVOICE TO BE SUBMITTED WITHIN THIRTY DAYS OF COMLETION OF WORK

CONTRACTOR'S REPRESENTATIVE CONTRACT ADMINISTRATOR

ORIGINALCC-754

Jniario

MinistryofTransportation

DAILY WORK RECORD 1-07416ACCOUNT NO..

•OJECT l iNTRACT NO..

PRIME CONTRACTOR DATE

ORK PERFORMED BY. REG./DIST. NO..

( IF OPERATOR INCLUDED UNDER "EQUIPMENT" DO NOT SHOW IN THIS SECTION ) LABOUR

CLASSIFICATION

\~OCerf\ftj~\

bvtllrs-

OfornrDrA'lteJerLfiLhf)!U(S~

NUMBER

/

/

/

(

l

HOURS EACH

CI

q/o3z

TOTAL MAN HOURS

q9(Oy•z

REMARKS

EQUIPMENT RENTAL - COMPLETE DETAIL TO BE SHOWNDESCRIPTION

TYPE MAKE, MODEL AND YEAR H. P.FUELa OASn-DMSFL

OPERATOR INCL

PjCpcn/O

fa te

MA 1 tHIAL bUPPLltD BY UONTHAU 1 UH

TYPE OUANITY UNITS NEW),) USED). 1 REMARKS

DESCRIBE TO-DAYS WORK AND LOCATION

DOES THE ABOVE WORK COMPLETE ENTIRE TIME AND MATERIAL ACCOUNT ? YES D NO D ^^^^

THE SIGNATURE OF THE CONTRACT ADMINISTRATOR IS ONLY A VERIFICATION OF THE LABOUR, EQUIPMENT AND MATERIALS USED ON THE WORK AND IS NOT TO BE CONSIDERED AS INVOLVING ANY LIABILITY FOR PAYMENT BY THE MINISTRY.

NVOICE TO BE SUBMITTED WITHIN THIRTY DAYS OF COMLETION OF WORK

ORIGINALCC-754 92-11 ^ Ontario^

Ontario

MinistryofTransportation

DAILY WORK RECORD 1-07416

lOJECT/ iNTRACT NO..

PRIME CONTRACTOR

ACCOUNT NO..

DATE l J

ORK PERFORMED BY. REG./DIST.NO.

( IF OPERATOR INCLUDED UNDER "EQUIPMENT" DO NOT SHOW IN THIS SECTION ) LABOUR

CLASSIFICATION NUMBERHOURS EACH

TOTAL MAN HOURS REMARKS

2L

EQUIPMENT RENTAL - COMPLETE DETAIL TO BE SHOWNDESCRIPTION

TYPE MAKE. MODEL AND YEAR H. P. OPERATOR INCL.

-IrurJt/f?

MATERIAL SUPPLIED BY CONTRACTOR ^

TYPE OUANITY UNITS NEW), ) USED (t ) REMARKS

^

DESCRIBE TO-DAYS WORK AND LOCATION

DOES THE ABOVE WORK COMPLETE ENTIRE TIME AND MATERIAL ACCOUNT ? YES NO Q

THE SIGNATURE OF THE CONTRACT ADMINISTRATOR IS ONLY A VERIFICATION OF THE LABOUR, EQUIPMENT AND MATERIALS USED ON THE WORK AND IS NOT TO BE CONSIDERED AS INVOLVING ANY LIABILITY FOR PAYMENT BY THE MINISTRY.

INVOICE TO BE SUBMITTED WITHIN THIRTY DAYS OF COMLETION OF WORK

CONTRACTOR'S REPRESENTATIVE CONTRACT ADMINISTRATOR

ORIGINAL(-CC-7S4 92-11

f®^ Ontario^

i

•itario

Ministryor Transportation

DAILY WORK RECORD 1-07416ACCOUNT NO.______

1JECT l NTRACTNO..

PRIME CONTRACTOR DATE rrT,

PERFORMED BY. REG./DIST.NO.

'F OPERATOR INCLUDED UNDER "EQUIPMENT" DO NOT SHOW IN THIS SECTION ) LABOUR "^

CLASSIFICATION

rnrf^rnfinhrillr/-Qpem-forhlte^LrmniLf

NUMBER

l

j

1

l

f

HOURS EACH

37fa9fayf

TOTAL MAN HOURS

J?

r?ta

9 fa

xf

REMARKS

^

EQUIPMENT RENTAL - COMPLETE DETAIL TO BE SHOWNDESCRIPTION

TYPE MAKE, MODEL AND YEAR H. P. OPf RATCm INCL.

A r, II Ctoco'

'/JL

g

MATERIAL SUPPLIED BY CONTRACTOR ^

TYPE OUANITY UNITS NEW(,) USEDU REMARKS

| ^

DESCRIBE TO-DAYS WORK AND LOCATION

DOES THE ABOVE WORK COMPLETE ENTIRE TIME AND MATERIAL ACCOUNT ? YES Q NO Q

l HE SIGNATURE OF THE CONTRACT ADMINISTRATOR IS ONLY A VERIFICATION OF THE LABOUR, EQUIPMENT AND MATERIALS USED ON THE WORK AND IS NOT TO BE CONSIDERED AS INVOLVING ANY LIABILITY FOR PAYMENT BY THE MINISTRY.

'NVOICE TO BE SUBMITTED WITHIN THIRTY DAYS OF COMLET1ON OF WORK

ORIGINALCC-nt 9M1 ^ Ontario^

Buario

MinistryOfTransportation

DAILY WORK RECORD l 07416

UECT/ MTRACTNO..

PRIME CONTRACTOR .

ACCOUNT NO..

DATEra

RK PERFORMED BY. REO./DIST.NO..

' OPERATOR INCLUDED UNDER "EQUIPMENT1 DO NOT SHOW IN THIS SECTION ) LABOUR

CLASSIFICATION

rfy&mfts}/V,//^Cln^^nJrD/^

filn^4erin hour

NUMBER

1

t

f

f

f

HOURS EACH

9

/^

If

yz

TOTAL MAN HOURS

9/oH

3z

REMARKS

^

EQUIPMENT RENTAL - COMPLETE DETAIL TO BE SHOWN "^DESCRIPTION

TYPE

HI i rim j i h r J\n lifAtrjiiin Jar-7: "n A r k-Pfiuirtps -^rutk

^•x~r\Jirt -~7??jrA

MAKE. MODEL AND YEAR

finorn 5jafa-T r03T-fa -TOnfa —m^3/V -7^^

H. P.CAPACITY

CM 0 V W

n*L n rwso-wfsn

O PT R A TOR fNCLMO).) vrs* )

HoumWOMIFO

/n//3Ft)

MOM STAND PIV

^

MATERIAL SUPPLIED BY CONTRACTOR ^

TYPE OUANITY UNITS Nt-WU USEOU REMARKS

DESCRIBE TO-DAYS WORK AND LOCATION

DOES THE ABOVE WORK COMPLETE ENTIRE TIME AND MATERIAL ACCOUNT ? YES Q NO Q

i HE SIGNATURE OF THE CONTRACT ADMINISTRATOR IS ONLY A VERIFICATION OF THE LABOUR. EQUIPMENT AND MATERIALS USED ON THE WORK AND IS NOT TO BE CONSIDERED AS INVOLVING ANY LIABILITY FOR PAYMENT BY THE MINISTRY.

INVOICE TO BE SUBMITTED WITHIN THIRTY DAYS OF COMLETION OF WORK

CONTBACTOFTS REPRESENTATIVE COHTRACT ADMINISTRATOR

ORIGINALCC-TS4 W-11 Ontario

itano

MinistryOfTransportation

DAILY WORK RECORD 1-07416ACCOUNT NO. --—^—-

'JECT/J TRACT NO..

PRIME CONTRACTOR .

iK PERFORMED BY.

HATC

REG7DIST. NO.

' OPERATOR INCLUDED UNDER "EQUIPMENT" DO NOT SHOW IN THIS SECTION ) LABOUR ^

CLASSIFICATION

^-zy??rry?v)hrillfy-OperatorJM^4erLfiHouS'

NUMBER

;x111

HOURS ^EACH

9/n/xf^

TOTAt. MAN HOURS

^

/O/x7rf

REMARKS

EQUIPMENT RENTAL - COMPLETE DETAIL TO BE SHOWNDESCRIPTION

TYPE MAKE, MODEL AND YEAR H. P. OPERATOR INCLNOI i vrsi i

\n///x

KJtZ

MATERIAL SUPPLIED BY CONTRACTOR ^

TYPE OUANITY UNITS NEW*,) U*ED(,) REMARKS

J

DESCRIBE TO-DAYS WORK AND LOCATION

DOES THE ABOVE WORK COMPLETE ENTIRE TIME AND MATERIAL ACCOUNT ? YES Q NO D

HE SIGNATURE OF THE CONTRACT ADMINISTRATOR IS ONLY A VERIFICATION OF THE LABOUR, EQUIPMENT AND MATERIALS USED ON THE WORK AND IS NOT TO BE CONSIDERED AS INVOLVING ANY LIABILITY FOR PAYMENT BY THE MINISTRY.

INVOICE TO BE SUBMITTED WITHIN THIRTY DAYS OF COMLETION OF WORK

CONTRACTOR'S REPRESENTATIVE CONTRACT ADMINISTRATOR

ORIGINALCC-7S4 W-11 ^ Ontario j

D'lario

MinistryofTransportation

DAILY WORK RECORD 1-07416ACCOUNT NO. -^-—™

iJECT/ JTRACTNO..

PRIME CONTRACTOR . DATE. 3/43

RK PERFORMED BY. REG./DIST. NO.

IF OPERATOR INCLUDED UNDER "EQUIPMENT" DO NOT SHOW IN THIS SECTION ) LABOUR ^

CLASSIFICATION

/-/)frrcVrVl/'!

/Vi'l/rT'lf)f*f7L1Dr

fttfxJesLahrtji/'

NUMBER

sys/1

HOURS EACH

?ft

910x3

TOTAL MAN HOURSV'fc9/ot??

REMARKS

^

EQUIPMENT RENTAL - COMPLETE DETAIL TO BE SHOWNDESCRIPTION

TYPE MAKE, MODEL AND YEAR H. P.run.n OA8o-Dirsn

OPf RATOW (NCL.

/-Ir m /G

Polde

MATERIAL SUPPLIED BY CONTRACTOR ^

TYPE OUANITY UNITS N6WI.) USED!,) REMARKS

-4

DESCRIBE TO-DAYS WORK AND LOCATION

DOES THE ABOVE WORK COMPLETE ENTIRE TIME AND MATERIAL ACCOUNT ? YES Q NO Q

HE SIGNATURE OF THE CONTRACT ADMINISTRATOR IS ONLY A VERIFICATION OF THE LABOUR. EQUIPMENT AND MATERIALS USED ON THE MDRK AND IS NOT TO BE CONSIDERED AS INVOLVING ANY LIABILITY FOR PAYMENT BY THE MINISTRY.

JVOICE TO BE SUBMITTED WITHIN THIRTY DAYS OF COMLETION OF WORK

CONTRACTOR'S REPRESENTATIVE CONTRACT ADMINISTRATOR

ORIGINALC-7S4 W-11 L Ontario ,

MinistryOfTransportation

DAILY WORK RECORDnano

1-07416ACCOUNT NO. ______

UECT/ JTRACTNO..

PRIME CONTRACTOR DATE.

IK PERFORMED BY. REG7DIST. NO.

F OPERATOR INCLUDED UNDER "EQUIPMENT" DO NOT SHOW IN THIS SECTION ) LABOUR ^

CLASSIFICATION

\^frtYfis\t\n\\rrnflr/nJwtiJMk^y/9/y^x"

NUMBER

;s\ii

HOURS EACH

g

tfo

9foxZ

TOTAL MAN HOURS

?

Ifa

9ftfZ

REMARKS

^

EQUIPMENT RENTAL - COMPLETE DETAIL TO BE SHOWNDESCRIPTION

TYPE MAKE, MODEL AND YEAR H. P.

r/*h

MATERIAL SUPPLIED BY CONTRACTOR ^

TYPE OUANITV UNITS NEWU USED(,) REMARKS

DESCRIBE TO-DAYS WORK AND LOCATION

DOES THE ABOVE WORK COMPLETE ENTIRE TIME AND MATERIAL ACCOUNT ? YES Q NO Q

HE SIGNATURE OF THE CONTRACT ADMINISTRATOR IS ONLY A VERIFICATION OF THE LABOUR, EQUIPMENT AND MATERIALS USED ON THE MDRK AND IS NOT TO BE CONSIDERED AS INVOLVING ANY LIABILITY FOR PAYMENT BY THE MINISTRY.

NVOICe TO BE SUBMITTED WITHIN THIRTY DAYS OF COMLETtON OF WORK

CONTRACTOR'S REPRESENTATIVE CONTRACT ADMINISTRATOR

ORIGINALC-nt BM1 ^ Ontario ^

MinistryofTransportation

DAILY WORK RECORD l 07416itario

XJECT/ JTRACT NO .,

IK PERFORMED BY

PRIM -CONI

E TRACTOR

AnroiiNT NO

f 2 2 *~\jh-y

^REG./DIST. NO.

'P OPERATOR INCLUDED UNDER "EQUIPMENT" DO NOT SHOW IN THIS SECTION ) LABOUR ^

CLASSIFICATION(-~~

rv.'f/r^yQf)f*sriTDrn^-/?/l&inQijf

iniuacB HOUnS TOT*L numcn eACH MAN HOURS

1 tf yt n fi

j %'U X faj 4fa 9fat O Oy A ,/jl 3 *Z

REMARKS

EQUIPMENT RENTAL - COMPLETE DETAIL TO BE SHOWN ^

TYPE

l-LAf(iul,r A^/7/f A/ r fa** kv"7?t/ CAffaiAides' ^fn^rA^)rruisj ^TnjfX

TYPE

DESCRIPTIONMAKE, MODEL AND YEAR H. D '"if* S^U. OPf.RATOnlNCL. ^m, MOIM

r ' O VW D-bltSn. NO 1,1 *fSM *upwtu ftTAHOIW

fayyy) 5~/** f fafiAr- 33-? *9'/*fa -Ten 3fafa T&n 23A/ -ras-* .-T

^MATERIAL SUPPLIED BY CONTRACTOR ^

OUANITY UNfTS NEW d ) UXDU REMARKS

DESCRIBE TO-DAYS WORK AND LOCATION ^

DOES THE ABOVE WORK COMPLETE ENTIRE TIME AND MATERIAL ACCOUNT ? YES Q NO Q

t IE SIGNATURE OF THE CONTRACT ADMINISTRATOR IS ONLY A VERIFICATION OF THE LABOUR, EQUIPMENT AND MATERIALS USED ON THE VORK AND IS NOT TO BE CONSIDERED AS INVOLVING ANY LIABILITY FOR PAYMENT BY THE MINISTRY.

WOICE TO BE SUBMITTED WITHIN THIRTY DAYS OF COMLETION OF WORK

CONTRACTOR'S REPRESENTATIVE CONTRACT ADMINISTRATOR

ORIGINALC-754 W-11 ^Ontario ^

Bert Duchesne Rejean Roy25 Tiller Street 4598 LafontaineKilarney, Ontario Hanmer, OntarioPOM 2AO P3P 1K6

Position: Foreman Position: Blaster

John Mourot John Cameron58 Brunet W. 78 Coniston RoadAzilda, Ontario Garson, OntarioPOM 1BO POM 170

Position: Driller Position: Labour

Bruce Burke Joe Bardswich40 Charles Street 1387 OrangegroveKillarney, Ontario Sudbury, OntarioPOM 2AO P3A 4T9

Position: Operator Position: Engineer

Glen Stewart 505 Dutrisac Road Sturgeon Falls, Ontario POH 2GO

Position: Operator

OntarioMinistry ofNorthern Developmentand Mines

Ministers duDeveloppement du Nord et des Mines

Geoscience Approvals Office 933 Ramsey Lake Road 6th Floor Sudbury, Ontario P3E 6B5

April 3, 1995 Our File: 2.15835Transaction #: W9470. 00236

.00237

.00252 Mines

Mining RecorderMinistry of Northern Development933 Ramsey Lake Road3rd FloorSudbury, OntarioP3E 6B5

Dear Sir:

Subject: APPROVAL OF ASSESSMENT WORK CREDITS ON MINING CLAIM 8.1179570 IN HENRY AND LOUGHRIN TOWNSHIPS

The deficiencies in the original submission have been rectified.

Assessment work credits have been approved as outlined on the original report of work. The credits have been approved under Section 10, Physical, Section 12, Geology and Section 18(4), Other, Mining Act Regulations.

The approval date is March 30, 1995.

If you have any questions regarding this correspondence, please contact Lucille Jerome at (705) 670-5855.

ORIGINAL SIGNED BY:

Ron C. GashinskiSenior Manager, Mining Lands Section Mining and Land Management Branch Mines and Minerals Division

LJ/jl Enclosure:

cc: Resident Geologist Sudbury, Ontario

ssessment Files Library Sudbury, Ontario

Ministry o y oNorthern Developmentand Mines

DAVJ S T 0/W NINDEX TO LAND DISPOSITION

M.H.R. ADMINISTRATIVE DISTRICT

SUDBURYDIVISION

SUDBURY1MB TITLES/REGISTRY DfVtSION

SUDBURY

PLAN

G-4075TOWNSHIP

S4}97990 |g03GQ3 t

97^2 LOUGHRIN119-799^I1979ST980332 Q 3 6 fi RECEIVED

1197^89

- - ^L-a*-^- - - - — /^-' - -r -- — —--- -* J ,——, ,

979857987 419 7 9

7957098043

\

o.k

t?-~ *- s-90" * CO

80 LU

J X *c^-O"

\—

. 7 C

(O

:- -5V

1CV

- -V

V*

60

50

40

— ^ *" ** ^

, ** c ."l v*

1197977 --iH 98044 '20365^- 1

.1-4

t " 1

± -^ [

*. ~ ,.~~-^^l

~-\ r

r*' J,-,^ ~1

IB

1196054^

9

E: -v _ ^~,

5i3- '---""9 ~

f" ^ ^ [ 11979*4

E ; 7^JI IPQS677J '

* 5

IPO3 5B

O /"k "2 r "7 d~S, r

r 5^ I•i

9-

*

CL 963

0

—— — — — __^_^>_

r — "\

s' -t*

J.

9 r- -.

9

\^,

CL 363

*

~r~

/s*

<

^jtf*T*76

— ff-QistT

^-

X -

** *

' i ;' *- s

" ^ ^— -

-f s

i

""7

t

1

1- t

rH(5) j

OjHTO '

MtTMI

— — -~

^-T

9 '

* *

IHT17S,-JL -''go1667

, . ./|

1197965|gQ3C7G |

.— — — — — — — ^jl ^

11 -v^j*--"

B V

*

**

1

9

*

f

t

i t

1197979 ^ f

-^- ^ -' ^ - ^ 1

,- \ ^"^

tr97980 ]~- r~" — " 400"^"^^^ i ^^^^,

^ - O"

-119791 L. w O O ^ ^ ^

*~ '^ ' ~ y'^'

^--—-' '^s~

t

^ f

1

1

^

f . 11^97-

t ^g Q-^

K - -'

l.r^-.

, "* -

^ .*

- ;i -^4— —^i975C* f~~ f~~

,\ ^' \

e'^

. r:...... , -" '

9\

' ^ vs

f ;' 1197

' ~^^

t L

?5~

"^ ~

/X

0

* * w

® .

- -

I197SI -Ytttr

L ————— —, jf^

- r ~~ - - 'v,

\960^~~^

\^~

ea -l/ ^-^^ ' ^~-~

x"1" - Tv ^-.1

-VT

f9

" *

- A^-7 - - - ——"-^:

t

0

"Iv^T

s*•s - -

sf ^~

_ "- ^*-

f ~~

1197973 — fgQ3664

^v

9 .* —

- — - — — -C^-'j

^ ^

0

1197967-

——H ^j* - ^"~66

tt,-t- - " *

...,:.-j

9

• - —

-^ -**

9

9

1197959•I203C80

\

^1 '

il

8i ; - . :5 4- ' ; 1 1 Q 7 Q -Q o. -~- -^— ~ ,

1 ^ ^X f ^tc —.^^T1^^" -'-- —— -~~" " ~-

^?-E.-~ - '. ^- -, i

•*- ^-^5^^-

,^-\ -~

1197983 . -.- i •^2-9^-6^^^.. - , -fie-9^4

-~ ^-^ t -1 i —L- r — ^ '

i ^ ~ - ' :i - ,- L~-~i _ — ~~\ ~~

L ^ "" r " i i

* 1 11*7171I97B72 i-*^*^- i - i

L - ^--J'~ c ^ 1 ^~ r— "--r l ~^--A.~J-

•^ 1 " i1 *

...:.i..J1*1' -J 1

11

J* * J *v H 1 1

l -~ A' 5 1 t^---- ln o ~? b c P. 1 1 y f y o o

. 1....... i

9 . ^ — -i ; .~ ^(^

—— ^

— ^^ — — — — — — p — — T-— — — —

; , - ' y 11975|~V J"~"-'X^ '' -~^ i o pv 77

---^-'^r |( "r ^UO* .1! i

L- .."^"^1

^ 1l

M979I -f^0^4

1

7 0

L r ^--- - -J--"--

1197969

i i

" *

_ ^-q: ^r — ^^-^

* ^

^

58J Q | —— "^ ^

s

f

^^^

.

0 *. ,-^ ce -"1

1^—

"- 0

^r 1

- 1197*87

ICOE6M

l .J '

^~^~L-^ . r

t

1 - ! H l

l

11971956 H20^CCO-

t

e

\i -\ i l l 1 1 l

* 1 *^-C-^'^. . i ^ — , -

1 'i

- 11

L^-J^ ^ "^

-~ - Hs' s — '

0 -"0

-r

J^^

* /* -^*

" * -s* *

119795-4

i

T

- ~ - —— 't

1197355-

i-L

1L — - — - ~"".~Y "

9 9

.* —————— —— _ -~

•*" *"

fc

*

* 9

^ 1

1 . r ^1 JU*-'M-r

' 117*551 J1 -r- -hi *

3I VE"E ^^'~

' fl-i'X* — " *

*o co o3

Xm

X)^

90

O)ec

70*

se

- /

40

14 13 12 11 10 6 ^ 4- ;*—^^cvO"

. zM Er o•—o 2 o* fO

SMD 4075

•^ A R TOWNSHLP^-A ^ --

'f 1

53JO00"E 40 5C 70 80B0 0 34 60 0 52 80 C 3C'

90

ZONE 17

54QOOO m E 20 30 40 545COC"E800 36'

, A 9 ff*

PO O3

BS 06

AREAS WITHDRAWN FROM DISPOSfTIONMRO- Mining Rights OnlySRO - Surface Rights OnlyM -t- S - Mining and Surface Rtghts

SYMBOLS Oaacnpltoft

Sw. 36 8C

Order No

l* 99/96

Dote5/11/86

F9e• •f S

Township Meridian Baseline

Road allowance sjrveved snorelme

surveyedunsu'veyed

Parcel surveyedunsurveyed

Right-of-way ^oad

Jldry

Reservation

Cliff Pu Pite

Contou-Interpolatec Aoprox mateDepression

Cant'Ol poml (horizontal)

Flooded land

Mine head frame

Pipeline (above grounci

Ratlwav sngle - racK double f ace, aoandoned

Road hignwav coun*y lownsnio access trat. oush

Shoreline (original i

Transmission (.ne

Wooded area

MSPOSmON OF CROWN LANDSPatent

Strface A Mining Rights Surface Rights Only Mining Rights Only

LeaseSurface 8. Mining Rights Surface Rignts Only Mining Rights Only

Licence of Occupation

Order-m-Council

Cancelled

Reservation

Sand A Gravel

e e

H aT oc ® O O

THE INFORMATION THAT APPEARS ON THIS MAP HAS BfiEN COMPILED ROM VARIOUS SOURCES AND ACCURACY IS NOT GUARANTEED THOSE WISHING TO STAKE MIN- TNG CLAIMS SHOULD CON SULT WITH T,HE MINING RECORDER MINISTFT OF NORTHflRN DEVELOP MENT AND MINES FOR AD DmOMAlt INFORMATION ON THE [STATUS OF THE LANDS Sf OWN HEP.EON

Map base and land disposition drafting by Surveys and Mapping Branch Ministry of Natural Resources

The disposition of land location of tot fabric and parcel boundaries on the nfex was compiled for administrative purposes only

O

CD

^D

nj

CDl-1^o-Nl

01

200

WOT t *

V * JANES TOWNSHIP

9 7 912 232- .197911 .1979099,7910 1203-23

979I7 979 ?0360

197918 , T(1203238, 1203^*4

7 l Id 7 9(1

1979221197921795731197929

, 7 w 'i7-9' 24

^-"^ 1) ^ '-"YP"krryr-'.;

i i -4. .-J/—I-—,'——,.V' * v,-*. i! 1 '

LTSJj*———.——^—l ^ 'l -- Y l.

l ____ j,^

RATTER-. OWNSH

41I088W0014 2 16836 HENRY 210

Ministry of Ministry ofNatural Northern AffairsResources and Mines

Ontario

INDEX TO LAND DISPOSITION

PLAN

G-29I3TOWNSHIP

HENRY

ME OF ISSUE

warn

M.N.R. ADMINISTRATIVE DISTRICT

NORTH BAYMINING DIVISION

SUDBURYLAND TITLES/REGISTRY DIVISION

SUDBURY

1000Metrti

1000 OFMI H H M H a ir-

Scale 1 20 000

1000

1000 2000 3000 4000 SOOO 9000 7000 0000

2000 -l M*tr*t

eooo loooo- —————l f Ml

Contour Interval 10 Metre*

AREAS WITHDRAWN FROM DISPOSITIONMRO- Mining Rights OnlySRO- Surface Rights OnlyM t S - Mining and Surface Rights

SYMBOLS D*tcrlptlQn OrdarNo DM* Dl*po*ltlon FM*

BoundaryTownship Meridian, Baseline

Road allowance, surveyed shoreline

Lnt/Concession, surveyed unsurveyed

Parcel, surveyedunsurveyed

Right-of-way, roadrailwa/ utility

Resetvdliun

Contour Interpolated Approximate Depression

Control point (horizontal)

Flooded land

Mine head frame

Pipeline (above ground)

Railway, single track double track abandoned

Road, highway, county, township access trail, bush

Shoreline (original)

Transmission line

Wooded area

AANNULMENT

SUBDIVISION OF THIS TOWNSHIP INTO LOTS AND C ONCESSIONS WAS PARTIALLY ANNULLED ON JANUARY 2, 1904

A.P ISST* WWYMAYIT. 11(4

A.P.ISSTS tXPlHY HAY IT, IM4

DISPOSITION OF CROWN LANDSPatent

Surface A Mining Rights Surface Rights Only Mining Rights Only

LeaseSurface 8, Mining Rights Surface Rights Only Mining Rights Only

Licence of Occupation

Order-m-Council

Cancelled

Reservation

Sand S Gravel

e Q

aT

ocT rie iNFORMAflON THAT APPFARS ON THIS MAP HAS BEEN COMPILED FROM VARIOUS SOURCES, AND ACCURACY IS NOT GUARANTEED THOSE WISHING TO STAKE MIN ING CLAIMS SHOULD CON SULT WITH THE FINING HECORDER, MIMSTRY OF NORTHCRN DEVELOP MENT AND MNES, FOR AD DITIONAL INFORMATION ON THE STATUS OF THE l.AKDF SHOWN H6REON

Map base and land disposition drafting by Surveys and Mapping Branch, Ministry of Natural Resources

The disposition of land, location of lot fabric and parcel boundaries on this index was compiled for administrative purposes only

mCOL/)

l CD

..Q

O)

O

UJ

enroLO

iCD