Page 1: Geoff Price November 4, 2009 Notes go here....Nov 04, 2009  · Pipeline Rules of Thumb Handbook : Quick and Accurate Solutions to Your Everyday Pipeline Problems. 6th ed. Burlington,

Geoff Price

Pipeline Routing ForumNovember 4, 2009

Presenter
Presentation Notes
Notes go here.
Page 2: Geoff Price November 4, 2009 Notes go here....Nov 04, 2009  · Pipeline Rules of Thumb Handbook : Quick and Accurate Solutions to Your Everyday Pipeline Problems. 6th ed. Burlington,

• GIS Data overview• GIPRO Routing and Costing Models• Benchmarking GISPRO• Scenario walk through• Comparing GISPRO outputs• LandPipe inputs/outputs

2

Page 3: Geoff Price November 4, 2009 Notes go here....Nov 04, 2009  · Pipeline Rules of Thumb Handbook : Quick and Accurate Solutions to Your Everyday Pipeline Problems. 6th ed. Burlington,

…enables timely cost estimates for early phase pipeline opportunities based on optimal routing anywhere in the world.

3

Page 4: Geoff Price November 4, 2009 Notes go here....Nov 04, 2009  · Pipeline Rules of Thumb Handbook : Quick and Accurate Solutions to Your Everyday Pipeline Problems. 6th ed. Burlington,

…enables timely cost estimates for early phase pipeline opportunities based on optimal routing anywhere in the world.

4

Page 5: Geoff Price November 4, 2009 Notes go here....Nov 04, 2009  · Pipeline Rules of Thumb Handbook : Quick and Accurate Solutions to Your Everyday Pipeline Problems. 6th ed. Burlington,

CONSTUCTION

ENVIRONMENTALSOCIAL

5

Page 6: Geoff Price November 4, 2009 Notes go here....Nov 04, 2009  · Pipeline Rules of Thumb Handbook : Quick and Accurate Solutions to Your Everyday Pipeline Problems. 6th ed. Burlington,

•Avoid steep slopes

•Minimize crossings

•Avoid environmentally sensitive areas

•Maximize use of existing corridors

6

Page 7: Geoff Price November 4, 2009 Notes go here....Nov 04, 2009  · Pipeline Rules of Thumb Handbook : Quick and Accurate Solutions to Your Everyday Pipeline Problems. 6th ed. Burlington,

• Digitized from existing maps• USGS Topo

• Survey or GPS• As-Built• TeleAtlas/Google Maps

• Remote Sensing• Spaceborne

• SRTM• LandSat

• Airborne• DOQQ• LiDAR

7

Image courtesy of The Boeing Company

Page 8: Geoff Price November 4, 2009 Notes go here....Nov 04, 2009  · Pipeline Rules of Thumb Handbook : Quick and Accurate Solutions to Your Everyday Pipeline Problems. 6th ed. Burlington,

8

In house Cost

estimating software

Page 9: Geoff Price November 4, 2009 Notes go here....Nov 04, 2009  · Pipeline Rules of Thumb Handbook : Quick and Accurate Solutions to Your Everyday Pipeline Problems. 6th ed. Burlington,

9

SME Input

Feedback

Page 10: Geoff Price November 4, 2009 Notes go here....Nov 04, 2009  · Pipeline Rules of Thumb Handbook : Quick and Accurate Solutions to Your Everyday Pipeline Problems. 6th ed. Burlington,

10

Existing

Page 11: Geoff Price November 4, 2009 Notes go here....Nov 04, 2009  · Pipeline Rules of Thumb Handbook : Quick and Accurate Solutions to Your Everyday Pipeline Problems. 6th ed. Burlington,

11

Existing

Proposed

Page 12: Geoff Price November 4, 2009 Notes go here....Nov 04, 2009  · Pipeline Rules of Thumb Handbook : Quick and Accurate Solutions to Your Everyday Pipeline Problems. 6th ed. Burlington,

12

•Name•Description•Area of Interest•Waypoints•Coordinate Information•Working Directory

Page 13: Geoff Price November 4, 2009 Notes go here....Nov 04, 2009  · Pipeline Rules of Thumb Handbook : Quick and Accurate Solutions to Your Everyday Pipeline Problems. 6th ed. Burlington,

13

Benchmark Variant 1

Variant 2

Page 14: Geoff Price November 4, 2009 Notes go here....Nov 04, 2009  · Pipeline Rules of Thumb Handbook : Quick and Accurate Solutions to Your Everyday Pipeline Problems. 6th ed. Burlington,

14

DEM Terrain Slope

Elevation Range: 250’ – 5,000’

Slope Range:0 – 90 deg

Page 15: Geoff Price November 4, 2009 Notes go here....Nov 04, 2009  · Pipeline Rules of Thumb Handbook : Quick and Accurate Solutions to Your Everyday Pipeline Problems. 6th ed. Burlington,

15

Terrain Slope

Slope Range:0 – 90 deg

Cost Surface

Slope Range Costs:0 to 25 deg = 1

25 to 90 = 9

High Cost

Low Cost

Page 16: Geoff Price November 4, 2009 Notes go here....Nov 04, 2009  · Pipeline Rules of Thumb Handbook : Quick and Accurate Solutions to Your Everyday Pipeline Problems. 6th ed. Burlington,

16

2% corridor

GISPRO Result (True/False Scenario)

Page 17: Geoff Price November 4, 2009 Notes go here....Nov 04, 2009  · Pipeline Rules of Thumb Handbook : Quick and Accurate Solutions to Your Everyday Pipeline Problems. 6th ed. Burlington,

17

Terrain Slope

Slope Range:0 – 90 deg

Slope Range Costs:00 to 8 = 1 (green)

08 to 15 = 215 to 20 = 320 to 30 = 630 to 45 = 845 to 90 = 9 (red)

Revised Cost Surface

Page 18: Geoff Price November 4, 2009 Notes go here....Nov 04, 2009  · Pipeline Rules of Thumb Handbook : Quick and Accurate Solutions to Your Everyday Pipeline Problems. 6th ed. Burlington,

18

2% corridor

4% corridorGISPRO Result

Continuous Slope Scenario

Page 19: Geoff Price November 4, 2009 Notes go here....Nov 04, 2009  · Pipeline Rules of Thumb Handbook : Quick and Accurate Solutions to Your Everyday Pipeline Problems. 6th ed. Burlington,

19

Conservation Easement & Land Ownership

ConstraintsMultiple

Crossings

ROW Constraint

Page 20: Geoff Price November 4, 2009 Notes go here....Nov 04, 2009  · Pipeline Rules of Thumb Handbook : Quick and Accurate Solutions to Your Everyday Pipeline Problems. 6th ed. Burlington,

• Avoid Sensitive Areas

• Maximize Access

• Following Existing Corridors

• Avoid Crossings

• Proximity Gradients

• Manual Routes

• Tie-ins

20

Page 21: Geoff Price November 4, 2009 Notes go here....Nov 04, 2009  · Pipeline Rules of Thumb Handbook : Quick and Accurate Solutions to Your Everyday Pipeline Problems. 6th ed. Burlington,

21

Charts Profiles

Executive Summary & Detailed Report

Maps

Page 22: Geoff Price November 4, 2009 Notes go here....Nov 04, 2009  · Pipeline Rules of Thumb Handbook : Quick and Accurate Solutions to Your Everyday Pipeline Problems. 6th ed. Burlington,

22

Remote Sensing Data

GISPRO Output & LandPipe Terrain Input

Small treesLight brush no Trees

Page 23: Geoff Price November 4, 2009 Notes go here....Nov 04, 2009  · Pipeline Rules of Thumb Handbook : Quick and Accurate Solutions to Your Everyday Pipeline Problems. 6th ed. Burlington,

23

Small Mts.

Level to Rolling

Choppy, Very Hilly

Digital Elevation Model

GISPRO Output & LandPipe Terrain Input

Page 24: Geoff Price November 4, 2009 Notes go here....Nov 04, 2009  · Pipeline Rules of Thumb Handbook : Quick and Accurate Solutions to Your Everyday Pipeline Problems. 6th ed. Burlington,

24

Terrain Formation Rippability Inference

No rock to occasional < 12" boulders

Fragmented Rock or Boulders <36’’

Blasting or Drilling

Page 25: Geoff Price November 4, 2009 Notes go here....Nov 04, 2009  · Pipeline Rules of Thumb Handbook : Quick and Accurate Solutions to Your Everyday Pipeline Problems. 6th ed. Burlington,

25

Population Density Estimates

Rual

Low PopIndustrial/Suburban

Page 26: Geoff Price November 4, 2009 Notes go here....Nov 04, 2009  · Pipeline Rules of Thumb Handbook : Quick and Accurate Solutions to Your Everyday Pipeline Problems. 6th ed. Burlington,

26

Terrain

Rock

Class

Surface

Page 27: Geoff Price November 4, 2009 Notes go here....Nov 04, 2009  · Pipeline Rules of Thumb Handbook : Quick and Accurate Solutions to Your Everyday Pipeline Problems. 6th ed. Burlington,

27

Terrain

Rock

Class

Surface

Hazards

Earthquake Zone

Page 28: Geoff Price November 4, 2009 Notes go here....Nov 04, 2009  · Pipeline Rules of Thumb Handbook : Quick and Accurate Solutions to Your Everyday Pipeline Problems. 6th ed. Burlington,

28

In house Cost

estimating software

Engineering Discretion/ Scenario Analysis

FINAL OUTPUT+/- 50% Cost

Estimate

Page 29: Geoff Price November 4, 2009 Notes go here....Nov 04, 2009  · Pipeline Rules of Thumb Handbook : Quick and Accurate Solutions to Your Everyday Pipeline Problems. 6th ed. Burlington,

29

Scenario 1

Scenario 2

Presenter
Presentation Notes
3D example of NW Australia (Gorgon Project Area). Actual GISPRO subsea scenarios produced using bathymetric data and least slope path. Additional data layers could include protected areas, mudslide areas, geohazards,etc.
Page 30: Geoff Price November 4, 2009 Notes go here....Nov 04, 2009  · Pipeline Rules of Thumb Handbook : Quick and Accurate Solutions to Your Everyday Pipeline Problems. 6th ed. Burlington,

30

Berry, K., J., 2000, Optimal Path Analysis and Corridor Routing: Infusing StakeholderPerspective in Calibration and Weighting of Model Criteria, www.innovativegis.com.

McAllister, E. W. Pipeline Rules of Thumb Handbook : Quick and Accurate Solutions to Your Everyday Pipeline Problems. 6th ed. Burlington, MA: Gulf Professional Pub., 2005.

Mohitpour, Mo, H Golshan, and A Murray. Pipeline Design & Construction : a Practical Approach. 3rd ed. New York: ASME Press, 2007.

Rizkalla, Moness. Pipeline Geo-environmental Design and Geohazard Management.New York, NY: ASME, 2008.