geo work plan symposium 2011 days 2 ds-05 highlights

17
GEO Work Plan Symposium 2011 Days 2 DS-05 Highlights

Upload: rachel-montgomery

Post on 27-Mar-2015

216 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: GEO Work Plan Symposium 2011 Days 2 DS-05 Highlights

GEO Work Plan Symposium 2011

Days 2

DS-05 Highlights

Page 2: GEO Work Plan Symposium 2011 Days 2 DS-05 Highlights

DS-05 Integrated Water-cycle Information

DefinitionDevelop an operational and sustained global network of in-situ observation

sites. Increase the availability of information products and services for monitoring changes in the water cycle, including clouds and precipitation, appropriate for both research and integrated water resource management. Increase the availability of data and information, including quantity and quality of both surface and groundwater, to support a water cycle decision making system. Develop routine, reliable production of “watershed” and human health indicators from satellite data, surface and subsurface data, and data assimilation capabilities (Water Target)

Increase knowledge of environmental flow requirements of river baseflow and peak flow, as well as human requirements for irrigation and power plant cooling water and domestic usage (Ecosystems Target)

… Discussed: Some wordsmithing will be done

Page 3: GEO Work Plan Symposium 2011 Days 2 DS-05 Highlights

Variable Ranking in the Cross-SBA List in US-09-01a

Status of Observations

Possible Follow-on

Precipitation #1 In good shape in most areas

GPM needs supportIGWCO happy to help with US-09-01a follow-on

Soil Moisture #2 SMOS & SMAP beneficial.Surface obs need help

Surface HumidityU. Air Humidity

#6#17

IGWCO has looked to GEWEX to lead

Intercomparison of products.

Vegetation Cover(Evapo-transpiration)

#7 ET is not included as an GCOS ECV

ET workshop recently held

River flowObservations

#19 WMO has advanced HARON proposal

NASA/CNES has a mission proposal under development

Results of a recent US-09-01A survey of data needs in GEO’s nine Societal Benefit Areas

Page 4: GEO Work Plan Symposium 2011 Days 2 DS-05 Highlights

Deliverables (we like objective better)

1. Integrated water-cycle information service

Priority Actions:

- Data product development- Data System development and implementation- Demonstration and capacity building- User engagement - Leads: Japan, USA, Canada, EC, WMO, IGWCO COP

Support: WCRP, ESA, UNESCO, the Netherlands, Germany, France, World Bank, Columbia, Brazil, Argentina, Peru, China, IEEE, Austria,

Page 5: GEO Work Plan Symposium 2011 Days 2 DS-05 Highlights

Deliverables

Component 1:Data product Development

Component 2: Data Systems Development

and coordination

Component 3:Demonstration

projects and education

Component 4:User engagement and operational services

-Precipitation-Soil Moisture-Evaportran-

spiration-Runoff/ Surface

Water-Groundwater

-Development of Interoperable Data services- Global Water Cycle Portal- Water ML

-Africa- Asia

-Latin and Caribbean America

-Water for the World

-Assessment of benefits of EO

-Indicators of the status of water

resources --Global Water Cycle Integrator

Part of IN-06

STC

ADC

CBCUIC

Page 6: GEO Work Plan Symposium 2011 Days 2 DS-05 Highlights

Deliverables

2. Global water quality information system

Priority Actions: – Algorithms to interpret satellite data– Develop enabling processing platforms and tools– Select test cases and carry out demonstrations– System implementation– Build an integrated model system bringing together

a global hydrologic model and GEMS in-situ wq data

- Develop a sediment program.

Leads: USA, Australia, Germany, Estonia, UNEP

Contributors: Canada, IEEE, WMO, UNESCO

Page 7: GEO Work Plan Symposium 2011 Days 2 DS-05 Highlights

Deliverables

3. Cryosphere information system

Priority Actions: – If we have a Cryosphere information system in

GEO it will only be developed after the upcoming

WMO Executive meeting

Potential Leads: Canada, IEEE, USA

Comments:

The approach should emphasize the integrated nature

of the information (GTOS comment)

Page 8: GEO Work Plan Symposium 2011 Days 2 DS-05 Highlights

Related 2009-2011 Work Plan Progress

• The February 2011 Second African Water Cycle Initiative Symposium agreed to initiate two transboundary basin studies to demonstrate the value of GEO principles for

water management in Africa.• The water cycle activities have engaged 1000’s of people in

discussions about GEO; have brought research funds to advance issues/ products of interest to GEO; and have led to the registration of 240 products and services in the GCI, etc.

• The Evapotranspiration workshop has launched an effort to make ET an ECV.

Page 9: GEO Work Plan Symposium 2011 Days 2 DS-05 Highlights

Related 2009-2011 Work Plan Progress• CEOS Water Cycle portal, which builds on CEOP and DIAS is

ready to go “operational”• Soil moisture data center has developed a global

mapping capability.• Precipitation (#1 GEO Variable) activities focused on key

scientific issues (measurement of snow and drizzle), extending homogeneous global data sets for trend analysis and preparing for GPM.

• User engagement activities using simulations to assess drought preparedness have provided assessments of information requirements.

• Water quality COP established and has developed a plan for

satellite applications to water quality mapping.

Page 10: GEO Work Plan Symposium 2011 Days 2 DS-05 Highlights

Re-organization of 2009-2011 Sub-tasks in the new work plan

• Sub-Tasks to be integrated with other activities: WA-06-02A• Sub-Tasks to be moved:

- WA-06-02C will move to climate activities

- WA- 06-02B and WA-06-02D will move to DS-01

Remainder of the 10 other WA sub-tasks will be folded into

DS-05 Deliverables 1 and 2 with WA-08-01G going to the deliverable 2 and the other 9 (including 3<4> of the top 7

variables from the US-09-01A survey) will be submerged

into one deliverable.

Page 11: GEO Work Plan Symposium 2011 Days 2 DS-05 Highlights

Inclusion of New ProposalsDeliverable 1:• ET to address the needs identified in the user survey and

take advantage of major user interest in western USA• Integration of GTN-H data centers and CEOS Water Cycle

Data Portal and Service (Builds on CEOP and DIAS)• Water ML• Assessment of benefits of EO in the water sector• Indicators of the status of water resources • Global Water Cycle Integrator

Page 12: GEO Work Plan Symposium 2011 Days 2 DS-05 Highlights

Inclusion of New Proposals (if any)Deliverable 2:• Sediment and Biogeochemical Sources, Fluxes and Sinks

(Germany, Bonn University)

Sustaining Arctic Observing Networks (USA, USGEO) Incorporated into IN-02It could support Deliverable 3 in a secondary way (if there is aDeliverable 3!)

Page 13: GEO Work Plan Symposium 2011 Days 2 DS-05 Highlights

Resources Available for Implementation

(current status and in planning)• EC: Plans to have calls that will address DS-05 and other DS

issues. Currently supporting EGIDA, GEO-WOW, etc• Japan: MEXT plans to continue support for data system

development and Arctic observing systems. CB also is being supported by Japanese agencies.

• USA – supports all aspects of Deliverables 1 and 2.• Germany – supports some aspects of Deliverables 1 and 2• Others supporting meetings: Columbia, Brazil, China,

Canada, WMO, UNESCO, etc

Methods of access: Write proposals, co-op funded projects

and people, proposals to ODAs.

Page 14: GEO Work Plan Symposium 2011 Days 2 DS-05 Highlights

Issues and Gaps

Concerns raised:• Use of terms such as “system” and “operational” (thought to

reflect different perspectives on ownership of activities)• New work plan appears to confuse links to strategic targets.• Coordination mechanisms beyond GEO for DS-05 activities

is unclear (Issue for the IGWCO COP).

Page 15: GEO Work Plan Symposium 2011 Days 2 DS-05 Highlights

Issues and Gaps

• Cryosphere – how do we address the regions of the world

where climate change is producing the strongest signals?

(Norway, others supportive of GEO initiative in this area)• The current structure appears to have consigned GEO

activities of three of the variables most in demand by users

to a sub-element of a deliverable within one of the tasks.

(Not a good example of wanting to communicate how

GEO is addressing the needs of the public)

Page 16: GEO Work Plan Symposium 2011 Days 2 DS-05 Highlights

Possible Measures to fill Gaps

• Work on Cryosphere issues in the background with

several options and be ready to roll out one of the

options after WMO commitments are clearer.

Loss of visibility for US-09-01A priorities.• May be too late but it has been suggested we

redefine the global water cycle as a Task not a deliverable.

Measurement of progress (very little discussion)

Possible solution: Conduct of a “IGOS-P type theme assessment” of global water cycle activities one decade later.

Page 17: GEO Work Plan Symposium 2011 Days 2 DS-05 Highlights

Discussion