task in-05 geo work plan symposium 2014 iib aip-7 (may 1 st ) reporting: bart de lathouwer (ogc)
TRANSCRIPT
Task IN-05
GEO Work Plan Symposium 2014
IIBAIP-7
(May 1st)
Reporting: Bart De Lathouwer (OGC)
Task IN-05
What is AIP• Develops and deploys new process and
infrastructure components for GCI and broader
GEOSS architecture.
• Requirements from user needs and community
scenario.
• Results conveyed to the GEO Implementation
Boards for consideration as operational elements.
2
Task IN-05
• AIP-7 will be different– Based on feedback from GEO-X– Based on user requirements
– Focus on apps
Task IN-05
AIP-7 Key-apps
• Why Apps?– Data to Knowledge• Show value of the data to the user
– Do something before everything• Pilot
– Based on SBA expert interviews• Championed by field users; and ideally stimulate interest
in providing more data to GEOSS
4
Task IN-05
Key-apps
• Promote the benefit of having standards-based services registered with GEOSS
• Championed by field users; and ideally stimulate interest in providing more data to GEOSS
• Provide a real-world test of operational protocol and format standards which may provide useful information for standards revision, adoption and documentation.
5
Task IN-05
Requirements
• Cross SBA
– “Desilofication”
• Beyond visualization
– Data analytics, simulations, graphs, tables, …
• As Real-Time as possible
• Easy to use
– For decision makers
• Interactive
– Model or alert interfaces6
Task IN-05
Cross-Task Activities (pls propose 2-3 activities along with practical actions)
• Key-apps will be designed to address specific user-driven problems:
– Flood and drought Monitoring, Food security and Energy management
– Environmental monitoring using Mobile Sensors, Citizen Observatories, Crowd Sourcing
– Wind and Solar Energy Potential Estimator– Earth cover change detection– Ocean observations & commercial fisheries
Task IN-05
Supporting activities
• Mobile & web development frameworks
• User authentication & SSO
• Geoprocessing workflows
• Support for registration and re-use of key apps and data sources
• Use metrics
• Tutorials, Data & Service Quality
• Capacity Building
• Documentation8
Task IN-05
23 (25) Responses(> 100 organizations involved):
• Univ Geneva• Jaxa• SmartOpenData• SDI4Apps• ETT• Chile• PLM• INCOSE• GEOSS Water Services• CMRE, TerraDue• Jacobs Univ.
9
• Compusult• UHawaii• CITI-SENSE• CITI-SENSE-MOB• CEIBA• GMU CSISS• BGS• NASA/Vightel, SGT• NASA, IDEAM, NOAA• INGV• POGO/AWI/SAHFOS• SECOORA
Task IN-05
10
SBAOrganisation He Cl We Dm Ag Wa Bd En Ocean EcoUni. Geneva Models
Jaxa GEOSS Water
Services SmartOpenData ST ST STSDI4Apps ST ETT App Chile App Plymouth Marine Lab Fish Farm App INCOSE GEOSS Water Services X
Compusult app framework
Uni. Hawaii
data, looks for app dev support
CITI-SENSE App, App
Framework Citi-Sense-MOD Data
CEIBA
App (forest cover and carbon
content) NASA, IDEAM, NOAA app app BGS App GMU app app app NASA, Vightel, SGT
app (social netw)
INGV
app volcanic ash (crowd sourced)
NATO (CMRE), TerraDue data Jacobds CSW server POGO/AWI/SAHFOS plakton app SECOORA app
Task IN-05
11
Task IN-05
Agenda:
• Understand before being understood09:30 09:45 Intro, goals for the kickofff09:45 11:30 Go over responses (http://www.ogcnetwork.net/node/1936)
• Understanding• 11:30 12:30 Initial WG Grouping and discussion• Strengthening the Inner Self12:30 13:00 Lunch on your own (in WMO building)• Understanding13:00 13:30 Finalize WG Grouping and recap for people joining the
meeting (US)• Understood13:30 16:00 Break-out session (various groups)16:00 17:00
Reporting back, discussion, WG goals (scenario, schedule)17:00 17:20 Conclusion and next steps17:20 17:30 Wrap-up
12
Task IN-05
Thank you. Questions?