general contractors association - microsoft...august 20, 2019 robert j. kroning, p.e., director...

22
August 20, 2019 Robert J. Kroning, P.E., Director Department of Design and Construction City and County of Honolulu General Contractors Association Construction Update

Upload: others

Post on 28-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: General Contractors Association - Microsoft...August 20, 2019 Robert J. Kroning, P.E., Director Department of Design and Construction City and County of Honolulu General Contractors

August 20, 2019Robert J. Kroning, P.E., Director

Department of Design and ConstructionCity and County of Honolulu

General Contractors AssociationConstruction Update

Page 2: General Contractors Association - Microsoft...August 20, 2019 Robert J. Kroning, P.E., Director Department of Design and Construction City and County of Honolulu General Contractors

PurposeTo inform the General Contractors Association about theCity’s Capital Improvements Program

ENERGY CONSERVATION PARK IMPROVEMENTS

REHABILITATION & COMPLETE STREETSFLOOD CONTROL

Page 3: General Contractors Association - Microsoft...August 20, 2019 Robert J. Kroning, P.E., Director Department of Design and Construction City and County of Honolulu General Contractors

Mayor’s Priorities

• Restore needed bus routes• Build rail better• Wastewater upgrades• Road paving• Park improvements• Homelessness solutions

Page 4: General Contractors Association - Microsoft...August 20, 2019 Robert J. Kroning, P.E., Director Department of Design and Construction City and County of Honolulu General Contractors

LANDDIVISION

ChiefScott Shigeoka

DIRECTORRobert Kroning

DEPUTY DIRECTORMark Yonamine

MECHANICAL/ELECTRICAL

DIVISION

Chief Allyn Lee

FACILITIESDIVISION

ChiefClifford LauAsst. Chief

Dennis Kodama

ADMIN

CIVIL DIVISION

Chief Stan KatsuraAsst. ChiefTim Trang

DDC Organization

Mission Statement: To provide engineering expertise and advice to the City’sprogram planning and perform project planning, design, construction, inspection,and land acquisition for public facilities of the City and County of Honolulu.

Page 5: General Contractors Association - Microsoft...August 20, 2019 Robert J. Kroning, P.E., Director Department of Design and Construction City and County of Honolulu General Contractors

DDC’s CIP by Fiscal Years

0

100

200

300

400

500

600

700

FY 2018 FY 2019 * FY 2020 *Planning 11.8 14.1 11Design 96.4 37.7 32.4Construction 605.1 220.3 302.6

Mill

ions

of D

olla

rs

* Excludes Wastewater Projects

Page 6: General Contractors Association - Microsoft...August 20, 2019 Robert J. Kroning, P.E., Director Department of Design and Construction City and County of Honolulu General Contractors

DDC’s FY 2020 CIP Projects

Bridges & Viaducts $5.0Culture & Recreation $114.6

Drainage Improvements $8.8

Fire Station Improvements $4.7

Flood Control $8.3

Highways & Streets $111.0

Other Protection $8.2

Police Station Improvements $8.5

Public Facilities Improvements $114.6

Street Lighting $0.5

($)Funding in Millions

Page 7: General Contractors Association - Microsoft...August 20, 2019 Robert J. Kroning, P.E., Director Department of Design and Construction City and County of Honolulu General Contractors
Page 8: General Contractors Association - Microsoft...August 20, 2019 Robert J. Kroning, P.E., Director Department of Design and Construction City and County of Honolulu General Contractors

Facilities Division FY 2020 Upcoming CIP Projects to Bid from 2019 3rd Qtr to 2020 4th Qtr

Construction Cost Index (CCI): A < $100k <= B < $250k <= C < $500k <= D < $1m <= E < $5m <= F(List subject to change)

Project Title Cost Index Bid Opening QtrChinatown Gateway Plaza Parking Structure Trench Drain Imps A 2019-3rd QtrHonolulu Hale BFS Treasury Room 115 Counter Imps B 2019-3rd QtrHonolulu Zoo Historic Rehab of the Former Entrance Bldg E 2019-3rd QtrHonolulu Zoo Spider Monkey Exhibit, Ph 2 B 2019-3rd QtrHPD Headquarters Cell Block & Sally Port Door Imps E 2019-3rd QtrHPD Microwave Radio - Kapaa BWS Reservoir Site D 2019-3rd QtrKaneohe Fire Station – NPDES Imps D 2019-3rd QtrManana Corporation Yard Imps, Ph 1 F 2019-3rd QtrOneula Beach Park Reconstruction of Ballfield & Water System E 2019-3rd QtrWahiawa District Park Water Infiltration Imps B 2019-3rd QtrWaialua District Park Swimming Pool Water Line Imps D 2019-3rd QtrWaiau District Park Recreation Bldg Imps D 2019-3rd QtrWest Loch Golf Course - Drainage Imps, Ph I F 2019-3rd Qtr51 Merchant Bldg Imps - Basement Imps C 2019-4th QtrAla Moana Regional Park McCoy Pavilion Imps E 2019-4th QtrAla Moana Regional Park Perpendicular Parking D 2019-4th Qtr

Page 9: General Contractors Association - Microsoft...August 20, 2019 Robert J. Kroning, P.E., Director Department of Design and Construction City and County of Honolulu General Contractors

Facilities Division FY 2020 Upcoming CIP Projects to Bid from 2019 3rd Qtr to 2020 4th Qtr

Construction Cost Index (CCI): A < $100k <= B < $250k <= C < $500k <= D < $1m <= E < $5m <= F(List subject to change)

Project Title Cost Index Bid Opening QtrKamehameha Community Park Imps (CDBG) E 2019-4th QtrKauluwela Community Park Imps (CDBG) E 2019-4th QtrEwa Villages Dwelling Facility Imps (CDBG) D 2019-4th QtrEwa Villages Golf Course Restroom Imps C 2019-4th QtrHPD Microwave Radio - Kalihi Police Station D 2019-4th QtrHPD Microwave Radio - Kaneohe Police Station D 2019-4th QtrKaaawa Fire Station Exterior Soffit Imps C 2019-4th QtrKalihi Kai Fire Station Plumbing & Misc Imps E 2019-4th QtrKapaa Corporation Yard DFM AES Roof Replacement & Bldg Imps E 2019-4th QtrKualoa Regional Park Maintenance Bldg Imps E 2019-4th QtrRenovation of Existing Bldg at 91-832 Pohakupuna Rd D 2019-4th QtrWalter Murray Gibson Bldg Imps, FY 2018 D 2019-4th QtrAla Moana Regional Park Shared-Use Path D 2020-1st QtrBlaisdell Center Master Plan Ph 1 - Demolition F 2020-1st QtrDemolition of Alzheimer’s Facility at Na Pueo Mini Park (1816 Alewa Dr Respite Center)

D 2020-1st Qtr

Honolulu Zoo - New Large Hoof Stock Barn C 2020-1st Qtr

Page 10: General Contractors Association - Microsoft...August 20, 2019 Robert J. Kroning, P.E., Director Department of Design and Construction City and County of Honolulu General Contractors

Facilities Division FY 2020 Upcoming CIP Projects to Bid from 2019 3rd Qtr to 2020 4th Qtr

Construction Cost Index (CCI): A < $100k <= B < $250k <= C < $500k <= D < $1m <= E < $5m <= F(List subject to change)

Project Title Cost Index Bid Opening QtrHPD Training Academy Pursuit Track Pavement Repair E 2020-1st QtrKaimuki Community Park Gym Roof Imps C 2020-1st QtrPearlridge Bus Transfer Center & Plaza - Transit Oriented Development D 2020-1st QtrResurface/Reconstruction of Park Parking Lots, IDIQ D 2020-1st QtrWahiawa Botanical Garden Pedestrian Bridge Restoration E 2020-1st QtrWest Loch Golf Course Club House Roof Imps B 2020-1st QtrWhitmore Community Park Gym Roof Imps D 2020-1st QtrAikahi Park/Aikahi Loop Erosion Prone Imps B 2020-2nd QtrAla Moana Regional Park - Sand Replenishing F 2020-2nd QtrAla Moana Regional Park Japanese Pond Imps E 2020-2nd QtrFoster Botanical Garden & Kalihi Valley District Park Imps (CDBG) E 2020-2nd QtrHonolulu Zoo - Tiger Exhibit View Portal B 2020-2nd QtrHoomaluhia Botanical Gardens Reconstruct Sewer, Ph 2 E 2020-2nd QtrKahaluu Fire Station Imps D 2020-2nd QtrKapiolani Regional Park Shared Use Path Imps D 2020-2nd QtrKeehi Lagoon Beach Park Comfort Station Demolition D 2020-2nd Qtr

Page 11: General Contractors Association - Microsoft...August 20, 2019 Robert J. Kroning, P.E., Director Department of Design and Construction City and County of Honolulu General Contractors

Facilities Division FY 2020 Upcoming CIP Projects to Bid from 2019 3rd Qtr to 2020 4th Qtr

Construction Cost Index (CCI): A < $100k <= B < $250k <= C < $500k <= D < $1m <= E < $5m <= F(List subject to change)

Project Title Cost Index Bid Opening QtrMakakilo Neighborhood Park Erosion Prone Imps E 2020-2nd QtrMakiki District Park Parking Lot Imps E 2020-2nd QtrMedical Examiner Bldg Imps E 2020-2nd QtrMokuleia Radio System Upgrade D 2020-2nd QtrOcean Safety Lifeguard Towers Replacement, Ph 1A D 2020-2nd QtrPali Golf Course - NPDES Imps B 2020-2nd QtrPali Golf Course 2nd Level Parking Lot Curb/Wall Reconstruction C 2020-2nd QtrPearl City & Waipahu District Park Replace Gym Bleachers B 2020-2nd QtrPearl City Fire Station Roof Imps B 2020-2nd QtrWaialua Corporation Yard NPDES Imps Ph 3 E 2020-2nd QtrWaianae District Park Imps (CDBG) B 2020-2nd QtrWaianae Reflector Radio System Upgrade B 2020-2nd QtrWaikiki Fire Station Apparatus Bay Door Replacement B 2020-2nd QtrWaikiki Shell Concession Kitchen D 2020-2nd QtrKualoa Administrative Office Bldg D 2020-3rd QtrHonolulu Zoo Water System Upgrade E 2020-4th QtrKapolei Consolidated Corporation Yard, Ph IV F 2020-4th Qtr

Page 12: General Contractors Association - Microsoft...August 20, 2019 Robert J. Kroning, P.E., Director Department of Design and Construction City and County of Honolulu General Contractors

• Master Plan – EIS: Mid - 2018• Projects Completed or in Construction:

• Irrigation System Renovations• Sand Volleyball Courts• Improvements Along Ala Moana Blvd• Concession & Comfort Station LED

Lighting• Sand Pushing/Beach Restoration• Magic Island Path Repairs• Diamond Head Bathhouse Improvements• Magic Island Exercise Equipment• Magic Island Outdoor Shower

Improvements• Park Road & Magic Island Parking Lot

Repaving• Ewa Bathhouse Improvements• McCoy Pavilion Auditorium AC

Replacement• Trellis Improvements• Keyhole Parking Lot Improvements• LED Lighting Replacement• Bridle Bridge & Canal Wall Repairs• Widen Pedestrian Bridge Crossings

(Piikoi & Queen Streets• Hawaiian Pond Improvements

* EIS Dependent

• Potential Future Improvements:• * Sand Nourishment • * Pathway Improvements• McCoy Pavilion & Banyan Courtyard

Improvements• Magic Island Lagoon Retaining Wall &

Walkway• Lawn Bowling• Japanese Pond Improvements

Page 13: General Contractors Association - Microsoft...August 20, 2019 Robert J. Kroning, P.E., Director Department of Design and Construction City and County of Honolulu General Contractors

• Feasibility Study Complete• Master Plan & Conceptual Design Phase

Complete• Schematic Design Completed• Potential Future Improvements:

o Parking Structure – Increase capacity & updated technology

o Arts Ensemble Bldg - Offices, rehearsal & performance space for local performance organizations

o Exhibition Hall – Demolish & build new Retail, Performance Hall, DES Office, & Storage Spaces

o Concert Hall – Increase seating capacity, add new Rehearsal Hall, improve lobby, & overall upgrade/refresh

o Arena – Increase concert seating capacity, create VIP Area, Arena Sports Pavilion, & additional back of house space, & overall upgrade/refresh

o Victoria Street – Extend along property lineo Kapiolani Blvd – Incorporate complete

street elements, activate site perimeter to attract increased use of facilities

o Grounds – Add public art & gathering places

Page 14: General Contractors Association - Microsoft...August 20, 2019 Robert J. Kroning, P.E., Director Department of Design and Construction City and County of Honolulu General Contractors
Page 15: General Contractors Association - Microsoft...August 20, 2019 Robert J. Kroning, P.E., Director Department of Design and Construction City and County of Honolulu General Contractors

Civil Division FY 2020 Upcoming CIP Projects to Bid from 2019 3rd Qtr to 2020 4th Qtr

Construction Cost Index (CCI): A < $100k <= B < $250k <= C < $500k <= D < $1m <= E < $5m <= F(List subject to change)

Project Title Cost Index Bid Opening QtrRehab of Sts, Unit 65B (Concrete Rds) F 2019-3rd QtrBridge Rehab at Various Locations II, FY 2017 - Bridge 822 Helelua; Bridge 926 Olai Dbl Box Culvert

D 2019-4th Qtr

Erosion Control Imps - 42-323 & 42 Old Kalanianaole (Kooku Pl) F 2019-4th QtrErosion Control Imps - Aiki St & H1 Overpass B 2019-4th QtrGuardrail Imps - La’i Rd, Wikao St C 2019-4th QtrRehab of Localized Sts, Ph 12D (Iwilei, Chinatown) F 2019-4th QtrRehab of Localized Sts, Ph 20B (Lower Manoa) E 2019-4th QtrRehab of Localized Sts, Ph 21 Kalihi D 2019-4th QtrRehab of Sts (followup projects) - Mona & Papahehi Pl C 2019-4th QtrRehab of Sts Unit 87 Ward Avenue Interim Resurfacing & Bikeway Networking

E 2019-4th Qtr

Bridge Rehab at Various Locations II, FY 2015 - Numana Bridge #129 E 2020-1st QtrErosion Control Imps - Anapalau St Channel E 2020-1st QtrManoa Stream Poelua Rd Flood Control Imps D 2020-1st QtrRehab of Sts Unit 88 - Punchbowl St, Bishop St, Richards St, & King St Interim Rd Resurfacing & Bikeway Networking

F 2020-1st Qtr

Rehab of Sts, Unit 76 (Kalakaua Ave) E 2020-1st QtrRehabilitation of Sts, Unit 89 (Kapiolani Boulevard) F 2020-1st QtrRockfall Hazard Mitigation at Various Locations, FY19 - Mokulua Dr (121) D 2020-1st Qtr

Page 16: General Contractors Association - Microsoft...August 20, 2019 Robert J. Kroning, P.E., Director Department of Design and Construction City and County of Honolulu General Contractors

Civil Division FY 2020 Upcoming CIP Projects to Bid from 2019 3rd Qtr to 2020 4th Qtr

Construction Cost Index (CCI): A < $100k <= B < $250k <= C < $500k <= D < $1m <= E < $5m <= F(List subject to change)

Project Title Cost Index Bid Opening Qtr4334 Round Top Slope Stabilization E 2020-2nd QtrBridge Rehab at Various Locations, FY 2015 - Kelewina St Double 90” Culvert (No. 478)

C 2020-2nd Qtr

Kaamilo/Okana/Pacific Heights Outlet Repairs D 2020-2nd QtrKapiolani Blvd Dbl Box Culvert (#273) Imps E 2020-2nd QtrKawailoa Rd Drainage Imps, Kailua D 2020-2nd QtrMapunapuna Drainage Imps A 2020-2nd QtrNorth Kalaheo Avenue Bridge (#445) FY 2017 Imps E 2020-2nd QtrReconstruction of Storm Drain Structures, Moiliili-Kapahulu D 2020-2nd QtrRehab of Localized Sts, Ph 12E (Kakaako Area) F 2020-2nd QtrRehab of Localized Sts, Ph 23 (Waikele Area) E 2020-2nd QtrRehab of Sts, Unit 65C (Concrete Rds) F 2020-2nd QtrRehab of Sts, Unit 65D (Hotel St Concrete Rds) E 2020-2nd QtrRehab of Sts, Unit 79 (Alewa Dr) D 2020-2nd QtrRock Slide Potential Inspections & Mitigative Imps, FY17 - Diamond Head Rd (53-E)

E 2020-2nd Qtr

Anuenue St Drainage Imps B 2020-3rd QtrBridge Rehab at Various Locations I, FY 2009 - Kalihi St Bridge No.3 #148 Replacement

E 2020-4th Qtr

Salt Lake Boulevard Widening - Ph 3, Maluna St to Ala Lilikoi St F 2020-4th Qtr

Page 17: General Contractors Association - Microsoft...August 20, 2019 Robert J. Kroning, P.E., Director Department of Design and Construction City and County of Honolulu General Contractors

050

100150200250300350400450500

2013 2014 2015 2016 2017 2018 2019*

130

Lane Miles Paved

398 305 247 314 276

Upcoming:• Kakaako Area, Phase 12E• Ward Ave, King St, Punchbowl

St, Bishop St with protected bike lanes, Unit 87 and Unit 88

• Concrete Roads, Unit 65B• Kalakaua, Unit 76• Alewa Drive, Unit 79• Lower Manoa, Phase 20B• Waikele, Phase 23• Iwilei/Chinatown, Phase 12D• Kapiolani Blvd, Unit 89• Kalihi, Phase 21• Kamehameha Hwy – Haleiwa,

Unit 93

462

* Projected

Page 18: General Contractors Association - Microsoft...August 20, 2019 Robert J. Kroning, P.E., Director Department of Design and Construction City and County of Honolulu General Contractors
Page 19: General Contractors Association - Microsoft...August 20, 2019 Robert J. Kroning, P.E., Director Department of Design and Construction City and County of Honolulu General Contractors

Mechanical/Electrical Division FY 2020 Upcoming CIP Projects to Bid from 2019 3rd Qtr to 2020 4th Qtr

Construction Cost Index (CCI): A < $100k <= B < $250k <= C < $500k <= D < $1m <= E < $5m <= F(List subject to change)

Project Title Cost Index Bid Opening Qtr

HPD Headquarters Computer Room AC Imps B 2019-3rd Qtr

HPD Training Academy Portable Classroom AC Imps C 2019-3rd Qtr

Kapiolani Boulevard St Light Imps E 2019-3rd Qtr

Pearl City Police Station Fuel Storage Tank Replacement E 2019-3rd Qtr

Thurston Fire Training Center Air Conditioning System Imps C 2019-3rd Qtr

51 Merchant Bldg Imps - Fire Alarm Replacement B 2019-4th Qtr

Fuel Storage Imps at Various Fire Stations - Mokulele Fire Station D 2019-4th Qtr

Hauula Civic Center Fire Alarm System Imps B 2019-4th Qtr

Heeia Stream Bridge St Light Replacement C 2019-4th Qtr

HPD Training Academy Indoor Firing Range Filtration & AC System Imps B 2019-4th Qtr

Kahuku Police Station Fire Alarm System Imps B 2019-4th Qtr

Replacement of Fire Alarm Systems at Various Parks, Ph V C 2019-4th Qtr

Replacement of St Light Meter Cabinets & Transformers, Ph 4 C 2019-4th Qtr

Waipahu HFD Maintenance Facility Air Conditioning System Imps C 2019-4th Qtr

Page 20: General Contractors Association - Microsoft...August 20, 2019 Robert J. Kroning, P.E., Director Department of Design and Construction City and County of Honolulu General Contractors

Mechanical/Electrical Division FY 2020 Upcoming CIP Projects to Bid from 2019 3rd Qtr to 2020 4th Qtr

Construction Cost Index (CCI): A < $100k <= B < $250k <= C < $500k <= D < $1m <= E < $5m <= F(List subject to change)

Project Title Cost Index Bid Opening Qtr

Electrification of Transportation Program, Middle St Transit Center, Ph 2 E 2020-1st Qtr

HPD Headquarters Elevator Modernization E 2020-1st Qtr

Fire Station Emergency Vehicle Caution System (EVCS) Upgrade - Kalihi Kai (31)

C 2020-2nd Qtr

Halawa Corporation Yard Lighting Imps D 2020-2nd Qtr

HPD Training Academy Indoor Firing Range Target System C 2020-2nd Qtr

Kapolei Hale Chiller Plant Replacement E 2020-2nd Qtr

Kupuna Loop & Kupuohi St Lighting Imps A 2020-2nd Qtr

Palolo Valley District Park Pool Lighting System Upgrade D 2020-2nd Qtr

Puu Papaa Telecommunications Facilities Upgrade Generator & Fuel Tank C 2020-2nd Qtr

Replacement of Fire Alarm Systems at Various Parks, Ph IV C 2020-2nd Qtr

Upgrade of Security Cameras (& Access Controls) at Waipahu Training Academy

C 2020-2nd Qtr

Waikiki Shell Upgrade Light Poles (WO #7) B 2020-2nd Qtr

Generator & Electrical Imps at Various Fire Stations (Manoa #22 & Olomana #39)

C 2020-3rd Qtr

Page 21: General Contractors Association - Microsoft...August 20, 2019 Robert J. Kroning, P.E., Director Department of Design and Construction City and County of Honolulu General Contractors

Project Description: Installation of 11 chargers for future electric buses.Approximate bid date: March 2020Estimated Cost: $3.6 Million

Page 22: General Contractors Association - Microsoft...August 20, 2019 Robert J. Kroning, P.E., Director Department of Design and Construction City and County of Honolulu General Contractors