ge battery energy storage systems (bess)...
TRANSCRIPT
GE Battery Energy Storage Systems (BESS) presentation for:
Imperial Valley Sustainable Futures
March 10, 2016
Energy Storage – Discharged?
Hydrogen Business Council 2
Energy Storage
3
Success requires speed + flexibility… plus grid experience
Grid energy storage just emerging…
5
Model Citizens
Energy App: Peak ManagementPower Apps: Freq. Regulation
Spin/RampContingency: Capacity
Replaces: Single cycle gas turbine
Digital Peaker
Energy App: ShiftPower Apps: Freq. Regulation
Responsive ReservesContingency: Capacity
Replaces: Less flexible Gas turbine
Thermal Hybrid
Energy App: ShiftPower Apps: Firming
Freq Regulation Contingency: Responsive Reserves
Replaces: No direct substitute
Renewable Hybrid
Energy App: Freq Regulation Power Apps: Response Reserve
Peak management Contingency: Capacity Voltage: Voltage support
Replaces: Substation upgrades & line capacity
Energy App: Peak Management Power Apps: Smoothing
Contingency: Back upVoltage: Voltage support
Replaces: Substation upgrades & line capacity
D- Sub. & CES
Energy App: Shift Power Apps: Smoothing
Contingency: Back Up Voltage: Power Factor
Replaces: Other Batteries
Residential
Energy App: Peak Management Power Apps: Shift
Contingency: Back Up Voltage: Power Factor
Replaces: Building energy efficiency & DB back up
Commercial
Energy App: Peak Management Power Apps: Shift
Contingency: Back Up Voltage: Power Factor
Replaces: Building energy efficiency & DB back up
Microgrid
T- Substation
Model Supply Model Movement Model Load
20MWh lead-acidPR, CA, AK (‘94-’96)
40MWh DurathonGlobally (‘08-’15)
65MWh Li-ionN. America (‘16)
GE has been in energy storage for >25 years
GE IB: 50% centralized, 40% behind the meter, 10% distribution utilities
GE Energy Grid ProjectsExpanding Global Presence and Grid Applications
4 MW / 18 MWh Behind the Meterat large Industrial
(5x) 50 kW / 100 kWh T&D Network
Support
1 MW / 2 MWhWind Integration
(3x) 200 kW / 400 kWhIntegrated Wind
Turbine
(2x) 10 kW / 20 kWh Behind the Meter
1 MW / 2 MWh T&D Network
Support
1 MW / 2 MWh RenewableIntegration
1
53
6
78
9
10 11
0.1 MW / .5 MWh Behind the Meter
0.5 MW / 1 MWh Behind the Meter at industrial plant
>75 MWh of Grid & Micro-grid projects (Durathon & Li-Ion)
2
7MW / 7MWhIESO Ancillary
Services Convergent E & P
433MW / 20MWh
Utility T&DImperial Irrigation
Commissioned or in commissioning process Recent order or being built
3MW / 6 MWh PV/Storage Micro
gridMAECI Solar
12
13
200kW/1MWhT&D Network
SupportMajor Utility
14
1 MW / 2 MWh Behind the
Meter
100kW/200kWhMicro grid, Solar
Integration
15
2MW / 8MWh PV/Storage
Con Ed Development
1617
1MW/1MWhPeak Shaving
GE Power & Water
GE CONFIDENTIAL
IID/Coachella ProjectPROJECT SUMMARYCustomer: Imperial Irrigation District Location: El Centro, CAProject Type: Turnkey Battery Energy Storage System (BESS)Equipment / System Information:
System Type – Size: Energy - 30MW / 20MWh BESSApplication: Solar Ramping / Spinning ReserveGE Supplied Equip: 30 -1.275MVA Brilliance Inverters; 30 GE Prolec 1.25MVA Transformers; Redundant ESPC w/SCADA point integration
CURRENT STATUS
Civil And Building Works
(By EPC)
Install and Connect Equipment(by EPC with GEES Support)
Commissioning Test(by GEES)
4/1/16: Start Equipment installation
7/1/16: Energize BESS
8/12/16: COD
Other System Equip: Samsung Li-Ion Batteries, MV Switchgear and Aux Distribution, on-site erected prefabricated building with HVAC and Fire Suppression System. All Union Labor under PLA.
Availability Guarantee: 98% at full rated output or 99.5% at 50% full rated output
Performance Guarantee: 10 years
Future Capabilities: Black start of Gas Turbine
Finance: Bring the world class expertise of GE project finance & Energy Financial Services
Finance
Software: optimization ofbattery to grid requirements
Mark VI platform:seamless integration w/ installed base
Software
Battery agnostic : right performance, cost-effectiveLeverage Tier-1 Li capacity
GE inverters & transformers: best in class
HardwareBattery
GE Brilliance inverters
Upgrades: GE provides >30% of the worlds power generation assets
Leverage wind & thermal controls & operations experience
Upgrades
Market Channels : * PJM RegD * Solar+storage* Wind+storage* Digital peaker* Deferred T&D* Avoided Capacity Investment* Microgrids
Customers
The GE Battery Energy Storage play:
We are a Solutions Provider of energy storage systems … focused on solving customers energy storage challenges
Building on the design strengths of GE…• Safety & compliance:
Ground-up thermal management, electrical safety/arc flash compliance, Tier 1 batteries
• Constructability:Purpose Built Enclosure: Faster, pre-installed battery racks, HVAC and fire suppression Engineered Steel Building: Lower cost, reduced footprint ...ideal for >20MWH
• Advanced grid-friendly inverters:in >25,000 wind turbines w/>98% efficiency
• Serviceability:Robust degradation modeling; 10-year and 20-year performance guarantees
• Financing: Competitive project / program financing
… for competitive total cost of ownership, not just initial CapEx
Energy Storage Modeling & Analytics
Solar+Storage
Energy Storage modeling & value analytics Providing statistically-based data science techniques to optimize battery system size
Battery system analytics
Access to GE Energy Consulting grid studies & detailed Li-ion battery efficiency and lifetime models in Predix
Analyzes solar power purchase agreement (PPA) and sizes battery to optimize solar payments
Links GE controls to prioritize battery charge and discharge times using hourly cost analysis
Accepts inputs of each customer’s unique load profile or PV simulation to customize project analysis
Identify possible additional revenue streams from ancillary services
Final value analytics package
Access to GE’s data science capabilities
Customized project sizing & alternate recommendations (e.g. ancillary services)
Sensitivity analysis & customization can be run in real-time to generate alternative project outputs
Full financial analysis & support for each project and use case (e.g. IRR, NPV, cash flow stream)
Example: Coupling GE Energy Storage & Solar
13
Result & recommendation
Result: 1.8MW/9MWh deal has the best financial return
Consideration: Ability to capture additional revenue streams from frequency response, VAR support or spinning reserve
Ran 15 different scenarios for size of project vs. expected return
Customer problem• Did not have 1 minute solar production estimates necessary to size battery for firming• Did not have the ability to simulate battery degrade and efficiency over 20 year project to estimate revenue, CapEx & OpEx
Desired outcome• Shift solar energy output and provide firm power coincident with utility peak demand to maximize PPA value proposition
+
Used GE data science to simulate 1 minute PV production for 20 year scopeCreated multiple scenarios with customer for use of combined PV + storage plant and analyzed each scenario for optimal battery size
Calculated revenue stream for each potential scenario to optimize system size by NPV & IRR
Modeling process
So … how can GE help with your energy storage needs ?
• Full EPC or EEP only (engineered equipment package, with installation by others)
• Full system commissioning by GE in either case
• Performance Guarantees• 10 or 20 years
• Covers: Availability, Capacity, AC/AC Efficiency
• Custom metrics can be guaranteed; i.e. PJM Performance Score
• Project Finance, including generation asset (solar, wind, or gas turbine)
• Detailed engineering, modeling and studies to optimize BESS system design & performance
15
GE’s BESS Services Available
Multiple Technologies Can Drive Better Outcomes… GE Can Make It Easy
Reduce… your need for energy
Shift… demand from
costly peak power
LED & Intelligent
Environments
Solar
Energy Storage
HVAC/ BMS
On Site GasLoad
Management
Produce… reliable, cleaner, cheaper energy
Solution Financingincluding a PPA
GE Capabilities to design, build, manage tailored
solutions to meet your needs
Software & Services dashboards , analytics & apps for continually improved performance
Technology Stackflexible, customizable tech solutions
Introducing Current, Powered by GE: A New Kind of Energy Company
For more information please contact your GE Account Manager:
Joe HeinzmannSenior Product Manager+1 [email protected]