Keywords S6 energy storage E-13 Grid-connected power conversion system (PCS) for NAS (sodium-sulfur) battery energy storage system. This system corresponds to a wide range of NAS battery capacities, from 600kVA to 4800kVA. In addition to being used for load leveling during day and night, it can also be applied for an emergency backup power generator or a large-capacity uninterruptible power supply (UPS). Applicable to system stabilization and ancillary service by making use of high-speed responsiveness and high controllability. - The basic function of the unit is to operate as a load leveling unit (peak shift due to night time charging/daytime discharging). It performs charging/discharging operation according to a set charging/discharging operation pattern (time schedule), where automatic operation is possible by a load following operation function that restricts the charge/discharge power according to increases or decreases in the load power. - When the system power is interrupted, the unit can supply power to a load from the PCS as an emergency backup generator. - The unit can function as an UPS, with a line up of PCS having voltage dip compensation. When power outage is detected in the system, a high-speed switch (GTO semiconductor) releases the PCS from the system in about 2msec, and switches the PCS to independent operation, which makes it possible to protect important load from system power outages (and voltage fluctuation due to instantaneous lows). - Alternative for the SVC. Capable of operating at any power factor combining active power and reactive power. Features Basic Concept or Summary Power Conversion System (PCS) for NAS BESS Y3 equipment or facility Z4 electricity E29 electrical machinery MEIDENSYA CORPORATION AC/DC converter Linkage breaker High-speed switching unit Bypass breaker Incoming breaker Semiconductor switch (GTO) AC conversion unit NAS battery unit System Configuration Diagram (with UPS function) Auxiliary transformer Linkage transformer 600kVA or 1200kVA per row 600kW or 1200kW per row Supply heater power Source:JASE-W Japanese Smart Energy Products & Technologies https://www.jase-w.eccj.or.jp/technologies/index.html

Upload: others

Post on 24-Jan-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Power Conversion System (PCS) for NAS BESS...Keywords S6 energy storage E-13 Grid-connected power conversion system (PCS) for NAS (sodium-sulfur) battery energy storage system. This

KeywordsS6 energy storage

E-13

Grid-connected power conversion system (PCS) for NAS (sodium-sulfur) battery energy storage system.This system corresponds to a wide range of NAS battery capacities, from 600kVA to 4800kVA.In addition to being used for load leveling during day and night, it can also be applied for an emergencybackup power generator or a large-capacity uninterruptible power supply (UPS).Applicable to system stabilization and ancillary service by making use of high-speed responsivenessand high controllability.

- The basic function of the unit is to operate as a load leveling unit (peak shift due to night timecharging/daytime discharging). It performs charging/discharging operation according to a setcharging/discharging operation pattern (time schedule), where automatic operation is possible by a loadfollowing operation function that restricts the charge/discharge power according to increases ordecreases in the load power.

- When the system power is interrupted, the unit can supply power to a load from the PCS as anemergency backup generator.

- The unit can function as an UPS, with a line up of PCS having voltage dip compensation. When poweroutage is detected in the system, a high-speed switch (GTO semiconductor) releases the PCS from thesystem in about 2msec, and switches the PCS to independent operation, which makes it possible toprotect important load from system power outages (and voltage fluctuation due to instantaneous lows).

- Alternative for the SVC. Capable of operating at any power factor combining active power and reactivepower.

Features

Basic Concept or Summary

Power Conversion System (PCS) for NAS BESS

Y3 equipment or facility Z4 electricity E29 electrical machinery

MEIDENSYA CORPORATION

AC/DCconverter

Linkage breaker

High-speed switching unitBypassbreaker

Incomingbreaker

Semiconductor switch (GTO)

AC conversion unit

NAS battery unit

System Configuration Diagram (with UPS function)

Auxiliarytransformer

Linkagetransformer

600kVA or 1200kVAper row

600kW or 1200kWper row

Supply heater power

Source:JASE-W Japanese Smart Energy Products & Technologieshttps://www.jase-w.eccj.or.jp/technologies/index.html

Page 2: Power Conversion System (PCS) for NAS BESS...Keywords S6 energy storage E-13 Grid-connected power conversion system (PCS) for NAS (sodium-sulfur) battery energy storage system. This

E-13

Effects or Remarks

Through load leveling operation, an improvement in the utilization of power facilities can be expected.By cutting the power peak, reduction of electric charges is expected.Elimination of an emergency generator facility for power failures can be expected.Awarded the JEMA technology achievement award for the "development of a AC-DC converter for anNAS battery having a 4MW class large-capacity uninterrupted power supply function".Awarded the Electric Scientific Technology Encouragement Prize for “development and practical use of theAC-DC conversion system for NAS batteries with instantaneous low countermeasure function”.

Installation in Practice or Schedule

Contact: MEIDENSHA CORPORATIONThinkPark Tower, 2-1-1, Osaki, Shinagawa-ku, Tokyo, 141-6029TEL: +81-3-6420-7228 FAX: +81-3-5745-3042 URL: www.meidensha.co.jp

Domestic

Overseas

Installed systems for a total of 175 MW (at 92 locations) since 2001.

Delivered 1 MW worth of system in 2009 (1 customer).

2000kW class NAS battery system (with UPS function)

Source:JASE-W Japanese Smart Energy Products & Technologieshttps://www.jase-w.eccj.or.jp/technologies/index.html