gasification business overview - syngas · edward lowe general manager, gasification ge energy. 2/...
TRANSCRIPT
-
Gasification Business Overview
GTC 2006October 2006
Edward LoweGeneral Manager, Gasification
GEEnergy
-
2 /
Growing Gasification In Multiple Segments
Coal to Liquids (CTL)
Coal toChemicals
RefineryPolygeneration
IGCC/Coal to Power
• Low cost fuels/feedstock
• Reduced emissions
• Fuel diversity
-
3 /
Recent Successes: North America
North AmericaNorth
America
• Executed License Agreements:
–DKRW, Medicine Bow, Wyoming CTL Project
–Erora/Tenaska, Christian County, IL IGCC
–Synenco Energy, Northern Lights Upgrader, Alberta, Canada
–Pet coke to ammonia, Mosaic off take agreement
• Executed Heads of Agreement with BP for Global Hydrogen to Power Projects. First gasification project proposed in Carson, CA.
-
4 /
Recent Successes: China
• Signed 4 coal-to-chemical licenses in China-Coal Mine Company: Coal to Methanol-Dalian: Coal to Ammonia-Private Company: Coal to Methanol-Shenmu II: Coal to Methanol
• Successful startup of 3 coal-to-chemical plants in China
-Sinopec Jinling: Coal/pet coke to ammonia-Shenmu: Coal to methanol-Sinopec Nanjing: Coal/pet coke to ammonia
ChinaChina
-
5 /
• Gasification leader since 1948 with62 facilities operating worldwide
• First coal gasification plant in 1978
• 21 gas turbines operating on synthesis gas, 900,000 operating hours
• IGCC leader: >3 GW with GE technologies
• >6 centuries team gasification experience
GE Gasification & IGCC Experience Leadership
74
Total Plantson All Fuels
Total PlantsOn Solid Fuels
Plants OperatingPlants in Design orUnder Construction
GE’s Gasification Experience~120 Vessels In Operation
24
-
6 /
Houston, TX – process & product design & IGCC experienceNiskayuna, NY – materials, design, system analysisShanghai, China – materials, chemistry, instrumentation Schenectady, NY/ Salem, VA – controls, simulationBangalore, India – computational, experimentalGreenville, SC – design, adv materials & manufacturingIrvine, CA – gasification modeling & experimental expertsWarsaw, Poland – reliability and maintenance analysis
… to lower CAPEX, plus increase efficiency & RAM
Utilizing a Diverse Global Team …300 Technologists
IrvineIrvine HoustonHoustonChinaChina IndiaIndiaNiskayunaNiskayuna PolandPoland
-
7 /
staffin
g
Investing for Success
04
Step Increases in Product
Development
‘05 ‘06
$ Y
Avg/yr ‘01–‘04
10*$Y
20*$Y
‘07
30*$Y(est.)
Jun- Dec-05
Dec-06
0
Advanced Technologies
Gasification Technology
Power Generation Technology
0
50
100
150
200
250
Hea
dcou
nt
300
-
8 /
IGCC Launch Plants Status
Columbus
Cincinnati
Cleveland
OHIO
AEP IGCC Project
Meigs County,Ohio
Indianapolis
Fort WayneGary
INDIANA
Duke IGCC Project• 03/06 announced FEED study
• 1Q07 FEED to be complete
• 2011 expected commercial start up*
Edwardsport,Indiana
*pending project approval
WEST VIRGINIA
AEP IGCC Project• 08/06 announced project
• 12/06 FEED to be completed
• 2011 expected commercial start up
• 9/05 announced FEED study
• 4Q06 FEED to be complete
• 2012 expected commercial start up
Mason County,West Virginia
-
9 /
GE & Bechtel Alliance IGCC Reference PlantReference plant design• Nominal 630MW net plant output
• 7FB gas turbine combined cycle system
• Fuel flexibility
– Wide range of bituminous coals
– Coal/coke blends
Reference plant status• RSC and GT preliminary designs
complete Dec ‘06
• ASU integration & plant performance models complete
• Layout being optimized, MTOsunderway
• Cost estimates being finalized
• Reference plant design 90% complete
-
10 /
Reference Plant … Enhanced Coal Envelope Program Initiated
Leveraging from initial Reference Plant product
– Gasification & heat recovery technology
– Process & power island designs– Integrated plant models & cycle
optimization– RAM modeling
Economically optimizing for PRBWorking with potential launch customer
From Energy Information Administration, Quarterly Coal Report, October 2006
-
11/
Hydrogen Power Projects• Utilize advantaged fossil fuels (coal, petcoke)• Produce high H2 fuel gas to burn in gas
turbines• Capture CO2 (~90%)• Utilize CO2 for Enhanced Oil Recovery (EOR)• Future storage in Saline Aquifers
Value Through Collaboration• Combine technology company with an
operations company• Leaders in gasification, power and CCS• 10 – 15 projects over next decade• Carson, CA is first gasification project
GE and BP Signed HOA To Accelerate Use of Low Carbon Power Generation
Carson Hydrogen Power Project
-
12 /
GE Growing Across the Gasification Segments
Power Chemicals CTL Refining
Accelerating technology development
Partnering with industry leaders
Delivering commercial solutions
-
Gasification Business Overview
GTC 2006October 2006
Edward LoweGeneral Manager, Gasification
GEEnergy
Gasification Business OverviewGrowing Gasification In Multiple SegmentsRecent Successes: North AmericaRecent Successes: ChinaGE Gasification & IGCC Experience LeadershipUtilizing a Diverse Global Team … �300 TechnologistsIGCC Launch Plants StatusGE & Bechtel Alliance IGCC Reference PlantReference Plant … Enhanced Coal Envelope Program InitiatedGE and BP Signed HOA To Accelerate Use of Low Carbon Power GenerationGE Growing Across the Gasification SegmentsGasification Business Overview