Energy www.gasfiredpowerplants.com Produced by: International Marketing Partner: Media Partners: IBC ENERGY POWER PLANTS Grand Copthorne Waterfront Hotel Singapore 2 - 5 December 2014 New investments, profit-maximisation and innovative technology for Gas Fired Power Plants The Premier Conference Showcasing New Investments and Technology of Gas Fired Power Plants: Economics of Gas Fired Power Plants Investment Trends and Technology in Gas Fired Power Plants Gas Market Outlook and Opportunities for Gas Fired Power Generation Gas Fired Power Generation for Peaking Power Plants Dual Fuel Power Generation Distributed Power Generation Featuring Leading Developers of Gas Fired Power Plants: Zainal Arifin Strategic Procurement Head, PT PLN, Indonesia Suriyanto Awi President Director, PT Enviromate International, Indonesia Karim Garcia Vice President, Strategic Planning, Trans-Asia Oil And Energy Development Corporation, Philippines Azhari Sulaiman Senior Vice President for Ventures, Malakoff Berhad, Malaysia Thought Leaders and Experts in Gas Fired Power Generation: Frederic Carron General Manager – Sales, Power Plants, Wartsila Pte Ltd, Singapore Irfan Choudhry Senior Director, Galway Group, Singapore Derek Jamieson Power Project Development Manager, Poyry Energy Ltd, Thailand Dr. Thomas Parkinson Partner, The Lantau Group, Hong Kong PLUS In-depth Workshops on the Hottest Issues In Gas Fired Power Plants! PRE-CONFERENCE WORKSHOP | TUESDAY, 2 DECEMBER 2014: 9am – 4pm Negotiating and Drafting Power Purchase Agreements (PPAs) for Gas Fired Power Projects POST-CONFERENCE WORKSHOP | FRIDAY, 4 DECEMBER 2014: 9am – 4pm Long Term Service Agreements (LTSAs) for Gas Fired Power Plants International Online Media Partner:

Upload: walter-lee

Post on 02-Jul-2015

98 views

Category:

Business


1 download

DESCRIPTION

The Premier Conference Showcasing New Investments and Technology of Gas Fired Power Plants: - Economics of Gas Fired Power Plants - Investment Trends and Technology in Gas Fired Power Plants - Gas Market Outlook and Opportunities for Gas Fired Power Generation - Gas Fired Power Generation for Peaking Power Plants - Dual Fuel Power Generation - Distributed Power Generation Web: http://www.GasFiredPowerPlants.com

TRANSCRIPT

Page 1: Gas Fired Power Plants Conference 2014

Energy

www.gasfiredpowerplants.com

Produced by:

International Marketing Partner:

Media Partners:

IBCENERGY

POWER PLANTS

Grand CopthorneWaterfront Hotel

Singapore

2 - 5 December 2014

New investments, profit-maximisation and innovative technology for Gas Fired Power Plants

The Premier ConferenceShowcasing NewInvestments andTechnology of Gas FiredPower Plants:

Economics of Gas Fired Power Plants

Investment Trends and Technology in Gas FiredPower Plants

Gas Market Outlook and Opportunities for GasFired Power Generation

Gas Fired Power Generation for Peaking PowerPlants

Dual Fuel Power Generation

Distributed Power Generation

Featuring Leading Developersof Gas Fired Power Plants:

Zainal ArifinStrategicProcurement Head,PT PLN,Indonesia

Suriyanto AwiPresident Director,PT EnviromateInternational,Indonesia

Karim GarciaVice President,Strategic Planning,Trans-Asia Oil AndEnergy DevelopmentCorporation,Philippines

Azhari SulaimanSenior Vice President forVentures,Malakoff Berhad,Malaysia

Thought Leaders and Experts inGas Fired Power Generation:

Frederic CarronGeneral Manager –Sales, Power Plants,Wartsila Pte Ltd,Singapore

Irfan ChoudhrySenior Director,Galway Group,Singapore

Derek JamiesonPower ProjectDevelopment Manager,Poyry Energy Ltd,Thailand

Dr. Thomas ParkinsonPartner,The Lantau Group,Hong Kong

PLUS In-depth Workshops on the HottestIssues In Gas Fired Power Plants!PRE-CONFERENCE WORKSHOP | TUESDAY, 2 DECEMBER 2014: 9am – 4pmNegotiating and Drafting Power Purchase Agreements(PPAs) for Gas Fired Power Projects

POST-CONFERENCE WORKSHOP | FRIDAY, 4 DECEMBER 2014: 9am – 4pmLong Term Service Agreements (LTSAs) for Gas FiredPower Plants

International OnlineMedia Partner:

Page 2: Gas Fired Power Plants Conference 2014

CONFERENCE DAY ONE3 December 2014 | Wednesday

REGISTER TODAY! +65 6508 2401 [email protected] www.gasfiredpowerplants.com

8.00 Registration and Morning Coffee

9.00 Welcome from IBC Asia & Speed Networking

9.15 Chairman’s Opening Remarks

Gavin Barfield, Independant Consultant, Singapore

The Economics of Gas FiredPower Plants

9.30 LNG / Gas Supply and Demand and the Impact on

Future Gas Fired Power Plant Projects

• Assessing gas supply and infrastructure to meetdomestic needs

• Evaluating gas prices for the near and the long term• Competitiveness of gas fired power vs alternatives in

the region• Securing energy through strategic infrastructure

investments in the LNG value chainIrfan Choudhry, Senior Director, Galway Group,Singapore

10.10 Comparing the Economic Viability of Coal vs. Gas Fired

Power Plants

• Analysing the different factors that make gas firedpower plants an attractive investment for powergenerators

• Diversifying power supply through gas fired powerplants

• Discovering the degree of efficiency compared withcoal fired power plants

Panelists:Azhari Sulaiman, SVP for Ventures, Malakoff Berhad,MalaysiaKarim Garcia, Vice President, Strategic Planning,Trans-Asia Oil and Gas, PhilippinesZainal Arifin, Strategic Procurement Head, PT PLN,Indonesia

10.40 Morning Networking & Refreshment Break

Mid-Merit Gas Fired PowerGeneration and PeakingPower Plants

11.10 Investing in Gas Fired Power Plants for Mid-Merit

Power Generation

• Why are gas fired power plants making their niche inmid-merit power generation?

• Gas power plant technology and commercial selectioncriteria for mid merit applications

• Analysing the challenges of gas-based mid-meritgeneration in the existing LNG value chain

• Requirements in the shift for a sustainable mid-meritLNG-fired generation sector

Dr. Thomas Parkinson, Partner, The Lantau Group,Hong Kong

11.40 Decreasing Electricity Production Costs through Gas

Based Peaking Power Plants

• Reducing reliance on fuel oil to decrease the productioncost (thereby reducing the subsidy)

• Gas engine vs. Gas turbine for peaking power plants• Selection criteria of gas fired power plants to ensure

reliable electricity supply to consumers during peakloads

Zainal Arifin, Strategic Procurement Head, PT PLN,Indonesia

12.15 Networking Luncheon

1.45 Using CNG for Peaking Power Plants

• Comparing the economic viability of CNG-based powerplants

• Analysing the applications for CNG power plants• Addressing challenges in developing CNG-based power

plantsSuriyanto Awi, President Director, PT Enviromate

International, Indonesia

Investment, Trends andTechnologies in Gas FiredPower Plants

2.20 Partnerships and Joint Ventures in Upgrading and

Retrofitting Existing Gas Fired Power Plants

• The economics of extending existing gas power plants• Improving capacity, efficiency and operational flexibility

of gas fired power plants• Retrofitting and upgrading CCGTs as operators of

existing plants work to keep pace with advanced gasturbine technologies

Azhari Sulaiman, SVP for Ventures, Malakoff Berhad,Malaysia

3.00 Afternoon Networking & Refreshment Break

3.40 Investing in Large Gas and Dual Fuel Engine Power

Plants

• Technology selection criteria• Advantages of operational and fuel flexibility• Unraveling the applications for gas and dual fuel engine

technologyFrederic Carron, General Manager – Sales, Power Plants,Wartsila Pte Ltd, Singapore

4.10 Challenges and Solutions in Building Turnkey Gas and

LNG Fired Power Plants

• Handling end-to-end project management• Driving efficiency of up to 60% in CCGTs• Selection of suitable contractors and evaluation of the

tender processes

4.45 Chairman’s Summary of the Day

5.00 End of Conference Day One

PAN

EL D

ISCU

SSIO

N

Page 3: Gas Fired Power Plants Conference 2014

8.30 Morning Networking & Coffee

9.00 Chairman’s Opening RemarksGavin Barfield, Independant Consultant, Singapore

Emerging Gas Fired PowerPlant Project Hotspots

9.15 Forging Partnerships for Gas Fired Power Projects inMyanmar• Understanding the challenges in doing business in

Myanmar• Partnering with the government for reference

installations of infrastructure projects• Discovering the technology used for a gas fired power

plant in YangonArno Hendriks, CEO, Maxpower Group, IndonesiaMAXPOWER Group is Asia’s leading gas-to-power specialist. Based inIndonesia, they started and developed over 15 gas fired power plantsin the country prior to investing and doing business in Myanmar.

9.55 What are the Challenges and Opportunities inDeveloping Gas Fired Power Plants in Indochina?• Alleviating the severely underdeveloped electricity

infrastructure with a rapid growth in electricity demand• Challenges and solutions to doing business in

Indochina• Ensuring LNG supply for Indochina• What is the future for power generation in Vietnam,

Cambodia and Myanmar?Panelists:These panelists have been successful in doing business in Indochina,specifically, Myanmar, Vietnam, Cambodia and Thailand.Arno Hendriks, CEO, Maxxpower Group, IndonesiaThomas Parkinson, Partner, The Lantau Group,Hong KongKelly Malone, Partner, King and Spalding, Singapore

10.35 Morning Refreshments and Networking

Gas Fired Power Plants forDistributed Power Generation

11.05 “Smaller, More-efficient and Less-costly”Power Generation• Understanding the role of gas fired power plants in

“distributed power” technologies• Discovering the applications for this new trend in

power distribution• Analysing the market drivers and opportunities for

gas fired power plants in small-demand powergeneration

Made Wiratma, Market Development Director,GE Indonesia, Indonesia

11.45 Power Purchase Agreements for Small-Size and Near-Demand Gas Fired Power Generation• Understanding the challenges in securing legal and

commercial licenses for small gas fired power plants• Partnering and negotiating with governments for

successful and expedited negotiations• Strategies for successful PPAs in distributed power

generationMatthew Osborne, Partner, Herbert Smith and Freehills,Singapore

CONFERENCE DAY TWO4 December 2014 | Thursday

REGISTER TODAY! +65 6508 2401 [email protected] www.gasfiredpowerplants.com

PAN

EL D

ISCU

SSIO

N

12.20 Networking Luncheon

1.40 Driving Market Development for Gas Fired Power

Plants in Distributed Power Generation

• Defining the market for small scale, near demand gasfired power plant solutions

• The economics and viability of distributed powergeneration

• What is the future for distributed power generation?Panelists:Made Wiratma, Market Development Director, GE,IndonesiaDerek Jamieson, Manager – Power Project Development,Poyry Energy Ltd, ThailandGavin Barfield, Independant Consultant, Singapore

Financial, Legal and GasSupply Challenges andSolutions in Investing in GasFired Power Plants

2.15 LNG Procurement Strategies for Gas Fired Power

Producers

• Fixed-price PPA market issues/strategies• Competitive spot market issues/strategies• Small-scale project issues/strategiesKelly Malone, Partner, King and Spalding, USA

3.00 Afternoon Networking and Refreshments

3.30 Financing Strategies for Gas Fired Power Plants

• What makes CCGTs attractive for bank financing?• What kinds of models are being used to finance gas

fired power plant projects?• Discovering the current trends in energy financing

models• Identifying and resolving the major risks in project

financeDerek Jamieson, Manager – Power Project Development,Poyry Energy Ltd, Thailand

4.10 IPP Development Risks in LNG Fired Power Plants

• Understanding the risks in gas fired power plantdevelopment

• Securing ECCs effectively and addressing ROW issues• OEM and EPC selection for LNG fired power plantsKarim Garcia, VP for Strategic Development, Trans-Asia

Oil and Gas, Philippines

5.10 Chairman’s Summary of the Day

5.15 End of the Gas Fired Power Plants Conference

Page 4: Gas Fired Power Plants Conference 2014

WORKSHOPS

REGISTER TODAY! +65 6508 2401 [email protected] www.gasfiredpowerplants.com

PRE-CONFERENCE WORKSHOP: TUESDAY, 2 DECEMBER 2014 | 9am – 4pm

Negotiating and Drafting Power PurchaseAgreements (PPAs) for Gas Fired Power ProjectsThe workshop aims to give the attendees a practical frameworkfor analyzing, drafting and negotiating long-term power purchaseagreements (PPA) for gas fired power projects. The attendeeswill familiarize themselves with the typical principles, organizationand structures of a PPA, compare alternative drafting andmechanisms to address key clauses, analyze the implications oftariff structures and risk allocation among project documents,and leave the course better prepared to approach and negotiatePPAs throughout Southeast Asia.

The participants will learn:Basic Commercial PrincipalsPPA StructureTariff StructureOther Key ProvisionsProject Financing Issues

About Your Workshop Leader:

Kevin Futch, Associate, King and Spalding,Singapore

Kevin Futch is an associate in King & Spalding’sSingapore office and a member of the firm’s GlobalTransactions Practice Group. His practice focuseson the development and financing of gas-fired

power, hydropower and other renewable energy projects globally,and includes experience with over 30 power purchase agreement(PPA) negotiations. He has advised project sponsors, governmentsand state-owned utilities during the development and/orfinancing of power projects across Southeast Asia, Africa andSouth America.

POST-CONFERENCE WORKSHOP: FRIDAY, 5 DECEMBER 2014 | 9am – 4pm

Long Term Service Agreements (LTSAs) forGas Fired Power PlantsLong-term service agreements for gas turbines and gas enginesin gas fired power plants are gaining favor in the tight market,but facility owners and project developers must carefullynegotiate price and coverage to arrive at an acceptable risk-reward position.

Considerations for LTSAs include scope, parts, performance,ancillary services, terms and conditions and some special casesfor aeroderivatives.

Participants will learn about and differentiate:Long Term Service AgreementsTerm Warranty AgreementsContractual Services AgreementsLong Term Parts AgreementsLong Term Program AgreementsLong Term Maintenance Program ContractsParts Lease Pooling Agreements

About Your Workshop Leader:

Matthew Osborne, Partner, Herbert Smith and

Freehills, Singapore

Matthew has over 15 years of legal experience andspecialises in the preparation and negotiation of,and due diligence reporting on, D&C, EPC, EPCMand FEED contracts, long term operation and

maintenance agreements, BOO and BOOT contracts, engineeringand technology supply agreements, feedstock and offtakeagreements, energy supply contracts, tolling, transmission andtransportation agreements and other related project documents.

Page 5: Gas Fired Power Plants Conference 2014

SPONSORSHIP AND EXHIBITION OPPORTUNITIESContact Anna Lee to find out about available sponsorship

Ms. Anna Lee Tel: +65 65082470 Email: [email protected]

IBCENERGY

POWER PLANTS

Grand CopthorneWaterfront Hotel

Singapore

2 - 5 December 2014

New investments, profit-maximisation and innovative technology for Gas Fired Power Plants

REGISTER TODAY! +65 6508 2401 [email protected] www.gasfiredpowerplants.com

“Fifteen gigawatt of new gas-fired power generation capacitythat will come online across Southeast Asia over the nextfive years are expected to run at 70 percent on average.”– Wood Mackenzie

The Elite Pan-Asia Gatheringof Key Project Owners andExperts on Gas Fired PowerPlantsWith new gas fired power generation projects coming online, IBC’s Gas Fired

Power Plants Conference is the leading platform to do business with professionalsinvolved with gas fired power generation and to discuss the lucrative investmentopportunities available. It brings together key decision makers from power plantdevelopers, leading power generation companies, equipment and service providers,and international investors in the power generation and energy sectors to sharecommercial strategies in building profitable and efficient gas fired power plantprojects.

Don’t miss the opportunity to take part in the networking and high-qualitydiscussions with industry and thought leaders in gas power generation.

“PLP’s new plant is one of the mostefficient operating units in theSingapore power market today, andthe first in Singapore to be completelyfuelled by liquefied natural gas fromthe new terminal. The units can alsobe operated with piped natural gasand fuel oil as back-up.” – Asian Power

Indonesia, Cambodia, Laos: DistributedPower Generation projects

Indonesia (Southern Sumatra): Peaker Power PlantIndonesia: CNG-Fired Power Plant

Philippines (Batangas): Tabangao Plant

Myanmar (Yangon): Thaketa Power Plant Why You Can’t Affordto Miss this Event

Hear from 16+ influential speakers andthought leaders in the gas fired powergeneration industryGain an in-depth understanding of longterm service agreements (LTSAs) and howthese impact commercial returnsExplore and capitalize on the lucrativeinvestment opportunities and upcomingprojects in gas fired power generationBe updated on projects across Indonesia,Singapore, Philippines and MalaysiaDevelop and widen business contacts in theAsia-Pacific region involved directly with gasfired power plants

Here’s a Snapshot of Who You’ll Meet:This conference is the strategic platform for high-level executives, key decision-makers from gas producers, leading power generation companies, equipment andservice providers, international investors and other senior business leaders in thepower generation and energy sectors;

Directors, Secretaries and Governors of Ministries and Departments of EnergyCEOs / MDs, Regional Managers, Country Managers, Asset Managers from IPPs,Power Generation and Gas CompaniesCEOs / MDs, Business Development Managers, Project Managers and TechnicalManagers from EPCs, Technology + Equipment Providers are also a key part ofour audienceProject Financiers, Investors, Energy Consultants and Lawyers will also send theirdirectors of energy and projects

40%Power GenerationCompanies, Gasand PowerProducers

25%OEMs,Maintenanceand RepairCompanies

15%IPPs,TechnologyandEquipment

10%EPCs andEngineeringCompanies

10%Banks,Consultants,Lawyers

Page 6: Gas Fired Power Plants Conference 2014

FREEGROUP

DISCOUNT

This label contains your priority booking code. To expedite registration, please do not remove label. If you havealready received a copy of this brochure, we apologise. For reasons of confidentiality, your full particulars were notavailable to IBC Asia (S) Pte Ltd for deduplication prior to mail drop.

If undelivered, please return to:

111 Somerset Road,TripleOne Somerset #10-06, Singapore 238164Tel: +65 6508 2400 Fax: +65 6508 2408

GAS FIRED POWER PLANTS

[email protected]

Fax+65 6508 2407

Scan the QR Code with yoursmartphone and register today

Customer Service Hotline+65 6508 2401

MAIL the attached registrationform with your cheque toIBC Asia (S) Pte Ltdc/o Informa Regional BusinessServices111 Somerset Road,TripleOne Somerset #10-06,Singapore 238164

Webwww.gasfiredpowerplants.com

HOTEL INFORMATION

DATA PROTECTION

PAYMENT TERMS

CANCELLATIONS / SUBSTITUTION

IMPORTANT NOTE

REG

NO

. 200

1082

03N

Payment must be received 10 business days prior to the event.To take advantage of discounts with an expiry date, registrationand payment must be received by the cut-off date.

• Payment by bankers draft or cheque in S$ or US$ should bemade in favour of “IBC Asia (S) Pte Ltd” and mailed to:IBC Asia (S) Pte Ltdc/o Informa Regional Business Services111 Somerset Road, TripleOne Somerset #10-06Singapore 238164Attn: The Accounts Receivable Team

• Payment by bank transfer in S$ or US$ made payable to:IBC Asia (S) Pte LtdA/C No.:147-059513-001 (S$)A/C No.:260-457866-178 (US$)The Hongkong and Shanghai Banking Corporation Limited21 Collyer Quay, HSBC BuildingSingapore 049320Bank Swift Code: HSBCSGSGBank Code: 7232

• Payment by Credit Card (AMEX, VISA or MasterCard).The best way to pay by credit card is through our secureportal built into the website. To pay by phone please indicatethe contact name and details below and our CustomerServices Team will call within 24 hours to take payment.Please do not send credit card information by email.

The personal information entered during your registration/order,or provided by you, will be held on a database and may beshared with companies in the Informa Group in the UK andinternationally. Occasionally, your details may be obtained fromor shared with external companies who wish to communicatewith you offers related to your business activities. If you do notwish your details to be used for this purpose, please contact ourDatabase Department at Email: [email protected],Tel: +65 6508 2400 or Fax: +65 6508 2408.

Should you be unable to attend, a substitute delegate iswelcome at no extra charge. Cancellations must be received inwriting at least 10 business days before the start of the event,to receive a refund less 10% processing fee per registration.The company regrets that no refund will be made available forcancellation notifications received less than 10 business daysbefore the event.

Please quote the name of the delegate, event title and invoicenumber on the advice when remitting payment. Bank chargesare to be deducted from participating organisations own accounts.Please fax your payment details (copy of remittance advice,cheque or draft to +65 6508 2407).

Attendance will only be permitted upon receipt of full payment.Participants wishing to register at the door are responsible toensure all details are as published. IBC assumes no furtherliability or obligation, beyond the refund of the paid registrationfee, in the event of postponement or cancellation by IBC.

6 EASY WAYS TO REGISTER

RESERVE YOUR PLACE TODAY!■ Yes! I/We will attend the Gas Fired Power Plants, 2 - 5 December 2014, Grand Copthorne Waterfront Hotel, Singapore■ I would like to purchase the conference presentations at SGD1000 + GST (SGD1070) per log in.

CREDIT CARD PAYMENTSThe best way to pay by credit card is through our secure on-line registration process, simply log on to the website atwww.gasfiredpowerplants.com and click “Register On-line”. If you would prefer to pay over the phone please complete the contactname and details and our Customer Services Team will call within 24 hours to take payment. As we treat your credit card informationin the strictest confidence, please do not send payment details by email.

Credit card contact: Department:

Direct phone number: Email:

P10541

Who is Head of your Department?

Who is Head of Training?

Company InformationCompany Name:

Address:

Main Business/Activity:

Postal Code:

■ I enclose my bankers draft / cheque payable to IBC Asia (S) Pte Ltd■ I am paying by bank transfer (copy attached)■ Payment by Credit Card. (AMEX, VISA or MasterCard accepted)

PAYMENT METHOD(Please tick)

• Multiple Bookings Discount pricing is applicable to groups of 3 or more delegates from the same organisation registering for the same event, at the same time.Fee stated is the discounted price PER DELEGATE. Only one discount applies; either the early bird rate OR special rate OR group rate.

• All fees stated include luncheons, refreshments and complete set of documentation. It does not include the cost of accommodation and travel.• A 7% Goods & Services Tax (GST) is applicable to all Singapore based companies for Singapore Venue.

Please photocopy for additional delegates

Early Bird RateRegister & pay on orbefore 26 Sep 2014

Special RateRegister & pay on orbefore 31 Oct 2014

Group Rate(3 or more delegates)

Normal RateRegister & pay after

31 Oct 2014FEE PER DELEGATE

Delegate 1 Details

Name: Dr/Mr/Ms

Job Title:

Department

Tel:

Mobile No.:

Email:

Register 3 Delegates & the4th Attends for FREE!

REGISTER TODAY! +65 6508 2401 [email protected] www.gasfiredpowerplants.com

Delegate 2 Details

Name: Dr/Mr/Ms

Job Title:

Department

Tel:

Mobile No.:

Email:

Delegate 3 Details

Name: Dr/Mr/Ms

Job Title:

Department

Tel:

Mobile No.:

Email:

Delegate 4 Details

Name: Dr/Mr/Ms

Job Title:

Department

Tel:

Mobile No.:

Email:

❑ 4 Day Pass: Conference + All Workshops

Grand Copthorne Waterfront Hotel392 Havelock Road, Singapore 169663

Contact Person: Tan Ai Li, Asst Director of Events

Mobile: + 65 9006 2432

Tel: +65 6233 1301 | Fax: +65 6233 1177

SGD 4,895 SGD 5,095 SGD 5,195 SGD 4,795

❑ 3 Day Pass: Conference +❑ Pre-Conference Workshop OR SGD 3,995 SGD 4,195 SGD 4,295 SGD 3,895❑ Post-Conference Workshop

❑ 2 Day Pass: 2 Day Conference Only SGD 2,995 SGD 3,195 SGD 3,295 SGD 2,895

WEB