gamble rd 100% submittal 16-5-st-15 ward 5 kanis rd to ...€¦ · zr. 100% submittal. 9"...

41
DEPARTMENT OF PUBLIC WORKS LITTLE ROCK, ARKANSAS 72201 701 W. MARKHAM CIVIL ENGINEERING CITY OF LITTLE ROCK, ARKANSAS SHEET NO. SCALE PROJECT NO. N.T.S. DATE DESIGNED CHECKED DRAWN BY REVISIONS DATE 16-5-ST-15 WARD 5 GAMBLE RD GAMBLE RD C1 COVER SHEET 2019-11-19 16-5-ST-15 RH RH ZR KANIS RD TO ARTHUR LN CENTRAL ARKANSAS ENGINEERIN CIVIL ENGINEERING SURVEYING GIS A PROFESSIONAL LIMITED LIABILITY COMPANY 1012 AUTUMN ROAD, SUITE #2 | LITTLE ROCK, ARKANSAS 72211 OFFICE: 501.227.4459 | FAX: 501.227.3820 | EMAIL: [email protected] www.CentralArkansasEngineering.com | | 100% SUBMITTAL SHEET NO. TITLE C1 COVER SHEET C2 LEGEND C3 CONSTRUCTION SECTIONS C4 PLAN & PROFILE STA. 10+00 TO STA. 12+50 C5 PLAN & PROFILE STA.12+50 TO STA. 15+00 C6 PLAN & PROFILE STA. 15+00 TO STA. 17+50 C7 PLAN & PROFILE STA. 17+50 TO STA. 20+00 C8 PLAN & PROFILE STA 20+00 TO STA. 22+50 C9 PLAN & PROFILE STA.22+50 TO STA. 25+00 C10 PLAN & PROFILE STA. 25+00 TO STA. 27+38 C11 DRIVEWAY 1 C12 DRIVEWAY 2 C13 DRIVEWAY 3 C14 DRIVEWAY 4 C15 DRIVEWAY 5 C16 SEGMENTAL RETAINING WALLS C17 SOUTH RETAINING WALL DETAILS C18 NORTH RETAINING WALL DETAILS C19 EROSION CONTROL 1 C20 EROSION CONTROL 2 C21 EROSION CONTROL 3 C22 EROSION CONTROL 4 C23 CROSS SECTION 1 C24 CROSS SECTION 2 C25 CROSS SECTION 3 C26 CROSS SECTION 4 C27 CROSS SECTION 5 C28 CROSS SECTION 6 C29 CROSS SECTION 7 C30 CROSS SECTION 8 C31 CROSS SECTION 9 C32 CROSS SECTION 10 C33 CROSS SECTION 11 C34 CROSS SECTION 12 C35 CROSS SECTION 13 C36 CROSS SECTION 14 C37 CROSS SECTION 15 C38 CROSS SECTION 16 C39 CROSS SECTION 17 C40 CROSS SECTION 18

Upload: others

Post on 11-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

N.T.S.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

16-5-ST-15WARD 5

GAMBLE RD

GA

MB

LE

RD

C1

CO

VE

R S

HE

ET

2019-11-19

16-5-ST-15

RH

RH

ZR

KANIS RD TO ARTHUR LN

CENTRAL ARKANSAS ENGINEERINGCIVIL ENGINEERING SURVEYING GIS

A PROFESSIONAL LIMITED LIABILITY COMPANY

1012 AUTUMN ROAD, SUITE #2 | LITTLE ROCK, ARKANSAS 72211OFFICE: 501.227.4459 | FAX: 501.227.3820 | EMAIL: [email protected]

www.CentralArkansasEngineering.com

| |

100% SUBMITTAL

SHEET NO. TITLE

C1 COVER SHEET

C2 LEGEND

C3 CONSTRUCTION SECTIONS

C4 PLAN & PROFILE STA. 10+00 TO STA. 12+50

C5 PLAN & PROFILE STA.12+50 TO STA. 15+00

C6 PLAN & PROFILE STA. 15+00 TO STA. 17+50

C7 PLAN & PROFILE STA. 17+50 TO STA. 20+00

C8 PLAN & PROFILE STA 20+00 TO STA. 22+50

C9 PLAN & PROFILE STA.22+50 TO STA. 25+00

C10 PLAN & PROFILE STA. 25+00 TO STA. 27+38

C11 DRIVEWAY 1

C12 DRIVEWAY 2

C13 DRIVEWAY 3

C14 DRIVEWAY 4

C15 DRIVEWAY 5

C16 SEGMENTAL RETAINING WALLS

C17 SOUTH RETAINING WALL DETAILS

C18 NORTH RETAINING WALL DETAILS

C19 EROSION CONTROL 1

C20 EROSION CONTROL 2

C21 EROSION CONTROL 3

C22 EROSION CONTROL 4

C23 CROSS SECTION 1

C24 CROSS SECTION 2

C25 CROSS SECTION 3

C26 CROSS SECTION 4

C27 CROSS SECTION 5

C28 CROSS SECTION 6

C29 CROSS SECTION 7

C30 CROSS SECTION 8

C31 CROSS SECTION 9

C32 CROSS SECTION 10

C33 CROSS SECTION 11

C34 CROSS SECTION 12

C35 CROSS SECTION 13

C36 CROSS SECTION 14

C37 CROSS SECTION 15

C38 CROSS SECTION 16

C39 CROSS SECTION 17

C40 CROSS SECTION 18

AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
Y
AutoCAD SHX Text
O
AutoCAD SHX Text
PROJECT LOCATION
AutoCAD SHX Text
WARD 5
AutoCAD SHX Text
WARD 4
AutoCAD SHX Text
WARD 3
AutoCAD SHX Text
WARD 1
AutoCAD SHX Text
WARD 2
AutoCAD SHX Text
WARD 6
AutoCAD SHX Text
WARD 7
AutoCAD SHX Text
PROJECT LOCATION - WARD 5
AutoCAD SHX Text
DEPARTMENT OF PUBLIC WORKS CIVIL ENGINEERING 701 WEST MARKHAM STREET LITTLE ROCK, ARKANSAS 72201
AutoCAD SHX Text
I-430
AutoCAD SHX Text
KANIS
AutoCAD SHX Text
KANIS
AutoCAD SHX Text
START PROJECT STA. 10+00
AutoCAD SHX Text
END PROJECT STA. 27+38
Page 2: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

C

L

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

SCALE

DATE

GA

MB

LE

RD

C2

LE

GE

ND

2019-11-19

16-5-ST-15

RH

RH

ZR

100% SUBMITTAL

AutoCAD SHX Text
9" CLASS 7 BASE COURSE AT 100% MODIFIED PROCTOR DENSITY
AutoCAD SHX Text
COMPACTED SUBGRADE AT 95% MODIFY PROCTOR DENSITY.
AutoCAD SHX Text
R-O-W
AutoCAD SHX Text
R-O-W
AutoCAD SHX Text
CLASS 3 CURB & GUTTER
AutoCAD SHX Text
OVERLAY 3" ASPHALT WEARING SURFACE
AutoCAD SHX Text
PROFILE GRADE
AutoCAD SHX Text
SODDING
AutoCAD SHX Text
3:1 MAX
AutoCAD SHX Text
3:1 MAX
AutoCAD SHX Text
IN AREAS TO RECEIVE BITUMINOUS PAVING, CONCRETE DRIVEWAYS, OR CURB AND GUTTER, SUBGRADE SHALL BE COMPACTED TO A DENSITY NOT LESS THAN 95% OF MAXIMUM DENSITY OBTAINED AT OPTIMUM MOISTURE CONTENT. (AASHTO T-180)
AutoCAD SHX Text
FOR AREAS OF SUBGRADE PREPARATION TO RECEIVE CONCRETE SIDEWALKS, SUBGRADE SHALL BE COMPACTED TO A DENSITY OF 90% MAXIMUM.(AASHTO T-180).
AutoCAD SHX Text
CRUSHED STONE- MATERIAL IN EACH COURSE SHALL BE COMPACTED TO A DENSITY OF 100% MAXIMUM (AASHTO T-191).
AutoCAD SHX Text
1.
AutoCAD SHX Text
2.
AutoCAD SHX Text
3.
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
27-0" PAVEMENT
AutoCAD SHX Text
SOLID
AutoCAD SHX Text
EDGE OF
AutoCAD SHX Text
PAVEMENT
AutoCAD SHX Text
CENTERLINE PROFILE WILL REQUIRE HEIGHT GREATER THAN CURB FOR SOME STREETS TO MAINTAIN 2% MINIMUM CROSS-SLOPE.
AutoCAD SHX Text
4.
AutoCAD SHX Text
4"x5'-0 CONCRETE SIDEWALK
AutoCAD SHX Text
2%
AutoCAD SHX Text
2%
AutoCAD SHX Text
2%
AutoCAD SHX Text
14.5'
AutoCAD SHX Text
2'
AutoCAD SHX Text
2'
AutoCAD SHX Text
2'
AutoCAD SHX Text
14.5'
AutoCAD SHX Text
3:1 MAX
AutoCAD SHX Text
3:1 MAX
AutoCAD SHX Text
2%
AutoCAD SHX Text
SODDING
AutoCAD SHX Text
SOLID
AutoCAD SHX Text
2'
AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
SETBACK LINE
AutoCAD SHX Text
24" CMP/RCP/DIP
AutoCAD SHX Text
650
AutoCAD SHX Text
EASEMENT LINE
AutoCAD SHX Text
CONTOUR LINE
AutoCAD SHX Text
GAS LINE
AutoCAD SHX Text
SEWER LINE
AutoCAD SHX Text
WATER LINE
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
OVERHEAD UTILITY
AutoCAD SHX Text
CURB
AutoCAD SHX Text
STORM SEWER/CULVERT
AutoCAD SHX Text
UNDERGROUND TELEPHONE
AutoCAD SHX Text
UNDERGROUND ELECTRIC
AutoCAD SHX Text
PROPERTY LINE
AutoCAD SHX Text
UTILITY POLE
AutoCAD SHX Text
LIGHT POLE
AutoCAD SHX Text
R.R. SPIKE
AutoCAD SHX Text
PK NAIL
AutoCAD SHX Text
IRON ROD
AutoCAD SHX Text
CO
AutoCAD SHX Text
ELECTRIC MANHOLE
AutoCAD SHX Text
TELEPHONE MANHOLE
AutoCAD SHX Text
BENCHMARK
AutoCAD SHX Text
SIGN POST
AutoCAD SHX Text
CLEAN-OUT
AutoCAD SHX Text
GAS VALVE
AutoCAD SHX Text
GAS METER
AutoCAD SHX Text
FIRE HYDRANT
AutoCAD SHX Text
WATER VALVE
AutoCAD SHX Text
WATER METER
AutoCAD SHX Text
GUARD POST (BOLLARD)
AutoCAD SHX Text
CONC. MONUMENT
AutoCAD SHX Text
T
AutoCAD SHX Text
TELEPHONE BOX
AutoCAD SHX Text
ELECTRIC BOX
AutoCAD SHX Text
T
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
EVERGREEN/CONIFEROUS TREE
AutoCAD SHX Text
DECIDUOUS TREE
AutoCAD SHX Text
GP
AutoCAD SHX Text
RR(Sp)
AutoCAD SHX Text
IR
AutoCAD SHX Text
PK
AutoCAD SHX Text
WM
AutoCAD SHX Text
FH
AutoCAD SHX Text
WV
AutoCAD SHX Text
CM
AutoCAD SHX Text
GM
AutoCAD SHX Text
GV
AutoCAD SHX Text
SPOT ELEVATION
AutoCAD SHX Text
CONTOUR
AutoCAD SHX Text
STORM SEWER - PIPE
AutoCAD SHX Text
STORM SEWER - JUNCTION BOX
AutoCAD SHX Text
STORM SEWER - MITERED END SECTION
AutoCAD SHX Text
STORM SEWER - GRATE INLET
AutoCAD SHX Text
HIGH POINT
AutoCAD SHX Text
HP
AutoCAD SHX Text
LOW POINT
AutoCAD SHX Text
LP
AutoCAD SHX Text
GRADE BREAK LINE
AutoCAD SHX Text
SPOT CURB ELEVATION
AutoCAD SHX Text
%%U25.50
AutoCAD SHX Text
25.00
AutoCAD SHX Text
25.00
AutoCAD SHX Text
25
AutoCAD SHX Text
PROPOSED
AutoCAD SHX Text
SANITARY SEWER PIPE
AutoCAD SHX Text
SANITARY SEWER MANHOLE
AutoCAD SHX Text
CO
AutoCAD SHX Text
CONSTRUCTION - ENTRANCE/EXIT
AutoCAD SHX Text
D
AutoCAD SHX Text
STORM SEWER - FLARED END SECTION
AutoCAD SHX Text
STORM SEWER - HEADWALL
AutoCAD SHX Text
STORM SEWER - INLET WITH SINGLE EXTENSION
AutoCAD SHX Text
STORM SEWER - INLET WITH DOUBLE EXTENSION
AutoCAD SHX Text
STORM SEWER - AREA INLET
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
CUT LINE
AutoCAD SHX Text
FILL LINE
AutoCAD SHX Text
SANITARY SEWER MANHOLE
AutoCAD SHX Text
S
AutoCAD SHX Text
STORM SEWER MANHOLE
AutoCAD SHX Text
D
AutoCAD SHX Text
CURB
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
GUY WIRE
AutoCAD SHX Text
CABLE BOX
AutoCAD SHX Text
C
AutoCAD SHX Text
POST OR POLE (TYPE AS NOTED)
AutoCAD SHX Text
MAILBOX
AutoCAD SHX Text
BUSH
AutoCAD SHX Text
CD
AutoCAD SHX Text
CHECK DAM
AutoCAD SHX Text
DI
AutoCAD SHX Text
DIVERSION BERM
AutoCAD SHX Text
DN
AutoCAD SHX Text
DOWNDRAIN STRUCTURE - TEMPORARY
AutoCAD SHX Text
RD
AutoCAD SHX Text
ROCK DAM
AutoCAD SHX Text
SFA
AutoCAD SHX Text
ST
AutoCAD SHX Text
SU
AutoCAD SHX Text
SILT FENCE - TYPE A
AutoCAD SHX Text
STORM DRAIN OUTLET PROTECTION
AutoCAD SHX Text
SURFACE ROUGHENING
AutoCAD SHX Text
TS1
AutoCAD SHX Text
DISTURBED AREA STABILIZATION -TEMPORARY STABILIZATION
AutoCAD SHX Text
TS2
AutoCAD SHX Text
DISTURBED AREA STABILIZATION -TEMPORARY GRASSING
AutoCAD SHX Text
TS3
AutoCAD SHX Text
DISTURBED AREA STABILIZATION -PERMANENT GRASSING
AutoCAD SHX Text
Mb
AutoCAD SHX Text
MATTING/BLANKETS
AutoCAD SHX Text
SD1
AutoCAD SHX Text
SEDIMENT BARRIER - SILT FENCE
AutoCAD SHX Text
SD2
AutoCAD SHX Text
SEDIMENT BARRIER - GRAVEL RING
AutoCAD SHX Text
SD3
AutoCAD SHX Text
SEDIMENT BARRIER - BLOCK & GRAVEL
AutoCAD SHX Text
SD4
AutoCAD SHX Text
SEDIMENT BARRIER - BLOCK
AutoCAD SHX Text
SB1
AutoCAD SHX Text
TEMPORARY SEDIMENT BASIN
AutoCAD SHX Text
SFB
AutoCAD SHX Text
SILT FENCE - TYPE B
AutoCAD SHX Text
SFC
AutoCAD SHX Text
SILT FENCE - TYPE C
AutoCAD SHX Text
S
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
TYP SECTION STA 13+12 TO STA 17+75
Page 3: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

TCE

TCE

T

C

E

AR

TH

UR

LN

9+

91

10+

00

10

+5

0

11

+0

0

11+

50

12+

00

12

+5

0

13

+0

0

13+

50

14+

00

14

+5

0

15+

00

15+

50

16+

00

16+

50

17+

00

17+

50

18+

00

18+

50

19

+0

0

19+

50

20

+0

0

20

+5

0

21+

00

21+

50

22

+0

0

22

+5

0

23+

00

23

+5

0

24

+0

0

24

+5

0

25

+0

0

25

+5

0

26

+0

0

26

+5

0

27

+0

0

27

+3

8

5

4

0

5

5

0

5

3

0

5

6

0

5

3

0

5

2

0

5

1

0

5

1

0

5

0

0

5

2

0

5

3

0

5

4

0

5

5

0

5

6

0

560

5

7

0

5

0

0

4

9

0

570

5

5

0

4

8

0

5

6

0

5

3

0

550

5

2

0

540

5

1

0

4

7

0

500

4

6

0

530

490

480

470

520

4

6

0

5

1

0

510

4

7

0

5

0

0

4

7

0

4

8

0

520

5

3

0

510

500

4

6

0

490

4

7

0

5

1

0

4

8

0

500

SE

QU

IN

A

VE

PA

LE

Z A

VE

ALLE

YA

LLE

Y

8''

SS

CO

LE

MA

N A

VE

.

SE

QU

IN

A

VE

CO

LE

MA

N A

VE

CLO

SE

D

R/ W R/ W R/ W R/ W R/ W R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W

R/ W R/ W R/ W R/ W R/ W R/ W

R/ WR/ W

R/ WR/ W

R/ WR/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W

PA

LE

Z A

VE

CLO

SE

D T

HIS

SID

E O

F R

OW

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

-1.0%

SFA TCE

R/ W R/ W

TCE TCETCE

TCETCE TCE TCE

R/ W R/ W

TCE

TCE

TCE

TCE

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

AS NOTED

GA

MB

LE

RD

C3

CO

NS

TR

UC

TIO

N S

EC

TIO

NS

2019-11-19

16-5-ST-15

RH

RH

ZR

COMPLETE RE-CONSTRUCTION

MILL & OVERLAY

EXISTING

61'

ST

A. 9

+9

1 B

OP

ST

A. 1

0+

50

ST

A. 2

7+

38

E

OP

ST

A. 2

6+

80

GAMBLE RD SECTIONS

100% SUBMITTAL

MILL & OVERLAY

EXISTING

58'

AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
0
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
35
AutoCAD SHX Text
70
AutoCAD SHX Text
140
AutoCAD SHX Text
210
AutoCAD SHX Text
280
Page 4: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

TCE

T

C

E

T

C

E

F F F F F F

F

F

F F

F F F F F F

F F F F F F F F F F F F F F

F

F

F

F

F

F

F

F

F

speed lim

it sign

bond m

oney sign

IR

stop sign

9+

91

10

+0

0

10

+5

0

11

+0

0

11

+5

0

12

+0

0

12

+5

0

5

0

0

>>

>>>>

>>

>>

>>

>>

>>

>>

>>

>>

>>

>>

>>

>>

>>

>>

>>

R/W

R/W

R/W

R/W

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE OHE OHE OHE OHE OHE OHE OHE

ASPHALT

GRAVEL DRIVE

N:1

49,7

11.9

5

E:1

,186,6

12.9

9

RP

N

:1

4

9

,7

5

3

.6

5

E

:1

,1

8

6

,6

9

7

.8

8

R

P

N

:1

4

9

,6

9

9

.6

4

E

:1

,1

8

6

,6

5

3

.2

4

LOT 13 BLK 22

1120 GAMBLE

LOT 11 BLK 22

1120 GAMBLE

LOT 9 BLK 22

1120 GAMBLE

LOT 10 BLK 22

1120 GAMBLE

LOT 8 BLK 23

1121 GAMBLE

LOT 7 BLK 23

1121 GAMBLE

LOT 6 BLK 23

1121 GAMBLE

LOT 5 BLK 23

1121 GAMBLE

LOT 4 BLK 23

1121 GAMBLE

Northwest Little Rock VFW POST 9095

149 Dunbar Road

Natchez, MS 39120

Lynn Wirtz

1121 Gamble Road Little Rock,

AR 72211

Northwest Little Rock VFW POST 9095

Northwest Little Rock VFW POST 9095

Northwest Little Rock VFW POST 9095

Northwest Little Rock VFW POST 9095

1121 Gamble Road Little Rock,

AR 72211

1121 Gamble Road Little Rock,

AR 72211

149 Dunbar Road

Natchez, MS 39120

1121 Gamble Road Little Rock,

AR 72211

1121 Gamble Road Little Rock,

AR 72211

149 Dunbar Road

Natchez, MS 39120

Lynn Wirtz Lynn Wirtz

Lynn Wirtz

Lynn Wirtz

149 Dunbar Road

Natchez, MS 39120

149 Dunbar Road

Natchez, MS 39120

Lynn Wirtz

149 Dunbar Road

Natchez, MS 39120

LOT 12 BLK 22

1120 GAMBLE

-1.0%

E

O

P

E

O

P

E

O

P

E

O

P

EOP

EOP

EOP

EOP EOPEOP

EOP

EOP

EOP

EOP

EO

P

EO

P

EO

P

EO

P

EOP

EOP

E

O

P

EO

P

EOPEOP

EOP

EOP

E

O

P

E

O

P

E

O

P

E

O

P

E

O

P

EO

P

EO

P

EO

P

EOP

EOP

EOP

EOP

EOP

EOP

EO

P

EO

P

EO

P EOP EOP EOP EOP EOP EOP EOP EOP EOP

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W

FFFFFFFFFFF

TCETCETCETCETCETCETCETCETCETCE

AR

EA

12

2327.43

OVERLAY ONLY

FROM STA 9+90 TO

STA 14+50

482.15

E48

3.12

F

484.05

E48

4.67

F

485.68

E48

6.25

F

487.44

E48

7.96

F

489.25

E48

9.79

F

491.18

E49

1.75

F

493.33

E49

3.81

F

495.75

E49

6.07

F

498.30

E49

9.10

F

501.16

E50

2.14

F

504.39

E50

5.18

F

LOW PT STA: 10+21.55

LOW PT ELEV: 484.46

PVI STA:10+79.35

PVI ELEV:487.94

K:50.71

10+

21.55

484.46

11+

37.16

492.74

115.62'

1

2

.1

4

%

6.0

3%

8

.3

1

%

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

H: 1"=10'

V: 1"=5'

GA

MB

LE

RD

C4

ST

A. 1

0+00

TO

ST

A. 1

2+50

2019-11-19

16-5-ST-15

RH

RH

ZR

PL

AN

- P

RO

FIL

E

100% SUBMITTAL

MA

TC

H L

IN

E S

H. 5

EXISTING R-O-W20'

NOTE:

R-O-W NOT ACQUIRED ON EAST SIDE

FROM STA 9+90 TO STA 14+50.

CONTRACTOR TO STAY WITH EXISTNG

R-O-W.

AutoCAD SHX Text
T.C.E.
AutoCAD SHX Text
Mill Butt Joint
AutoCAD SHX Text
TAPER 8:1 MATCH NEW GUTTER LINE
AutoCAD SHX Text
Type 3 Ramp
AutoCAD SHX Text
Mill & Overlay This Area
AutoCAD SHX Text
Proposed Profile
AutoCAD SHX Text
Existing Profile
AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
0
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
5
AutoCAD SHX Text
10
AutoCAD SHX Text
20
AutoCAD SHX Text
30
AutoCAD SHX Text
40
Page 5: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

TCETCE

TCETCE

TCE

IR

IR

12+

50

13+

00

13+

50

14+

00

14+

50

15+

00

>>>>

>>>>

>>

>>

>>

>>

>>>>>>>>

>>

>>

>>>>>>>>

>>

>>

>>

>>

>>

>>

>>

>>

>>

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

PA

LE

Z A

VE

-13.8%

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ WR/ W R/ W R/ W R/ W R/ W

PA

LE

Z A

VE

CLO

SE

D T

HIS

SID

E O

F R

OW

OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE

OHE OHEOHE OHE OHE

OHE OHE

OH

E

OH

E

OH

E

OH

E

OH

E

CONC

PI @

14+

57.83

N

:

1

5

0

,

1

5

7

.

3

7

E

:

1

,

1

8

6

,

6

6

2

.

7

2

LOT 9 BLK 19

LOT 8 BLK 18

1027 GAMBLE

LOT 16 BLK22

1120 GAMBLE

LOT 15 BLK22

1120 GAMBLE

LOT 14 BLK 22

1120 GAMBLE

LOT 13 BLK 22

1120 GAMBLE

LOT 4 BLK 23

1121 GAMBLE

LOT 3 BLK 23

1121 GAMBLE

LOT 2 BLK 23

1121 GAMBLE

LOT 1 BLK 23

1121 GAMBLE

Lynn Wirtz

149 Dunbar Road

Natchez, MS 39120

Northwest Little Rock VFW POST 9095

Northwest Little Rock VFW POST 9095

149 Dunbar Road

Natchez, MS 39120

149 Dunbar Road

Natchez, MS 39120

Shirley Davis

58 Chenal Circle

Little Rock, AR 72223

1121 Gamble Road Little Rock,

AR 72211

Northwest Little Rock VFW POST 9095

1121 Gamble Road Little Rock,

AR 72211

1121 Gamble Road Little Rock,

AR 72211

1121 Gamble Road Little Rock,

AR 72211

Northwest Little Rock VFW POST 9095

149 Dunbar Road

Natchez, MS 39120

Lynn Wirtz

Lynn Wirtz

149 Dunbar Road

Natchez, MS 39120

Lynn Wirtz

Lynn Wirtz

Lynn Wirtz

149 Dunbar Road

Natchez, MS 39120

1120 GAMBLE

-14.6%

-12.7%

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOPEOP

EOPEOP

EOP

EOP

EOP

EOP

EOP

EOP

EOPEOP

EOP

EOPEOP

EOP EOP

EOP EOPEOP

EOPEOP

EOPEOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EO

P

EO

P

EO

P

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W

CCC

AR

EA

1

6726.58

OVERLAY ONLY FROM STA

9+90 TO STA 14+50

1

3

.0

8

%

1

4

.1

4

%

1

4

.8

0

%

1

4

.9

3

%

1

3

.8

7

%

1

2

.1

4

%

HIGH PT STA: 15+88.09

HIGH PT ELEV: 529.99

PVI STA:14+75.71

PVI ELEV:532.58

K:22.03

13

+2

0.5

3

51

3.7

4

310.36'

504.39

E50

5.18

F

507.66

E50

8.21

F

510.99

E51

1.25

F

514.65

E51

4.28

F

518.38

E51

7.12

F

521.92

E51

9.68

F

525.39

E52

1.96

F

528.53

E52

3.95

F

531.03

E52

5.66

F

532.52

E52

7.08

F

534.01

E52

8.23

F

534.12

E52

9.08

F

HIGH PT STA: 13+74.99

HIGH PT ELEV: 519.68

PVI STA:13+47.76

PVI ELEV:517.39

K:13.35

13

+2

0.5

3

51

3.9

8

13

+7

4.9

9

5

19

.6

8

54.45'

517.33 R

EV

517.33 R

EV

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

PL

AN

- P

RO

FIL

E

H: 1"=10'

V: 1"=5'

GA

MB

LE

RD

C5

ST

A.

12+

50 T

O S

TA

. 15+

00

2019-11-19

16-5-ST-15

RH

RH

ZR

100% SUBMITTALM

AT

CH

L

IN

E S

H. 4

MA

TC

H L

IN

E S

H. 6

EXISTING R-O-W

20'

NOTE:

R-O-W NOT ACQUIRED ON EAST SIDE

FROM STA 9+90 TO STA 14+50.

CONTRACTOR TO STAY WITH EXISTNG

R-O-W.

STA 14+75 TO 14+40

TRANSITION FROM

PROPOSED TYP

SECTION TO

EXISTING EDGE OF

PAVEMENT

AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
0
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
5
AutoCAD SHX Text
10
AutoCAD SHX Text
20
AutoCAD SHX Text
30
AutoCAD SHX Text
40
Page 6: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

C

C

C

C

C

C

C

C

C

C

CC

C C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C C C

C

C

C

C

C

C

C

C

C

C

C C C

C

C

C C

IR

IR

IR

IR

IR

15

+0

0

15

+5

0

16

+0

0

16

+5

0

17

+0

0

17

+5

0

>>

>>

>>

>>

>>

>>

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

-13.8%

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W

OHEOHE

OHEOHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHEOHE

OHEOHE

OHEOHE

OHEOHE

OHE

OHE

OHE

OHE

GRAVEL

CONC

CONC

CONC

CONC

CONC

CONC

LOT 14 BLK 19

LOT 13 BLK 19

LOT 12 BLK 19

LOT 11 BLK 19

LOT 10 BLK 19

LOT 9 BLK 19

LOT 8 BLK 18

1027 GAMBLE

LOT 7 BLK 18

1023 GAMBLE

LOT 6 BLK 18

1019 GAMBLE

LOT 5 BLK 18

1015 GAMBLE

LOT 4 BLK 18

1011 GAMBLE

LOT 3 BLK 18

1007 GAMBLE

Lynn Wirtz

149 Dunbar Road

Natchez, MS 39120

Lynn Wirtz

149 Dunbar Road

Natchez, MS 39120

Lynn Wirtz

149 Dunbar Road

Natchez, MS 39120

Lynn Wirtz

149 Dunbar Road

Natchez, MS 39120

Lynn Wirtz

149 Dunbar Road

Natchez, MS 39120

Lynn Wirtz

149 Dunbar Road

Natchez, MS 39120

Clayton L. and Martha S. Taylor

1007 Gamble Road

Little Rock, AR 72211

Hamed Khalili Ardestani

1011 Gamble Road

Little Rock, AR 72211

JMC Properties, LLC

C/O Goss Management PO

Box 22693

Little Rock, AR 72221

Mark Stevens and Aundrea Stevens as

Co-Trustees of the Stevens Living Trust

1420 S. Taylor

Little Rock, AR 72204

Yanqiu Liao and Jinlong Huang

1023 Gamble Road

Little Rock, AR 72211

Shirley Davis

58 Chenal Circle

Little Rock, AR 72223

-14.6%

-18.6%

-19.2%

-22.1%

-18.4%

-21.7%

EOP

EOP

EOPEOP

EOPEOP

EOPEOP

EOPEOP

EOP EOPEOP

EOPEOP

EOPEOP

EOP

EOP

EOP

E

O

P

E

O

P

EO

P

EO

P

E

O

P

EOPEOP

EOP

EOP

EOP EOPEOP

EOP EOPEOP

EOPEOP

EOPEOP

EOPEOP

EOPEOP

EOP

EOP

EOPEOP

EOP

EOPEOP

EOPEOP

EOP

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W

TCE

TCE TCE

TCETCE

TCETCE

TCE

TCE

TCE

TCE

TCETCE

TCE

TCETCE

TCE

534.

01E

528.

23F

534.

12E

529.

08F

533.

95E

529.

66F

533.

62E

529.

95F

533.

20E

529.

95F

532.

78E

529.

68F

532.

37E

529.

20F

531.

91E

528.

71F

531.

36E

528.

23F

530.

81E

527.

74F

530.

21E

527.

26F

-1.94%

HIGH PT STA: 15+88.09

HIGH PT ELEV: 529.99

PVI STA:14+75.71

PVI ELEV:532.58

K:22.03

16+

30.89

529.57

310.36'

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

PL

AN

- P

RO

FIL

E

H: 1"=10'

13-B-3G

V: 1"=5'

GA

MB

LE

RD

C6

ST

A. 1

5+00

TO

ST

A. 1

7+50

2019-11-19

16-5-ST-15

RH

RH

ZR

100% SUBMITTAL

MA

TC

H L

IN

E S

H. 5

MA

TC

H L

IN

E S

H. 7

Property owners indicate they have existing sprinkler systems

which may be affected by proposed construction. It shall be the

responsibility of the contractor to locate any sprinkler system

components and relocate and repair to clear the proposed

construction and demostrate their proper function prior to project

completion.

AutoCAD SHX Text
Proposed Profile
AutoCAD SHX Text
Existing Profile
AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
0
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
5
AutoCAD SHX Text
10
AutoCAD SHX Text
20
AutoCAD SHX Text
30
AutoCAD SHX Text
40
Page 7: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

TCETCE

TCETCE

TCE

C

C

C

C

C

C

C

C

CC

C

C

C

C

C

C

C

C

C C C C C C C C C

C

C

C

C

C

C

C

F F F F F

IR

IR

12+

50

13+

00

13+

50

14+

00

14+

50

15+

00

>>>>

>>>>

>>

>>

>>

>>

>>>>>>>>

>>

>>

>>>>>>>>

>>

>>

>>

>>

>>

>>

>>

>>

>>

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

PA

LE

Z A

VE

-13.8%

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ WR/ W R/ W R/ W R/ W R/ W

PA

LE

Z A

VE

CLO

SE

D T

HIS

SID

E O

F R

OW

OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE

OHE OHEOHE OHE OHE

OHE OHE

OH

E

OH

E

OH

E

OH

E

OH

E

CONC

PI @

14+

57.83

N

:

1

5

0

,

1

5

7

.

3

7

E

:

1

,

1

8

6

,

6

6

2

.

7

2

LOT 9 BLK 19

LOT 8 BLK 18

1027 GAMBLE

LOT 16 BLK22

1120 GAMBLE

LOT 15 BLK22

1120 GAMBLE

LOT 14 BLK 22

1120 GAMBLE

LOT 13 BLK 22

1120 GAMBLE

LOT 4 BLK 23

1121 GAMBLE

LOT 3 BLK 23

1121 GAMBLE

LOT 2 BLK 23

1121 GAMBLE

LOT 1 BLK 23

1121 GAMBLE

Lynn Wirtz

149 Dunbar Road

Natchez, MS 39120

Northwest Little Rock VFW POST 9095

Northwest Little Rock VFW POST 9095

149 Dunbar Road

Natchez, MS 39120

149 Dunbar Road

Natchez, MS 39120

Shirley Davis

58 Chenal Circle

Little Rock, AR 72223

1121 Gamble Road Little Rock,

AR 72211

Northwest Little Rock VFW POST 9095

1121 Gamble Road Little Rock,

AR 72211

1121 Gamble Road Little Rock,

AR 72211

1121 Gamble Road Little Rock,

AR 72211

Northwest Little Rock VFW POST 9095

149 Dunbar Road

Natchez, MS 39120

Lynn Wirtz

Lynn Wirtz

149 Dunbar Road

Natchez, MS 39120

Lynn Wirtz

Lynn Wirtz

Lynn Wirtz

149 Dunbar Road

Natchez, MS 39120

1120 GAMBLE

-14.6%

-12.7%

F

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOPEOP

EOPEOP

EOP

EOP

EOP

EOP

EOP

EOP

EOPEOP

EOP

EOPEOP

EOP EOP

EOP EOPEOP

EOPEOP

EOPEOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EO

P

EO

P

EO

P

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W

FFFFFFFCCC

AR

EA

1

6726.58

OVERLAY ONLY FROM STA

9+90 TO STA 14+50

1

3

.0

8

%

1

4

.1

4

%

1

4

.8

0

%

1

4

.9

3

%

1

3

.8

7

%

1

2

.1

4

%

HIGH PT STA: 15+88.09

HIGH PT ELEV: 529.99

PVI STA:14+75.71

PVI ELEV:532.58

K:22.03

13

+2

0.5

3

51

3.7

4

310.36'

504.39

E50

5.18

F

507.66

E50

8.21

F

510.99

E51

1.25

F

514.65

E51

4.28

F

518.38

E51

7.12

F

521.92

E51

9.68

F

525.39

E52

1.96

F

528.53

E52

3.95

F

531.03

E52

5.66

F

532.52

E52

7.08

F

534.01

E52

8.23

F

534.12

E52

9.08

F

HIGH PT STA: 13+74.99

HIGH PT ELEV: 519.68

PVI STA:13+47.76

PVI ELEV:517.39

K:13.35

13

+2

0.5

3

51

3.9

8

13

+7

4.9

9

5

19

.6

8

54.45'

517.33 R

EV

517.33 R

EV

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

PL

AN

- P

RO

FIL

E

H: 1"=10'

V: 1"=5'

GA

MB

LE

RD

C5

ST

A.

12+

50 T

O S

TA

. 15+

00

2019-11-19

16-5-ST-15

RH

RH

ZR

100% SUBMITTALM

AT

CH

L

IN

E S

H. 4

MA

TC

H L

IN

E S

H. 6

EXISTING R-O-W

20'

NOTE:

R-O-W NOT ACQUIRED ON EAST SIDE

FROM STA 9+90 TO STA 14+50.

CONTRACTOR TO STAY WITH EXISTNG

R-O-W.

STA 14+75 TO 14+40

TRANSITION PROM

PROPOSED TYP

SECTION TO

EXISTING EDGE OF

PAVEMENT

AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
0
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
5
AutoCAD SHX Text
10
AutoCAD SHX Text
20
AutoCAD SHX Text
30
AutoCAD SHX Text
40
Page 8: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

C

C

C

C

C

C

C

C

C

C

C

C

C

CC

CC

CC

CC

CC

FF F F

F

FF F

IR

1717

523.113

tele ped

IR

IR

IR

17

+5

0

18

+0

0

18

+5

0

19

+0

0

19

+5

0

20

+0

0

>>>>

>>

>>

>>

>>

>>

>>

>>>>

>>>>

>>

>>

>>>>

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

CO

LE

MA

N A

VE

.

CO

LE

MA

N A

VE

CLO

SE

D

R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ W R/ W R/ W R/ WR/ W

R/ WR/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W

R/ W R/ W R/ W R

R/ WR/ W

R/ WR/ W

R/ WR/ W R/ W R/ W R/ W

R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ W R/ W R/ W R/ W R/ W R/ W R/ WR/ W R/ W R/ W R/ W R

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

GRAVEL

CONC

CONC

CONC

GRAVEL

PI @

1

8+

96

.7

5

N

:

1

5

0

,

5

9

6

.

1

6

E

:

1

,

1

8

6

,

6

7

3

.

4

4

LOT 8 BLK 15

LOT 7 BLK 15

LOT 10 BLK 14

LOT 9 BLK 14

LOT 16 BLK19

LOT 15 BLK19

LOT 14 BLK 19

LOT 3 BLK 18

1007 GAMBLE

LOT 2 BLK 18

1003 GAMBLE

LOT 1 BLK 18

1001 GAMBLE

Lynn Wirtz

149 Dunbar Road

Natchez, MS 39120

James S. Elliott

1717 Point West Drive Little

Rock, AR 72211

James S. Elliott

1717 Point West Drive Little

Rock, AR 72211

Dorothea G Davis Living Revocable Trust

8 Duclair Court

Little Rock, AR 72223

Dorothea G Davis Living Revocable Trust

8 Duclair Court

L

ittle

Rock, AR 72223

William Sims and James Campbell

1001 Gamble Road

Little Rock, AR 72211

Blake A. and Ashley Loy

1003 Gamble Road

Little Rock, AR 72211

Clayton L. and Martha S. Taylor

1007 Gamble Road

Little Rock, AR 72211

Edward M Bradshaw

Edward M Bradshaw

409 Cheshire Drive

Benton, AR 72015

409 Cheshire Drive

Benton, AR 72015

R/ W R/ W R/ W R/ W

EOP

EOP

EOP EOP EOPEOP EOP EOP EOP EOP

EOP EOP EOP

EOP EOP EOP

EOP

EOP

E

O

P

E

O

P

E

O

PE

O

P

EO

P

EOP

EOP

EOP

EOPEOP

EOP

E

O

P

EO

P

EO

P

EO

P

E

O

P

EOP

EOP

EO

P

EOPEOP

EOP

EOP

EOP

EOP

EOP

EOP EOP EOPEOP EOP

EOPEOP

EOP

EOP

EOP

EOP

EOP

R/ W R/ W R/ W R/ W

C

C

C

R/ WR/ W

R/ W R/ W R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ WR/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W

R/ W R/ W

R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ W R/ W R/ W R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ W R/ W R/ W R/ W R/ W R/ WR/ W R/ W R/ W

R/ W R/ W R/ W R/ W R/ W R/ W

FFFFFFFFFFF

C

C

C

℄℄

TCE

TCE

TCE TCE

TCETCE

TCE

TCE TCETCE

TCE TCETCE

TCE TCETCE

TCE

530.

21E

527.

26F

529.

51E

527.

08F

529.

00E

526.

91F

528.

50E

526.

74F

528.

07E

526.

60F

527.

71E

526.

56F

527.

56E

526.

60F

527.

39E

526.

74F

527.

40E

526.

96F

527.

40E

527.

18F

527.

54E

527.

40F

-0.69%

ST

A: 1

7+

50

.1

0

EL

EV

: 5

27

.2

5

LOW PT STA: 18+74.61

LOW PT ELEV: 526.56

PVI STA:18+81.10

PVI ELEV:526.35

K:66.85

18+

28.50

526.71

19+

33.70

526.82

105.20'

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

PL

AN

- P

RO

FIL

E

H: 1"=10'

V: 1"=5'

GA

MB

LE

RD

C7

ST

A. 1

7+50

TO

ST

A. 2

0+00

2019-11-19

16-5-ST-15

RH

RH

ZR

100% SUBMITTALM

AT

CH

L

IN

E S

H. 6

MA

TC

H L

IN

E S

H. 8

AutoCAD SHX Text
9 C.Y. RIP RAP
AutoCAD SHX Text
NORTH RET. WALL STA. 18+75.70 26.4' OFF WALL WALL BEGIN SEGMENTAL RET. WALL /DITCH PAVING
AutoCAD SHX Text
NORTH RET. WALL STA. 19+75.6 26.4' OFF WALL WALL END SEGMENTAL RET. WALL /DITCH PAVING
AutoCAD SHX Text
Proposed Profile
AutoCAD SHX Text
Existing Profile
AutoCAD SHX Text
STA. 18+75.7 BEGIN SEG. RET. WALL/DITCH PAVING SEE SHEET 16 & 18
AutoCAD SHX Text
STA. 19+75.6 END SEG. RET. WALL/DITCH PAVING SEE SHEET 16 & 18
AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
0
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
5
AutoCAD SHX Text
10
AutoCAD SHX Text
20
AutoCAD SHX Text
30
AutoCAD SHX Text
40
Page 9: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

F F F F F F F F F F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

IR

IR

IR

IR

IR

IR

20

+0

0

20

+5

0

21

+0

0

21

+5

0

22

+0

0

22

+5

0

>>

>>

>>

>>

>>

>>

>>

>>

>>

>>

>>

>>

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W

OHE

OHE

OHE

OHEOHE

OHEOHE

OHEOHE

OHEOHE

OHEOHE

OHE OHEOHE

OHEOHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

DIRT

DIRT

DIRT

LOT 7 BLK 15

LOT 6 BLK 15

LOT 5 BLK 15

LOT 4 BLK 15

LOT 3 BLK 15 LOT 2 BLK 15

LOT 15 BLK 14

804 GAMBLE

LOT 14 BLK 14

LOT 13 BLK 14

LOT 12 BLK 14

LOT 11 BLK 14

LOT 10 BLK 14

Michael & Melody Turpin

804 Gamble Road

Little Rock, Ar 72211

Latreese L. Evans

6901 Camelot Drive

Little Rock, AR 72209

Latreese L. Evans

6901 Camelot Drive

Little Rock, AR 72209

Dorothea G Davis Living Revocable Trust

8 Duclair Court

Little

Rock, AR 72223

Dorothea G Davis Living Revocable Trust

8 Duclair Court

Little

Rock, AR 72223

Dorothea G Davis Living Revocable Trust

8 Duclair Court

Little

Rock, AR 72223

Dorothea G Davis Living Revocable Trust

8 Duclair Court

Little

Rock, AR 72223

Dorothea G Davis Living Revocable Trust

8 Duclair Court

Little

Rock, AR 72223

Dorothea G Davis Living Revocable Trust

8 Duclair Court

Little Rock, AR 72223

Edward M Bradshaw

Edward M Bradshaw

409 Cheshire Drive

Benton, AR 72015

409 Cheshire Drive

Benton, AR 72015

Edward M Bradshaw

409 Cheshire Drive

Benton, AR 72015

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

EOPEOP

EOPEOP

EOP EOP EOP EOP EOPEOP EOP EOP

EOP

EOP EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOPEOP

EOPEOP

EOP

EOP

EOP

EOP

EOP

EOP EOPEOP

EOPEOP

EOPEOP

EOPEOP

EOP EOP EOP

EOP

EOP

EOP

EOP

EOP

EOPEOP

EOPEOP

EOP

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W

TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE

TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE

527.

54E

527.

40F

527.

72E

527.

62F

528.

01E

527.

84F

528.

16E

528.

07F

528.

23E

528.

20F

528.

17E

528.

14F

527.

85E

527.

87F

527.

41E

527.

41F

526.

72E

526.

74F

525.

77E

525.

88F

524.

71E

524.

81F

0.88%

HIGH PT STA: 21+04.48

HIGH PT ELEV: 528.20

PVI STA:22+22.34

PVI ELEV:529.37

K:31.21

20+

76.89

528.08

290.89'

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

PL

AN

- P

RO

FIL

E

H: 1"=10'

V: 1"=5'

GA

MB

LE

RD

C8

ST

A. 2

0+00

TO

ST

A. 2

2+50

2019-11-19

16-5-ST-15

RH

RH

ZR

100% SUBMITTAL

MA

TC

H L

IN

E S

H. 7

MA

TC

H L

IN

E S

H. 9

AutoCAD SHX Text
NORTH RET. WALL STA. 19+75.6 26.4' OFF WALL WALL END SEGMENTAL RET. WALL /DITCH PAVING
AutoCAD SHX Text
Proposed Profile
AutoCAD SHX Text
Existing Profile
AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
0
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
5
AutoCAD SHX Text
10
AutoCAD SHX Text
20
AutoCAD SHX Text
30
AutoCAD SHX Text
40
Page 10: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

C

C

C

C

C

C

C

C C C C C C C

F

F

F

F

F

F

F

F

F F F F F F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F F

F

F

IR

IR

IR

IR

IR

IR

cpe carc

1452

517.980

sbc tele box

22

+5

0

23

+0

0

23

+5

0

24

+0

0

24

+5

0

25

+0

0

>>

>>

>> >>

>>

>>

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

SE

QU

IN

A

VE

W

3

W

3

W

3

W

3

SE

QU

IN

A

VE

EO

P

EO

P

EOP

EO

P

EO

P

EO

P

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ WR/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ WR/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHEOHE

OHE OHE OHE OHEOHE OHE

OHEOHE

CONC

CONC

CONC

CONC

CONC

PI @ 23+37.81

N:151,075.90

E:1,186,640.10

RP

N

:

1

5

0

,

9

9

9

.

9

1

E

:

1

,

1

8

6

,

6

3

8

.

9

5

R

P

N

:

1

5

1

,

0

3

7

.

1

8

E

:

1

,

1

8

6

,

6

7

9

.

9

4

LOT 9 BLK 10

617 GAMBLE

LOT 10 BLK 10

619 GAMBLE

LOT 11 BLK 10

621 GAMBLE

LOT 2 BLK 15

LOT 1 BLK 15

LOT 14 BLK 11

618 GAMBLE

LOT 13 BLK 11

621 GAMBLE

LOT 12 BLK 11

624 GAMBLE

LOT 16 BLK 14

804 GAMBLE

LOT 15 BLK 14

804 GAMBLE

Michael & Melody Turpin

804 Gamble Road

Little Rock, Ar 72211

Lucas Vincent /Christopher J. Smith et al

624 Gamble Rd.

Little Rock, AR 72211

Bethany Lynn Butler

620 Gamble Road

Little Rock,

AR 72211

Karen S. Cope

618 Gamble Road

Little Rock, AR 72211

Christopher Allen & Lauren Rae Kelsey

616 Gamble Road

Little Rock, AR 72211

Joseph Christopher and Rachel Logan Hritz

Andrew J. Young

617 Gamble Road

Little Rock, AR 72211

Derek Michael Hollowoa

Brooke Anne Woodward

Troy Dwaine Hollowoa

619 Gamble Road

Little Rock,

AR 72211

Raees Ahmand and

Saba Qadir

621 Gamble Road

Little Rock, AR 72211

Dorothea G Davis Living Revocable Trust

8 Duclair Court

Little

Rock, AR 72223

Dorothea G Davis Living Revocable Trust

8 Duclair Court

Little

Rock, AR 72223

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

EOP

EOP

EOP

EOPEOP

EOP

EOPEOP EOP EOP

EOP

EOP

EOP

EOP

EOP

E

O

P

E

O

P

EOPEOP

EOPE

OP

EOP

EOP

EOP

EOPEOP

EOP

EOP

EOP

EOP

EOP EOP

EOPEOP

EOPEOP EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOPEOP

EOPEOP

EOP

EOP

EOP

EOP

EOP

E

O

P

EO

P

C C C

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W

TCETCE TCE TCE TCE

T

C

E

T

C

E

TCE TCE

TCE

TCETCE

TCE

TCETCE

TCE TCE

Michael & Melody Turpin

804 Gamble Road

Little Rock, Ar 72211

TCE TCE TCETCE TCE TCE

TCE TCE TCE TCE

TCE TCE TCE TCE

TCE TCE

524.

71E

524.

81F

523.

46E

523.

55F

521.

84E

522.

08F

520.

31E

520.

41F

518.

32E

518.

55F

516.

32E

516.

49F

514.

48E

514.

61F

512.

67E

513.

04F

511.

51E

511.

79F

510.

43E

510.

86F

509.

78E

510.

24F

-8

.4

4

%

LOW PT STA: 25+35.82

LOW PT ELEV: 509.92

PVI STA:24+60.56

PVI ELEV:509.27

K:19.66

23+

69.93

516.92

181.26'

HIGH PT STA: 21+04.48

HIGH PT ELEV: 528.20

PVI STA:22+22.34

PVI ELEV:529.37

K:31.21

23+

67.78

517.10

290.89'

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

PL

AN

- P

RO

FIL

E

H: 1"=10'

V: 1"=5'

GA

MB

LE

RD

C9

2019-11-19

16-5-ST-15

RH

RH

ZR

ST

A. 2

2+50

TO

ST

A. 2

5+00

100% SUBMITTAL

MA

TC

H L

IN

E S

H. 8

MA

TC

H L

IN

E S

H. 1

0

AutoCAD SHX Text
Type 3 Ramp
AutoCAD SHX Text
Type 3 Ramp
AutoCAD SHX Text
TAPER 8:1 TO MATCH EXIST EOP 46.4 NORTH 17' SOUTH
AutoCAD SHX Text
Proposed Profile
AutoCAD SHX Text
Existing Profile
AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
0
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
5
AutoCAD SHX Text
10
AutoCAD SHX Text
20
AutoCAD SHX Text
30
AutoCAD SHX Text
40
Page 11: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

C C C C

C

C

C

C

CC

C

C

C

C

C

C C

F

F

F F F

F

F

F

F

F

F F F F F F F F F F F F F F

F F

IR

IR

AR

TH

UR

LN

25+

00

25+

50

26+

00

26+

50

27+

00

27+

38

>>

>>

>>

>>

>>

>

>

>>

>>

>>

>>

>>

>>

>>

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

1

2

W

1

2

W

1

2

W

12

ALLE

Y

W

1

2

W

1

2

W

1

2

W

1

2

W

1

2

W

12

W

12

W

12

W

12

W

12

W

3

W

3

W

3

W

3

W

3

W

3

W

3

W

3

W

8

W

8

W

8

W

8

W

8

ALLE

Y

SS

8''SS

8''SS

8''SS

8''SS

8''SS

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W

OHEOHE

OHEOHE

OHEOHE

OHEOHE

OHEOHE

OHEOHE

OHE

OHEOHE

OHEOHE

OHE

OHEOHE

OHEOHE

OHEOHE

O

H

E

CONC

CONC

CONC

N

:

1

5

1

,

4

3

7

.

4

7

E

:

1

,

1

8

6

,

6

8

6

.

7

8

LOT 6 BLK 10

12917 ARTHUR

LOT 7 BLK 10

611 GAMBLE

LOT 8 BLK 10

615 GAMBLE

LOT 9 BLK 10

617 GAMBLE

LOT 16 BLK 11

612 GAMBLE

LOT 15 BLK 11

616 GAMBLE

LOT 14 BLK 11

618 GAMBLE

Karen S. Cope

618 Gamble Road

Little Rock, AR 72211

Christopher Allen & Lauren Rae Kelsey

616 Gamble Road

Little Rock, AR 72211

Sheria Herren

612 Gamble Road

Little Rock, AR 72211

Joseph Christopher and Rachel Logan Hritz

615 Gamble Road

Little Rock, AR 72211

Rostami Ghasem

PO BOX 56354

Little Rock, AR 72215

Linda Kay Johnson

8810 Gina Road Mabelvale, AR

72103

LOT 1 BLK 11

Amir M. Qureshi

600 Gamble Road Little Rock,

AR 72211

Andrew J. Young

617 Gamble Road

Little Rock, AR 72211

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12 W

1

2

W

1

2

W

1

2

W

1

2

W

12

EOP

EOP

EOP

EOP

EOPEOP EOP EOP EOP EOP

EOP

EOPEOP

EOP

EOPEOP

EOPEOP

EOP

EOP EOP EOP EOP

EOP

EOP

EOP EOPEOP EOP

EOP EOP EOP EOP EOP

EOP

EOPEOP

EOPEOP

EOPEOP

EOP

EOP

EOP EOP

EOP

N

:

1

5

1

,

3

4

9

.

3

3

E

:

1

,

1

8

6

,

6

8

5

.

2

7

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W

TCE TCE

TCETCE

TCE

TCETCE

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W

TCE TCE TCE TCE TCE TCE TCE TCE TCETCE TCE

TCE

TCE

TCE

509.

78E

510.

24F

509.

77E

509.

95F

509.

88E

509.

97F

509.

99E

510.

16F

510.

49E

510.

68F

511.

19E

511.

48F

512.

16E

512.

53F

513.

42E

513.

82F

514.

92E

515.

17F

516.

42E

516.

51F

517.

24E F

5.3

8%

0.78%

2.03%

ST

A: 2

5+

78

.9

4

EL

EV

: 5

10

.1

9

ST

A: 2

7+

29

.4

2

EL

EV

: 5

16

.7

5

LOW PT STA: 25+35.82

LOW PT ELEV: 509.92

PVI STA:24+60.56

PVI ELEV:509.27

K:19.66

25+

51.19

509.98

181.26'

LOW PT STA: 25+83.12

LOW PT ELEV: 510.28

PVI STA:26+25.00

PVI ELEV:511.13

K:25.00

25+

83.12

510.28

26+

66.88

513.38

83.77'

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

PL

AN

- P

RO

FIL

E

H: 1"=10'

V: 1"=5'

GA

MB

LE

RD

C10

ST

A. 2

5+00

TO

ST

A. 2

7+38

2019-11-19

16-5-ST-15

RH

RH

ZR

100% SUBMITTAL

MA

TC

H L

IN

E S

H. 9

AutoCAD SHX Text
REMOVE FES/TIE TO EXIST TIE CURB & GUTTER TO EXIST
AutoCAD SHX Text
TYPE 3 RAMP
AutoCAD SHX Text
TYPE 3 RAMPS
AutoCAD SHX Text
ELEC BOX
AutoCAD SHX Text
REMOVE FES/TIE TO EXIST TIE CURB & GUTTER TO EXIST
AutoCAD SHX Text
TYPE 3 RAMP
AutoCAD SHX Text
TYPE 3 RAMP
AutoCAD SHX Text
Proposed Profile
AutoCAD SHX Text
Existing Profile
AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
0
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
5
AutoCAD SHX Text
10
AutoCAD SHX Text
20
AutoCAD SHX Text
30
AutoCAD SHX Text
40
Page 12: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

F

F

F

F

F

F

F

F

F

F

11+00

>>

>>

-5.3%

3.4%

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

OH

EO

HE

OH

EO

HE

OH

EO

HE

OH

EO

HE

OH

EO

HE

AS

PH

AL

T

LOT 7 BLK 23

1121 GAMBLE

No

rth

we

st L

ittle

R

ock V

FW

P

OS

T 9

09

5

11

21

G

am

ble

R

oa

d L

ittle

R

ock,

AR

7

22

11

SF

A

SF

A

-1.0%

E

O

P

E

O

PE

OP

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R

S

F

A

SF

A

SF

A

SF

A

SF

A

S

F

A

TC

E

TC

E

TC

E

TC

E

TC

E

TC

E

TC

E

6.9%

6'

-7.7%

13'

C

C

C

C

C

C

C

C

C

C

C

C

IR

-15.1%

-12.8%

-20.0%

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

OH

EO

HE

OH

EO

HE

OH

EO

HE

OH

EO

HE

OH

E

CO

NC

LOT 7 BLK 18

1023 GAMBLE

Ya

nq

iu

L

ia

o a

nd

Jin

lo

ng

H

ua

ng

10

23

G

am

ble

R

oa

d

Little

R

ock, A

R 7

22

11

-20.6%

-21.5%

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R

SF

A

SF

A

SF

A

SF

A

SF

A

SF

A

TC

E

TCE

TC

E

TC

E

TC

E

TC

E

TC

E

7.0%

6'

-19.0%

7'

-8.0%

6'

TC

E

F

F

F

F

F

F

F

F

F

F

F

12+00

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

LOT 11 BLK 22

1120 GAMBLE

14

9 D

un

ba

r R

oa

d

Na

tch

ez, M

S 3

91

20

Lyn

n W

irtz

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

E

O

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

S

F

A

11.0%

3'

-2.0%

4'

-10.5%

2'

-16.0

%

3'

TC

E

TC

E

C

C

C

C

C

C

C

C

C

C

C

15+00

-12.1%

-24.0%

-13.8%

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

CO

NC

LOT 8 BLK 18

1027 GAMBLE

Sh

irle

y D

avis

58

C

he

na

l C

ircle

Little

R

ock, A

R 7

22

23

-14.6%

-12.7%

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

SF

A

S

F

A

S

F

A

S

F

A

T

C

E

TCE

TC

E

7.0%

6'

2.4%

15'

C

C

C

C

C

C

C

C

C

C

C

IR

16+00

-22.1%

-19.4%

-15.1%

-19.1%

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

OH

EO

HE

OH

EO

HE

OH

EO

HE

OH

EO

HE

OH

E

CO

NC

LOT 6 BLK 18

1019 GAMBLE

Ma

rk S

te

ve

ns a

nd

A

un

dre

a S

te

ve

ns a

s

Co

-T

ru

ste

es o

f th

e S

te

ve

ns L

ivin

g T

ru

st

14

20

S

. T

aylo

r

Little

R

ock, A

R 7

22

04

SF

A

SF

A

-20.6%

-18.9%

-19.1%

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

SF

AS

FA

SF

A

TCE

TC

E

-19.0%

6.7%

6'

-15.7%

7'

-8.0%

6'

C

C

C

C

C

C

C

C

C

C

C

C

C

IR

16+50

-21.2%

-17.2%

-19.0%

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

CO

NC

LOT 5 BLK 18

1015 GAMBLE

JM

C P

ro

pe

rtie

s, L

LC

C/O

G

oss M

an

ag

em

en

t P

O

Bo

x 2

26

93

Little

R

ock, A

R 7

22

21

SF

A

SF

A

-18.5%

-20.0%

-18.6%

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

PE

OP

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

S

F

A

S

F

A

SF

A

SF

A

SF

A

SF

A

TC

E

TCE

TC

E

TC

E

TC

E

TC

E

TCE

TC

E

7.1%

6'

???

???'

-10.4%

6'

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

DR

IV

EW

AY

P

RO

FIL

ES

1" = 5'

STA 15+92 RT CONC

STA 11+07 RT ASPHALT

STA 14+90 RT CONC

STA 11+80 LT GRAVEL

STA 15+59 RT CONCSTA 16+43 RT CONC

GA

MB

LE

RD

C11

DR

IVE

WA

Y 1

2019-11-19

16-5-ST-15

RH

RH

ZR

100% SUBMITTAL

AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
vharper
Polygonal Line
vharper
Polygonal Line
vharper
Polygonal Line
vharper
Polygonal Line
Page 13: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

C

C

C

C

C

C

C

C

C

C

C

C

C

IR

17+00

-19.0%

-22.5%

-19.8%

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

CO

NC

LOT 4 BLK 18

1011 GAMBLE

Ha

me

d K

ha

lili A

rd

esta

ni

10

11

G

am

ble

R

oa

d

Little

R

ock, A

R 7

22

11

-19.2%

-20.0%

-19.2%

-22.1%

-18.4%

-21.7%

EO

PE

OP

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R

SF

A

SF

A

SF

A

SF

A

SF

A

SF

A

S

F

A

TC

E

TCE

TC

E

TC

E

TC

E

TC

E

TCE

TC

E

TC

E

7.0%

4'

-19.8%

7'

-8.0%

6'

C

C

C

C

C

IR

17+00

17+50

>>

>>

>>

>>

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

-16.4%

-19.0%

8.8%

11.3%

-19.8%

-21.2%

14.5%

W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

W

R/W

R/W

R/W

R/W

OH

E

OH

E

OH

E

OH

E

OH

EO

HE

OH

EO

HE

GR

AV

EL

CO

NC

LOT 14 BLK 19

LOT 13 BLK 19

LOT 4 BLK 18

1011 GAMBLE

LOT 3 BLK 18

1007 GAMBLE

Lyn

n W

irtz

14

9 D

un

ba

r R

oa

d

Na

tch

ez, M

S 3

91

20

Lyn

n W

irtz

14

9 D

un

ba

r R

oa

d

Na

tch

ez, M

S 3

91

20

-20.0%

-21.6%

-22.6%

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

-21.7%

EO

P

EO

P

EO

P

E

O

P

E

O

P

EO

P

EO

P

E

O

P

E

O

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

7.0%

-8.0%

6'

7.0%

6'

-8.0%

6'

11.1%

3'

2.0%

2'

17.5

%

6'

C

C

C

C

C

C

C

C

C

C

C

C

C

C

IR

17+50

-16.4%

-21.2%

W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

OH

E

OH

E

OH

EO

HE

OH

EO

HE

OH

EO

HE

OH

E

CO

NC

LOT 3 BLK 18

1007 GAMBLE

Clayton L. and M

artha S

. T

aylor

1007 G

am

ble R

oad

Little R

ock, A

R 72211

-21.6%

-22.6%

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

SF

A

SF

A

SF

A

SF

A

SF

A

SF

A

SF

A

TC

E

TC

E

7.0%

6'

-8.0%

6'

C

C

C

C

C

C

C

C

C

18+00

4.4%

1.9%

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

OH

EO

HE

OH

EO

HE

OH

EO

HE

OH

EO

HE

OH

E

-10.7%

-9.5%

CO

NC

LOT 2 BLK 18

1003 GAMBLE

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

PE

OP

EO

P

W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

SF

A

SF

A

SF

A

SF

A

SF

A

SF

A

SF

A

TC

E

TC

E

7.0%

7'

1.9%

9'

C

C

C

IR

18+00

>>

>>

>>

>>

>>

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

6.4%

7.4%

12.2%

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

2.1'

5.67%

GR

AV

EL

LOT 15 BLK19

Ja

me

s S

. E

llio

tt

17

17

P

oin

t W

est D

rive

L

ittle

Ro

ck, A

R 7

22

11

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

EO

P

EO

P

EO

P

EO

P

E

O

P

E

O

P

E

O

P

E

O

P

E

O

P

E

O

P

EO

P

E

O

P

EO

P

EO

P

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

11.0%

2'

2.0%

1'

17.0%

10'

C

C

C

C

C

C

1717

523.113

tele ped

IR

18+50

3.1%

3.3%

-7.9%

R/W

R/W

R/W

R/W

R/W

R/W

R/W

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

EO

HE

-5.1%

CO

NC

N

:

1

5

0

,

5

9

6

.

1

6

E

:

1

,

1

8

6

,

6

7

3

.

4

4

S

F

A

E

O

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/

F

F

F

F

SF

A

SF

A

SF

A

SF

A

SF

A

TC

E

TC

E

TC

E

7.0%

7'

-7.3%

9'

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

N.T.S.

STA 18+04 LT GRAVEL

STA 16+94 RT CONC

STA 17+42 RT CONC

STA 17+25 LT GRAVEL

STA 17+92 RT CONC

STA 18+63 RT CONC

GA

MB

LE

RD

C12

DR

IVE

WA

Y 2

2019-11-19

16-5-ST-15

RH

RH

ZR

DR

IV

EW

AY

P

RO

FIL

ES

100% SUBMITTAL

AutoCAD SHX Text
NORTH RET. WALL STA. 18+75.70 26.4' OFF WALL WALL BEGIN SEGMENTAL RET. WALL /DITCH PAVING
AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
Page 14: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

F

IR

19+00

>>

>>

>>

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

4.8%

5.2%

13.9%

COLEMAN AVE

CLOSED

R/W

R/W

GR

AV

EL

PI @ 18+96.75

N

:

1

5

0

,

5

9

6

.

1

6

E

:

1

,

1

8

6

,

6

7

3

.

4

4

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

EO

PE

OP

EO

PE

OP

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

E

O

P

E

O

P

E

O

P

E

O

P

EO

P

EO

P

EO

P

EO

P

E

O

P

E

O

P

EO

P

EO

P

W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

11.0%

3'

2.0%

1'

17.8%

8'

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

IR

21+00

>>

>>

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12.3%

10.5%

16.8%

W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

DIR

T

LOT 12 BLK 14

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

PE

OP

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

11.0%

3'

2.0%

2'

17.5%

4'

C

C

C

C

F

F

F

IR

21+50

>>

>>

>>

>>

>>

>>

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

15.4%

10.3%

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

DIR

T

LOT 14 BLK 14

LOT 13 BLK 14

Latreese L. E

vans

6901 C

am

elot D

rive

Little R

ock, A

R 72209

Latreese L. E

vans

6901 C

am

elot D

rive

Little R

ock, A

R 72209

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

7.1%

4'

31.8%

6'

2.0%

1'

F

F

F

F

F

F

F

F

F

F

IR

23+50

-9.8%

-13.2%

-9.8%

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

-15.4%

CO

NC

LOT 11 BLK 10

621 GAMBLE

Ra

ee

s A

hm

an

d a

nd

Sa

ba

Q

ad

ir

62

1 G

am

ble

R

oa

d

Little

R

ock, A

R 7

22

11

S

F

A

S

F

A

EO

P

EO

PE

OP

EO

PE

OP

EO

P

EO

P

EO

P

EO

P

EO

P

EO

PE

OP

EO

PE

OP

EO

P

EO

P

W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

TC

E

7.0%

6'

-8.0%

6'

-19.0%

13'

F

F

F

F

F

FF

F

F

F

F

F

F

F

IR

24+00

-16.0%

-19.6%

-14.3%

/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

CO

NC

LOT 10 BLK 10

619 GAMBLE

De

re

k M

ich

ae

l

Ho

llo

wo

a

Bro

oke

A

nn

e

Wo

od

wa

rd

Tro

y D

wa

in

e

Ho

llo

wo

a

61

9 G

am

ble

R

oa

d L

ittle

R

ock,

AR

7

22

11

SF

A

SF

A

S

F

A

S

F

A

S

F

A

SF

A

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

TC

E

TCE

TCE

TC

E

7.0%

6'

-8.0%

4'

-28.1%

14'

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

1" = 5'

STA 23+74 RT CONC

STA 19+02 LT GRAVEL

STA 21+67 LT GRASS

STA 21+04 LT GRASS

STA 24+23 RT CONC

DR

IV

EW

AY

P

RO

FIL

ES

GA

MB

LE

RD

C13

DR

IVE

WA

Y 3

2019-11-19

16-5-ST-15

RH

RH

ZR

100% SUBMITTAL

AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
Page 15: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

C

C

C

C

C

C

C

F

F

F

F

F

IR

24+50

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

7.5%

6.6%

4.2%

10.0%

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

CO

NC

LOT 13 BLK 11

621 GAMBLE

Bethany Lynn B

utler

620 G

am

ble R

oad Little R

ock,

AR

72211

SF

A

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

EO

P

EO

P

EO

PE

OP

EO

PE

OP

EO

P

EO

P

EO

P

/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

9.7%

15'2.1%

1'

11.1%

1'

13.8%

7'

TC

E

TCE

TC

E

TC

E

TC

E

C

C

C

C

F

F

F

F

F

F

IR

24+50

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

7.5%

4.2%

7.7%

15.1%

10.0%

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

CO

NC

LOT 14 BLK 11

618 GAMBLE

Ka

re

n S

. C

op

e

61

8 G

am

ble

R

oa

d

Little

R

ock, A

R 7

22

11

SF

A

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

EO

PE

OP

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

2.1%

1'

11.0%

1'

17.4%

13'

TC

E

F

F

F

F

FF

F

F

F

F

IR

24+50

-14.2%

-14.9%

-9.7%

W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

CO

NC

LOT 9 BLK 10

617 GAMBLE

An

dre

w J. Y

ou

ng

61

7 G

am

ble

R

oa

d

Little

R

ock, A

R 7

22

11

SF

A

SF

A

SF

A

SF

A

SF

A

SF

A

EO

P

EO

P

EO

PE

OP

EO

PE

OP

EO

PE

OP

EO

P

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R

TC

E

TCE

TC

E

TC

E

TC

E

TC

E

TCE

TC

E

5.8%

7'

-10.2%

7'

-25.4%

7'

F

F

F

F

F

F

F

F

F

F

F

F

IR

25+50

-5.5%

-6.3%

-5.2%

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

CO

NC

LOT 8 BLK 10

615 GAMBLE

Jo

se

ph

C

hristo

ph

er a

nd

R

ach

el L

og

an

H

ritz

61

5 G

am

ble

R

oa

d

Little

R

ock, A

R 7

22

11

S

F

A

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

TC

E

TCE

TCE

TC

E

7.0%

6'

-8.0%

9'

-11.5%

10'

7.0%

6'

-8.0%

9'

-11.5%

10'

C

C

C

C

C

C

C

C

C

C

C

C

C

25+50

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

3.1%

5.7%

18.1%

W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

CO

NC

LOT 16 BLK 11

612 GAMBLE

Ch

risto

ph

er A

lle

n &

L

au

re

n R

ae

K

else

y

61

6 G

am

ble

R

oa

d

Little

R

ock, A

R 7

22

11

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

2.0%

1'

11.0%

1'

16.4%

15'

TC

E

TCE

TC

E

TC

E

F

F

F

F

F

F

F

F

26+00

ALLEY

-11.5%

-2.5%

-0.9%

-2.7%

R/W

R/W

R/W

R/W

R/W

R/W

R/W

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

OH

E

CO

NC

Little

R

ock, A

R 7

22

15

S

F

A

SF

A

SF

A

SF

A

EO

P

EO

P

EO

PE

OP

EO

PE

OP

EO

PE

OP

EO

P

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

TCE

TC

E

TC

E

TC

E

TC

E

TCE

R/W

7.0%

6'

-8.0%

6'

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

1" = 5'

STA 25+45 LT CONC

STA 24+41 LT CONC

STA 24+75 RT CONC

STA 24+71 LT CONC

STA 25+42 RT CONC

STA 25+93 RT CONC

DR

IV

EW

AY

P

RO

FIL

ES

GA

MB

LE

RD

C14

DR

IVE

WA

Y 4

2019-11-19

16-5-ST-15

RH

RH

ZR

100% SUBMITTAL

AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
Page 16: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

C

C

C

C

C

C

C

C

C

C

26+00

>>

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

ALLEY

12.6%

10.5%

16.0%

R/W

R/W

R/W

R/W

R/W

R/W

R/W

Sh

eria

H

erre

n

61

2 G

am

ble

R

oa

d

Little

R

ock, A

R 7

22

11

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

EO

P

EO

P

EO

PE

OP

EO

PE

OP

EO

PE

OP

EO

P

EO

P

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

2.0%

1'

11.0%

1'

17.9%

7'

TC

E

TC

E

TCE 23+50

>>

>>

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

3

W

3

W

3

W

3

W

3

W

3

E

O

P

EO

P

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

E:1,186,640.10

LOT 12 BLK 11

624 GAMBLE

Luca

s V

incen

t /C

hristophe

r J. S

mith

et al

62

4 G

am

ble

R

d.

Little

R

ock, A

R 7

22

11

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

EO

P

EO

P EOP

E

O

P

EO

P

EO

P

EO

PE

OP

EO

PE

OP

EO

P

EO

P

CC

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

R/W

2.0%

2'

11.0%

2'

17.9%

4'

TC

E

TC

E

TC

E

TC

E

TC

E

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

1" = 5'

STA 26+02 LT CONC

DR

IV

EW

AY

P

RO

FIL

ES

GA

MB

LE

RD

C15

DR

IVE

WA

Y 5

2019-11-19

16-5-ST-15

RH

RH

ZR

100% SUBMITTAL

STA 23+75 LT CONC

AutoCAD SHX Text
Type 3 Ramp
AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
Page 17: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

Ele

va

tio

n

Ele

va

tio

n

Profile View of South Ret Wall

490.00

500.00

510.00

490.00

500.00

510.00

11+82.00

11+82.00

12+00.00 12+25.00 12+50.00 12+75.00 13+00.00 13+07.00

11+82.00

11+82.00

12+00.00 12+25.00 12+50.00 12+75.00 13+00.00 13+07.00

Panel 1

BW 493.07

Station 1182.00

BW 493.07

Station 1185.67

BW 493.71

Station 1191.55

BW 494.34

Station 1197.42

BW 494.98

Station 1203.30

TW 497.52

Station 1198.89TW 496.88

Station 1194.49TW 496.25

Station 1189.34TW 495.61

Station 1184.20

TW 494.98

Station 1182.00

1

Panel 2

BW 495.61

Station 1204.04

BW 495.61

Station 1209.18

BW 496.25

Station 1215.79

BW 496.88

Station 1221.66

BW 497.52

Station 1227.54

BW 498.15

Station 1233.42

TW 501.33

Station 1229.01TW 500.70

Station 1224.60TW 500.06

Station 1219.46TW 499.42

Station 1214.32TW 498.79

Station 1209.18TW 498.15

Station 1204.04

2

Panel 3

BW 498.79

Station 1234.15

BW 498.79

Station 1239.29

BW 499.42

Station 1248.84

BW 500.06

Station 1261.33

BW 500.70

Station 1269.41

TW 506.41

Station 1269.41

TW 505.78

Station 1264.26TW 505.14

Station 1259.12TW 504.51

Station 1253.98TW 503.87

Station 1249.57TW 503.24

Station 1244.43TW 502.60

Station 1239.29TW 501.97

Station 1234.15

3

Panel 4

BW 501.33

Station 1270.14

BW 501.33

Station 1272.34

BW 501.97

Station 1276.02

BW 502.60

Station 1278.95

TW 507.68

Station 1278.95TW 507.05

Station 1274.55TW 506.41

Station 1270.14

4

Panel 5

BW 503.24

Station 1281.89

BW 503.24

Station 1282.63

BW 503.87

Station 1285.56

BW 504.51

Station 1288.50

BW 505.14

Station 1291.44

TW 508.96

Station 1289.24TW 508.32

Station 1284.10TW 507.68

Station 1281.89

5

Panel 6

BW 506.41

Station 1294.38

BW 506.41

Station 1297.32

BW 507.05

Station 1300.25

BW 507.68

Station 1303.19

BW 508.32

Station 1306.13

TW 510.86

Station 1303.93TW 510.23

Station 1298.79TW 509.59

Station 1294.38

6

Elevation View

TOP OF WALL ELEV. DOES NOT

INCLUDE DEPTH OF CAP

TOP OF WALL ELEV. DOES NOT

INCLUDE DEPTH OF CAP

Ele

va

tio

n

Ele

va

tio

n

Profile View of North Ret Wall

517.00

520.00

530.00

517.00

520.00

530.00

18+75.70

18+75.70

19+00.00 19+25.00 19+50.00

19+74.56

19+75.00

18+75.70

18+75.70

19+00.00 19+25.00 19+50.00

19+74.56

19+75.00

Panel 1

BW 521.66

Station 1875.00

TW 524.21

Station 1875.00

1

Panel 2

BW 521.66

Station 1888.96BW 521.03

Station 1894.10 BW 520.39

Station 1898.50

TW 524.21

Station 1888.96

2

Panel 3

BW 520.39

Station 1899.97

BW 520.39

Station 1913.19

BW 521.03

Station 1945.51

TW 524.84

Station 1912.46TW 524.21

Station 1899.97

3

Panel 4

BW 521.66

Station 1949.18

BW 521.66

Station 1970.48

TW 524.84

Station 1949.18

4

Elevation View

EXISTING GRADE

DESIGN GRADE

TOP OF WALL ELEV. DOES NOT

INCLUDE DEPTH OF CAP

TOP OF WALL ELEV. DOES NOT

INCLUDE DEPTH OF CAP

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

SO

UT

H R

ET

AIN

IN

G W

AL

L

1"=5'

GA

MB

LE

RD

C16

2019-11-19

16-5-ST-15

RH

RH

ZR

100% SUBMITTAL

AutoCAD SHX Text
EXISTING GRADE
AutoCAD SHX Text
DESIGN GRADE
AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
0
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
2.5
AutoCAD SHX Text
5
AutoCAD SHX Text
10
AutoCAD SHX Text
15
AutoCAD SHX Text
20
vharper
Line
vharper
Line
Page 18: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

A - Miragrid 3XT

250 psf Dead Load

10 ft

Low Permeable Soil Cap

Drainage Swale

1A

2A

3A

Section 1: (1182 ft - 1204 ft)

494.98 ft

495.83 ft

497.52 ft

*Total Panel Height Shown

3.6

0.4

0.5

0.5

2.0

3

3

.0

0

°

5.0

4.0

7.0

Panel 1

BW 493.07

Station 1182.00

BW 493.07

Station 1185.67

BW 493.71

Station 1191.55

BW 494.34

Station 1197.42

BW 494.98

Station 1203.30

BW 495.61

Station 1204.04

TW 497.52

Station 1204.04

TW 497.52

Station 1198.89

TW 496.88

Station 1194.49

TW 496.25

Station 1189.34

TW 495.61

Station 1184.20

TW 494.98

Station 1182.00

1

250 psf Dead Load

10 ft

Low Permeable Soil Cap

Drainage Swale

Low Permeable Granular Soil

1A

2A

3A

4A

Section 2: (1204 ft - 1234.1 ft)

498.15 ft

498.83 ft

501.33 ft

*Total Panel Height Shown

5.0

0.6

0.5

0.5

2.0

3

3

.0

0

°

5.0

4.0

7.0

Panel 2

BW 495.61

Station 1204.04

BW 495.61

Station 1209.18

BW 496.25

Station 1215.79

BW 496.88

Station 1221.66

BW 497.52

Station 1227.54

BW 498.15

TW 501.33TW 501.33

Station 1229.01

TW 500.70

Station 1224.60

TW 500.06

Station 1219.46

TW 499.42

Station 1214.32

TW 498.79

Station 1209.18

TW 498.15

Station 1204.04

2

250 psf Dead Load

10 ft

Low Permeable Soil Cap

Drainage Swale

Low Permeable Granular Soil

1A

2A

3A

4A

5A

Section 3: (1234.1 ft - 1270.1 ft)

501.33 ft

502.01 ft

506.41 ft

*Total Panel Height Shown

6.3

0.7

0.5

0.5

2.0

3

3

.0

0

°

5.0

4.5

3.8

BW 498.79

Station 1234.15

BW 498.79

Station 1239.29

BW 499.42

Station 1248.84

BW 500.06

Station 1261.33

BW 500.70

Station 1269.41

BW 501.33

Station 1270.14

TW 506.41

Station 1270.14

TW 506.41

Station 1269.41

TW 505.78

Station 1264.26

TW 505.14

Station 1259.12

TW 504.51

Station 1253.98

TW 503.87

Station 1249.57

TW 503.24

Station 1244.43

TW 502.60

Station 1239.29

TW 501.97

Station 1234.15

3

250 psf Dead Load

10 ft

Low Permeable Soil Cap

Drainage Swale

Low Permeable Granular Soil

1A

2A

3A

4A

5A

Section 4: (1270.1 ft - 1281.9 ft)

501.33 ft

502.01 ft

506.41 ft

*Total Panel Height Shown

5.7

0.7

0.5

0.5

2.0

3

3

.0

0

°

5.0

4.0

7.0

Panel 4

BW 501.33

Station 1270.14

BW 501.33

Station 1272.34

BW 501.97

Station 1276.02

BW 502.60

Station 1278.95

BW 503.24

Station 1281.89

TW 507.68

Station 1281.89

TW 507.68

Station 1278.95

TW 507.05

Station 1274.55

Station 1270.14

4

250 psf Dead Load

10 ft

Low Permeable Soil Cap

Drainage Swale

Low Permeable Granular Soil

1A

2A

3A

4A

Section 5: (1281.9 ft - 1294.4 ft)

*Total Panel Height Shown

4.5

0.6

0.5

0.5

2.0

3

3

.0

0

°

5.0

4.0

7.0

BW 503.24

Station 1281.89

BW 503.24

Station 1282.63

BW 503.87

Station 1285.56

BW 504.51

Station 1288.50

BW 505.14

Station 1291.44

BW 505.78

Station 1294.38

TW 508.96

Station 1294.38

TW 508.96

Station 1289.24

TW 508.32

Station 1284.10

TW 507.68

Station 1281.89

5

250 psf Dead Load

10 ft

Low Permeable Soil Cap

Drainage Swale

Low Permeable Granular Soil

1A

2A

3A

Section 6: (1294.4 ft - 1306.9 ft)

506.41 ft

507.09 ft

508.96 ft

*Total Panel Height Shown

3.8

0.4

0.5

0.5

2.0

3

3

.0

0

°

3.0

4.0

7.0

Panel 6

BW 506.41

Station 1294.38

BW 506.41

Station 1297.32

BW 507.05

Station 1300.25

BW 507.68

Station 1303.19

BW 508.32

Station 1306.13

BW 508.96

Station 1306.86

TW 510.86

Station 1306.86

TW 510.86

Station 1303.93

TW 510.23

Station 1298.79

TW 509.59

Station 1294.38

6

Soil Notes

Soil loading considered in this design and calculations are based on the following parameters:

Internal Friction Angle Cohesion Unit WT

Deg. psf pcf Soil Type

Infill Soil 30 0 120 Well compacted silty, sandy clay

Retained Soil 35 0 120 Well compacted silty, sandy clay

Foundation Soil 30 - 35 0 120 Well compacted silty, sandy clay

CONSTRUCTION NOTES:

1. ACTUAL SOIL PARAMETERS MUST MEET OR EXCEED THESE LISTED CONDITIONS TO BE USED IN WALL CONSTRUCTION. IN GENERAL, GRANULAR SOILS (FRICTION ANGLE

GREATER THAN OR EQUAL TO 32 DEGREES) ARE RECOMMENDED AS INFILL SOIL. FINE GRAINED COHESIVE SOILS (FRICTION ANGLE LESS THAN 32 DEGREES) WITH LOW

PLASTICITY (PI LESS THAN 20) MAY BE USED IN WALL CONSTRUCTION, BUT ADDITIONAL BACKFILLING AND COMPACTION EFFORTS ARE REQUIRED. PP.

2. SUBSTITUTION OF INFILL SOILS ARE STRICTLY PROHIBITED UNLESS APPROVED BY THE ENGINEER OF RECORD.

3. IN THIS ANALYSIS, THE EFFECTIVE FRICTION ANGLE WITHOUT THE ADDITION OF COHESION IS USED TO DETERMINE THE DESIGN STRENGTH OF THE SOIL WHEN CALCULATING

LATERAL FORCES. AT THE DISCRETION OF THE ENGINEER OF RECORD, COHESION MAY BE USED WHEN CALCULATING THE ULTIMATE BEARING CAPACITY EVEN THOUGH IT IS

TYPICALLY IGNORED.

4. GLOBAL STABILITY AND SEISMIC LOADING ARE NOT CONSIDERED IN THIS DESIGN.

5. HYDROSTATIC LOADING IS NOT CONSIDERED IN THIS ANALYSIS. SUFFICIENT DRAINAGE MUST BE PROVIDED SUCH THAT HYDROSTATIC LOADING (PORE PRESSURE) DOES

NOT DEVELOP IN THE REINFORCED ZONE.

6. ANALYSIS ASSUMES FILL PLACEMENT IN 8 INCH (200 MM) LIFTS COMPACTED TO 95% STANDARD PROCTOR DENSITY. FOR ANY WALL OVER 10 FEET (3 METERS), WITH A

SURCHARGE OR CONTAINS COHESIVE SOILS, COMPACTION TEST FREQUENCY AND LOCATION SHALL BE DETERMINED BY THE ENGINEER OF RECORD OR AS OTHERWISE

SPECIFIED.

7. ALL FILL PLACED ABOVE WALLS SHALL BE PLACED AND COMPACTED IN ACCORDANCE WITH THE REQUIREMENTS FOR ALL OTHER REINFORCED MATERIAL.

8. RETAINING WALL UNITS AND INSTALLATION SHALL CONFORM TO THE MANUFACTURES SPECIFICATION GUIDELINES, GEOGRID REINFORCEMENT SYSTEMS SPECIFICATION

GUIDELINES, AND WATER MANAGEMENT SPECIFICATION GUIDELINES.

9. RETAINING WALLS MUST BE INSTALLED AND CONSTRUCTED ACCORDING TO THE CONTRACT DRAWINGS. THE RETAINING WALL PLAN VIEW IS FOR WALL IDENTIFICATION

ONLY.

10.GEOGRID SPACING IS DETERMINED BY STRUCTURAL CROSS-SECTION DESIGN REQUIREMENTS. TO INSURE PROPER GEOGRID PLACEMENT, CONTRACTOR MUST REVIEW

BOTH ELEVATION VIEW AND CROSS SECTIONS PRIOR TO WALL CONSTRUCTION.

11.SUGGESTED QUALITY ASSURANCE REQUIREMENTS: A QUALIFIED ENGINEER OR TECHNICIAN SHALL SUPERVISE THE WALL CONSTRUCTION TO VERIFY FIELD AND SITE SOIL

CONDITIONS. IN THE EVENT THAT THE SITE GEOTECHNICAL ENGINEER DOES NOT PERFORM THIS WORK, A QUALIFIED GEOTECHNICAL ENGINEER/TECHNICIAN SHALL BE

CONSULTED TO ASSURE THE WALL IS CONSTRUCTED WITH PROPER SOIL PARAMETERS.

12. SEE SHEET C18 FOR SURFACE DRAINAGE NOTES

5

"

6"

1'

1.5'

TYP.

CONC. DITCH PAVING

BEHIND WALLS

MIN. SLOPE 0.5%

M

A

T

C

H

C

O

N

S

T

R

U

C

T

I

O

N

S

L

O

P

E

4" PERF. PIPE DRAIN

DAYLIGHT TO SLOPE

10' INCREMENTS

HEEL DRAIN IF NECESSARY

TYP. ALL WALLS

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

SO

UT

H R

ET

AIN

IN

G W

AL

L D

ET

AIL

S

1"=3'

GA

MB

LE

RD

C17

2019-11-19

16-5-ST-15

RH

RH

ZR

100% SUBMITTAL

AutoCAD SHX Text
Station 1233.42
AutoCAD SHX Text
BW 498.79
AutoCAD SHX Text
Station 1234.15
AutoCAD SHX Text
Station 1234.15
AutoCAD SHX Text
Panel 3
AutoCAD SHX Text
TW 506.41
AutoCAD SHX Text
503.24 ft
AutoCAD SHX Text
504.44 ft
AutoCAD SHX Text
507.68 ft
AutoCAD SHX Text
Panel 5
AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
0
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
1.5
AutoCAD SHX Text
3
AutoCAD SHX Text
6
AutoCAD SHX Text
9
AutoCAD SHX Text
12
vharper
Line
vharper
Line
Page 19: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

A - Miragrid 3XT

250 psf Dead Load

10 ft

Drainage Swale

Blanket Drain

Depth = 6 in

1A

2A

Section 1: (1875 ft - 1889 ft)

521.66 ft

522.46 ft

524.2 ft

1.7474

0.2249

0.5052

0.5000

2.0000

33°

3.4107

4.0000

7.0000

Panel 1

BW 521.66

Station 1875.00

BW 521.66

Station 1888.96

TW 524.21

Station 1888.96

TW 524.21

Station 1875.00

1

250 psf Dead Load

10 ft

Low Permeable Soil Cap

Drainage Swale

Blanket Drain

Depth = 6 in

1A

2A

3A

Section 2: (1889 ft - 1900 ft)

520.39 ft

521 ft

524.2 ft

3.2024

0.3749

0.5052

0.5000

2.0000

33°

4.1386

4.0000

7.0000

Panel 2

BW 521.66

Station 1888.96

BW 521.03

Station 1894.10

BW 520.39

Station 1898.50

BW 520.39

Station 1899.97

TW 524.21

Station 1899.97

TW 524.21

Station 1888.96

2

250 psf Dead Load

10 ft

Low Permeable Soil Cap

Drainage Swale

Blanket Drain

Depth = 6 in

1A

2A

3A

Section 3: (1900 ft - 1949.2 ft)

520.39 ft

521 ft

524.2 ft

*Total Panel Height Shown

3.8378

0.4499

0.5052

0.5000

2.0000

33°

5.0000

4.0000

7.0000

250 psf Dead Load

10 ft

Drainage Swale

Blanket Drain

Depth = 6 in

1A

2A

Section 4: (1949.2 ft - 1974.9 ft)

521.66 ft

521.8 ft

524.84 ft

3.0372

0.2999

0.5052

0.5000

2.0000

33°

3.7747

4.0000

7.0000

Panel 4

BW 521.66

Station 1949.18

BW 521.66

Station 1970.48

BW 522.30

Station 1974.89

TW 524.84

Station 1974.89

TW 524.84

Station 1949.18

4

SOIL NOTES

SOIL LOADING CONSIDERED IN THIS DESIGN AND CALCULATIONS ARE BASED ON THE FOLLOWING PARAMETERS:

Internal Friction Angle COHESION Unit WT

DEG. PSF PCF SOIL TYPE

INFILL SOIL 30 0 120 WELL COMPACTED SILTY, SANDY CLAY

RETAINED SOIL 35 0 120 WELL COMPACTED SILTY, SANDY CLAY

FOUNDATION SOIL 30 - 35 0 120 WELL COMPACTED SILTY, SANDY CLAY

SURFACE DRAINAGE NOTES:

1 RAINFALL AND OTHER WATER SOURCES SUCH AS IRRIGATION ACTIVITIES CAN BE DEFINED AS SURFACE WATER. THE RETAINING WALL DESIGN SHALL TAKE INTO CONSIDERATION THE

MANAGEMENT OF THIS WATER.

2 SITE GRADING SHALL BE DESIGNED TO ROUTE SURFACE WATER AROUND AND AWAY FROM THE WALL.

3 THE INTERNAL DRAINAGE SYSTEM OF THE RETAINING WALL IS DESIGNED TO REMOVE INCIDENTAL WATER THAT INFILTRATES INTO THE SOIL BEHIND THE WALL. ADEQUATE STORM WATER

DRAINAGE SYSTEMS ARE REQUIRED TO COMPLETELY DRAIN THE AREA AROUND THE RETAINING WALL STRUCTURE.

4 DRAIN PIPING, TOE DRAIN, SHOULD BE LOCATED AT THE BACK OF THE ROCK DRAIN FIELD BEHIND THE WALL AS CLOSE TO THE BOTTOM OF THE WALL AS ALLOWED WHILE STILL

MAINTAINING A POSITIVE GRADIENT FOR DRAINAGE TO DAYLIGHT, OR TO A STORM WATER MANAGEMENT SYSTEM.

5 A HEEL DRAIN MAY BE REQUIRED AT BACK OF THE CUT TO ROUTE WATER AWAY FROM THE REINFORCED SOIL MASS DURING THE CONSTRUCTION PROCESS.

6 GROUND WATER CAN BE PRESENT WITHIN THE SOIL DUE TO SURFACE INFILTRATION OR WATER TABLE FLUCTUATION. IF GROUND WATER IS ENCOUNTERED DURING CONSTRUCTION, AN

ADEQUATE DRAINAGE SYSTEM MUST BE INSTALLED OR THE WALL DESIGN MUST CONSIDER THE PRESENCE OF WATER WITHIN THE SOIL MASS.

7 ALL WATER COLLECTION DEVICES SUCH AS ROOF DOWNSPOUTS, STORM SEWERS, AND CURB GUTTERS MUST BE DESIGNED TO ACCOMMODATE MAXIMUM FLOW RATES AND OUTLET

OUTSIDE THE RETAINING WALL AREA.

8 RETAINING WALLS IN CONDITIONS THAT ALLOW STANDING WATER TO OVERLAP THE WALL FACE ARE CONSIDERED WATER APPLICATIONS. THESE WALLS REQUIRE SPECIFIC DESIGN AND

CONSTRUCTION STEPS TO ENSURE PERFORMANCE.

SEE SHEET C17 FOR CONSTRUCTION NOTES

Panel 3

BW 520.39

Station 1899.97

BW 520.39

Station 1913.19

BW 521.03

Station 1945.51

BW 521.66

Station 1949.18

TW 524.84

Station 1949.18

TW 524.84

Station 1912.46

TW 524.21

Station 1899.97

3

5

"

6"

1'

1.5'

TYP.

CONC. DITCH PAVING

BEHIND WALLS

MIN. SLOPE 0.5%

M

A

T

C

H

C

O

N

S

T

R

U

C

T

I

O

N

S

L

O

P

E

4" PERF. PIPE DRAIN

DAYLIGHT TO SLOPE

10' INCREMENTS

HEEL DRAIN IF NECESSARY

TYP. ALL WALLS

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

NO

RT

H R

ET

AIN

IN

G W

AL

L D

ET

AIL

S

1"=3'

GA

MB

LE

RD

C18

2019-11-19

16-5-ST-15

RH

RH

ZR

100% SUBMITTAL

AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
0
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
1.5
AutoCAD SHX Text
3
AutoCAD SHX Text
6
AutoCAD SHX Text
9
AutoCAD SHX Text
12
vharper
Line
vharper
Line
Page 20: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

TCE

T

C

E

T

C

E

T

C

E

T

C

E

T

C

E

T

C

E

TCETCE

C

C

C

C

C

C

C

C

C

C

C

C C C C C

C

C

C

F F F

F

F

F F F

F F

F F F F F F F

F

F

F

F

F

F

F

IR

IR

IR

speed lim

it sign

bond m

oney sign

IR

stop sign

9+

91

10+

00

10+

50

11+

00

11+

50

12+

00

12+

50

13+

00

13+

50

14+

00

14+

50

15+

00

>>

>>>>

>>

>>

>>>>

>>

>>

>>

>>

>>

>>>>

>>

>>

>>

>>

>>

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

PA

LE

Z A

VE

-12.1%

-24.0%

-5.3%

3.4%

-13.8%

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R

PA

LE

Z A

VE

CLO

SE

D T

HIS

SID

E O

F R

OW

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHEOHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE

OH

E

OH

E

OH

E

OH

E

N:1

49,7

11.9

5

E:1

,186,6

12.9

9

RP

N

:1

4

9

,7

5

3

.6

5

E

:1

,1

8

6

,6

9

7

.8

8

R

P

N

:1

4

9

,6

9

9

.6

4

E

:1

,1

8

6

,6

5

3

.2

4

N

:

1

5

0

,

1

5

7

.

3

7

E

:

1

,

1

8

6

,

6

6

2

.

7

2

SFA

SFA

SFA

SFA

SFA

-14.6%

-12.7%

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

F

F

-1.0%

E

O

P

E

O

P

EOP

EOPEOP

EOP

EOP

EO

P

EO

P

EOP

EO

P

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOPEOP

EOP

EOP

EOP

EOP

EOP

EOP

E

O

P

E

O

P

EO

P

EO

P

EOP

EOP

EOP

EO

P

EOP EOP EOP EOP EOP EOPEOP

EOP

EOP

EOP

EOP

EOP

EOP

EO

P

℄ ℄

SFA

SFA

SFA

SF

A

SFA

S

F

A

S

F

A

FFFFFFFC

S

F

A

S

F

A

S

F

A

S

F

A

SFA

SFA

SFA

SFASFASFASFASFASFA

SFA

SFA

SFA

SFA

TCE TCE TCE TCE TCE TCETCE TCE TCE TCE TCE TCE

TCE

T

C

E

TCE

TCE

TCE

TCETCETCETCETCE

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

AS NOTED

GA

MB

LE

RD

C19

ER

OS

ION

1

2019-11-19

16-5-ST-15

RH

RH

ZR

100% SUBMITTAL

AutoCAD SHX Text
T.C.E.
AutoCAD SHX Text
Mill Butt Joint
AutoCAD SHX Text
TAPER 8:1 MATCH NEW GUTTER LINE
AutoCAD SHX Text
Type 3 Ramp
AutoCAD SHX Text
Mill & Overlay This Area
AutoCAD SHX Text
STA. 11+82 26.4' OFF WALL WALL BEGIN SEGMENTAL RET. WALL /DITCH PAVING
AutoCAD SHX Text
STA. 13+07 26.4' OFF WALL WALL END SEGMENTAL RET. WALL /DITCH PAVING
AutoCAD SHX Text
RIP RAP SLOPE FROM DITCH PAVING TO R/W 3.0 CU.YDS
AutoCAD SHX Text
SD1
AutoCAD SHX Text
SD4
AutoCAD SHX Text
SD1
AutoCAD SHX Text
SD4
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
PHASING LEGEND PHASE 1 (INITIAL STRIP AND DEMOLITION) PHASE 2 (NEW DRAINAGE AND BASE COURSE IN PLACE) PHASE 3 (PAVED, GRASS NOT YET ESTABLISHED)
AutoCAD SHX Text
TS-3
AutoCAD SHX Text
TS-3
AutoCAD SHX Text
TS-3
AutoCAD SHX Text
TS-3
AutoCAD SHX Text
TS-3
AutoCAD SHX Text
TS-3
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
SOD - PHASE 3
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
PHASE 1
AutoCAD SHX Text
PHASE 3
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
PHASE 3
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
SOD - PHASE 3
AutoCAD SHX Text
SOD - PHASE 3
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
PHASE 1
AutoCAD SHX Text
SOD - PHASE 3
AutoCAD SHX Text
SOD - PHASE 3
AutoCAD SHX Text
SOD - PHASE 3
AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
PHASE 1
AutoCAD SHX Text
SD1
AutoCAD SHX Text
SD4
AutoCAD SHX Text
PHASE 3
AutoCAD SHX Text
PHASE 2
vharper
Callout
OVERLAY ONLY FROM 9+90 TO 14+50
Page 21: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

TCE TCE TCE TCE

TCETCE

TCETCE

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

CC C C

FF

F

F

IR

1717

523.113

tele ped

IR

IR

IR

IR

IR

IR

IR

IR

IR

15+

00

15+

50

16+

00

16+

50

17+

00

17+

50

18+

00

18+

50

19+

00

19+

50

20+

00

>>

>>

>>

>>

>>

>>>>>>

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

3.1%

3.3%

4.4%

1.9%

-16.4%

-19.0%

-22.5%

-21.2%

-17.2%

-22.1%

-19.4%

-15.1%

-12.8%

-12.1%

8.8%

11.3%

6.4%

7.4%

4.8%

5.2%

-13.8%

-20.0%

-19.1%

-19.0%

-19.8%

-21.2%

-7.9%

13.9%

12.2%

14.5%

CO

LE

MA

N A

VE

.

CO

LE

MA

N A

VE

CLO

SE

D

W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W

R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W

R/ WR/ W

R/ WR/ W

R/ WR/ W

2.1'

5.67%

OHE

OHE

OHE

OHE

OHE

OHEOHE

OHEOHE

OHE

OHE

OHE

OHE

OHE

OHE OHE

OHEOHE

OHEOHE

-10.7%

-9.5%

-5.1%

N

:

1

5

0

,

5

9

6

.

1

6

E

:

1

,

1

8

6

,

6

7

3

.

4

4

409 Cheshire Drive

Benton, AR 72015

SFA

S

F

A

S

F

A

S

F

A

SFASFA SFA

-14.6%

-20.6%

-21.5%

-18.9%

-19.1%

-18.5%

-20.0%

-19.2%

-20.0%

-21.6%

-22.6%

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

R/ W R/ W

-18.6%

-19.2%

-22.1%

-18.4%

-21.7%

EOP

EOPEOP EOP EOP EOP EOP

EOP

EOPEOP

EOPEOP

EOPEOP

EOP EOP

EOP

E

O

P

EO

P

EOPEOP

EOP

E

O

P

E

O

P

EOP

EOPEOP

E

O

P

EOP

E

O

P

EOP

EOP EOPEOP

EOP

EOP EOP EOP EOPEOP EOP EOP EOP

EOPEOP

EOPEOP

EOPEOP

EOP EOPEOP

R/ W R/ W

C

C

FF

FF

F

C

SFASFASFASFASFA

SFA

SFA

SFA

SFA

℄ ℄

TCE

TCETCE

TCE

TCE

TCETCE

TCETCE

TCETCE

TCE

TCETCETCE

TCE TCE TCE TCE

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

REVISIONS DATE

AS NOTED

GA

MB

LE

RD

C20

ER

OS

ION

2

2019-11-19

16-5-ST-15

RH

ZR

100% SUBMITTAL

DRAWN BY

RH

AutoCAD SHX Text
9 C.Y. RIP RAP
AutoCAD SHX Text
NORTH RET. WALL STA. 18+75.70 26.4' OFF WALL WALL BEGIN SEGMENTAL RET. WALL /DITCH PAVING
AutoCAD SHX Text
NORTH RET. WALL STA. 19+75.6 26.4' OFF WALL WALL END SEGMENTAL RET. WALL /DITCH PAVING
AutoCAD SHX Text
PHASING LEGEND PHASE 1 (INITIAL STRIP AND DEMOLITION) PHASE 2 (NEW DRAINAGE AND BASE COURSE IN PLACE) PHASE 3 (PAVED, GRASS NOT YET ESTABLISHED)
AutoCAD SHX Text
SD1
AutoCAD SHX Text
SD4
AutoCAD SHX Text
TS-3
AutoCAD SHX Text
TS-3
AutoCAD SHX Text
TS-3
AutoCAD SHX Text
TS-3
AutoCAD SHX Text
TS-3
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
SOD - PHASE 3
AutoCAD SHX Text
SOD - PHASE 3
AutoCAD SHX Text
SOD - PHASE 3
AutoCAD SHX Text
PHASE 1
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
PHASE 3
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
SOD - PHASE 3
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
PHASE 1
AutoCAD SHX Text
PHASE 1
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
SOD - PHASE 3
AutoCAD SHX Text
SD1
AutoCAD SHX Text
SD4
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
TS-3
AutoCAD SHX Text
TS-3
AutoCAD SHX Text
TS-3
AutoCAD SHX Text
SD1
AutoCAD SHX Text
SD4
AutoCAD SHX Text
SOD - PHASE 3
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
PHASE 1
AutoCAD SHX Text
PHASE 3
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
SOD - PHASE 3
AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
Y
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
PHASING LEGEND PHASE 1 (INITIAL STRIP AND DEMOLITION) PHASE 2 (NEW DRAINAGE AND BASE COURSE IN PLACE) PHASE 3 (PAVED, GRASS NOT YET ESTABLISHED)
AutoCAD SHX Text
TS-3
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
PHASE 3
AutoCAD SHX Text
SOD - PHASE 3
AutoCAD SHX Text
SOD - PHASE 3
AutoCAD SHX Text
T
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
TS-3
AutoCAD SHX Text
SOD - PHASE 3
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
PHASE 1
Page 22: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

TCETCE

TCETCE

C

C

C

C

C

C

C C

C

C

C

C

C

C

C

C

C

CC

FF

FF

F F

F

F

F

F

F

F

F

F

F

FF

F

F

F

F

F

F

F

F

F

IR

IR

IR

IR

IR

IR

cpe carc

1452

517.980

sbc tele box

IR

IR

IR

IR

IR

IR

20+

00

20+

50

21+

00

21+

50

22+

00

22+

50

23+

00

23+

50

24+

00

24+

50

25+

00

>>>>

>>

>>

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

SE

QU

IN

A

VE

W

3

W

3

W

3

W

3

W

3

-6.3%

-14.2%

-14.9%

-16.0%

-19.6%

-9.8%

-13.2%

12.3%

10.5%

14.1%

15.4%

8.1%

13.6%

7.5%

6.6%

4.2%

7.7%

3.1%

-9.8%

-14.3%

-9.7%

15.1%

10.0%

20.3%

10.3%

16.8%

SE

QU

IN

A

VE

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

EO

P

R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ WR/ W

OHEOHE OHE OHE OHE OHE OHE OHE

OHEOHE OHE

OHEOHE

OHEOHE

OHEOHE

OHE OHE OHE OHE OHE

-15.4%

N:151,075.90

E:1,186,640.10

RP

N

:

1

5

0

,

9

9

9

.

9

1

E

:

1

,

1

8

6

,

6

3

8

.

9

5

R

P

SFASFA

SFA

SFA SFA

SFA

SF

A

SF

A

SFA

S

F

A

SFA

SFA

SF

A

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

EOP

EOP EOPEOP

EOP

EOP

EOPEOP

EO

P

EOP

EOP

EOP

EOPEOP

EOP

EOP EOP

EOP EOP

EOP EOPEOP

EOP

EOP

EOP

EOP

EOPEOP EOP EOP

EOP

EOP

EOP

EOP

EOPEOP EOP EOP EOP EOP

EOP

EOP

EOPEOP

EOP

EOP

EOP

EOP

E

O

P

C

TCETCE

TCETCE

TCETCE

TCE

TCETCE

TCETCE

T

C

E

TCETCE

TCE

TCE

TCE

TCETCE

TCE

TCETCE

TCE

TCETCE

TCETCE

TCE

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

AS NOTED

GA

MB

LE

RD

C21

ER

OS

ION

3

2019-11-19

16-5-ST-15

RH

RH

ZR

100% SUBMITTAL

AutoCAD SHX Text
Type 3 Ramp
AutoCAD SHX Text
Type 3 Ramp
AutoCAD SHX Text
TAPER 8:1 TO MATCH EXIST EOP 46.4 NORTH 17' SOUTH
AutoCAD SHX Text
NORTH RET. WALL STA. 19+75.6 26.4' OFF WALL WALL END SEGMENTAL RET. WALL /DITCH PAVING
AutoCAD SHX Text
TS-3
AutoCAD SHX Text
TS-3
AutoCAD SHX Text
TS-3
AutoCAD SHX Text
TS-3
AutoCAD SHX Text
TS-3
AutoCAD SHX Text
SOD - PHASE 3
AutoCAD SHX Text
SOD - PHASE 3
AutoCAD SHX Text
SOD - PHASE 3
AutoCAD SHX Text
SOD - PHASE 3
AutoCAD SHX Text
SOD - PHASE 3
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
PHASING LEGEND PHASE 1 (INITIAL STRIP AND DEMOLITION) PHASE 2 (NEW DRAINAGE AND BASE COURSE IN PLACE) PHASE 3 (PAVED, GRASS NOT YET ESTABLISHED)
AutoCAD SHX Text
TS-3
AutoCAD SHX Text
TS-3
AutoCAD SHX Text
TS-3
AutoCAD SHX Text
TS-3
AutoCAD SHX Text
TS-3
AutoCAD SHX Text
TS-3
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
SD1
AutoCAD SHX Text
SD4
AutoCAD SHX Text
SD1
AutoCAD SHX Text
SD4
AutoCAD SHX Text
SOD - PHASE 3
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
PHASE 1
AutoCAD SHX Text
SOD - PHASE 3
AutoCAD SHX Text
SOD - PHASE 3
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
PHASE 1
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
PHASE 3
AutoCAD SHX Text
SOD - PHASE 3
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
PHASE 3
AutoCAD SHX Text
SOD - PHASE 3
AutoCAD SHX Text
SOD - PHASE 3
AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
PHASE 1
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
PHASE 1
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
PHASE 1
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
PHASE 1
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
PHASE 1
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
PHASE 1
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
PHASE 1
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
TS-3
AutoCAD SHX Text
SOD - PHASE 3
AutoCAD SHX Text
PHASE 1
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
PHASE 1
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
PHASE 1
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
SD1
AutoCAD SHX Text
SD4
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
PHASE 3
AutoCAD SHX Text
SD1
AutoCAD SHX Text
SD4
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
PHASE 3
Page 23: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

CC

CC

C

C

F

F

F

F

FF

FF

FF

F

IR

IR

AR

TH

UR

LN

25+

00

25+

50

26+

00

26+

50

27+

00

27+

38

>>

>>

>>

>>

>>

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

1

2

ALLE

Y

W

1

2

W

1

2

W

12

W

12

W

12

W

3

W

3

W

3

W

3

W

3

W

8

W

8

W

8

ALLE

Y

-11.5%

-2.5%

-0.9%

-5.5%

-6.3%

-14.2%

-14.9%

4.2%

7.7%

3.1%

5.7%

12.6%

10.5%

-9.7%

-5.2%

-2.7%

16.0%

18.1%

15.1%

8''

SS

8''

SS

8''

SS

8''

SS

8''

SS

8''SS

8''SS

8''SS

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W

R/ W R/ W R/ W R/ W R/ W R/ W R/ W R/ W

OHE OHE OHE OHE OHE OHE OHE

OHE

OHE

OHE

OHE

OHE

O

H

E

O

HE

OH

EO

HE

OH

EO

HE

OH

EO

HE

OH

EO

HE

OH

EO

HE

OH

EO

HE

OH

EO

HE

OH

EO

HE

OH

E

N

:

1

5

1

,

4

3

7

.

4

7

E

:

1

,

1

8

6

,

6

8

6

.

7

8

S

F

A

SF

A

SFA

SFA

SFA

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

12

W

1

2

W

1

2

EOP

EOPEOP EOP EOP

EOP

EOP

EOPEOP

EOPEOP EOP

EOP

EOPEOP EOP

EOPEOP

EOP EOP EOP

EOP

EOPEOP

N

:

1

5

1

,

3

4

9

.

3

3

E

:

1

,

1

8

6

,

6

8

5

.

2

7

R/ W R/ W R/ W R/ W R/ W R/ W R/ W

TCE

TCE

TCE TCE

R/ WR/ W

R/ WR/ W

R/ WR/ W

R/ W

TCETCE

TCETCE

TCE

TCE

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

AS NOTED

GA

MB

LE

RD

C22

ER

OS

ION

4

2019-11-19

16-5-ST-15

RH

RH

ZR

100% SUBMITTAL

AutoCAD SHX Text
REMOVE FES/TIE TO EXIST TIE CURB & GUTTER TO EXIST
AutoCAD SHX Text
TYPE 3 RAMP
AutoCAD SHX Text
TYPE 3 RAMPS
AutoCAD SHX Text
ELEC BOX
AutoCAD SHX Text
REMOVE FES/TIE TO EXIST TIE CURB & GUTTER TO EXIST
AutoCAD SHX Text
TYPE 3 RAMP
AutoCAD SHX Text
TYPE 3 RAMP
AutoCAD SHX Text
SD1
AutoCAD SHX Text
SD4
AutoCAD SHX Text
SD1
AutoCAD SHX Text
SD4
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
PHASING LEGEND PHASE 1 (INITIAL STRIP AND DEMOLITION) PHASE 2 (NEW DRAINAGE AND BASE COURSE IN PLACE) PHASE 3 (PAVED, GRASS NOT YET ESTABLISHED)
AutoCAD SHX Text
TS-3
AutoCAD SHX Text
TS-3
AutoCAD SHX Text
TS-3
AutoCAD SHX Text
TS-3
AutoCAD SHX Text
SOD - PHASE 3
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
PHASE 1
AutoCAD SHX Text
PHASE 3
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
PHASE 3
AutoCAD SHX Text
SOD - PHASE 3
AutoCAD SHX Text
SOD - PHASE 3
AutoCAD SHX Text
SOD - PHASE 3
AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
SD1
AutoCAD SHX Text
SD4
AutoCAD SHX Text
SD1
AutoCAD SHX Text
SD4
AutoCAD SHX Text
PHASE 3
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
PHASE 3
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
PHASE 1
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
SF-A
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
PHASE 1
Page 24: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

10+25.00

477.50

480.00

485.00

490.00

477.50

480.00

485.00

490.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

10+50.00

472.50

475.00

480.00

485.00

490.00

495.00

472.50

475.00

480.00

485.00

490.00

495.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

10+75.00

482.50

485.00

490.00

495.00

482.50

485.00

490.00

495.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

11+00.00

482.50

485.00

490.00

495.00

482.50

485.00

490.00

495.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

11+25.00

482.50

485.00

490.00

495.00

500.00

482.50

485.00

490.00

495.00

500.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

11+50.00

482.50

485.00

490.00

495.00

500.00

482.50

485.00

490.00

495.00

500.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

1

1

2

" OVERLAY FROM

STA 9+90 TO STA 13+12

1

1

2

" OVERLAY FROM

STA 9+90 TO STA 13+12

1

1

2

" OVERLAY FROM

STA 9+90 TO STA 13+12

1

1

2

" OVERLAY FROM

STA 9+90 TO STA 13+12

1

1

2

" OVERLAY FROM

STA 9+90 TO STA 13+12

1

1

2

" OVERLAY FROM

STA 9+90 TO STA 13+12

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

AS NOTED

GA

MB

LE

RD

C23

CR

OS

S S

EC

TIO

N 1

2019-11-19

16-5-ST-15

RH

RH

ZR

100% SUBMITTAL

SCALE:

1"= 5'V

1"= 10'H

AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
Page 25: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

11+75.00

487.50

490.00

495.00

500.00

505.00

487.50

490.00

495.00

500.00

505.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

12+00.00

487.50

490.00

495.00

500.00

505.00

487.50

490.00

495.00

500.00

505.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

12+25.00

487.50

490.00

495.00

500.00

505.00

510.00

487.50

490.00

495.00

500.00

505.00

510.00

0 5 10 15 20 25 30 35 400-5-10-15-20-25-30-35-40-45-50-55

12+50.00

487.50

490.00

495.00

500.00

505.00

510.00

487.50

490.00

495.00

500.00

505.00

510.00

0 5 10 15 20 25 30 35 400-5-10-15-20-25-30-35-40-45-50-55

1

1

2

" OVERLAY FROM

STA 9+90 TO STA 13+12

1

1

2

" OVERLAY FROM

STA 9+90 TO STA 13+12

1

1

2

" OVERLAY FROM

STA 9+90 TO STA 13+12

1

1

2

" OVERLAY FROM

STA 9+90 TO STA 13+12

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

AS NOTED

GA

MB

LE

RD

C24

CR

OS

S S

EC

TIO

N 2

2019-11-19

16-5-ST-15

RH

RH

ZR

100% SUBMITTAL

SCALE:

1"= 5'V

1"= 10'H

AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
Page 26: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

12+75.00

487.50

490.00

495.00

500.00

505.00

510.00

515.00

487.50

490.00

495.00

500.00

505.00

510.00

515.00

0 5 10 15 20 25 30 35 400-5-10-15-20-25-30-35-40-45-50-55-60-65

13+00.00

492.50

495.00

500.00

505.00

510.00

515.00

520.00

492.50

495.00

500.00

505.00

510.00

515.00

520.00

0 5 10 15 20 25 30 35 400-5-10-15-20-25-30-35-40-45-50-55-60-65-70-75-80

13+25.00

492.50

495.00

500.00

505.00

510.00

515.00

520.00

525.00

492.50

495.00

500.00

505.00

510.00

515.00

520.00

525.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45-50-55-60-65-70-75-80

13+50.00

497.50

500.00

505.00

510.00

515.00

520.00

525.00

530.00

497.50

500.00

505.00

510.00

515.00

520.00

525.00

530.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

Cut

Fill

Area

0.00

0.00

Volume

0.00

0.00

Cumulative Volume

0.00

0.00

Cut

Fill

Area

0.00

0.00

Volume

0.00

0.00

Cumulative Volume

0.00

0.00

19.9

20.2

CL

E

LE

V-5

14

.5

3C

L E

LE

V-5

17

.3

3

9" CLASS 7

3" ASPHALT

SURFACE

COURSE

9" CLASS 7

3" ASPHALT

SURFACE

COURSE

1

1

2

" OVERLAY FROM

STA 9+90 TO STA 13+12

1

1

2

" OVERLAY FROM

STA 9+90 TO STA 13+12

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

AS NOTED

GA

MB

LE

RD

C25

CR

OS

S S

EC

TIO

N 3

2019-11-19

16-5-ST-15

RH

RH

ZR

100% SUBMITTAL

SCALE:

1"= 5'V

1"= 10'H

AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
Page 27: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

13+75.00

502.50

505.00

510.00

515.00

520.00

525.00

530.00

502.50

505.00

510.00

515.00

520.00

525.00

530.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

14+00.00

502.50

505.00

510.00

515.00

520.00

525.00

530.00

535.00

502.50

505.00

510.00

515.00

520.00

525.00

530.00

535.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

14+25.00

507.50

510.00

515.00

520.00

525.00

530.00

535.00

540.00

507.50

510.00

515.00

520.00

525.00

530.00

535.00

540.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

14+50.00

512.50

515.00

520.00

525.00

530.00

535.00

540.00

512.50

515.00

520.00

525.00

530.00

535.00

540.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

E

LE

V: 5

19

.6

8@

0.0

E

LE

V: 5

19

.6

8@

0.0

E

LE

V: 5

19

.7

9@

-1

5.5

E

LE

V: 5

19

.8

0@

15

.5

-1

2

%

3%

1

0

%

E

LE

V: 5

21

.9

6@

0.0

E

LE

V: 5

21

.9

6@

0.0

E

LE

V: 5

22

.0

7@

-1

5.5

E

LE

V: 5

22

.0

7@

15

.5

2%

1%

3

4

%

E

LE

V: 5

23

.9

5@

0.0

E

LE

V: 5

23

.9

5@

0.0

E

LE

V: 5

24

.0

6@

-1

5.5

E

LE

V: 5

24

.0

6@

15

.5

1

5

%

2%

3

2

%

E

LE

V: 5

25

.6

6@

0.0

E

LE

V: 5

25

.6

6@

0.0

E

LE

V: 5

25

.7

7@

-1

5.5

E

LE

V: 5

25

.7

7@

15

.5

2

8

%

3%

3

3

%

Cut

Fill

Area

151.45

0.01

Volume

109.70

1.62

Cumulative Volume

310.08

1186.18

Cut

Fill

Area

256.55

0.00

Volume

188.89

0.00

Cumulative Volume

498.97

1186.19

Cut

Fill

Area

306.64

0.00

Volume

260.74

0.00

Cumulative Volume

759.70

1186.19

Cut

Fill

Area

353.78

0.00

Volume

305.75

0.00

Cumulative Volume

1065.45

1186.19

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

AS NOTED

GA

MB

LE

RD

C26

CR

OS

S S

EC

TIO

N 4

2019-11-19

16-5-ST-15

RH

RH

ZR

100% SUBMITTAL

SCALE:

1"= 5'V

1"= 10'H

AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
Page 28: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

13+75.00

502.50

505.00

510.00

515.00

520.00

525.00

530.00

502.50

505.00

510.00

515.00

520.00

525.00

530.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

14+00.00

502.50

505.00

510.00

515.00

520.00

525.00

530.00

535.00

502.50

505.00

510.00

515.00

520.00

525.00

530.00

535.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

14+25.00

507.50

510.00

515.00

520.00

525.00

530.00

535.00

540.00

507.50

510.00

515.00

520.00

525.00

530.00

535.00

540.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

14+50.00

512.50

515.00

520.00

525.00

530.00

535.00

540.00

512.50

515.00

520.00

525.00

530.00

535.00

540.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

Cut

Fill

Area

0.00

0.00

Volume

0.00

0.00

Cumulative Volume

0.00

0.00

Cut

Fill

Area

0.00

0.00

Volume

0.00

0.00

Cumulative Volume

0.00

0.00

Cut

Fill

Area

0.00

0.00

Volume

0.00

0.00

Cumulative Volume

0.00

0.00

Cut

Fill

Area

0.00

0.00

Volume

0.00

0.00

Cumulative Volume

0.00

0.00

20.4

CL E

LE

V-519.68

9" CLASS 7

3" ASPHALT

SURFACE

COURSE

20.7

9" CLASS 7

3" ASPHALT

SURFACE

COURSE

CL E

LE

V-521.96

CL E

LE

V-523.95

S

L

O

P

E

1

.

7

:

1

S

L

O

P

E

3

:

1

3" ASPHALT

SURFACE

COURSE

9" CLASS 7

CL E

LE

V-525.66

S

L

O

P

E

1

.

7

:

1

PALEZ AVE

14+40 TO 14+75

S

L

O

P

E

2

.

5

:

1

3" ASPHALT

SURFACE

COURSE

9" CLASS 7

22.0

24.5

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

AS NOTED

GA

MB

LE

RD

C26

CR

OS

S S

EC

TIO

N 4

2019-11-19

16-5-ST-15

RH

RH

ZR

100% SUBMITTAL

SCALE:

1"= 5'V

1"= 10'H

AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
Page 29: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

15+84.83

512.50

515.00

520.00

525.00

530.00

535.00

540.00

545.00

512.50

515.00

520.00

525.00

530.00

535.00

540.00

545.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45 E

LE

V: 5

29

.9

8@

0.0

E

LE

V: 5

29

.7

2@

15

.5

E

LE

V: 5

29

.9

8@

0.0

E

LE

V: 5

30

.0

9@

-1

5.5

1

4

%

1

4

%

3

3

%

E

LE

V: 5

29

.6

6@

0.0

E

LE

V: 5

29

.6

6@

0.0

E

LE

V: 5

29

.7

7@

-1

5.5

E

LE

V: 5

29

.7

7@

15

.5

-5%

3

3

%

15+50.00

512.50

515.00

520.00

525.00

530.00

535.00

540.00

545.00

512.50

515.00

520.00

525.00

530.00

535.00

540.00

545.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

E

LE

V: 5

29

.9

5@

0.0

E

LE

V: 5

29

.9

5@

0.0

E

LE

V: 5

30

.0

6@

-1

5.5

E

LE

V: 5

30

.0

6@

15

.5

-2%

3

3

%

15+74.99

512.50

515.00

520.00

525.00

530.00

535.00

540.00

545.00

512.50

515.00

520.00

525.00

530.00

535.00

540.00

545.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

E

LE

V: 5

29

.6

8@

0.0

E

LE

V: 5

29

.6

8@

0.0

E

LE

V: 5

29

.7

9@

-1

5.5

E

LE

V: 5

29

.7

9@

15

.5

-7%

3

3

%

16+25.00

512.50

515.00

520.00

525.00

530.00

535.00

540.00

545.00

512.50

515.00

520.00

525.00

530.00

535.00

540.00

545.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

Cut

Fill

Area

288.44

0.10

Volume

284.77

0.05

Cumulative Volume

2387.63

1186.26

Cut

Fill

Area

263.89

0.00

Volume

255.59

0.05

Cumulative Volume

2643.22

1186.31

Cut

Fill

Area

252.29

0.00

Volume

94.08

0.00

Cumulative Volume

2737.30

1186.31

Cut

Fill

Area

220.39

0.00

Volume

208.71

0.44

Cumulative Volume

3081.62

1187.02

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

AS NOTED

GA

MB

LE

RD

C28

CR

OS

S S

EC

TIO

N 6

2019-11-19

16-5-ST-15

RH

RH

ZR

100% SUBMITTAL

SCALE:

1"= 5'V

1"= 10'H

AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
Page 30: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

16+34.90

512.50

515.00

520.00

525.00

530.00

535.00

540.00

545.00

512.50

515.00

520.00

525.00

530.00

535.00

540.00

545.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

16+50.00

512.50

515.00

520.00

525.00

530.00

535.00

540.00

545.00

512.50

515.00

520.00

525.00

530.00

535.00

540.00

545.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

16+85.64

512.50

515.00

520.00

525.00

530.00

535.00

540.00

545.00

512.50

515.00

520.00

525.00

530.00

535.00

540.00

545.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

E

LE

V: 5

29

.4

9@

0.0

E

LE

V: 5

29

.2

3@

15

.5

E

LE

V: 5

29

.4

9@

0.0

E

LE

V: 5

29

.6

0@

-1

5.5

1

4

%

1

4

%

3

3

%

E

LE

V: 5

29

.2

0@

0.0

E

LE

V: 5

28

.9

3@

15

.5

E

LE

V: 5

29

.2

0@

0.0

E

LE

V: 5

29

.3

1@

-1

5.5

1

4

%

1

4

%

3

3

%

E

LE

V: 5

28

.5

1@

0.0

E

LE

V: 5

28

.2

4@

15

.5

E

LE

V: 5

28

.5

1@

0.0

E

LE

V: 5

28

.6

2@

-1

5.5

1

4

%

1

4

%

3

3

%

E

LE

V: 5

28

.7

1@

0.0

E

LE

V: 5

28

.7

1@

0.0

E

LE

V: 5

28

.8

2@

-1

5.5

E

LE

V: 5

28

.8

3@

15

.5

-1

2

%

3

3

%

16+75.00

512.50

515.00

520.00

525.00

530.00

535.00

540.00

545.00

512.50

515.00

520.00

525.00

530.00

535.00

540.00

545.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

Cut

Fill

Area

217.58

0.00

Volume

80.30

0.00

Cumulative Volume

3161.91

1187.02

Cut

Fill

Area

212.04

0.00

Volume

120.13

0.00

Cumulative Volume

3282.05

1187.02

Cut

Fill

Area

207.41

0.00

Volume

194.19

0.00

Cumulative Volume

3476.24

1187.02

Cut

Fill

Area

202.67

0.93

Volume

80.82

0.18

Cumulative Volume

3557.05

1187.20

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

AS NOTED

GA

MB

LE

RD

C29

CR

OS

S S

EC

TIO

N 7

2019-11-19

16-5-ST-15

RH

RH

ZR

100% SUBMITTAL

SCALE:

1"= 5'V

1"= 10'H

AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
Page 31: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

17+00.00

512.50

515.00

520.00

525.00

530.00

535.00

540.00

545.00

512.50

515.00

520.00

525.00

530.00

535.00

540.00

545.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

17+50.00

517.50

520.00

525.00

530.00

535.00

540.00

545.00

517.50

520.00

525.00

530.00

535.00

540.00

545.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

E

LE

V: 5

28

.2

3@

0.0

E

LE

V: 5

27

.9

6@

15

.5

E

LE

V: 5

28

.2

3@

0.0

E

LE

V: 5

28

.3

4@

-1

5.5

7%

7% -

8%

-8%

-

2

0

%

-

2

0

%

3

3

%

E

LE

V: 5

27

.2

6@

0.0

E

LE

V: 5

26

.9

9@

15

.5

E

LE

V: 5

27

.2

6@

0.0

E

LE

V: 5

27

.3

7@

-1

5.5

7%

7% -

8

%

-8

%

-

2

4

%

-

2

4

%

3

3

%

E

LE

V: 5

27

.7

4@

0.0

E

LE

V: 5

27

.7

4@

0.0

E

LE

V: 5

27

.4

8@

-1

5.5

E

LE

V: 5

27

.8

6@

15

.5

-1

1

%

1

1

%

2%

1

8

%

1

8

%

3

3

%

3

3

%

17+25.00

517.50

520.00

525.00

530.00

535.00

540.00

545.00

517.50

520.00

525.00

530.00

535.00

540.00

545.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

E

LE

V: 5

27

.0

8@

0.0

E

LE

V: 5

27

.0

8@

0.0

E

LE

V: 5

27

.1

9@

-1

5.5

E

LE

V: 5

27

.2

0@

15

.5

-6%

3

3

%

17+75.00

517.50

520.00

525.00

530.00

535.00

540.00

545.00

517.50

520.00

525.00

530.00

535.00

540.00

545.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

Cut

Fill

Area

201.87

1.29

Volume

107.57

0.59

Cumulative Volume

3664.62

1187.79

Cut

Fill

Area

247.35

0.21

Volume

207.97

0.70

Cumulative Volume

3872.59

1188.49

Cut

Fill

Area

216.44

0.24

Volume

214.72

0.21

Cumulative Volume

4087.31

1188.70

Cut

Fill

Area

185.14

0.23

Volume

185.92

0.21

Cumulative Volume

4273.23

1188.91

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

AS NOTED

GA

MB

LE

RD

C30

CR

OS

S S

EC

TIO

N 8

2019-11-19

16-5-ST-15

RH

RH

ZR

100% SUBMITTAL

SCALE:

1"= 5'V

1"= 10'H

AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
Page 32: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

17+82.69

517.50

520.00

525.00

530.00

535.00

540.00

545.00

517.50

520.00

525.00

530.00

535.00

540.00

545.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

17+98.36

517.50

520.00

525.00

530.00

535.00

540.00

545.00

517.50

520.00

525.00

530.00

535.00

540.00

545.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

18+25.00

517.50

520.00

525.00

530.00

535.00

540.00

517.50

520.00

525.00

530.00

535.00

540.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

E

LE

V: 5

27

.0

3@

0.0

E

LE

V: 5

26

.7

6@

15

.5

E

LE

V: 5

27

.0

3@

0.0

E

LE

V: 5

27

.1

4@

-1

5.5

1

4

%

1

4

%

3

3

%

E

LE

V: 5

26

.9

2@

0.0

E

LE

V: 5

26

.6

6@

15

.5

E

LE

V: 5

26

.9

2@

0.0

E

LE

V: 5

27

.0

3@

-1

5.5

1

4

%

1

4

%

3

3

%

E

LE

V: 5

26

.7

4@

0.0

E

LE

V: 5

26

.7

4@

0.0

E

LE

V: 5

26

.8

5@

-1

5.5

E

LE

V: 5

26

.8

5@

15

.5

-2%

3

3

%

E

LE

V: 5

26

.9

1@

0.0

E

LE

V: 5

26

.9

1@

0.0

E

LE

V: 5

26

.6

5@

-1

5.5

E

LE

V: 5

27

.0

2@

15

.5

-0%

1

1

%

2%

1

8

%

1

8

%

3

3

%

3

3

%

18+00.00

517.50

520.00

525.00

530.00

535.00

540.00

545.00

517.50

520.00

525.00

530.00

535.00

540.00

545.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

Cut

Fill

Area

171.95

0.01

Volume

50.88

0.03

Cumulative Volume

4324.10

1188.94

Cut

Fill

Area

171.43

0.01

Volume

99.61

0.01

Cumulative Volume

4423.71

1188.95

Cut

Fill

Area

167.37

0.00

Volume

10.30

0.00

Cumulative Volume

4434.01

1188.95

Cut

Fill

Area

103.10

0.05

Volume

125.22

0.02

Cumulative Volume

4559.23

1188.97

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

AS NOTED

GA

MB

LE

RD

C31

CR

OS

S S

EC

TIO

N 9

2019-11-19

16-5-ST-15

RH

RH

ZR

100% SUBMITTAL

SCALE:

1"= 5'V

1"= 10'H

AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
Page 33: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

18+50.00

522.50

525.00

530.00

535.00

540.00

522.50

525.00

530.00

535.00

540.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

18+70.31

517.50

520.00

525.00

530.00

535.00

540.00

517.50

520.00

525.00

530.00

535.00

540.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

E

LE

V: 5

26

.6

0@

0.0

E

LE

V: 5

26

.6

0@

0.0

E

LE

V: 5

26

.7

1@

-1

5.5

E

LE

V: 5

26

.7

1@

15

.5

-2%

4

5

%

E

LE

V: 5

26

.5

6@

0.0

E

LE

V: 5

26

.2

9@

15

.5

E

LE

V: 5

26

.5

6@

0.0

E

LE

V: 5

26

.6

7@

-1

5.5

1

4

%

1

4

%

3

6

%

E

LE

V: 5

26

.5

9@

0.0

E

LE

V: 5

26

.3

2@

15

.5

E

LE

V: 5

26

.5

9@

0.0

E

LE

V: 5

26

.7

0@

-1

5.5

1

4

%

1

4

%

4

3

%

18+53.94

522.50

525.00

530.00

535.00

540.00

522.50

525.00

530.00

535.00

540.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

E

LE

V: 5

26

.5

6@

0.0

E

LE

V: 5

26

.5

6@

0.0

E

LE

V: 5

26

.6

7@

-1

5.5

E

LE

V: 5

26

.6

7@

15

.5

-

2

0

%

3

4

%

18+75.00

517.50

520.00

525.00

530.00

535.00

540.00

517.50

520.00

525.00

530.00

535.00

540.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

Cut

Fill

Area

76.54

4.67

Volume

83.17

2.18

Cumulative Volume

4642.40

1191.15

Cut

Fill

Area

73.79

6.41

Volume

10.96

0.81

Cumulative Volume

4653.36

1191.96

Cut

Fill

Area

67.94

12.98

Volume

42.98

5.88

Cumulative Volume

4696.34

1197.84

Cut

Fill

Area

59.29

35.95

Volume

11.04

4.25

Cumulative Volume

4707.38

1202.09

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

AS NOTED

GA

MB

LE

RD

C32

CR

OS

S S

EC

TIO

N 1

0

2019-11-19

16-5-ST-15

RH

RH

ZR

100% SUBMITTAL

SCALE:

1"= 5'V

1"= 10'H

AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
Page 34: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

19+00.00

507.50

510.00

515.00

520.00

525.00

530.00

535.00

540.00

545.00

507.50

510.00

515.00

520.00

525.00

530.00

535.00

540.00

545.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

19+25.00

512.50

515.00

520.00

525.00

530.00

535.00

540.00

512.50

515.00

520.00

525.00

530.00

535.00

540.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

19+50.00

512.50

515.00

520.00

525.00

530.00

535.00

540.00

512.50

515.00

520.00

525.00

530.00

535.00

540.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

19+75.00

517.50

520.00

525.00

530.00

535.00

540.00

545.00

517.50

520.00

525.00

530.00

535.00

540.00

545.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

E

LE

V: 5

26

.6

0@

0.0

E

LE

V: 5

26

.7

2@

15

.5

E

LE

V: 5

26

.6

0@

0.0

E

LE

V: 5

26

.3

4@

-1

5.5

1

1

%

2%

1

8

%

1

8

%

3

3

%

3

3

%

E

LE

V: 5

26

.7

4@

0.0

E

LE

V: 5

26

.8

6@

15

.5

E

LE

V: 5

26

.7

4@

0.0

E

LE

V: 5

26

.8

5@

-1

5.5

3

3

%

E

LE

V: 5

26

.9

6@

0.0

E

LE

V: 5

27

.0

7@

15

.5

E

LE

V: 5

26

.9

6@

0.0

E

LE

V: 5

27

.0

7@

-1

5.5

4

3

%

E

LE

V: 5

27

.1

8@

0.0

E

LE

V: 5

27

.1

8@

0.0

E

LE

V: 5

27

.2

9@

-1

5.5

E

LE

V: 5

27

.2

9@

15

.5

-

2

5

%

3

3

%

Cut

Fill

Area

118.12

38.99

Volume

82.14

34.69

Cumulative Volume

4789.52

1236.78

Cut

Fill

Area

55.71

35.81

Volume

80.48

34.63

Cumulative Volume

4870.00

1271.41

Cut

Fill

Area

38.97

36.88

Volume

43.83

33.65

Cumulative Volume

4913.83

1305.06

Cut

Fill

Area

48.73

31.36

Volume

40.60

31.59

Cumulative Volume

4954.43

1336.65

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

AS NOTED

GA

MB

LE

RD

C33

CR

OS

S S

EC

TIO

N 1

1

2019-11-19

16-5-ST-15

RH

RH

ZR

100% SUBMITTAL

SCALE:

1"= 5'V

1"= 10'H

AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
Page 35: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

20+00.00

517.50

520.00

525.00

530.00

535.00

540.00

545.00

517.50

520.00

525.00

530.00

535.00

540.00

545.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

20+25.00

517.50

520.00

525.00

530.00

535.00

540.00

517.50

520.00

525.00

530.00

535.00

540.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

20+50.00

517.50

520.00

525.00

530.00

535.00

540.00

517.50

520.00

525.00

530.00

535.00

540.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

20+75.00

517.50

520.00

525.00

530.00

535.00

540.00

517.50

520.00

525.00

530.00

535.00

540.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

E

LE

V: 5

27

.4

0@

0.0

E

LE

V: 5

27

.4

0@

0.0

E

LE

V: 5

27

.5

1@

-1

5.5

E

LE

V: 5

27

.5

2@

15

.5

-

2

4

%

3

3

%

E

LE

V: 5

27

.6

2@

0.0

E

LE

V: 5

27

.6

2@

0.0

E

LE

V: 5

27

.7

3@

-1

5.5

E

LE

V: 5

27

.7

4@

15

.5

-

2

3

%

3

3

%

E

LE

V: 5

27

.8

4@

0.0

E

LE

V: 5

27

.8

4@

0.0

E

LE

V: 5

27

.9

5@

-1

5.5

E

LE

V: 5

27

.9

6@

15

.5

-

2

4

%

3

3

%

E

LE

V: 5

28

.0

7@

0.0

E

LE

V: 5

28

.0

7@

0.0

E

LE

V: 5

28

.1

8@

-1

5.5

E

LE

V: 5

28

.1

8@

15

.5

-

2

8

%

3

3

%

Cut

Fill

Area

48.83

27.84

Volume

45.16

27.40

Cumulative Volume

4999.59

1364.06

Cut

Fill

Area

48.78

27.02

Volume

45.19

25.40

Cumulative Volume

5044.78

1389.46

Cut

Fill

Area

48.93

21.70

Volume

45.24

22.56

Cumulative Volume

5090.02

1412.01

Cut

Fill

Area

43.43

19.37

Volume

42.76

19.01

Cumulative Volume

5132.78

1431.02

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

AS NOTED

GA

MB

LE

RD

C34

CR

OS

S S

EC

TIO

N 1

2

2019-11-19

16-5-ST-15

RH

RH

ZR

100% SUBMITTAL

SCALE:

1"= 5'V

1"= 10'H

AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
Page 36: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

21+00.00

517.50

520.00

525.00

530.00

535.00

540.00

517.50

520.00

525.00

530.00

535.00

540.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

21+25.00

517.50

520.00

525.00

530.00

535.00

540.00

517.50

520.00

525.00

530.00

535.00

540.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

21+50.00

517.50

520.00

525.00

530.00

535.00

540.00

517.50

520.00

525.00

530.00

535.00

540.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

21+75.00

512.50

515.00

520.00

525.00

530.00

535.00

540.00

512.50

515.00

520.00

525.00

530.00

535.00

540.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

E

LE

V: 5

28

.2

0@

0.0

E

LE

V: 5

28

.2

0@

0.0

E

LE

V: 5

27

.9

4@

-1

5.5

E

LE

V: 5

28

.3

1@

15

.5

-

3

3

%

1

1

%

2%

1

8

%

1

8

%

3

3

%

3

3

%

E

LE

V: 5

28

.1

4@

0.0

E

LE

V: 5

28

.1

4@

0.0

E

LE

V: 5

28

.2

5@

-1

5.5

E

LE

V: 5

28

.2

5@

15

.5

-

3

3

%

3

3

%

E

LE

V: 5

27

.8

7@

0.0

E

LE

V: 5

27

.8

7@

0.0

E

LE

V: 5

27

.9

8@

-1

5.5

E

LE

V: 5

27

.9

9@

15

.5

-

3

3

%

3

3

%

E

LE

V: 5

27

.4

1@

0.0

E

LE

V: 5

27

.4

1@

0.0

E

LE

V: 5

27

.1

4@

-1

5.5

E

LE

V: 5

27

.5

2@

15

.5

E

LE

V: 5

27

.4

1@

0.0

E

LE

V: 5

27

.4

1@

0.0

E

LE

V: 5

27

.1

4@

-1

5.5

E

LE

V: 5

27

.5

2@

15

.5

-

3

3

%

1

1

%

2%

3

3

%

3

3

%

-

3

3

%

1

1

%

2%

3

3

%

3

3

%

Cut

Fill

Area

45.65

27.86

Volume

41.24

21.87

Cumulative Volume

5174.03

1452.89

Cut

Fill

Area

45.87

25.91

Volume

42.37

24.89

Cumulative Volume

5216.40

1477.79

Cut

Fill

Area

45.04

21.96

Volume

42.09

22.16

Cumulative Volume

5258.49

1499.95

Cut

Fill

Area

37.57

25.18

Volume

38.25

21.82

Cumulative Volume

5296.74

1521.77

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

AS NOTED

GA

MB

LE

RD

C35

CR

OS

S S

EC

TIO

N 1

3

2019-11-19

16-5-ST-15

RH

RH

ZR

100% SUBMITTAL

SCALE:

1"= 5'V

1"= 10'H

AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
Page 37: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

22+00.00

512.50

515.00

520.00

525.00

530.00

535.00

540.00

512.50

515.00

520.00

525.00

530.00

535.00

540.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

22+25.00

512.50

515.00

520.00

525.00

530.00

535.00

540.00

512.50

515.00

520.00

525.00

530.00

535.00

540.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

22+50.00

512.50

515.00

520.00

525.00

530.00

535.00

540.00

512.50

515.00

520.00

525.00

530.00

535.00

540.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

22+75.00

507.50

510.00

515.00

520.00

525.00

530.00

535.00

540.00

507.50

510.00

515.00

520.00

525.00

530.00

535.00

540.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

E

LE

V: 5

26

.7

4@

0.0

E

LE

V: 5

26

.7

4@

0.0

E

LE

V: 5

26

.8

5@

-1

5.5

E

LE

V: 5

26

.8

6@

15

.5

-

3

3

%

3

3

%

E

LE

V: 5

25.8

8@

0.0

E

LE

V: 5

25.8

8@

0.0

E

LE

V: 5

25

.9

9@

-1

5.5

E

LE

V: 5

25

.9

9@

15

.5

-

3

3

%

3

3

%

E

LE

V: 5

24

.8

1@

0.0

E

LE

V: 5

24

.8

1@

0.0

E

LE

V: 5

24

.9

2@

-1

5.5

E

LE

V: 5

24

.9

2@

15

.5

-

3

3

%

3

3

%

E

LE

V: 5

23

.5

5@

0.0

E

LE

V: 5

23

.5

5@

0.0

E

LE

V: 5

23

.6

6@

-1

5.5

E

LE

V: 5

23

.6

6@

15

.5

-

3

3

%

3

3

%

Cut

Fill

Area

42.70

24.38

Volume

37.16

22.94

Cumulative Volume

5333.90

1544.72

Cut

Fill

Area

48.02

22.37

Volume

42.00

21.64

Cumulative Volume

5375.90

1566.36

Cut

Fill

Area

44.78

25.34

Volume

42.96

22.09

Cumulative Volume

5418.86

1588.45

Cut

Fill

Area

44.09

21.03

Volume

41.14

21.47

Cumulative Volume

5460.01

1609.91

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

AS NOTED

GA

MB

LE

RD

C36

CR

OS

S S

EC

TIO

N 1

4

2019-11-19

16-5-ST-15

RH

RH

ZR

100% SUBMITTAL

SCALE:

1"= 5'V

1"= 10'H

AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
Page 38: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

23+00.00

507.50

510.00

515.00

520.00

525.00

530.00

535.00

507.50

510.00

515.00

520.00

525.00

530.00

535.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

23+25.00

507.50

510.00

515.00

520.00

525.00

530.00

535.00

507.50

510.00

515.00

520.00

525.00

530.00

535.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

23+50.00

507.50

510.00

515.00

520.00

525.00

530.00

507.50

510.00

515.00

520.00

525.00

530.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

23+75.00

507.50

510.00

515.00

520.00

525.00

530.00

507.50

510.00

515.00

520.00

525.00

530.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

E

LE

V: 5

22

.0

8@

0.0

E

LE

V: 5

22

.0

8@

0.0

E

LE

V: 5

22

.1

9@

-1

5.5

E

LE

V: 5

22

.1

9@

15

.5

E

LE

V: 5

22

.0

8@

0.0

E

LE

V: 5

22

.0

8@

0.0

E

LE

V: 5

22

.1

9@

-1

5.5

E

LE

V: 5

22

.1

9@

15

.5

3

3

%

3

3

%

E

LE

V: 5

20

.4

1@

0.0

E

LE

V: 5

20

.5

3@

15

.5

E

LE

V: 5

20

.4

1@

0.0

-

3

2

%

E

LE

V: 5

18

.5

5@

0.0

E

LE

V: 5

18

.6

6@

15

.5

E

LE

V: 5

18

.5

5@

0.0

-

3

1

%

E

LE

V: 5

16

.4

9@

0.0

E

LE

V: 5

16

.2

3@

15

.5

E

LE

V: 5

16

.4

9@

0.0

E

LE

V: 5

16

.2

3@

-1

5.5

7%

-

3

1

%

-

3

1

%

-8

%

1

1

%

2%

1

8

%

1

8

%

1

6

%

1

6

%

Cut

Fill

Area

43.72

15.87

Volume

40.65

17.08

Cumulative Volume

5500.66

1626.99

Cut

Fill

Area

24.97

9.48

Volume

31.80

11.74

Cumulative Volume

5532.46

1638.73

Cut

Fill

Area

22.68

12.21

Volume

22.06

10.04

Cumulative Volume

5554.52

1648.77

Cut

Fill

Area

44.90

30.48

Volume

31.29

19.76

Cumulative Volume

5585.81

1668.54

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

AS NOTED

GA

MB

LE

RD

C-37

CR

OS

S S

EC

TIO

N 1

5

2019-11-19

16-5-ST-15

RH

RH

ZR

100% SUBMITTAL

SCALE:

1"= 5'V

1"= 10'H

AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
Page 39: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

24+00.00

502.50

505.00

510.00

515.00

520.00

525.00

502.50

505.00

510.00

515.00

520.00

525.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

24+25.00

502.50

505.00

510.00

515.00

520.00

525.00

502.50

505.00

510.00

515.00

520.00

525.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

24+50.00

502.50

505.00

510.00

515.00

520.00

525.00

502.50

505.00

510.00

515.00

520.00

525.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

24+75.00

502.50

505.00

510.00

515.00

520.00

502.50

505.00

510.00

515.00

520.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

25+00.00

497.50

500.00

505.00

510.00

515.00

520.00

497.50

500.00

505.00

510.00

515.00

520.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

25+25.00

502.50

505.00

510.00

515.00

520.00

502.50

505.00

510.00

515.00

520.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

E

LE

V: 5

14

.6

1@

0.0

E

LE

V: 5

14

.6

1@

0.0

E

LE

V: 5

14

.7

2@

-1

5.5

E

LE

V: 5

14

.7

2@

15

.5

-

2

9

%

1

5

%

E

LE

V: 5

13

.0

4@

0.0

E

LE

V: 5

12

.7

8@

15

.5

E

LE

V: 5

13

.0

4@

0.0

E

LE

V: 5

13

.1

5@

-1

5.5

7% -

8%

-

2

3

%

-

3

3

%

-

3

3

%

1

2

%

E

LE

V: 5

11

.7

9@

0.0

E

LE

V: 5

11

.7

9@

0.0

E

LE

V: 5

11

.9

0@

-1

5.5

E

LE

V: 5

11

.9

0@

15

.5

-

3

3

%

1

2

%

E

LE

V: 5

10

.8

6@

0.0

E

LE

V: 5

10

.5

9@

15

.5

E

LE

V: 5

10

.8

6@

0.0

E

LE

V: 5

10

.5

9@

-1

5.5

7% -

8

%

-

2

3

%

-

2

5

%

-

2

5

%

1

1

%

2%

1

8

%

1

8

%

E

LE

V: 5

10

.2

4@

0.0

E

LE

V: 5

10

.2

4@

0.0

E

LE

V: 5

10

.3

5@

-1

5.5

E

LE

V: 5

10

.3

6@

15

.5

-

2

7

%

2

0

%

E

LE

V: 5

09

.9

5@

0.0

E

LE

V: 5

09

.9

5@

0.0

E

LE

V: 5

10

.0

6@

-1

5.5

E

LE

V: 5

10

.0

6@

15

.5

-

1

8

%

2

8

%

Cut

Fill

Area

24.24

17.44

Volume

32.01

22.18

Cumulative Volume

5617.82

1690.72

Cut

Fill

Area

22.92

48.66

Volume

21.83

30.60

Cumulative Volume

5639.65

1721.32

Cut

Fill

Area

17.37

24.65

Volume

18.65

33.94

Cumulative Volume

5658.30

1755.26

Cut

Fill

Area

18.95

39.44

Volume

16.81

29.67

Cumulative Volume

5675.11

1784.93

Cut

Fill

Area

17.83

22.41

Volume

17.03

28.64

Cumulative Volume

5692.14

1813.56

Cut

Fill

Area

20.07

14.80

Volume

17.54

17.23

Cumulative Volume

5709.69

1830.79

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

AS NOTED

GA

MB

LE

RD

C-38

CR

OS

S S

EC

TIO

N 1

6

2019-11-19

16-5-ST-15

RH

RH

ZR

100% SUBMITTAL

SCALE:

1"= 5'V

1"= 10'H

AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
Page 40: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

25+50.00

502.50

505.00

510.00

515.00

520.00

502.50

505.00

510.00

515.00

520.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

25+75.00

502.50

505.00

510.00

515.00

520.00

502.50

505.00

510.00

515.00

520.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

26+00.00

502.50

505.00

510.00

515.00

520.00

525.00

502.50

505.00

510.00

515.00

520.00

525.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

26+25.00

502.50

505.00

510.00

515.00

520.00

525.00

502.50

505.00

510.00

515.00

520.00

525.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

26+50.00

502.50

505.00

510.00

515.00

520.00

525.00

502.50

505.00

510.00

515.00

520.00

525.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

26+75.00

502.50

505.00

510.00

515.00

520.00

525.00

502.50

505.00

510.00

515.00

520.00

525.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

E

LE

V: 5

09

.9

7@

0.0

E

LE

V: 5

09

.7

0@

15

.5

E

LE

V: 5

09

.9

7@

0.0

E

LE

V: 5

09

.7

0@

-1

5.5

7% -

8

%

-1

1

%

-1

1

%

1

1

%

2%

1

6

%

1

5

%

1

5

%

E

LE

V: 5

10

.1

6@

0.0

E

LE

V: 5

10

.1

6@

0.0

E

LE

V: 5

10

.2

7@

-1

5.5

E

LE

V: 5

10

.2

8@

15

.5

-1

0

%

2

9

%

E

LE

V: 5

10

.6

8@

0.0

E

LE

V: 5

10

.4

1@

15

.5

E

LE

V: 5

10

.6

8@

0.0

E

LE

V: 5

10

.4

1@

-1

5.5

7% -

8%

-9

%

-9

%

1

1

%

2%

1

8

%

1

8

%

E

LE

V: 5

11

.4

8@

0.0

E

LE

V: 5

11

.4

8@

0.0

E

LE

V: 5

11

.5

9@

-1

5.5

E

LE

V: 5

11

.5

9@

15

.5

-7%

2

1

%

E

LE

V: 5

12

.5

3@

0.0

E

LE

V: 5

12

.5

3@

0.0

E

LE

V: 5

12

.6

4@

-1

5.5

E

LE

V: 5

12

.6

5@

15

.5

-5%

1

9

%

E

LE

V: 5

13

.8

2@

0.0

E

LE

V: 5

13

.8

2@

0.0

E

LE

V: 5

13

.9

3@

-1

5.5

E

LE

V: 5

13

.9

3@

15

.5

-6%

1

4

%

Cut

Fill

Area

38.74

14.88

Volume

27.23

13.74

Cumulative Volume

5736.91

1844.53

Cut

Fill

Area

35.78

8.85

Volume

34.50

10.99

Cumulative Volume

5771.41

1855.52

Cut

Fill

Area

36.93

6.19

Volume

33.66

6.96

Cumulative Volume

5805.08

1862.48

Cut

Fill

Area

18.36

23.57

Volume

25.60

13.78

Cumulative Volume

5830.68

1876.26

Cut

Fill

Area

16.54

19.26

Volume

16.16

19.83

Cumulative Volume

5846.84

1896.09

Cut

Fill

Area

13.49

27.59

Volume

13.90

21.69

Cumulative Volume

5860.74

1917.78

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

AS NOTED

GA

MB

LE

RD

C-39

CR

OS

S S

EC

TIO

N 1

7

2019-11-19

16-5-ST-15

RH

RH

ZR

100% SUBMITTAL

SCALE:

1"= 5'V

1"= 10'H

AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I
Page 41: GAMBLE RD 100% SUBMITTAL 16-5-ST-15 WARD 5 KANIS RD TO ...€¦ · zr. 100% submittal. 9" class 7 base course at 100% modified proctor density. compacted subgrade at 95% modify proctor

27+00.00

507.50

510.00

515.00

520.00

525.00

507.50

510.00

515.00

520.00

525.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

27+25.00

507.50

510.00

515.00

520.00

525.00

507.50

510.00

515.00

520.00

525.00

0 5 10 15 20 25 30 35 40 450-5-10-15-20-25-30-35-40-45

E

LE

V: 5

15

.1

7@

0.0

E

LE

V: 5

15

.1

7@

0.0

E

LE

V: 5

15

.2

8@

-1

5.5

E

LE

V: 5

15

.2

8@

15

.5

-4%

9

%

E

LE

V: 5

16

.5

1@

0.0

E

LE

V: 5

16

.5

1@

0.0

E

LE

V: 5

16

.6

2@

-1

5.5

E

LE

V: 5

16

.6

3@

15

.5

-0%

1

6

%

Cut

Fill

Area

19.69

16.60

Volume

15.36

20.46

Cumulative Volume

5876.10

1938.23

Cut

Fill

Area

25.08

15.60

Volume

20.73

14.91

Cumulative Volume

5896.82

1953.14

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

LIT

TL

E R

OC

K, A

RK

AN

SA

S 72201

701 W

. M

AR

KH

AM

CIV

IL

E

NG

IN

EE

RIN

G

CIT

Y O

F L

IT

TL

E R

OC

K, A

RK

AN

SA

S

SHEET NO.

SCALE

PROJECT NO.

DATE

DESIGNED

CHECKED

DRAWN BY

REVISIONS DATE

AS NOTED

GA

MB

LE

RD

C-40

CR

OS

S S

EC

TIO

N 1

8

2019-11-19

16-5-ST-15

RH

RH

ZR

100% SUBMITTAL

SCALE:

1"= 5'V

1"= 10'H

AutoCAD SHX Text
O
AutoCAD SHX Text
O
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
W
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
K
AutoCAD SHX Text
K
AutoCAD SHX Text
C
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
I