TRANSCRIPT
GAIL (India) LimitedCorporate HSE Department
IOM
Ref. No. GAIL/NOIDA/CO-H SEI 4t201 6-17 Dated: 23'd Aug ,2016
SUB: MONTHLY HSE scoRE REpoRT - Juty z0t6
HSE Score Report for the month of July 2016 containing inter alia HSE Scorefor the following Installations / Plants is sent herewith for your kind perusal &information please.
1. HVJ and Non HVJ Gas Pipeline Installations.2. LPG Pipeline Installations.3. Process Plants.
overall HSE Score stands at 93.72 for the month of July, 2016.
General
T'o : AII OICs (as per the mailing list)
CC: for favor of infonnation to:
. C&MDo Director (Marketing/BD/Finance/HR/project)
' ED ( PD/CRO )/ED (O&M-CR)/ED(O&M-C0)/ED(OIC-Pata)/ ED(IA)/ ED(pC)/- ED(E&P)/ ED(HR/HRD)/GM(SR)
Manager (HSE)
1. Bo
2. Gp
3. E((
4. BC
5. AP
6. H7. G
R8. D
U9. H
“CH
10. Oc
BehaviourorganizedGPU Ganpipelines uException( Projects ( PC-O&MBBS FollChhainsa,As a leadProcessingHSE checGAIL aloResponse Dy. DirecUsar PlanHealth tal“How to Chhainsa Heart InstOccupatiocommittee
r Based sd at Jaipur ndhar and under NC
n report o) on 29th J
M ) & GMow up vi, Vadodarader of OIg Facilitie
ck was perong with o
Centre mctor Industt on 27th Jk on “Lifeprevent
respectivetitute, Farional Heale on 26th &
P
safety region 8th July Desu- M
R region won MonthJuly 2016
M ( SR ) wsits were a, MumbaSD audit
es , Gandhrformed byother com
meeting heltrial SafetyJuly, 2016e Style Mothe Heartely by the idabad. lth Audit& 27th July
Cor
Monthly
Page 1 of 13
ional wory 2016.
Maruti as were safethly Safety6. ED (O&were conne
organisedai, Hazira
team, GMhar for safey HSE off
mmittee mld at EIL Dy & Health. odificationt Disease”faculty fr
t of Patay 2016.
rporate H
HSE Sco
Hig
3
rkshop on
well as Dty auditedy Day w
&M)-CO, Eected throud at all sit& Jaipur.M ( HSEety audit oficials of J
members pDelhi on 1h, Raigad
n for Hear” were drom Care H
a was co
HSE Depa
ore Repor
ghlights
“Safety L
Desu-Sonid by OISDwas reviewED ( O&Mugh VC. tes of JLP
) visitedof installatJhabua Coparticipate14th July, 2
Distt, Ma
rt and Othdelivered aHospital, V
onducted
artment
rt: July 20
Leadershi
ipat-Bahad.
wed by DM – CR ) a
PL, Ahme
d ONGC tion mp Statio
ed in Eme2016. aharashtra
her Diseaseat DT ViVizag and
by the i
016
ip” was
durgarh
Director and ED
edabad,
Central
on. ergency
a visited
es” and izag & d Metro
internal
GROUUPWISE
Sl. Categ
01 HVJ
02 REGI
03 PROC
04 LPG
OVER
93.1
90
80
82
84
86
88
90
92
94
96
98
100
Apr.16
80828486889092949698100
HSE SCO
gory
NATURAL
IONAL PIP
CESS PLAN
PIPELINES
ERALL HSE
92.16 92.870
90 90
6May.16Jun.16
P
ORE
J
L GAS PIPE
PELINES
NTS
S
ESCORE
HSE Pe(
93.72
0 90
6 Jul.16
Achieve
HSE Scor
Achieve
Page 2 of 13
July, 2016
ELINE
erformancHSE Scor
ement IM
re vs IMo
ement
3
6
HSE S
93.56
93.07
92.20
96.05
93.72
ceTrendre)
MoU Target
oU target
IMoU Targe
core
IMoU T
t
t
Target: 90
1
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 0 1 0 0 1 1 1
2
(b) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 2 2 2 2 2 2 2 2 2 2 2 2 2
(c) 2 2 2 2 2 2 2 2 2 2 2 1 2 0 2 2 2 2 2 2 2 2 1 2 2 2 2 2 2 2 2 2
3
(a) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
(b) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4
(a) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
(b) 1 1 1 1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
(c) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
5
(a) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6
(a) 1 1 1 1 1 0 1 1 1 1 1 1 0 1 1 1 1 1 1 1 0 1 1 1 1 1 1 0 1 1 1 1
7
(a) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 1
(b) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
8 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
9
(a) 2 2 0 0 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Workplace monitoring
Availability of PPEs
Third Paty Services
Safety Rule Violation
Monthly HSE briefing Undertaken by OIC/WIC
Unsafe condition/Act reported by employees
11 1 11 1 1
Review of HSE policy (Y)
Work Permit System
Job safety analysis
1 1
Safety Committee meeting(Q)
1 1 1 1 1 11 1 1 1 11 1 1(a) Safety Suggestion from Employee
1 1 1
Sam
akhi
ali
Jam
naga
r
Kan
dla
NC
R
Mum
bai
HSE Leadership and Commitment (M)
Employees Participation
Sl
WORK CENTRE --->
Max
. P
ts.
Haz
ira
Jhab
ua
Khe
ra
11 1 1 1
HSE SCORE AT A GLANCE FOR THE MONTH OF July 2016
Category ---> Process Plants L P G P/L Stations
Chh
ains
a
HVJ NG P/L Stations Regional NG P/L Stations
Koc
hi
Ben
galu
ru
Vad
odar
a
Aga
rtal
a
Gan
dhar
Vij
aipu
r
Vag
hodi
a
Dib
iyap
ur
Kai
lara
s
G K
ondu
ru
Che
rlap
alli
ELEMENTS
Nas
irab
ad
Abu
Ros
d
Raj
ahm
undr
y
Pud
uchh
ery
Viz
ag
Pat
a
Usa
r
Vag
hodi
a
Vij
aipu
r
Lon
i Reg
ion
Man
sara
mpu
ra
Facility Design, construction & pre-start up review
Control of defeat and reliability of critical system and devices
Display of critical SOP
Risk analysis and management
Risk analysis
Process safety information
HAZOP study
Pre-start up review
Display of MSDs
Display of Electrical area classification
1
Personal Safety
Page 3 of 13
Sam
akhi
ali
Jam
naga
r
Kan
dla
NC
R
Mum
baiSl
WORK CENTRE --->
Max
. P
ts.
Haz
ira
Jhab
ua
Khe
ra
HSE SCORE AT A GLANCE FOR THE MONTH OF July 2016
Category ---> Process Plants L P G P/L Stations
Chh
ains
a
HVJ NG P/L Stations Regional NG P/L Stations
Koc
hi
Ben
galu
ru
Vad
odar
a
Aga
rtal
a
Gan
dhar
Vij
aipu
r
Vag
hodi
a
Dib
iyap
ur
Kai
lara
s
G K
ondu
ru
Che
rlap
alli
ELEMENTS
Nas
irab
ad
Abu
Ros
d
Raj
ahm
undr
y
Pud
uchh
ery
Viz
ag
Pat
a
Usa
r
Vag
hodi
a
Vij
aipu
r
Lon
i Reg
ion
Man
sara
mpu
ra
(b) 2 2 2 2 2 2 2 2 2 2 2 2 2 0 0 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
10
(a) 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 0 1 1 1 1
(b) 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
(c) 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 2 3 3 3 3 3 3 3 3 3 3
(d) 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
(e) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
(f) 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 2 3 3 2 3 3 3 3 3 3 3 3 3 3 3 3 3
(g) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
(h) 2 2 2 2 2 0 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 0 2 2 0 2
11
(a) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
(b) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
(c) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
(d) 2 2 2 2 2 2 0 2 0 2 2 2 2 2 2 2 2 2 2 0 2 2 2 2 2 2 2 2 2 2 2 2
(e) 3 1 3 3 3 1 0 3 0 3 3 3 3 3 3 3 3 3 3 3 1 3 3 3 3 3 3 3 3 3 1 3
12 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
13 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
14
(a) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
(b) 18 18 18 18 18 18 18 18 18 18 18 18 18 12 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18
(c) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
15
(a) 4 0 4 4 0 4 0 4 0 4 4 0 4 0 4 0 4 0 0 0 0 0 4 4 4 4 0 4 4 4 4 4Health Monitoring
Occupational Health
Fire Fighting Chemicals
Critical Instruments
Communication System
Near miss Incidents
Pipeline Thickness
Pressure Vessels
Portable equipments
Load bearing Installed equipment
Safe Operating Procedures
Inspection and Maintenance
Incident Reporting, Investigation and analysis
Fire Detection & Alarm System
Fire Water-Based System & Non-Water based system
Fire Fighting Appliances
Training:Health,Safety and Environment
Operation and Maintenance (Procedure)
Safety Toolbox Talk
Fire & Safety Manpower
Management of Change
Calibration/Resetting
Incident Investigation and analysis
Incident Reporting
Page 4 of 13
Sam
akhi
ali
Jam
naga
r
Kan
dla
NC
R
Mum
baiSl
WORK CENTRE --->
Max
. P
ts.
Haz
ira
Jhab
ua
Khe
ra
HSE SCORE AT A GLANCE FOR THE MONTH OF July 2016
Category ---> Process Plants L P G P/L Stations
Chh
ains
a
HVJ NG P/L Stations Regional NG P/L Stations
Koc
hi
Ben
galu
ru
Vad
odar
a
Aga
rtal
a
Gan
dhar
Vij
aipu
r
Vag
hodi
a
Dib
iyap
ur
Kai
lara
s
G K
ondu
ru
Che
rlap
alli
ELEMENTS
Nas
irab
ad
Abu
Ros
d
Raj
ahm
undr
y
Pud
uchh
ery
Viz
ag
Pat
a
Usa
r
Vag
hodi
a
Vij
aipu
r
Lon
i Reg
ion
Man
sara
mpu
ra
(b) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
16
(a) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
(b) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
(c) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
(d) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
17 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
18
(a) 8 6 8 6 4 8 7 4 4 8 3 7 8 3 8 8 8 4 5 8 6 7 0 7 1 7 7 7 7 8 8 8
(b) 4 3 4 4 3 4 4 3.5 3.5 4 2.5 3.5 1.5 3.5 4 4 3.5 4 4 4 4 4 4 4 2 4 4 4 4 4 3.5 4
100 91 98 96 91 94 90 95.5 86.5 100 93.5 92.5 95.5 80.5 97 93 99.5 92 91 94 90 94 91 99 91 98 95 94 98 100 94.5 10019 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
91.00 98.00 96.00 91.00 94.00 90.00 95.50 86.50 100.00 93.50 92.50 95.50 80.50 97.00 93.00 99.50 92.00 91.00 94.00 90.00 94.00 91.00 99.00 91.00 98.00 95.00 94.00 98.00 ##### 94.50 #####
Excel Excel Excel Excel Excel Excel Excel VG Excel Excel Excel Excel VG Excel Excel Excel Excel Excel Excel Excel Excel Excel Excel Excel Excel Excel Excel Excel Excel Excel Excel
Sl
1
2345
* : Minor gas leakage was reportrd on 8" Pipeline at GNAQ, Magnad, Vadodara on 22.07.2016 at 09.02 Hrs.
Environment Management
Occupational Health Facility
Hazardous waste
Environment audit by external agencies
Environment Monitoring
External HSE audit Observations & Compliance
Compliance audit
Emergency planning and Response:Onsite Mock Drill
TotalScore Deduction on NC
92.20 96.05
Overall HSE Score 93.72
Below 60 POOR
RATING
90 - 100 EXCELLENT
93.56 93.07
HSE Score Achieved
Rating
Groupwise HSE Score
Internal HSE audit (Including IUSA) observations & Compliance
≥80 & <90 V. GOOD ≥70 & <80 GOOD ≥60 & <70 FAIR
Environment related accident/incident
Page 5 of 13
Page 6 of 13
Highlights of HSE Activities for the Month - July, 2016
Highlights of HSE Activities at Work Centres are summarized below:
1. Behavior Based Safety (BBS):
BBS schedule meetings of functional committee and Steering Committee organised at various sites.
1. BBS follow up visit by representatives from M/S Obul Consultancy has taken place all along JLPL, Ahmedabad, Chhainsa, Vadodara, Mumbai, Hazira & Jaipur.
2. Emergency Response and Disaster Management Plan (ERDMP) / Mock Drill:
ERDMP of Gandhar has been reviewed & verified by the accrediting agency M/s. CEIL, Mumbai representatives, and found to comply with requirements of Petroleum & Natural Gas Regulatory Board.
ERDMP of Nasirabad has been reviewed & verified by the accrediting agency M/s. CEIL, Mumbai representatives, and found to comply with requirements of Petroleum & Natural Gas Regulatory Board.
Level II on site Mock Drill conducted in presence of PNGRB ERDMP accrediting agency M/s. CEIL, Mumbai representatives.
GAIL Usar & Vizag participated in the emergency response drill conducted by their Mutual Aid partners HPCL & BPCL respectively.
Quarterly On-Site Mock Drill organised at Gandhar, NCR, Pata & Samakhiali.
3. OISD / T4S Audit
OISD audit has been conducted at GPU, Gandhar..
OISD audit has been conducted for the Desu- Maruti pipe line & Desu Sonipat Bahadurgarh pipelines under NCR region.
T4S audit as per PNGRB Regulation of Agartala & Puducherry region pipeline system has been conducted by M/s Intertek Moody International Private Limited.
Page 7 of 13
4. External Safety Audit/QRA
QRA of Vijaipur Complex has been conducted by M/s DNV-GL.
5. Other Highlights
Public Awareness meet on “Pipeline Safety” conducted at Village Vankamamidi near SV 35 in the Pochampalli Taluka of Nalgonda District under Cherlapalli region.
Pipeline Safety Awareness program conducted for school children at Village Debar Bari of Jhabua district.
Pipeline safety committee meeting conducted for villagers at Panchayat Bhawan Village Debar Bari under Jhabua region.
Safety awareness and emergency handling program conducted for Kerala State Fire & Rescue department and for customers under Kochi region.
A mass Public Awareness programme on “Ensuring Safety in urban area in case of Emergency” was organized for all the residents of Sattivani Pallem and nearby residents along the RoU in the Urban Area of Vizag City at Chainage 3.5 Km of Vizag- Secunderabad LPG pipeline.
Community Awareness program on Natural Gas Pipelines safety and Dos & Don’ts in case of leakage are being conducting by hiring local focus group and arranging in PL ROU Villages.
*****
Page 8 of 13
Near-miss Incidents Reported by Work Centres:
Near miss incidents have been reported from various sites in the month of July 2016. Notable near-miss incidents are summarized as below:
Agartala: On 27.07.2016, construction of Stores Building is under progress at Anand Nagar Terminal and due to this construction, various civil related activities are going on in front of the Terminal. During cleaning pigging activity for the section from Konaban Tap-off Point to Anand Nagar Section Terminal of the pipeline (10” dia. X 20 Kms.). GAIL Officer, Sh. S C Reang, SM (O&M) is about to hit by the extended bamboo piece of scaffolding of Stores Building construction, just outside the gate while coming out from the Terminal after completion of the pigging activity. He could manage to avoid and escape any bodily/ head injury because of alertness and moreover, he was wearing the Safety Helmet. Otherwise, he could have been injured. Immediately, the supervisor of the contractor was instructed to cut the extended piece of the bamboo scaffolding and the same was cut and removed to make the space clear and for free movement. Chhainsa: On 08.07.2016 at 1655 hrs, at the rear entrance of administrative building a metal framework structure is provided to enhance the aesthetic look of the building. On 08.07.2016 at around 5 PM due to sudden change in weather condition, strong winds started blowing which forced a large piece of metal sheet installed at the top of the framework to come out from its fitting, resulting into falling of the sheet on the ground. Sh. Yogesh who was going to take refuge in the building due to the rain narrowly escaped an injury from the falling sheet. Jhabua: On 08.07.2016, security guard Sh. Jagdish Prajapati, when approaching to watch tower no 2, got minor first aid injury due to tripping by an earth cable which was left loose near the walkway. He could not see the earth cable. Though a serious did not happened but there was potential of sever injury had he fallen on ground. Kailaras: On 02.07.2015 at 15:35 hrs, at RR Station Sone Ka Gurja- During Pigging activity, contract labor was engaged to dispose the debris and the black mug received during the pigging. After disposing the debris, It was observed that one of the contract employee was going to light the bidi, immediately he was stopped as his clothes were dipped with the black mug and training was imparted to all the contract workers and supervisors for the hazards and the fire risk associated with the pigging debris. Security guards were instructed not to allow any persons with flammable items at the work site. Nasirabad: On 26.07.2016 at 15:45 hrs, Fire water line modification job was done in LPG process area. During plant round it was observed that support frame were removed but the grouting bolts were left on ground as it is. The Unsafe condition was having potential to be converted into any accident. Samakhiali: On 27.07.2016 at 16:30 hrs, Main bank of CO2 cylinders of SV-18 operated by push button in the telecom room, SOV of master cylinder operated and when CO2 gas started
Page 9 of 13
coming into the common manifold, gasket of common service line failed and gas started leaking into battery room also, However since it was operated by push button and no one was present in the battery room, no injury was reported. Vadodara: On 22.07.2016 at 09:02 hrs, Foot Patroller from ONGC has reported leakage in 8" GNAQ- Magnad Pipeline near Khanpur village (at 6-6.5 Km chainage) at 9.02 Hrs. on 22.07.2016 in common RoU of ONGC and GAIL- O&M Undera has confirmed that the minor leakage is on GAIL Pipeline at 11:49 Hrs. of 22.07.2016 to RGMC-Vadodara. Vijaipur GPU: On 26.07.2016, during Heat exchanger shifting job in Phase 2 LPG unit area, after successful bolting and installation of new heat exchanger, the sling of crane got stuck in the name plate of the heat exchanger. This was not observed carefully by neither crane operator nor supervisor. As a result, when the boom lifted, a huge shock has come in the structure which could have had a serious effect. Luckily nobody was affected.
Page 10 of 13
Details of Deduction of Marks in the Month of July 2016
Sl. No.
Name of Installation Marks Deducted
Element No.
Reason for Mark Deduction
1.
HV
J N
G P
/L S
TA
TIO
NS
Hazira
2 11 ( e ) PSV monitoring / testing not done as due
4 15 (a ) 100% manpower not covered for health check up
2 18 (a) Pending ESA (OISD June 2014) points
1 18 (b) Pending IUSA (26.11.2013) points
2. Jhabua 2 9 ( a ) JSA not done 100%
3. Khera
2 9 ( a ) JSA not done 100%
2 18 (a) Pending ESA (CEIL July 2014) points
4. Vijaipur, CS
4 15 ( a ) 100% manpower not covered for health check up
4 18 ( a ) Pending T4S Audit points 28.07.2011
1 18 ( b ) Pending ( IUSA March 2014 ) points
5. Vaghodia, CS
1 6 Safety violation by contract employees
1 10 (a) Available Staff+ Outsourced <95% of Std. Requirement
2 10 ( h ) SOP not reviewed as due
2 11 ( e ) PSV monitoring /testing not done as due
6. Dibiyapur
2 11 ( d ) Pipeline thickness survey not done as due
3 11(e) PSV/LEL monitoring /testing not done as due
4 15 ( a ) 100% manpower not covered for health check up
1 18 ( a ) Pending OISD ( Aug 2014 ) point
7. Kailaras
4 18 ( a ) Pending T4S audit (16.08.2011) points
0.5 18 ( b ) Pending ( IUSA 27.11.2014 ) points
8. NCR
2 11 ( d ) Pipeline thickness survey not done as due
3 11(e) LEL detector & PSV monitoring /testing not done as due
Page 11 of 13
Sl. No.
Name of Installation Marks Deducted
Element No.
Reason for Mark Deduction
4 15 ( a ) 100% manpower not covered for health check up
4 18 (a) Pending T4S Audit ( 11.08.2011) points
0.5 18( b ) Pending IUSA point of Aug 2014
9. Chhainsa NIL
10.
RE
GIO
NA
L N
G P
/L S
TA
TIO
NS
Mumbai
5 18 (a) Pending ESA (OISD 06.12.2010) points
1.5 18 (b) Pending IUSA (26.03.2013) points
11. Rajahmundry
1 1 HSE policy not reviewed as due
1 2 (c) No. of reported unsafe conditions = 2
4 15 ( a ) 100% manpower not covered for health check up
1 18 (a) Pending ESA ( CEIL Nov., 2014) points
0.5 18 ( b ) Pending ISA ( Feb 2015 ) point
12.
Puducherry
1 4 ( b ) Area classification drawing not displayed at site
1 6 Safety Violation by Contract employees
2.5 18 (b) Pending IUSA (26.11.2010) points
13.
Vadodara
2 2 (c) No. of reported unsafe conditions = 1
2 9 ( b ) Tool Box talk not done 100%
6 14 ( b ) Minor gas leakage
4 15 ( a ) 100% manpower not covered for health check up
5 18 (a) Pending ESA (CEIL 19.03.2011) points
0.5 18 ( b ) Pending IUSA ( Mar 2015 ) point
14. Agartala
2 9 ( b ) Safety tool box talk not done 100%
1 10 ( e ) Communication system not checked as due
15. Kochi 1 4 ( c ) SOP not displayed
1 10 (f) DCP quantity not 100% available
Page 12 of 13
Sl. No.
Name of Installation Marks Deducted
Element No.
Reason for Mark Deduction
1 11 ( b ) Portable equipment not checked as due
4 15 ( a ) 100% manpower not covered for health check up
16. Bengaluru 0.5 18 ( b ) Pending ISA ( Mar 2015 ) point
17.
PR
OC
ESS
PL
AN
TS
Gandhar
4 15 ( a ) 100% manpower not covered for health check up
4 18 (a) Pending ESA (OISD 15.06.2012) points
18. Pata
1 2 ( b ) 95% of previous Safety Committee meetings not complied
1 10 (f) DCP quantity not 100% available
4 15 ( a ) 100% manpower not covered for health check up
3 18 (a) Pending ESA ( OISD Feb 2013) points
19. Usar
2 11 ( d ) Pipeline thickness survey not done as due
4 15 ( a ) 100% manpower not covered for health check up
20. Vaghodia, GPU
1 6 Safety Violation by Contract employees
1 10 (a) Available Staff+ Outsourced <95% of Std. Requirement
2 11(e) PSV monitoring /testing not done as due
4 15 ( a ) 100% manpower not covered for health check up
2 18 (a) Pending ESA (OISD 21.11.2013) points
21. Vijaipur, GPU
1 10 ( c ) Fire System availability is <95%
4 15 ( a ) 100% manpower not covered for health check up
1 18 (a) Pending ESA( CEIL Oct 2014) points
22.
LP
G P
/L
ST
AT
ION
S
Loni Region
1 2 (c) No. of reported unsafe conditions = 4
8 18 ( a ) Pending ESA (OISD Nov 2001) points
23. Mansharampura 1 18 (a) Pending ESA (CEIL Nov 2014)
points
Page 13 of 13
Sl. No.
Name of Installation Marks Deducted
Element No.
Reason for Mark Deduction
24. Nasirabad
7 18 (a) Pending ESA (OISD 23.02.2009) points
2 18 (b) Pending IUSA (05.07.2012) points
25. Abu Road
1 1 HSE policy not reviewed as due
1 18 (a) Pending ESA (OISD 03.06.2015) points
26. Samakhiali
4 15 ( a ) 100% manpower not covered for health check up
1 18 (a) Pending ESA (CEIL Nov 2014) points
27. Jamnagar
1 1 HSE policy not reviewed as due
1 6 Safety Violation by Contract employees
1 10 (a) Available Staff+ Outsourced <95% of Std. Requirement
2 10 ( h ) SOP not reviewed as due
1 18 (a) Pending ESA (CEIL Nov 2014) points
28. Kandla
1 1 HSE policy not reviewed as due
1 18 (a) Pending ESA (CEIL Nov 2014) points
29. Vizag NIL
30. G Konduru
1 7 ( a ) Work place monitoring not done as due
2 10 ( h ) SOP not reviewed as due
2 11(e) PSV monitoring /testing not done as due
0.5 18 ( b ) Pending ISA ( Mar 2015) points
31. Cherlapalli NIL