FY 2017 Proposed Budget
Work Session
Monday, March 14, 5:30 – 8:00
Department of Environmental Services
95% of regulatory signs
repaired within 24 hours
DES Builds and Maintains a Sustainable Community
2
6 new traffic signal installed
2,347 tons of street sweeping
debris and sediment collected
The DES Call Center
handled 50,890 calls
in 2015
92 lane miles
paved in 2015
11,336 potholes filled
424, water quality facilities constructed to
meet stormwater ordinance requirements
bring total to over 1,300
220 new water service
installations completed 294 water system leak
repairs resolved
3,096 water meters installed
16 new and replacement
shelters installed (with
benches) and 23 stops
improved for ADA access
2,938 catch
basins cleaned
25 homes certified by
Green Home Choice,
bringing total to 200
2,821,980 ART Trips
99% removal of phosphorous
from wastewater cleaned at
Water Pollution Control Plant
and released to Four Mile Run
5,367 tons of brush and tree
material collected making
approximately 11,050 cubic
yards of wood mulch
Pavement Condition Index 66
86% reduction in
lost workdays
85% of streetlights
converted to LED
Achieved an annual
recycling rate of 53.5%
Received the SWANA
Gold Award for Special
Waste (Earth Products
Recycling Yard)
3
AgendaMonday, March 14, 2016
5:30 – 8:00 PM
Related FAAC Report: DES
Department / Topic Book pgs Web pgs Web Link
DES General Fund 187 -190 397 - 468 Click here
Stormwater 255 - 260 779 - 788 Click here
Utilities Fund 273 - 276 809 - 826 Click here
Auto Fund 285 - 287 851 - 862 Click here
Printing Fund 289 - 291 863 - 868 Click here
Ballston Public Parking Garage
Funds
277 - 280 827 - 836 Click here
Department of Environmental Services
General Fund
Proposed FY 2017 Budget Highlights
March 14, 2016
5
Budget Priorities
• Basic Services to meet expectations− Maintenance of existing assets
− Expansion of baseline services
− Accountability to service standards
− Aligning the standard with community expectations
• Better linkage between operating and
capital− Balancing revenue/program input with organizational throughput
− Strategy to address capital backlog
− Providing efficient operating space as services and capabilities grow
Budget Priority - Safety
6
7
General Fund Budget
• Proposed budget totals $91M6% increase from FY 2016 due to:
– Externalities
– Salaries, Health Insurance, non-discretionary contracts
– Basic Services:
• Maintaining what we have
– Street Light Maint $283K, Residential Concrete $150K
• Increasing services
– HSWR from $271.04 to $307.28 with yard waste
– Full year funding ART 55 plus other FY 16 expansions
8
Streetlights
• From 2010 – 2016- County-owned streetlights 4700 7150
- 6,150 new LED converted, including 400
new Cobra LED
Sidewalks
9
Protected Bike Lanes
10
Achieving Better Linkage
• Balancing revenue/program input with
organizational throughput
• Strategy to address capital backlog:− Expand contracts and hire right mix of skilled FTEs
− Provide sufficient oversight
− Monitor/adjust output by program
• Restructure/Increase Engineering Bureau
Staffing − Improve Throughput using Dedicated Program Teams
11
Decision Support Office
12
An Integrated and Programmatic Approach for Making
“Better and Informed Decisions”
Business Intelligence for Basic Services
Program Management
Office
GIS
Technology
&
Innovation
Business Intelligence: Proof-of-Concept
13
How many work orders created and completed YTD…
Business Intelligence: Rosslyn Streetlights
14
Location of County-owned lights and estimated completion dates…
Achieving Better Linkage
• Providing efficient operating space as
services and capabilities grow
– Incremental growth in infrastructure and
service commitments does not incrementally
grow the operating space
– Siting process for service space is
challenging
15
School Buses
16
Transit Stations / Bus Shelters
17
FY 2018 and Beyond
• Provide basic services to meet expectations– Street Lights—after we master plan
– Commercial sidewalk maintenance
– Maintaining and operating the fiber network
– Ensuring long-term sustainability of asset base
• Achieve better linkage between operating and capital
− Balancing revenue/program input with organizational throughput
− Assess and update our strategy to address capital backlog
− Providing efficient operating space as services and capabilities grow
• Plus
− Transit Development Plan Implementation
− Increased Operating Costs As A Result of the MS4 Permit
− Even more transportation funds
18
Department of Environmental Services
Stormwater Fund
Proposed FY 2017 Budget Highlights
March 14, 2016
20
Stormwater Fund Budget at a Glance
• Proposed budget totals $9.8M
– A 6% increase from FY 2016 due to:
• Revenue growth from increasing
assessments
• New contract for maintenance of
stormwater facilities and other
contractual increases
• Funding to plant new trees, formerly
included in the Department of Parks &
Recreation budget
• Capital budget decreases due to an
increase in the budget for personnel and
non-personnel expenses
Proposed Budget Changes
• 1 inspector for construction site compliance inspections
• 1 management specialist to add bandwidth in two key areas of
workload growth:
• Management of comprehensive new maintenance contract for County-owned
stormwater management facilities
• Inspection and maintenance of rapidly growing portfolio of privately-owned
facilities
• 1 position in Department of Parks & Recreation to manage
compliance with MS4 permit and stormwater ordinance 21
• Total FTEs: 42.0– 5.0 FTE increase from FY 2016
includes:
• 1 engineer + 1 engineering supervisor to
create a dedicated engineering team to
support stormwater projects
Stormwater Achievements & Challenges
• MS4 permit requirements– Arlington successfully met 5% nutrient and
sediment reduction requirements for current
permit cycle, 3 years ahead of schedule.
– An additional 35% reduction in nutrient and
sediment loads will be required during next
permit cycle (2018 – 2023).
• Stormwater Management Ordinance– Critical new tool to meet MS4 permit
pollution reduction requirements and reduce
impacts to local streams and adjacent
properties.
– Technically complex and stringent
performance requirements—staff are
actively working to improve guidance for
increased clarity and customer service.22
Department of Environmental Services
Utilities Fund
Proposed FY 2017 Budget Highlights
March 14, 2016
24
Utilities Fund Budget at a Glance
The total Water-Sewer rate is proposed
to remain at current level of
$13.27 per Thousand Gallons (TG)
25
Utilities Fund Budget at a Glance
• Proposed expenditure budget totals
$89.5M– Increases for normal salary increases,
operating costs for new software systems,
and share of General Fund services
– Offset by reductions in debt service, transfer
to capital, and use of excess fund balance
• Balanced Budget does not require a
rate increase for FY 2017
Arlington County W-S Rate History
Fiscal
Year
Water
Rate/TG
Sewer
Rate/TG
Combined
rate/TG
$
Change
from Prior
Year/TG
%
Change
from Prior
Year
$
Est. Annual
Cost to
Homeowner
FY2010 $3.42 $7.78 $11.20 $0.66 6.3% $784
FY2011 $3.50 $8.24 $11.74 $0.54 4.8% $822
FY2012 $3.68 $8.51 $12.19 $0.45 3.8% $853
FY2013 $3.98 $8.63 $12.61 $0.42 3.4% $883
FY2014 $3.98 $8.63 $12.61 - - $883
FY2015 $4.10 $8.94 $13.04 $0.43 3.4% $913
FY2016 $4.21 $9.06 $13.27 $0.23 1.8% $929
FY2017 $4.21 $9.06 $13.27 - - $929
26
Annual Household Cost Comparison
• Calculated for the average household using 70,000 gallons annually.
• *Alexandria Renew Enterprises has not yet proposed their sewer rate for FY17 27
Jurisdiction
Current
Annual Cost
(FY16)
Proposed
Annual Cost
(FY17)
% Change
District of Columbia $1,199 $1,256 4.7%
Falls Church 1,009 1,029 2.0%
City of Alexandria * 987 1,004 1.7%
Arlington County 929 929 -
Prince Georges &
Montgomery Counties (MD)
863 908 5.2%
Prince William County 860 874 1.6%
Fairfax County 764 794 4.0%
Fairfax City 680 736 8.2%
Loudoun County 708 730 3.1%
28
Major Initiatives
• Technology enhancements– Utility Billing System
– SCADA upgrades at WSS
• Currently updating Master Plans:– WPCP Master Plan (Solids Treatment only)
– Sanitary Sewer Master Plan (last update: 2002)
• Executing Water Master Plan projects (Plan
adopted by County Board: September 2014)
29
Major Initiatives (cont’d)
• Secondary Clarifiers at
WPCP
• Solids projects at WPCP (WPCP Master Plan, Phase I
projects)
30
FY 2018 and Beyond
• Potential upgrades at Washington Aqueduct –
Advanced Treatment
• Solids treatment projects resulting from WPCP
Master Plan update
31
Department of Environmental Services
Auto Fund
Proposed FY 2017 Budget Highlights
March 14, 2016
33
Auto Fund Budget at a Glance
• Proposed budget totals $17.2M– A 6% increase from FY 2016 due to:
• Increased replacement expenses based on number and
configuration of vehicles set for replacement
• Total FTEs: 63.00– No increase from FY 2016
Auto Fund Budget
• Since FY 2011, the school bus fleet has grown
by 37 buses to 165, an increase of 29%
• The cost for maintenance of vehicles is included
in the proposed APS “Rental Book” submitted to
APS
34
Department of Environmental Services
Printing Fund
Proposed FY 2017 Budget Highlights
March 14, 2016
36
Printing Fund Budget at a Glance
• Proposed budget totals $2.1M– An 11% increase from FY 2016 due to:
• Personnel increases – regular step increases and
reclassifications
• Contractual obligations
• Total FTEs: 8.00– No increase from FY 2016
Ballston Public Parking Garage Funds
Proposed FY 2017 Budget Highlights
March 14, 2016
Ballston Public Parking Garage Funds
• Levels 1-7
− Proposed budget totals $10.5 M
• A 59% increase from FY 2016 due to planned garage
improvements as part of the Ballston Quarter partnership
• Revenue decreases 15% due to less hourly parking revenue
during planned mall redevelopment
• Concrete remediation design moving ahead
• Level 8
− Proposed budget totals $112 K
• A 44% increase from FY 2016 for adjustments in the cost of
contracted services
• Revenue decreases 14% due to planned renovation of the
mall 38
95% of regulatory signs
repaired within 24 hours
DES Builds and Maintains a Sustainable Community
39
6 new traffic signal installed
2,347 tons of street sweeping
debris and sediment collected
The DES Call Center
handled 50,890 calls
in 2015
92 lane miles
paved in 2015
11,336 potholes filled
424, water quality facilities constructed to
meet stormwater ordinance requirements
bring total to over 1,300
220 new water service
installations completed 294 water system leak
repairs resolved
3,096 water meters installed
16 new and replacement
shelters installed (with
benches) and 23 stops
improved for ADA access
2,938 catch
basins cleaned
25 homes certified by
Green Home Choice,
bringing total to 200
2,821,980 ART Trips
99% removal of phosphorous
from wastewater cleaned at
Water Pollution Control Plant
and released to Four Mile Run
5,367 tons of brush and tree
material collected making
approximately 11,050 cubic
yards of wood mulch
Pavement Condition Index 66
86% reduction in
lost workdays
85% of streetlights
converted to LED
Achieved an annual
recycling rate of 53.5%
Received the SWANA
Gold Award for Special
Waste (Earth Products
Recycling Yard)