frequency responsive reserve process update w. shannon black chair, wecc frr drafting team

6
Frequency Responsive Reserve Process Update W. Shannon Black Chair, WECC FRR Drafting Team

Upload: hailey-reed

Post on 27-Mar-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Frequency Responsive Reserve Process Update W. Shannon Black Chair, WECC FRR Drafting Team

Frequency Responsive Reserve Process Update

W. Shannon Black

Chair, WECC FRR Drafting Team

Page 2: Frequency Responsive Reserve Process Update W. Shannon Black Chair, WECC FRR Drafting Team

Convened to Draft a “Standard”

• Examined the data available– Determined

• Current response is adequate• Data synchronization concerns

–Varying scan rates»Resulted in forced normalization of

data »Resulted in some interpolation

Page 3: Frequency Responsive Reserve Process Update W. Shannon Black Chair, WECC FRR Drafting Team

Decided on “Criterion”

• “Process for Developing and Approving WECC Standards” (Step 3, Page 4)

– “If the [SDT] determines, by majority vote, that a new or revised Standard is not needed, it will prepare an explanation in consultation with the Standards Request Routing Committee and post it on the WECC website…”

Page 4: Frequency Responsive Reserve Process Update W. Shannon Black Chair, WECC FRR Drafting Team

Moving Forward

• Current Option– Post the criterion

• November 08– Answer Comments / Repost as needed

• Three iterations contemplated• December 08 through April 09

– Post final Criterion • May 09

– OC Votes• June 09

– Board Votes• July 09

– Implementation Period

Page 5: Frequency Responsive Reserve Process Update W. Shannon Black Chair, WECC FRR Drafting Team

Parallel Path / 7 Month Delta• Current Option

– Post the criterion• November 2008

– Answer Comments / Repost as needed

• Three iterations contemplated• December 2008 through April

2009 – Post final Criterion

• May 2009– OC Votes

• June 2009– Board Votes

• July 2009

– “Would have been”• NERC / FERC approval • August 2009 - August 2010

– Implementation Period

• Parallel Option– Draft a new SAR

• March 2009• SAR addresses retirement of

BAL-02 • SAR includes final criterion

– WECC Staff drafts compliance• May 2009

– Table top test of the criterion• June 2009

– Finalize SAR and convene a team

• October 2009– WECC posting / approval

• November 2009 - October 2010

– “Proposed Parallel Outcome”• NERC / FERC approval • March 2010 - March 2011

– Implementation Period