fqi-mpr-2014-08
DESCRIPTION
monthly progress report for the month of July 2014 for an interchange project in OmanTRANSCRIPT
-
SULTANATE OF OMAN
MINISTRY OF TRANSPORT AND COMMUNICATIONS DIRECTORATE GENERAL OF ROADS & LAND TRANSPORT
MUSCAT
UPGRADING OF FALAJ AL QABAIL ROUNDABOUT TENDER NO. 51/2012
MONTHLY PROGRESS REPORT NO. 8
AUGUST 2014
CONSULTANT:
RENARDET S.A. & PARTNERS CONSULTING ENGINEERS LLC. P.O. Box 579, Muscat, P.C. 100, Sultanate of Oman
CONTRACTOR:
CONSOLIDATED CONTRACTORS CO. LLC P.O. Box 614, Muscat, P.C. 100, Sultanate of Oman
-
Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014
RENARDET S.A. & PARTNERS Page 1
Table of Contents
S. No. Description Page No.
1. Project Particulars 2
2. Scope of Work 3
3. Typical Cross Sections 4
4. Site visits/ Meetings 6
5 Engineers Site Staff 7
6. Progress Review 8
7. Financial Status 22
8. Contractors Resources 23
9. QA/ QC Reports 27
10. Engineers Comments 31
11. Project Correspondence 32
12. Progress Photographs 36
-
Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014
RENARDET S.A. & PARTNERS Page 2
Project Particulars
Client: Ministry of Transport &
Communications
P.O. Box 684, Muscat, Postal Code 113
Directorate General of Roads
Sultanate of Oman.
Consultant: Renardet S.A & Partners L.L.C. P.O. Box 579, Muscat, Postal Code 100
Sultanate of Oman.
Contractor: Consolidated Contractors Company
L.L.C.
P.O. Box 614, Muscat, Postal Code 100
Sultanate of Oman.
Project Commencement Date: 30.10.2013
Mobilization Period: 60 Days
Construction Period: 548 Days
Completion date: 29.06.2015
Original Contract Value:
(Including Contingencies) R.O. 17,884,403.000
Amount of Contingencies: R.O. 1,402,155.613
Original Contract Value:
(Excluding Contingencies) R.O. 16,482,247.387
Planned physical progress
cumulative up to end of August 2014
30.78%
Achieved physical progress
cumulative up to end of August 2014 29.80%
-
Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014
RENARDET S.A. & PARTNERS Page 3
Scope of Work
This project is located in Batinah Region on existing Batinah Highway in the Wilayat Sohar and
consists of construction of an interchange in place of existing roundabout along with allied works.
Total length of the project along Batinah highway is about 4.0 km which shall be converted from four
lanes to six lanes with tapering back to 4lanes, all as shown on plans. Also included in the scope of
work is the construction of service roads, pedestrian underpasses.
The work also includes expropriation of properties, relocation/protection of services (sewerage,
telephone, electricity, water, irrigation) road lighting works and traffic signals.
Major items within the scope of work consist of but not limited to the following:
Removal of existing asphalt surface, extension of existing embankment and earthwork to achieve
the designed profile and gradient.
Removal of existing drainage structures and construction of new ones including protection works
as shown on construction drawings and as directed.
Expropriation of open/built up properties and removal of existing structures thereupon.
Construction of interchange ramps, Box Girder Bridge, roundabout, pedestrian underpasses and
service roads.
Provision of new street lighting system/traffic signals and removal/disposal of existing street light
poles including conductors/cables, transformers, feeder pillars, foundations etc., all for the
proper completion of the job.
Construction of earthen embankment/sub grade, sub-base, aggregate base course, bituminous base
course and bituminous wearing course as per details on the construction drawings.
Installation of road side furniture (traffic signs, road marking etc.) and protection works on
embankment slopes.
Relocation/Protection of existing LT, 11KV and 33KV transmission lines and allied items
(transformers etc.) as per the requirements of concerned authority.
Relocation/Protection of existing utilities (sewerage, telephone, electricity, water lines and
irrigation) as per the requirements of concerned authorities.
Provision of ducts for future utilities as per the requirements of utility operator.
Construction of concrete safety barriers, fixing of guard rails and paving tiles.
Provision of traffic diversion in coordination with concerned authorities.
-
Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014
RENARDET S.A. & PARTNERS Page 4
-
Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014
RENARDET S.A. & PARTNERS Page 5
-
Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014
RENARDET S.A. & PARTNERS Page 6
Site visits/ Meetings
S. No. Details of Site Visit Date Final Outcome/ Decisions
1 Meeting with QS and Projects
Manager of DGR and CCC at QS
department office in Muscat.
19.08.2014 Issues regarding IPC No. 6,
additional works and Variation
Order No. 1 are discussed.
2 Monthly Review meeting at DGR
Office in Muscat along CCC and
Renardet.
27.08.2014 Various issues regarding the
project execution are discussed.
-
Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014
RENARDET S.A. & PARTNERS Page 7
Engineers Site Staff
S.
No. Name Designation
Date of
Joining
1. Roberto Benigni Head Supervision Projects
2. Muneer Abdul Resident Engineer 19.03.2014
3. Hussein Shah Material Engineer 04.01.2014
4. Ernesto B. Paredes Bridge Engineer 16.04.2014
5. Sande H Tangaras Civil Engineer 08.06.2014
6. Danilo Quantity Surveyor 19.06.2014
6. Mohamed Safie Land Surveyor 04.01.2014
7. Aseef Iqbal Site Inspector 10.02.2014
8. Alaa Aldin Abdelfatah Site Inspector 30.03.2014
9. Walid Samy Abdoh Mostafa Material Inspector 01.04.2014
10. Haneefa Mohmmed Al Zadjali Secretary 13.04.2014
-
Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014
RENARDET S.A. & PARTNERS Page 8
2013
De
cJan
Fe
bM
ar
Ap
rM
ay
Ju
nJu
lA
ug
Se
pO
ct
No
vD
ec
Jan
Fe
bM
ar
Ap
rM
ay
Ju
nJu
lA
ug
Se
pO
ct
0.0
1
0.2
5
1.4
2
4.2
3
7.2
5
10.0
6
9.4
2
9.7
3
10.2
1
9.7
9
8.4
9
5.7
2
4.5
5
3.5
6
2.7
9
3.8
3
3.5
5
3.4
7
1.6
7
-
-
-
-
0.1
1
0.1
4
0.2
3
0.2
8
1.7
1
3.1
8
6.8
4
9.1
6
9.1
4
9.0
8
8.4
9
7.9
0
8.0
8
6.7
1
6.2
5
4.6
8
3.5
9
3.3
4
4.4
2
3.2
9
1.6
4
1.1
1
0.6
2
-
0.2
8
0.1
8
1.0
1
2.9
0
5.6
4
5.1
8
7.3
6
7.3
0
-
-
-
-
-
-
-
-
-
-
-
-
-
-
0.0
10.2
61.6
75.9
113.1
523.2
132.6
442.3
752.5
862.3
770.8
676.5
981.1
384.6
987.4
891.3
194.8
698.3
3100.0
0100.0
0100.0
0100.0
0100.0
0
0.1
10.2
50.4
80.7
62.4
75.6
412.4
821.6
430.7
839.8
748.3
556.2
664.3
471.0
577.3
181.9
985.5
988.9
393.3
596.6
498.2
799.3
8100.0
0
-
0.2
8
0.4
5
1.4
6
4.3
7
10.0
1
15.1
9
22.5
5
29.8
6
CU
MU
LA
TIV
E P
RO
GR
ES
S
CL
14 O
rg P
lan
Cu
mu
lati
ve
%
Actu
al C
um
ula
tive
2014
2015
MO
NT
HL
Y P
RO
GR
ES
S
CL
14 O
rg P
lan
pe
r M
on
th %
Actu
al p
er
Mo
nth
Re
vis
ed
Sch
. p
er
Mo
nth
%
Re
vis
ed
Sch
. C
um
mu
lati
ve
%
0.0
0
20
.00
40
.00
60
.00
80
.00
10
0.0
0
12
0.0
0
- 2 4 6 8
10
12
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
20
13
20
14
20
15
% Cumulative
% MONTHLY
MO
NT
HS
UP
GR
AD
ING
OF
FA
LA
J A
L Q
AB
AIL
RO
UN
DA
BO
UT
PR
OJ
EC
T -
OM
AN
MO
NT
HLY
CL
14
PL
AN
NE
D V
S. A
CT
UA
L M
AN
HO
UR
S
CL
14
Org
Pla
n p
er
Mo
nth
%R
evis
ed
Sch
. p
er
Mo
nth
%A
ctu
al p
er
Mo
nth
CL
14
Org
Pla
n C
um
ula
tive %
Revis
ed
Sch
. C
um
mu
lati
ve %
Actu
al C
um
ula
tiv
e
-
Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014
RENARDET S.A. & PARTNERS Page 9
2013
De
cJan
Fe
bM
ar
Ap
rM
ay
Ju
nJu
lA
ug
Se
pO
ct
No
vD
ec
Jan
Fe
bM
ar
Ap
rM
ay
Ju
nJu
lA
ug
Se
pO
ct
CL
14 P
lan
%0.3
08.6
719.2
326.8
931.7
736.6
441.5
146.3
951.2
656.1
361.0
165.8
870.7
675.6
380.5
085.3
890.2
595.1
3100.0
0100.0
0100.0
0100.0
0100.0
0
Re
vis
ed
Pla
n %
4.1
1
9.3
0
17.5
8
24.1
8
30.9
0
35.1
6
38.9
7
42.7
8
46.6
0
50.4
1
54.2
3
58.0
4
61.8
6
65.6
7
69.4
8
73.3
0
77.1
1
80.9
3
84.7
4
88.5
6
92.3
7
96.1
8
100.0
0
Actu
al
-
6.6
2
13.0
3
22.3
6
37.3
1
43.0
0
44.1
1
51.2
1
56.2
4
CL
14 P
lan
%0.0
00.0
00.3
820.3
747.7
048.3
348.3
348.3
348.3
348.3
348.3
348.3
348.3
359.9
177.8
490.2
794.9
3100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0
Re
vis
ed
Pla
n %
-
-
-
-
-
7.4
0
29.8
5
78.1
3
78.1
3
78.1
3
78.1
3
78.1
3
78.1
3
78.1
3
78.1
3
78.1
3
78.1
3
80.6
6
87.5
9
88.5
7
100.0
0
100.0
0
100.0
0
Actu
al
-
10.0
9
10.0
9
17.5
9
19.5
2
77.4
2
69.9
6
70.1
8
70.1
8
CL
14 P
lan
%0.0
00.0
00.0
00.7
86.5
816.7
629.3
841.3
758.6
466.6
074.1
882.8
584.7
584.7
585.2
492.3
492.3
498.3
6100.0
0100.0
0100.0
0100.0
0100.0
0
Re
vis
ed
Pla
n %
-
-
-
-
-
-
-
3.3
2
12.8
9
28.8
3
43.8
9
60.0
3
74.8
2
90.0
3
95.2
4
95.9
5
95.9
5
96.0
9
98.3
0
99.4
6
99.5
4
100.0
0
100.0
0
Actu
al
-
-
-
-
4.3
5
4.8
9
-
5.2
7
14.9
3
CL
14 P
lan
%0.0
00.0
01.0
19.2
129.3
045.9
156.9
062.2
464.5
967.9
469.0
869.0
875.0
582.8
593.4
898.6
4100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0
Re
vis
ed
Pla
n %
-
-
-
-
-
4.2
6
8.1
7
16.0
3
32.6
8
53.1
3
67.0
5
67.4
7
67.4
7
67.9
0
68.3
2
68.3
2
68.3
2
81.1
1
93.0
2
97.1
1
100.0
0
100.0
0
100.0
0
Actu
al
-
-
-
5.0
0
5.0
0
53.2
3
62.1
6
74.9
1
78.2
9
CL
14 P
lan
%0.0
00.0
00.0
00.0
00.0
00.0
00.0
00.0
011.0
726.2
741.9
859.9
878.7
379.9
079.9
085.2
089.4
592.6
0100.0
0100.0
0100.0
0100.0
0100.0
0
Re
vis
ed
Pla
n %
-
-
-
-
-
-
-
-
-
-
-
3.5
8
17.4
2
31.3
7
51.3
2
75.8
2
75.8
2
75.8
2
75.8
2
87.2
5
87.2
5
98.6
0
100.0
0
Actu
al
CL
14 P
lan
%0.0
00.0
00.0
00.0
00.0
00.0
00.0
00.0
00.0
00.0
87.7
719.3
231.2
244.9
451.9
852.1
490.1
490.1
4100.0
0100.0
0100.0
0100.0
0100.0
0
Re
vis
ed
Pla
n %
-
-
-
-
-
-
-
-
-
-
-
-
-
0.0
8
8.4
4
22.4
2
46.5
7
51.9
7
51.9
7
86.6
6
90.0
5
93.0
3
100.0
0
Actu
al
CL
14 P
lan
%0.0
00.0
00.2
31.4
32.9
710.1
723.6
536.5
151.4
763.0
674.2
675.9
777.3
780.0
582.4
088.9
792.1
398.5
5100.0
0100.0
0100.0
0100.0
0100.0
0
Re
vis
ed
Pla
n %
-
-
-
0.2
6
2.6
4
7.3
3
20.6
2
35.1
4
50.0
6
62.7
6
68.4
0
72.7
8
74.0
7
74.6
7
83.4
2
84.0
4
84.3
0
87.3
2
95.5
8
98.1
1
99.4
4
100.0
0
100.0
0
Actu
al
-
-
-
0.4
8
1.2
6
5.5
9
14.9
3
27.7
2
40.0
8
CL
14 P
lan
%0.0
00.0
04.0
215.2
134.6
257.8
969.2
681.4
083.3
883.4
684.5
092.8
999.9
6100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0
Re
vis
ed
Pla
n %
-
-
-
-
2.7
7
7.7
5
13.7
6
22.0
9
29.6
4
39.0
2
49.6
4
59.5
1
71.3
3
85.1
4
87.0
0
93.5
0
100.0
0
100.0
0
100.0
0
100.0
0
100.0
0
100.0
0
100.0
0
Actu
al
-
-
-
0.0
1
6.0
5
14.7
3
18.1
4
22.3
3
26.3
0
CL
14 P
lan
%0.0
00.0
00.0
00.0
00.0
00.3
81.2
12.6
33.4
24.2
35.5
06.0
86.0
834.3
599.3
899.7
699.7
6100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0
Re
vis
ed
Pla
n %
-
-
-
-
-
-
-
-
-
-
61.4
5
74.6
9
90.1
9
94.7
0
94.7
0
94.7
0
94.7
0
94.7
0
98.4
1
100.0
0
100.0
0
100.0
0
100.0
0
Actu
al
-
-
-
2.5
0
16.7
2
14.3
9
13.2
4
16.1
9
16.7
2
CL
14 P
lan
%0.0
00.0
00.0
00.0
00.0
00.0
00.0
02.8
017.8
743.8
561.5
972.9
881.1
583.9
484.4
285.3
592.8
696.3
9100.0
0100.0
0100.0
0100.0
0100.0
0
Re
vis
ed
Pla
n %
-
-
-
-
-
-
-
-
-
-
7.0
2
20.3
3
38.2
9
50.6
0
59.5
2
72.8
9
81.0
7
83.5
5
86.8
9
90.2
6
95.3
4
98.2
7
100.0
0
Actu
al
-
-
-
-
-
2.6
1
4.9
8
6.4
2
8.3
1
CL
14 P
lan
%0.0
00.0
00.0
04.4
317.2
333.3
649.1
365.0
780.7
993.8
2100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0
Re
vis
ed
Pla
n %
-
-
-
-
-
0.9
9
2.3
0
17.2
6
33.6
4
49.0
1
64.7
0
79.8
8
95.4
4
100.0
0
100.0
0
100.0
0
100.0
0
100.0
0
100.0
0
100.0
0
100.0
0
100.0
0
100.0
0
Actu
al
-
-
-
6.1
6
9.8
7
17.6
3
25.6
9
35.9
0
49.0
3
CL
14 P
lan
%0.0
00.0
00.0
00.0
00.0
00.1
70.7
91.4
35.6
513.4
121.8
430.5
632.9
470.9
475.0
494.0
296.4
3100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0
Re
vis
ed
Pla
n %
-
-
-
-
-
-
-
0.3
3
2.3
4
9.4
2
17.0
7
23.5
1
31.4
0
41.6
6
47.4
9
47.5
5
47.5
5
83.2
8
93.9
5
97.6
1
100.0
0
100.0
0
100.0
0
Actu
al
-
-
-
0.1
3
5.5
2
9.2
6
13.3
8
16.8
7
17.7
5
Re
vis
ed
Pla
n0.1
1
0.2
5
0.4
8
0.7
6
2.4
7
5.6
4
12.4
8
21.6
4
30.7
8
39.8
7
48.3
5
56.2
6
64.3
4
71.0
5
77.3
1
81.9
9
85.5
9
88.9
3
93.3
5
96.6
4
98.2
7
99.3
8
100.0
0
Actu
al C
um
-
0.2
8
0.4
5
1.4
6
4.3
7
10.0
1
15.1
9
22.5
5
29.8
6
-
-
-
-
-
-
-
-
-
-
-
-
-
-
2013
De
cJan
Fe
bM
ar
Ap
rM
ay
Ju
nJu
lA
ug
Se
pO
ct
No
vD
ec
Jan
Fe
bM
ar
Ap
rM
ay
Ju
nJu
lA
ug
Se
pO
ct
0.0
1
0.2
5
1.4
2
4.2
3
7.2
5
10.0
6
9.4
2
9.7
3
10.2
1
9.7
9
8.4
9
5.7
2
4.5
5
3.5
6
2.7
9
3.8
3
3.5
5
3.4
7
1.6
7
-
-
-
-
0.1
1
0.1
4
0.2
3
0.2
8
1.7
1
3.1
8
6.8
4
9.1
6
9.1
4
9.0
8
8.4
9
7.9
0
8.0
8
6.7
1
6.2
5
4.6
8
3.5
9
3.3
4
4.4
2
3.2
9
1.6
4
1.1
1
0.6
2
-
0.2
8
0.1
8
1.0
1
2.9
0
5.6
4
5.1
8
7.3
6
7.3
0
0.0
1
0.2
6
1.6
7
5.9
1
13.1
5
23.2
1
32.6
4
42.3
7
52.5
8
62.3
7
70.8
6
76.5
9
81.1
3
84.6
9
87.4
8
91.3
1
94.8
6
98.3
3
100.0
0
100.0
0
100.0
0
100.0
0
100.0
0
0.1
1
0.2
5
0.4
8
0.7
6
2.4
7
5.6
4
12.4
8
21.6
4
30.7
8
39.8
7
48.3
5
56.2
6
64.3
4
71.0
5
77.3
1
81.9
9
85.5
9
88.9
3
93.3
5
96.6
4
98.2
7
99.3
8
100.0
0
-
0.2
8
0.4
5
1.4
6
4.3
7
10.0
1
15.1
9
22.5
5
29.8
6
2014
2015
MO
NT
HL
Y P
RO
GR
ES
S
CL
14 O
rg P
lan
pe
r M
on
th %
Actu
al p
er
Mo
nth
CU
MU
LA
TIV
E P
RO
GR
ES
S
CL
14 O
rg P
lan
Cu
mu
lati
ve
%
Actu
al C
um
ula
tive
MM
EP
Wo
rks
&
Du
cts
4.0
3
TO
TA
L100.0
00
Re
vis
ed
Sch
. p
er
Mo
nth
%
Re
vis
ed
Sch
. C
um
mu
lati
ve
%
83,2
64
2,0
63
,64
4
LM
SE
wa
lls
6.8
4
JD
rain
ag
e W
ork
s1.5
0
KIn
cid
en
tal
Co
ns
tru
cti
on
13.3
3
30,9
20
275,0
37
1
41,1
90
IC
on
cre
te f
or
Bri
dg
e22.1
2
H
Co
nc
rete
fo
r
Bo
x C
ulv
ert
/Un
de
rpa
s
38.1
9788,1
38
4
56,5
22
GB
itu
min
ou
s
Pa
ve
me
nt
3.5
7
FS
ub
ba
se
&
Ag
gre
ga
te B
as
e2.4
250,0
04
7
3,7
24
ES
tru
ctu
ral
Ex
ca
va
tio
n0.7
2
DE
mb
an
km
en
t3.5
974,0
43
1
4,8
21
C
Cle
ari
ng
&
Re
mo
va
l o
f
Ob
str
uc
tio
ns
0.9
5
2015
BR
oa
d D
ive
rsio
ns
2.7
3
Bu
dg
ete
d
Man
-Hrs
56,4
23
1
9,5
58
Ite
mD
es
cri
pti
on
Wtd
.
%
Pla
n/
Actu
al
2014
PR
OJ
EC
T S
-CU
RV
E B
AS
ED
ON
PH
YS
ICA
L P
RO
GR
ES
S (
MA
NH
OU
RS
)
-
Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014
RENARDET S.A. & PARTNERS Page 10
Progress of Permanent Works
Sl. No.
Description Unit BOQ Qty.
(Revised)
Actual Qty.
% Completion
1 Clearing & Grubbing M2 162,000 129,901 80.19%
2 Borrow Excavation (to embankment)
M3 340,000 30,500 8.97%
3 Granular Sub-base M3 28,700 0.00 0.00%
4 Concrete for Culverts M3 15,000 5,340 35.60%
5 Concrete for Bridge M3 13,805 2,271 16.45%
6 Steel reinforcement Fixing ton 4,900 1,457 29.73%
7 Working Piles M3 2,826 2,826 100.00%
8 Mortared Stone Riprap M3 5,210 0.00 0.00%
9 MSE Walls M2 13,200 1,165 8.82%
11 RCC Drainage Pipes LM 4,530 712 15.71%
-
Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014
RENARDET S.A. & PARTNERS Page 11
LOCATIONPILE
NO.
CAS
TING
SETTING
OUT
BORING,
REBARS, &
CONCRETE
INTEGRITY
TESTLOCATION
PILE
NO.
CAS
TING
SETTING
OUT
BORING,
REBARS, &
CONCRETE
INTEGRITY
TEST
1 76 14/5/2014 15/5/2014 21/5/2014 56 73 12/5/2014 13/5/2014 21/5/2014
2 81 15/5/2014 17/5/2014 21/5/2014 57 79 13/6/2014 14/6/2014 21/5/2014
3 77 14/5/2014 15/5/2014 21/5/2014 58 74 12/5/2014 13/5/2014 21/5/2014
4 82 15/5/2014 17/5/2014 21/5/2014 59 80 13/6/2014 14/6/2014 21/5/2014
5 78 14/5/2014 15/5/2014 21/5/2014 60 75 12/5/2014 13/5/2014 21/5/2014
6 23 16/4/2014 17/4/2014 11/5/2014 61 13 9/4/2014 13/4/2014 28/4/2014
7 40 24/4/2014 26/4/2014 11/5/2014 62 16 12/4/2014 15/4/2014 28/4/2014
8 34 22/4/2014 23/4/2014 11/5/2014 63 6 9/4/2014 10/4/2014 28/4/2014
9 41 24/4/2014 26/4/2014 11/5/2014 64 22 16/4/2014 17/4/2014 28/4/2014
10 35 22/4/2014 23/4/2014 11/5/2014 65 7 9/4/2014 10/4/2014 28/4/2014
11 43 26/4/2014 27/4/2014 11/5/2014 66 12 12/4/2014 13/4/2014 28/4/2014
12 36 22/4/2014 23/4/2014 11/5/2014 67 17 14/4/2014 15/4/2014 28/4/2014
13 42 24/4/2014 26/4/2014 11/5/2014 68 11 12/4/2014 13/4/2014 28/4/2014
14 24 16/4/2014 17/4/2014 11/5/2014 69 18 14/4/2014 15/4/2014 28/4/2014
15 49 28/4/2014 29/4/2014 14/6/2014 70 51 28/4/2014 29/4/2014 11/5/2014
16 44 26/4/2014 27/4/2014 14/6/2014 71 52 29/4/2014 30/4/2014 11/5/2014
17 37 23/4/2014 24/4/2014 14/6/2014 72 47 27/4/2014 28/4/2014 11/5/2014
18 38 23/4/2014 24/4/2014 14/6/2014 73 53 29/4/2014 30/4/2014 11/5/2014
19 46 27/4/2014 28/4/2014 14/6/2014 74 30 19/4/2014 21/4/2014 11/5/2014
20 50 27/4/2014 29/4/2014 14/6/2014 75 54 29/4/2014 30/4/2014 11/5/2014
21 45 26/4/2014 27/4/2014 14/6/2014 76 29 19/4/2014 21/4/2014 11/5/2014
22 39 23/4/2014 24/4/2014 14/6/2014 77 48 27/4/2014 28/4/2014 11/5/2014
23 31 21/4/2014 22/4/2014 14/6/2014 78 28 19/4/2014 21/4/2014 11/5/2014
24 32 21/4/2014 22/4/2014 28/4/2014 79 5 8/4/2014 9/4/2014 23/4/2014
25 25 17/4/2014 20/4/2014 28/4/2014 80 14 13/4/2014 14/4/2014 23/4/2014
26 19 15/4/2014 16/4/2014 28/4/2014 81 4 8/4/2014 9/4/2014 23/4/2014
27 26 17/4/2014 20/4/2014 28/4/2014 82 10 10/4/2014 12/4/2014 23/4/2014
28 15 13/4/2014 14/4/2014 28/4/2014 83 3 8/4/2014 9/4/2014 23/4/2014
29 27 17/4/2014 20/4/2014 28/4/2014 84 9 10/4/2014 12/4/2014 23/4/2014
30 20 15/4/2014 16/4/2014 28/4/2014 85 1 7/4/2014 8/4/2014 23/4/2014
31 33 20/4/2014 22/4/2014 28/4/2014 86 8 10/4/2014 12/4/2014 23/4/2014
32 21 15/4/2014 16/4/2014 28/4/2014 87 2 7/4/2014 8/4/2014 23/4/2014
33 93 30/7/2014 31/7/2014 19/8/2014 88 102 4/8/2014 7/8/2014 19/8/2014
34 105 7/8/2014 9/8/2014 19/8/2014 89 108 10/8/2014 11/8/2014 19/8/2014
35 99 2/8/2014 4/8/2014 19/8/2014 90 103 4/8/2014 7/8/2014 19/8/2014
36 100 2/8/2014 4/8/2014 19/8/2014 91 109 10/8/2014 11/8/2014 19/8/2014
37 94 30/7/2014 31/7/2014 19/8/2014 92 96 31/7/2014 3/8/2014 19/8/2014
38 106 7/8/2014 9/8/2014 19/8/2014 93 110 10/8/2014 11/8/2014 19/8/2014
39 95 30/7/2014 31/7/2014 19/8/2014 94 97 31/7/2014 3/8/2014 19/8/2014
40 107 7/8/2014 9/8/2014 19/8/2014 95 104 4/8/2014 7/8/2014 19/8/2014
41 100 2/8/2014 4/8/2014 19/8/2014 96 98 31/7/2014 3/8/2014 19/8/2014
42 67 10/5/2014 11/5/2014 3/6/2014 97 61 6/5/2014 7/5/2014 18/5/2014
43 70 10/5/2014 12/5/2014 3/6/2014 98 62 6/5/2014 7/5/2014 18/5/2014
44 68 10/5/2014 11/5/2014 3/6/2014 99 63 6/5/2014 7/5/2014 18/5/2014
45 71 10/5/2014 12/5/2014 3/6/2014 100 60 5/5/2014 6/5/2014 18/5/2014
46 69 10/5/2014 11/5/2014 3/6/2014 101 59 5/5/2014 6/5/2014 18/5/2014
47 72 10/5/2014 12/5/2014 3/6/2014 102 58 5/5/2014 6/5/2014 18/5/2014
48 64 7/5/2014 8/5/2014 3/6/2014 103 57 4/5/2014 5/5/2014 18/5/2014
49 65 7/5/2014 8/5/2014 3/6/2014 104 56 4/5/2014 5/5/2014 18/5/2014
50 66 7/5/2014 8/5/2014 3/6/2014 105 55 4/5/2014 5/5/2014 18/5/2014
51 83 19/5/2014 20/5/2014 3/6/2014 106 86 19/5/2014 20/5/2014 3/6/2014
52 90 21/5/2014 22/5/2014 3/6/2014 107 91 21/5/2014 22/5/2014 3/6/2014
53 84 19/5/2014 20/5/2014 3/6/2014 108 88 20/5/2014 21/5/2014 3/6/2014
54 87 20/5/2014 21/5/2014 3/6/2014 109 92 21/5/2014 22/5/2014 3/6/2014
55 85 19/5/2014 20/5/2014 3/6/2014 110 89 20/5/2014 21/5/2014 3/6/2014
= 55 = 55
= 110
PREVIOUSP R EVIOUS
M ON T HTHIS MONTH
TOTAL NO. OF PILES CAST
AB2 L
LHS
AB1 R
P1R
P2R
P3R
P4R
P5R
AB2 R
AB1 L
P1L
P2L
P3L
P4L
NO. OF PILES CAST (LHS)
PROGRESS STATUS OF PILE FOUNDATION WORKS
as of 31 AUGUST 2014
NO. OF PILES CAST (RHS)
P5L
RHS
-
Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014
RENARDET S.A. & PARTNERS Page 12
ACTIVITY AB1 L P1L P2L P3L P4L P5L AB2 L
PEDESTAL - - - - - - -
PIER N/A - - - - - N/A
2nd Lift - 12-Aug-14 19-Aug-14 24-Jul-14 - on-going -
Height (m) - 6.920 6.920 6.920 6.920 6.920 -
1st Lift - 23-Jul-14 7-Aug-14 29-Jun-14 - on-going -
Height (m) - 1.153 1.210 1.440 1.248 1.225 -
BIT. PAINTING - 28-May-14 26-Jun-14 17-May-14 - 23-Jun-14 -
PILE CAP - 17-May-14 18-Jun-14 8-May-14 24-Aug-14 11-Jun-14 -
F/P & BLINDING N/A 11-May-14 11-Jun-14 1-May-14 17-Aug-14 3-Jun-14 N/A
ACTIVITY AB1 R P1R P2R P3R P4R P5R AB2 R
PEDESTAL - - - - - - -
PIER N/A - - - - - N/A
2nd Lift N/A 9-Jun-14 28-Jun-14 22-Jun-14 - 10-Jul-14 N/A
Height (m) - 6.920 6.920 6.920 6.920 6.920 -
1st Lift N/A 20-May-14 11-Jun-14 26-May-14 - 22-Jun-14 N/A
Height (m) - 0.366 0.423 0.649 0.461 0.438 -
BIT. PAINTING - 12-May-14 25-May-14 8-May-14 - 31-May-14 -
PILE CAP (Pier & Abut.)- 4-May-14 13-May-14 4/30/2014 27-Aug-14 20-May-14 -
F/P & BLINDING N/A 27-Apr-14 7-May-14 22-Apr-14 20-Aug-14 14-May-14 N/A
PREVIOUSPREVIOUS
MONTHTHIS MONTH
BRIDGE SUB-STRUCTURE PROGRESS SCHEDULE
As of 31 AUGUST 2014
SUB-STRUCTURE WORK PROGRESS (RHS)
SUB-STRUCTURE WORK PROGRESS (LHS)
-
Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014
RENARDET S.A. & PARTNERS Page 13
DATE Elevation DATE
FROM TO
FOUNDATI
ON
/BLINDING
FROM TO
FOUNDATI
ON
/BLINDING
22+702 22+825 - 22+718 22+810 -
- -
22+825 22+840 13-Jul-14 22+810 22+893 9-Aug-14
14-Jul-14 10-Aug-14
22+840 22+880 6-Jul-14 22+893 22+976 13-Aug-14
13-Jul-14 14-Aug-14
22+880 22+908 10-Aug-14 22+976 23+040 18-Aug-14
11-Aug-14 19-Aug-14
22+908 22+969 3-Jul-14 23+040 23+088 26-Jul-14
5-Jul-14 27-Jul-14
22+969 23+000 4-Aug-14 23+088 23+130 21-Jul-14
5-Aug-14 22-Jul-14
23+000 23+025 20-Jul-14 23+130 23+191 7-Jul-14
21-Jul-14 10-Jul-14
23+025 23+070 17-Jul-14 23+191 23+270 26-Jun-14
18-Jul-14 27-Jun-14
23+070 23+140 30-Jun-14
1-Jul-14
23+140 23+164 16-Jun-14
17-Jun-14 DATE
23+164 23+237 23-Jun-14 FROM TO BLINDING
24-Jun-14 23+270 (L) 23+270 (R ) 26-Jun-14
23+237 23+270 17-Jun-14 27-Jun-14
18-Jun-14El. 22.00
El. 22.80
El. 22.00
MSE WALL MONTHLY SCHEDULE (FOUNDATION @ APPROACH 1)
as of 31 AUGUST 2014
El. 21.20
LOCATION (AB 1)
Elevation
Elevation
LOCATION (LHS)
El. 20.40
El. 21.20
El. 22.00
El. 22.80
El. 22.00
LOCATION (RHS)
El. 20.40
El. 22.00
DATE DATEFROM TO FOUND'N FROM TO BLINDING
23+508 23+520 - 23+508 (L) 23+508 (R ) -
- -
23+520 23+580 20-Aug-1421-Aug-14
23+580 23+660 26-Aug-1427-Aug-14 DATE
23+660 23+735 - FROM TO BLINDING
- 23+508 23+607 -23+735 23+827 - -
- 23+607 23+950 -23+827 23+949 - -
-
PREVIOUSP R EVIOUS
M ON T HTHIS MONTH
El. 24.90
Elevation
El. 23.30
ElevationLOCATION (RHS)
El. 23.30
El. 24.10
LOCATION (LHS) LOCATION (AB 2)Elevation
MSE WALL MONTHLY SCHEDULE (FOUNDATION @ APPROACH 2)
El. 23.30
El. 24.10
-
Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014
RENARDET S.A. & PARTNERS Page 14
22+825 22+840 22+880 22+908.387 22+969.478 22+991 23+084 23+164.573 23+237.536 23+270.762
34.800 - - - - - - - - - -34.000 - - - - - - - - - -33.200 - - - - - - - - - -32.400 - - - - - - - - - -31.600 - - - - - - - - - -30.800 - - - - - - - - - -30.000 - - - - - - - - - -29.200 - - - - - - - - - -28.400 - - - - - - - - - -27.600 - - - - - - - - - -26.800 - - - - - - - - - -26.000 - - - - - - - - 28-Aug-14 28-Aug-1425.200 - - - - - - - 26-Aug-14 19-Aug-14 19-Aug-1424.400 - - - - - - - 18-Aug-14 6-Aug-14 6-Aug-1423.600 - - - - - - 27-Aug-14 13-Aug-14 24-Jul-14 24-Jul-1422.800 - - - - - 24-Aug-14 9-Aug-14 28-Jul-14 - 13-Jul-1422.000 - - - - 28-Aug-14 - - - - -21.200 - 28-Aug-14 28-Aug-14 28-Aug-14 - - - - - -
20.400 - - - - - - - - - -
22+810 22+893.03222+976.294 23+035 23+088.04623+191.77423+270.80023+270.762 (L)23+270.800 (R )
34.000 - - - - - - - - -33.200 - - - - - - - - -32.400 - - - - - - - - -31.600 - - - - - - - - -30.800 - - - - - - - - -30.000 - - - - - - - - -29.200 - - - - - - - - -28.400 - - - - - - - - -27.600 - - - - - - - - -26.800 - - - - - - - - -26.000 - - - - - - 31-Aug-14 28-Aug-14 28-Aug-1425.200 - - - - - 24-Aug-14 18-Aug-14 18-Aug-14 18-Aug-1424.400 - - - - - 13-Aug-14 6-Aug-14 7-Aug-14 7-Aug-1423.600 - - - - - 9-Aug-14 24-Jul-14 24-Jul-14 24-Jul-1422.800 - - - 21-Aug-14 18-Aug-14 - 13-Jul-14 13-Jul-14 13-Jul-1422.000 - - 26-Aug-14 - - - - - -21.200 - - - - - - - - -
20.400 - - - - - - - - -
PREVIOUSP R EVIOUS
M ON T HTHIS MONTH
RHS (AB 1), from Sta. 22+718.936 to Sta. 23+270.800
LHS (AB 1), from Sta. 22+702.653 to Sta. 23+270.762
AB 1 Face
MSE WALL MONTHLY SCHEDULE (PANELS FIXING @ APPROACH 1)as of 31 AUGUST 2014
ELEV.
ELEV.
-
Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014
RENARDET S.A. & PARTNERS Page 15
Rebars Concrete Rebars Concrete Rebars Concrete
1 21+260 3 cells - 2.0 x 1.5 43.039 0 - - - - - - - -LHS Block 1 3 cells - 2.0 x 1.5 19.526 0 - - - - - - - -RHS Block 2 3 cells - 2.0 x 1.5 23.493 0 - - - - - - - -
2 21+485 1 cell - 2.0 x 1.5 49.750 0 - - - - - - - -Block 1a 1 cell - 2.0 x 1.5 3.000 0 - - - - - - - -Block 1b 1 cell - 2.0 x 1.5 17.290 0 7/1/14 8/31/14 8/31/14 8/31/14 8/31/14 8/31/14 8/31/14Block 2a 1 cell - 2.0 x 1.5 7.710 0 7/1/14 8/31/14 8/31/14 8/31/14 8/31/14 8/31/14 8/31/14 -Block 2b 1 cell - 2.0 x 1.5 21.730 0 - - - - - - - -
3 21+838 2 x 4 cells (8) - 2.0 x 1.5 57.210 0 - - - - - - - -Block 1a 1 x 4 cells - 2.0 x 1.5 5.000 0 7/21/14 - - - - - - -Block 1b 1 x 4 cells - 2.0 x 1.5 17.600 0 7/3/14 - - - - - - -Block 2 1 x 4 cells - 2.0 x 1.5 22.600 0 7/3/14 8/20/14 8/20/14 - - - - -Block 3 1 x 4 cells - 2.0 x 1.5 11.970 0 - - - - - - - -
Block 4a 1 x 4 cells - 2.0 x 1.5 5.000 0 7/21/14 - - - - - - -Block 4b 1 x 4 cells - 2.0 x 1.5 17.600 0 7/3/14Block 5 1 x 4 cells - 2.0 x 1.5 22.600 0 7/3/14 - - - - - - -Block 6 1 x 4 cells - 2.0 x 1.5 11.970 0 - - - - - - - -
4 21+972.411 x 4 cells (44) - 3.0 x 2.0 57.629 0 - - - - - - - -Block 1 1 x 4 cells - 3.0 x 2.0 28.038 0 5/24/14 6/5/14 6/5/14 6/24/14 6/24/14 7/15/14 7/16/14 8/16/14Block 2 1 x 4 cells - 3.0 x 2.0 28.031 0 5/24/14 7/9/14 7/10/14 8/3/14 8/4/14 8/13/14 8/13/14 -Block 3 1 x 4 cells - 3.0 x 2.0 28.026 0 5/17/14 5/25/14 5/25/14 6/3/14 6/3/14 6/23/14 6/23/14 -Block 4 1 x 4 cells - 3.0 x 2.0 28.022 0 5/18/14 7/12/14 7/13/14 8/5/14 8/6/14 8/18/14 8/19/14 -Block 5 1 x 4 cells - 3.0 x 2.0 28.019 0 5/18/14 5/29/14 5/29/14 6/8/14 6/8/14 7/2/14 7/2/14 -Block 6 1 x 4 cells - 3.0 x 2.0 28.018 0 5/18/14 7/31/14 7/31/14 8/12/14 8/12/14 8/27/14 8/28/14 -Block 7 1 x 4 cells - 3.0 x 2.0 28.019 0 5/18/14 6/10/14 6/10/14 7/1/14 7/1/14 7/23/14 7/24/14 -Block 8 1 x 4 cells - 3.0 x 2.0 28.022 0 5/26/14 8/9/14 8/10/14 8/25/14 8/26/14 - - -Block 9 1 x 4 cells - 3.0 x 2.0 28.026 0 5/26/14 6/15/14 6/15/14 7/7/14 7/8/14 8/4/14 8/5/14 -
Block 10 1 x 4 cells - 3.0 x 2.0 28.031 0 5/28/14 8/17/14 8/18/14 - - - - -Block 11 1 x 4 cells - 3.0 x 2.0 28.038 0 5/28/14 6/19/14 6/19/14 7/20/14 7/20/14 - - -Block 12 1 x 4 cells - 3.0 x 2.0 21.015 0 8/10/14 8/25/14 8/26/14 - - - - -Block 13 1 x 4 cells - 3.0 x 2.0 21.010 0 7/27/14 - - - - - - -Block 14 1 x 4 cells - 3.0 x 2.0 21.006 0 7/27/14 - - - - - - -Block 15 1 x 4 cells - 3.0 x 2.0 21.003 0 7/24/14 8/23/14 8/23/14 - - - - -Block 16 1 x 4 cells - 3.0 x 2.0 21.001 0 6/16/14 7/27/14 7/27/14 8/14/14 8/14/14 - - -Block 17 1 x 4 cells - 3.0 x 2.0 21.000 0 6/16/14 - - - - - - -Block 18 1 x 4 cells - 3.0 x 2.0 21.001 0 6/12/14 - - - - - - -Block 19 1 x 4 cells - 3.0 x 2.0 21.003 0 6/12/14 - - - - - - -Block 20 1 x 4 cells - 3.0 x 2.0 21.006 0 6/8/14 - - - - - - -Block 21 1 x 4 cells - 3.0 x 2.0 21.010 0 6/8/14 - - - - - - -Block 22 1 x 4 cells - 3.0 x 2.0 21.015 0 6/8/14 6/25/14 6/25/14 7/30/14 7/30/14 - - -
4 21+972.4 11 x 4 cells - 3.0 x 2.0 57.629 0 - - - - - - - -Block 23 1 x 4 cells - 3.0 x 2.0 6.635 0 - - - - - - - -Block 24 1 x 4 cells - 3.0 x 2.0 6.782 0 - - - - - - - -Block 25 1 x 4 cells - 3.0 x 2.0 6.819 0 - - - - - - - -Block 26 1 x 4 cells - 3.0 x 2.0 7.217 0 - - - - - - - -Block 27 1 x 4 cells - 3.0 x 2.0 7.975 0 - - - - - - - -Block 28 1 x 4 cells - 3.0 x 2.0 8.571 0 - - - - - - - -Block 29 1 x 4 cells - 3.0 x 2.0 9.267 0 - - - - - - - -Block 30 1 x 4 cells - 3.0 x 2.0 9.949 0 - - - - - - - -Block 31 1 x 4 cells - 3.0 x 2.0 10.260 0 - - - - - - - -Block 32 1 x 4 cells - 3.0 x 2.0 10.262 0 - - - - - - - -Block 33 1 x 4 cells - 3.0 x 2.0 10.265 0 - - - - - - - -
5 22+655 2 x 4 cells (8) - 2.0 x 2.0 95.482 45 R - - - - - - - -(9 cells) 1 cell - 2.0 x 2.0 - - - - - - - -Block 1 1 x 4 cells - 2.0 x 2.0 9.675 45 R - - - - - - - -Block 2 1 x 4 cells - 2.0 x 2.0 32.711 45 R 06/30/14 08/06/14 08/07/14 - - - - -Block 3 1 x 4 cells - 2.0 x 2.0 32.711 45 R 06/24/14 07/21/14 07/21/14 08/17/14 08/18/14 08/17/14 08/18/14 -Block 4 1 x 4 cells - 2.0 x 2.0 20.315 45 R - - - - - - - -Block 5 1 x 4 cells - 2.0 x 2.0 19.035 45 R - - - - - - - -Block 6 1 x 4 cells - 2.0 x 2.0 32.711 45 R 06/29/14 07/27/14 07/28/14 - - - - -Block 7 1 x 4 cells - 2.0 x 2.0 32.711 45 R 06/24/14 08/28/14 08/28/14 - - - - -Block 8 1 x 4 cells - 2.0 x 2.0 10.95 45 R - - - - - - - -Block 9 1 cell - 2.0 x 2.0 25.03 45 R - - - - - - - -
Block 10 1 cell - 2.0 x 2.0 32.711 45 R 06/28/14 08/20/14 08/23/14 - - - - -Block 11 1 cell - 2.0 x 2.0 32.711 45 R 06/29/14 08/03/14 08/04/14 - - - - -Block 12 1 cell - 2.0 x 2.0 4.960 45 R - - - - - - - -
RHS
LHS
RHS
RHS
RHS
LHS
RHS
LHS
LHS
RHS
TYPE & DIMENSIONSTATION
RCBC PROGRESS SCHEDULE (BARREL)
As of 31 AUGUST 2014
BASE SLAB WALLNO.
TOP SLABBitumin
ous
Paint (2
Coats)
LENGTH
(m)
SKEW
( )
F/P &
BLINDIN
G
LHS
LHS
RHS
LHS
RHS
-
Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014
RENARDET S.A. & PARTNERS Page 16
Rebars Concrete Rebars Concrete Rebars Concrete
6 23+492 1 x 4 cells (4) - 3.0 x 2.0 79.065 15 R - - - - - - - -(5 cells) 1 cell - 3.0 x 2.0 - - - - - - - -Block 1 1 x 4 cells - 3.0 x 2.0 6.457 15 R - - - - - - - -Block 2 1 x 4 cells - 3.0 x 2.0 31.546 15 R 06/24/14 07/09/14 07/09/14 07/30/14 07/30/14 08/16/14 08/17/14 -Block 3 1 x 4 cells - 3.0 x 2.0 31.546 15 R 06/24/14 07/14/14 07/15/14 08/03/14 08/03/14 08/21/14 08/21/14 -Block 4 1 x 4 cells - 3.0 x 2.0 7.982 15 R - - - - - - - -Block 5 1 cell - 3.0 x 2.0 7.039 15 R - - - - - - - -Block 6 1 cell - 3.0 x 2.0 31.546 15 R 06/24/14 08/05/14 08/05/149 & 20/8/20149 & 23/8/201408/28/14 08/28/14 -Block 7 1 cell - 3.0 x 2.0 31.546 15 R 06/24/14 08/06/14 08/06/1411 & 25/8/201411 & 26/8/201408/31/14 - -Block 8 1 cell - 3.0 x 2.0 5.525 15 R - - - - - - - -
7 23+756.5 1 cell - 2.0 x 1.5 67.550 0 - - - - - - - -Block 1 1 cell - 2.0 x 1.5 12.090 0 - - - - - - - -Block 2 1 cell - 2.0 x 1.5 20.180 0 07/12/14 07/23/14 07/23/14 07/23/14 07/23/14 07/23/14 07/23/14 07/24/14
Block 3a 1 cell - 2.0 x 1.5 14.430 0 07/12/14 07/23/14 07/23/14 07/23/14 07/23/14 07/23/14 07/23/14 07/24/14Block 3b 1 cell - 2.0 x 1.5 8.700 0 08/11/14 08/26/14 08/26/14 08/26/14 08/26/14 08/26/14 08/26/14 08/28/14Block 4 1 cell - 2.0 x 1.5 12.090 0 - - - - - - - -
8 23+997 1 cell - 2.0 x 1.5 70.268 0 - - - - - - - -Block 1 1 cell - 2.0 x 1.5 16.128 0 - - - - - - - -
Block 2a 1 cell - 2.0 x 1.5 4.933 0 - - - - - - - -Block 2b 1 cell - 2.0 x 1.5 13.860 0 07/08/14 07/23/14 07/23/14 07/23/14 07/23/14 07/23/14 07/23/14 07/24/14Block 3a 1 cell - 2.0 x 1.5 16.300 0 07/08/14 07/23/14 07/23/14 07/23/14 07/23/14 07/23/14 07/23/14 07/24/14Block 3b 1 cell - 2.0 x 1.5 4.942 0 08/10/14 08/26/14 08/26/14 08/26/14 08/26/14 08/26/14 08/26/14 08/31/14Block 4a 1 cell - 2.0 x 1.5 7.848 0 08/10/14 08/26/14 08/26/14 08/26/14 08/26/14 08/26/14 08/26/14 08/31/14Block 4b 1 cell - 2.0 x 1.5 6.197 0
9 24+235 1 cell - 2.0 x 1.5 59.106 0 - - - - - - - -Block 1a 1 cell - 2.0 x 1.5 15.566 0 - - - - - - - -Block 1b 1 cell - 2.0 x 1.5 15.000 0 07/12/14 07/23/14 07/23/14 07/23/14 07/23/14 07/23/14 07/23/14 07/24/14Block 2a 1 cell - 2.0 x 1.5 8.900 0 07/12/14 07/23/14 07/23/14 07/23/14 07/23/14 07/23/14 07/23/14 07/24/14Block 2b 1 cell - 2.0 x 1.5 15.600 0 08/10/14 08/26/14 08/26/14 08/26/14 08/26/14 08/26/14 08/26/14 08/31/14Block 2c 1 cell - 2.0 x 1.5 4.020 0 - - - - - - - -
10 24+570 1 cell - 2.0 x 1.5 51.953 0 - - - - - - - -LHS Block 1 1 cell - 2.0 x 1.5 25.846 0 08/14/14 08/25/14 08/25/14 08/25/14 08/25/14 08/25/14 08/25/14 08/31/14
Block 2a 1 cell - 2.0 x 1.5 13.500 0 08/14/14 08/25/14 08/25/14 08/25/14 08/25/14 08/25/14 08/25/14 08/31/14Block 2b 1 cell - 2.0 x 1.5 12.587 0 - - - - - - - -
Note: Precast RCBC were used for all 1 cell - 2.0m x 1.5m locations.
PREVIOUSPREVIOU
S MONTHTHIS MONTH
LHS
RHS
RHS
RHS
LHS
LHS
RHS
LHS
RHS
RCBC PROGRESS SCHEDULE (BARREL)
As of 31 AUGUST 2014
NO. STATIONTOP SLAB
Bitumin
ous
Paint (2
BASE SLAB WALL
LHS
RHS
TYPE & DIMENSIONLENGTH
(m)
SKEW
( )
F/P &
BLINDIN
G
-
Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014
RENARDET S.A. & PARTNERS Page 17
DIA TYPESettingout-
Exc/InstallCONCRETE Backfil l
L
M
R
L
M
R
L
M
R
L
M
R
L 5/15/14 5/15/14 5/18/14 6/12/14 UTL-LAY- 81 UTL-CON- 65 UTL-BF- 01
M 6/11/14 6/11/14 6/12/14 7/10/14 UTL-LAY- 104 UTL-CON- 83 UTL-BF- 20
R
L 5/19/14 5/19/14 5/20/14 6/4/14 UTL-LAY- 87 UTL-CON- 66 UTL-BF- 03
M 6/14/14 14/06/014 6/14/14 6/21/14 UTL-LAY- 108 UTL-CON- 84 UTL-BF- 21
R
L 5/19/14 5/19/14 5/20/14 5/31/14 UTL-LAY- 85 UTL-CON- 63 UTL-BF- 02
M 6/15/14 6/15/14 6/15/14 UTL-LAY- 107 UTL-CON- 85 UTL-BF-
R
L 5/20/14 5/20/14 5/25/14 6/4/14 UTL-LAY- 86 UTL-CON- 64 UTL-BF- 05
M 6/15/14 6/15/14 6/15/14 7/8/14 UTL-LAY- 109 UTL-CON- 87 UTL-BF- 23
R
L 5/25/14 5/25/14 5/25/14 6/4/14 UTL-LAY- 90 UTL-CON-68 UTL-BF- 07
M 6/16/14 6/16/14 6/17/14 7/10/14 UTL-LAY- 111 UTL-CON- 88 UTL-BF- 28
R
L 6/17/14 6/17/14 6/18/14 7/9/14 UTL-LAY- 112 UTL-CON- 89 UTL-BF- 33
M 7/20/14 7/20/14 7/21/14 7/27/14 UTL-LAY- 131 UTL-CON- 106 UTL-BF-44
R
L 6/19/14 6/19/14 6/19/14 7/6/14 UTL-LAY- 114 UTL-CON- 92 UTL-BF- 31
M 7/20/14 7/20/14 7/21/14 7/17/14 UTL-LAY- 132 UTL-CON- 107 UTL-BF-46
R
L 6/19/14 6/19/14 6/19/14 7/5/14 UTL-LAY- 113 UTL-CON- 91 UTL-BF- 30
M 7/20/14 7/20/14 7/21/14 7/17/14 UTL-LAY- 133 UTL-CON- 108 UTL-BF-45
R
L
M
R
L
M
R
L 5/26/14 5/26/14 5/26/14 6/8/14 UTL-LAY- 88 UTL-CON- 69 UTL-BF- 08
M 6/11/14 6/11/14 6/11/14 7/22/14 UTL-LAY-106 UTL-CON- 81 UTL-BF-26
R
L
M
R
L 6/16/14 6/16/14 6/16/14 7/20/14 UTL-LAY- 102 UTL-CON- UTL-BF-19
M 7/8/14 7/8/14 7/9/14 7/27/14 UTL-LAY- 125 UTL-CON-99 UTL-BF-42
R
L 5/25/14 5/25/14 5/26/14 6/14/14 UTL-LAY- 91 UTL-CON- 71 UTL-BF- 06
M 11/06/201 6/11/14 6/11/14 6/23/14 UTL-LAY- 105 UTL-CON- 82 UTL-BF- 25
R
L 5/27/14 5/27/14 5/27/14 6/17/14 UTL-LAY- 92 UTL-CON- 72 UTL-BF- 09
M
R
L 5/28/14 5/28/14 5/28/14 6/17/14 UTL-LAY- 93 UTL-CON- 70 UTL-BF- 10
M
R
L 5/29/14 5/29/14 5/29/14 6/17/14 UTL-LAY- 94 UTL-CON- 73 UTL-BF- 11
M 7/30/14 8/12/14 8/19/14 8/26/14 UTL-LAY-142 UTL-CON-115 UTL-BF-48
R
DRAWING No.
Sta
ge
s
NO.
OF
Ways
SETOUT/E
XCV/BED
PREP
Progress Status of Underground Road Crossing Utilities
2
2
2
2
3
2
3
2
3
3
3
2
2
2
3
1
1
3
4
3
4
UPVC
UPVC
UPVC
UPVC
UPVC
UPVC
UPVC
UPVC
UPVC
RC
UPVC
UPVC
UPVC
UPVC
150
200
200
200
150
300
900
150
150
150
150
23+060
23+210
23+240
23+560
19 CCC/FQI/EL/13
CCC/FQI/EL/0820
CCC/FQI/EL/0921
11 CCC/FQI/EL/05 22+510
14CCC/FQI/IR/05
JUNCTION
CROSSING
22+587
LHS
12 CCC/FQI/IR/03
18 CCC/FQI/EL/07
15 CCC/FQI/EL/06
22+520
13CCC/FQI/IR/04
JUNCTION
CROSSING
22+520
LHS
CCC/FQI/WA/01
CCC/FQI/WA/02
JUNCTION16
17
23+008
LHS
23+020
22+760
300 UPVC
7 CCC/FQI/EL/02 21+660
10
150 UPVC
8 CCC/FQI/IR/02 21+780 300
150
150
9 CCC/FQI/EL/03 21+880
CCC/FQI/EL/04 22+260
BACKFILLI
NG
REF.S.
NO.
CHAINAG
E
PIPEINSTALLAT
IONCONCRETE
1CCC/FQI/IR/06
SERVICE ROAD-30+030 200 UPVC
2CCC/FQR/IR/11
SOL-20+150 300 UPVC
3CCC/FQR/IR/10
SOL-30+300 200 UPVC
4CCC/FQR/WA/05
SR-10+600 300 UPVC
5 CCC/FQI/EL/01 21+360 150 UPVC
6 CCC/FQI/IR/01 21+460
-
Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014
RENARDET S.A. & PARTNERS Page 18
DIA TYPESettingout-
Exc/InstallCONCRETE Backfil l
L 5/29/14 6/2/14 6/2/14 6/17/14 UTL-LAY- 95 UTL-CON- 75 UTL-BF- 15
M 7/14/14 7/14/14 7/14/14 8/20/14 UTL-LAY- 124 UTL-CON- 102 UTL-BF- 36
R
L 5/29/14 6/2/14 6/2/14 6/17/14 UTL-LAY-97 UTL-CON- 76 UTL-BF- 13
M 7/14/14 7/14/14 7/15/14 8/20/14 UTL-LAY- 127 UTL-CON- 101 UTL-BF- 38
R
L
M 8/10/14 8/11/14 8/11/14 8/26/14 UTL-LAY-149A UTL-CON- 120AUTL-BF- 58
R
L 5/29/14 6/2/14 6/3/14 6/19/14 UTL-LAY- 98 UTL-CON- 77 UTL-BF- 14
M 8/6/14 8/6/14 8/9/14 UTL-LAY- 134-R1UTL-CON- 109A
R
L
M
R
L 6/3/14 6/4/14 6/4/14 6/23/14 UTL-LAY- 99 UTL-CON- 78 UTL-BF- 16
M 8/11/14 8/11/14 8/19/14 8/26/14 UTL-LAY-140 R1UTL-CON-114 UTL-BF- 52
R
L 6/4/14 6/5/14 6/10/14 23/06/201 UTL-LAY- 100 UTL-CON- 79 UTL-BF- 17
M 7/23/14 7/24/14 8/19/14 8/26/14 UTL-LAY-139 UTL-CON-112-R1UTL-BF- 47
R
L 6/9/14 6/9/14 6/10/14 6/23/14 UTL-LAY- 101 UTL-CON- 80 UTL-BF- 18
M 8/6/14 8/6/14 8/6/14 8/26/14 UTL-LAY-138-R1UTL-CON-111-BUTL-BF- 56
R
L 7/5/14 7/5/14 7/5/14 UTL-LAY- 123 UTL-CON- 94
M
R
L 7/16/14 7/16/14 7/17/14 7/27/14 UTL-LAY- 130 UTL-CON- 105 UTL-BF- 43
M
R
L
M
R
L
M
R
L
M
R
L 5/21/14 5/21/14 5/21/14 6/4/14 UTL-LAY- 89 UTL-CON- 67 UTL-BF- 04
M 6/16/14 6/16/14 6/18/14 7/10/14 UTL-LAY- 110 UTL-CON- 90 UTL-BF- 29
R
L 5/29/14 5/31/14 5/31/14 6/17/14 UTL-LAY- 96 UTL-CON- 74 UTL-BF- 12
M 7/10/14 7/10/14 8/13/14 8/26/14 UTL-LAY- 120 R1UTL-CON- 95 UTL-BF- 49
R
L 8/6/14 8/6/14 UTL-LAY-137-R1
M 8/8/14 8/9/14 8/9/14 UTL-LAY-148A UTL-CON- 117
R
L 7/7/14 7/8/14 7/8/14 UTL-LAY-103A UTL-CON-98
M 8/12/14 8/13/14 8/14/14 8/15/14 UTL-LAY-150 UTL-CON-122 UTL-BF- 37A
R
L
M
R
L 7/9/14 7/9/14 UTL-LAY- 116
M 8/12/14 8/13/14 8/14/14 UTL-LAY-151 UTL-CON-100C
R
L
M 7/10/14 7/10/14 7/14/14 UTL-LAY-126 UTL-CON-103
R 7/22/14 7/22/14 7/23/14 8/20/14 UTL-LAY-136 UTL-CON-110 UTL-BF- 50
B 8/30/14 8/31/14 UTL-LAY-158
T
S.
NO.DRAWING No.
Sta
ge
s
CHAINAG
E
PIPE NO.
OF
Ways
SETOUT/E
XCV/BED
PREP
INSTALLAT
IONCONCRETE
BACKFILLI
NG
REF.
40 CCC/FQI/SL/02 22+080 150 UPVC 4
3
1
2
2
3
3
2
3
3
2
3
2
2
UPVC
UPVC
UPVC
UPVC
UPVC
4
3
1
UPVC
UPVC
UPVC
22+810 100 UPVC
100
21+870
23+580
24+720
150
150
300
150
100
100
37CCC/FQI/OMANT
EL.1
UPVC
RC
UPVC
RC
UPVC
UPVC
UPVC
150
150
300
150
600
150
600
300
33
CCC/FQI/WA/0425
CCC/FQI/IR/0726
34
35
36
CCC/FQI/EL/14
CCC/FQI/IR/08
CCC/FQI/EL/15
CCC/FQI/EL/16
CCC/FQI/IR/09
CCC/FQI/EL/17
CCC/FQI/NAW.2
CCC/FQI/NAW.3
CCC/FQI/NAW.4
CCC/FQI/EL/1227
23+820
23+900
23+980
24+000
24+020
24+120
CCC/FQI/EL/1022
CCC/FQI/WA/0323
24 CCC/FQI/EL/11
CCC/FQI/OMANT
EL.2100 UPVC38
0+140
SOL-34
39 CCC/FQI/SL/03 22+820 150 UPVC 4
40 CCC/FQI/SL/04 22+990 150 UPVC 4
23A 23+960 UPVC 2
24+220
24+340
24+520
24+820
24+960
25+160
28
29
30
31
32
-
Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014
RENARDET S.A. & PARTNERS Page 19
SUBGRADE IN CUT COMPLETED 21+000-21+500 As of August 30 2014BWC 6 cmTack Coat BBC 12 cmPRIME COAT ABC 2 ND 15 cmABC 1 ST 15 cmGSB 20 cmLayr 10Layr 9Layr 8Layr 7Layr 6Layr 5Layr 4Layr 3Layr 2
EMBANKMENT Layer 1 BED PREPRATION OGL SURVEY
21
+0
00
21
+0
20
21
+0
40
21
+0
60
21
+0
80
21
+1
00
21
+1
20
21
+1
40
21
+1
60
21
+1
80
21
+2
00
21
+2
20
21
+2
40
21
+2
60
21
+2
80
21
+3
00
21
+3
20
21
+3
40
21
+3
60
21
+3
80
21
+4
00
21
+4
20
21
+4
40
21
+4
60
21
+4
80
21
+5
00
OGL SURVEY BED PREPRATION EMBANKMENT Layer 1layer 2layer 3layer 4layer 5layer 6layer 7layer 8layer 9layer 10
GSB 20 cmABC 1 ST 15 cmABC 2 ND 15 cmPRIME COAT BBC 12 cmTack Coat BWC 6 cm
21+500-22+000BWC 6 cmTack Coat BBC 12 cmPRIME COAT ABC 2 ND 15 cmABC 1 ST 15 cmGSB 20 cmLayer 10Layer 9Layer 8Layer 7Layer 6Layer 5Layer 4Layer 3Layer 2
EMBANKMENT Layer 1BED PREPRATION OGL SURVEY
21
+5
00
21
+5
20
21
+5
40
21
+5
60
21
+5
80
21
+6
00
21
+6
20
21
+6
40
21
+6
60
21
+6
80
21
+7
00
21
+7
20
21
+7
40
21
+7
60
21
+7
80
21
+8
00
21
+8
20
21
+8
40
21
+8
60
21
+8
80
21
+9
00
21
+9
20
21
+9
40
21
+9
60
21
+9
80
22
+0
00
OGL SURVEY BED PREPRATION EMBANKMENT Layer 1layer 2layer 3layer 4layer 5layer 6layer 7layer 8layer 9layer 10
GSB 20 cmABC 1 ST 15 cmABC 2 ND 15 cmPRIME COAT BBC 12 cmTack Coat BWC 6 cm
RH
S
FQI PROJECT - PROGRESS STRIP CHART FOR ROAD WORKS
LHS
RH
SLH
S
-
Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014
RENARDET S.A. & PARTNERS Page 20
COMPLETED 22+000-22+500 As of August 30 2014BWC 6 cmTack Coat BBC 12 cmPRIME COAT ABC 2 ND 15 cmABC 1 ST 15 cmGSB 20 cmLayr 10Layr 9Layr 8Layr 7Layr 6Layr 5Layr 4Layr 3Layr 2EMBANKMENT Layer 1 BED PREPRATION OGL SURVEY
22
+00
0
22
+02
0
22
+04
0
22
+06
0
22
+08
0
22
+10
0
22
+12
0
22
+14
0
22
+16
0
22
+18
0
22
+20
0
22
+22
0
22
+24
0
22
+26
0
22
+28
0
22
+30
0
22
+32
0
22
+34
0
22
+36
0
22
+38
0
22
+40
0
22
+42
0
22
+44
0
22
+46
0
22
+48
0
22
+50
0
OGL SURVEY BED PREPRATION EMBANKMENT Layer 1layer 2layer 3layer 4layer 5layer 6layer 7layer 8layer 9layer 10GSB 20 cmABC 1 ST 15 cmABC 2 ND 15 cmPRIME COAT BBC 12 cmTack Coat BWC 6 cm
22+500-23+000BWC 6 cmTack Coat BBC 12 cmPRIME COAT ABC 2 ND 15 cmABC 1 ST 15 cmGSB 20 cmLayer 10Layer 9Layer 8Layer 7Layer 6Layer 5Layer 4Layer 3Layer 2EMBANKMENT Layer 1BED PREPRATION OGL SURVEY
22
+50
0
22
+52
0
22
+54
0
22
+56
0
22
+58
0
22
+60
0
22
+62
0
22
+64
0
22
+66
0
22
+68
0
22
+70
0
22
+72
0
22
+74
0
22
+76
0
22
+78
0
22
+80
0
22
+82
0
22
+84
0
22
+86
0
22
+88
0
22
+90
0
22
+92
0
22
+94
0
22
+96
0
22
+98
0
23
+00
0
OGL SURVEY BED PREPRATION EMBANKMENT Layer 1layer 2layer 3layer 4layer 5layer 6layer 7layer 8layer 9layer 10GSB 20 cmABC 1 ST 15 cmABC 2 ND 15 cmPRIME COAT BBC 12 cmTack Coat BWC 6 cm
LHS
RH
SLH
SR
HS
FQI PROJECT - PROGRESS STRIP CHART FOR ROAD WORKS
-
Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014
RENARDET S.A. & PARTNERS Page 21
COMPLETED 23+000-23+500 As of August 30 2014BWC 6 cmTack Coat BBC 12 cmPRIME COAT ABC 2 ND 15 cmABC 1 ST 15 cmGSB 20 cmLayr 10 LAYER 18Layr 9Layr 8Layr 7Layr 6Layr 5Layr 4Layr 3Layr 2EMBANKMENT Layer 1 BED PREPRATION OGL SURVEY
23
+00
0
23
+02
0
23
+04
0
23
+06
0
23
+08
0
23
+10
0
23
+12
0
23
+14
0
23
+16
0
23
+18
0
23
+20
0
23
+22
0
23
+24
0
23
+26
0
23
+28
0
23
+30
0
23
+32
0
23
+34
0
23
+36
0
23
+38
0
23
+40
0
23
+42
0
23
+44
0
23
+46
0
23
+48
0
23
+50
0
OGL SURVEY BED PREPRATION EMBANKMENT Layer 1layer 2layer 3layer 4layer 5layer 6layer 7layer 8 LAYER 18layer 9layer 10GSB 20 cmABC 1 ST 15 cmABC 2 ND 15 cmPRIME COAT BBC 12 cmTack Coat BWC 6 cm
23+500-24+000BWC 6 cmTack Coat BBC 12 cmPRIME COAT ABC 2 ND 15 cmABC 1 ST 15 cmGSB 20 cmLayer 10Layer 9Layer 8Layer 7Layer 6Layer 5Layer 4Layer 3Layer 2EMBANKMENT Layer 1BED PREPRATION OGL SURVEY
23
+50
0
23
+52
0
23
+54
0
23
+56
0
23
+58
0
23
+60
0
23
+62
0
23
+64
0
23
+66
0
23
+68
0
23
+70
0
23
+72
0
23
+74
0
23
+76
0
23
+78
0
23
+80
0
23
+82
0
23
+84
0
23
+86
0
23
+88
0
23
+90
0
23
+92
0
23
+94
0
23
+96
0
23
+98
0
24
+00
0
OGL SURVEY BED PREPRATION EMBANKMENT Layer 1layer 2layer 3layer 4layer 5layer 6layer 7layer 8layer 9layer 10GSB 20 cmABC 1 ST 15 cmABC 2 ND 15 cmPRIME COAT BBC 12 cmTack Coat BWC 6 cm
LHS
RH
SLH
SR
HS
FQI PROJECT - PROGRESS STRIP CHART FOR ROAD WORKS
-
Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014
RENARDET S.A. & PARTNERS Page 22
COMPLETED 24+000-24+500 As of August 30 2014
BWC 6 cmTack Coat BBC 12 cmPRIME COAT ABC 2 ND 15 cmABC 1 ST 15 cmGSB 20 cmLayer 10Layer 9Layer 8Layer 7Layer 6Layer 5Layer 4Layer 3Layer 2
EMBANKMENT Layer 1 BED PREPRATION OGL SURVEY
24
+00
0
24
+02
0
24
+04
0
24
+06
0
24
+08
0
24
+10
0
24
+12
0
24
+14
0
24
+16
0
24
+18
0
24
+20
0
24
+22
0
24
+24
0
24
+26
0
24
+28
0
24
+30
0
24
+32
0
24
+34
0
24
+36
0
24
+38
0
24
+40
0
24
+42
0
24
+44
0
24
+46
0
24
+48
0
24
+50
0
OGL SURVEY BED PREPRATION EMBANKMENT Layer 1layer 2layer 3layer 4layer 5layer 6layer 7layer 8layer 9layer 10
GSB 20 cmABC 1 ST 15 cmABC 2 ND 15 cmPRIME COAT BBC 12 cmTack Coat BWC 6 cm
24+500-25+000
BWC 6 cmTack Coat BBC 12 cmPRIME COAT ABC 2 ND 15 cmABC 1 ST 15 cmGSB 20 cmLayer 10Layer 9Layer 8Layer 7Layer 6Layer 5Layer 4Layer 3Layer 2
EMBANKMENT Layer 1BED PREPRATION OGL SURVEY
24
+50
0
24
+52
0
24
+54
0
24
+56
0
24
+58
0
24
+60
0
24
+62
0
24
+64
0
24
+66
0
24
+68
0
24
+70
0
24
+72
0
24
+74
0
24
+76
0
24
+78
0
24
+80
0
24
+82
0
24
+84
0
24
+86
0
24
+88
0
24
+90
0
24
+92
0
24
+94
0
24
+96
0
24
+98
0
25
+00
0
OGL SURVEY BED PREPRATION EMBANKMENT Layer 1layer 2layer 3layer 4layer 5layer 6layer 7layer 8layer 9layer 10
GSB 20 cmABC 1 ST 15 cmABC 2 ND 15 cmPRIME COAT BBC 12 cmTack Coat BWC 6 cm
LHS
RH
SLH
SR
HS
FQI PROJECT - PROGRESS STRIP CHART FOR ROAD WORKS
-
Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014
RENARDET S.A. & PARTNERS Page 23
COMPLETED 25+000-25+500 As of August 30 2014
BWC 6 cm
Tack Coat
BBC 12 cm
PRIME COAT
ABC 2 ND 15 cm
ABC 1 ST 15 cm
GSB 20 cm
Layr 10
Layr 9
Layr 8
Layr 7
Layr 6
Layr 5
Layr 4
Layr 3
Layr 2
EMBANKMENT Layer 1
BED PREPRATION
OGL SURVEY
25
+0
00
25
+0
20
25
+0
40
25
+0
60
25
+0
80
25
+1
00
25
+1
20
25
+1
40
25
+1
60
25
+1
80
25
+2
00
25
+2
20
25
+2
40
25
+2
60
25
+2
80
25
+3
00
25
+3
20
25
+3
40
25
+3
60
25
+3
80
25
+4
00
25
+4
20
25
+4
40
25
+4
60
25
+4
80
25
+5
00
OGL SURVEY
BED PREPRATION
EMBANKMENT Layer 1
layer 2
layer 3
layer 4
layer 5
layer 6
layer 7
layer 8
layer 9
layer 10
GSB 20 cm
ABC 1 ST 15 cm
ABC 2 ND 15 cm
PRIME COAT
BBC 12 cm
Tack Coat
BWC 6 cm
LHS
RH
SFQI PROJECT - PROGRESS STRIP CHART FOR ROAD WORKS
-
Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014
RENARDET S.A. & PARTNERS Page 24
Sl.
No
.D
ESC
RIP
TIO
NP
AYM
ENT
FOR
THE
MO
NTH
OF
GR
OSS
AM
OU
NT
(R.O
.)
GR
OSS
AM
OU
NT
CLA
IMED
(R
.O.)
NET
AM
OU
NT
CLA
IMED
(R.O
.)
DA
TE
SUB
MIT
TED
AM
OU
NT
CER
TIFI
ED (
R.O
.)D
ATE
CER
TIFI
ED
AM
OU
NT
REC
EIV
ED
(R.O
.)
DA
TE
PA
YMEN
T D
UE
DA
TE
PA
YMEN
T
REC
EIV
ED
1PA
YMEN
T A
PPLI
CA
TIO
N N
o. 1
(AD
VA
NC
E PA
YMEN
T)D
ec-1
3
1,6
48,2
25
1,6
48,2
25
1,64
8,22
5 23
-Nov
-13
1,6
48,2
25
29-J
an-1
41,
648,
225
6-
Feb
-14
2PA
YMEN
T A
PPLI
CA
TIO
N N
o. 2
Jan-
14
2,2
91,2
77
643,
052
51
4,44
2
12-F
eb-1
451
4,44
2
02
-Apr
-14
513,
608
10-A
pr-1
4
3PA
YMEN
T A
PPLI
CA
TIO
N N
o. 3
Feb
&M
ar-1
4
2,8
08,6
44
517,
367
50
4,14
7
06-A
pr-1
443
4,91
7
03
-May
-14
434,
917
13-A
ug-1
4
4PA
YMEN
T A
PPLI
CA
TIO
N N
o. 4
Apr
-14
3
,315
,692
50
7,04
8
417,
900
08
-May
-14
407,
538
05-J
un-1
437
5,01
3
13
-Aug
-14
5PA
YMEN
T A
PPLI
CA
TIO
N N
o. 5
May
-14
4
,109
,460
79
3,76
8
650,
802
05
-Jun
-14
445,
708
04-J
ul-1
437
4,17
2
13
-Aug
-14
6PA
YMEN
T A
PPLI
CA
TIO
N N
o. 6
Jun-
14
4,2
93,7
64
184,
304
38
2,11
6
15-J
ul-1
438
2,11
6
16
-Jul
-14
14-S
ep-1
4
7PA
YMEN
T A
PPLI
CA
TIO
N N
o. 7
Jul-
14
8PA
YMEN
T A
PPLI
CA
TIO
N N
o. 8
Aug
-14
9PA
YMEN
T A
PPLI
CA
TIO
N N
o. 9
Sep
-14
10PA
YMEN
T A
PPLI
CA
TIO
N N
o. 1
0O
ct-1
4
11PA
YMEN
T A
PPLI
CA
TIO
N N
o. 1
1N
ov-1
4
12PA
YMEN
T A
PPLI
CA
TIO
N N
o. 1
2D
ec-1
4
13PA
YMEN
T A
PPLI
CA
TIO
N N
o. 1
3Ja
n-15
14PA
YMEN
T A
PPLI
CA
TIO
N N
o. 1
4Fe
b-1
5
15PA
YMEN
T A
PPLI
CA
TIO
N N
o. 1
5M
ar-1
5
16PA
YMEN
T A
PPLI
CA
TIO
N N
o. 1
6A
pr-1
5
17PA
YMEN
T A
PPLI
CA
TIO
N N
o. 1
7M
ay-1
5
18PA
YMEN
T A
PPLI
CA
TIO
N N
o. 1
8Ju
n-15
4,29
3,76
4
4,
293,
764
4,11
7,63
2
3,
832,
946
3,
345,
935
TO
TAL
AM
OU
NT
(R.O
.)
ST
AT
US
OF
PA
YM
EN
T A
PP
LIC
AT
ION
-
Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014
RENARDET S.A. & PARTNERS Page 25
LIST OF AVAILABLE EQUIPMENTS AT SITE
Sl.
No.CCC HIRED
TOTAL
AVAILABLE
AT SITE
1 COMPRESSOR
2 AIR COMPRESSOR 1 1 2
3 MILLER WELDING MECHINE 2 2
4 GENERATOR 3 3
5 CRANES -
6 CRANES 30 TON / 25 TON / 70 TON 2 2 4
7 VEHICLES H.D. -
8 DIESEL TANKER -
9 FLAT TRAILER 1 1
10 HIAB TRUCK 2 2
11 P/MOVER + TIPPING TRAILER 3 3
12 TIPPER TRUCKS 13 1 14
13 WATER TANKER 5000 GAL 2 2 4
14 EARTH MOVING PLANT
15 BOBCAT 2 2
16 EXCAVATOR 2 2
17 JCB 4CX / 3CX 1 4 5
18 SHOVEL / WHEEL LOADER 3 1 4
19 DOZER D9N/D8R 1 1
20 TELEHANDLER -
21 CIVIL ENGINEERING EQUIPMENT
22 GREEN STABILIZER PLANT 1 1
23 DYNAPAC S/ROLLER -
24 E/WORK ROLLER 1 2 3
25 MOTOR GRADER 1 2 3
26 TITAN PAVER MACHINE -
27 TYRE / PTR ROLLER -
28 PAVER MACHINE -
29 L. D. VEHICLES & TRUCKS
30 DYNA TRUCK 1 2 3
31 MAINTENANCE TRUCKS 1 1
32 ASHOK LEYLAND BUS 55 SEAT 6 6
33 TOYOTA COASTER BUS 24 S 1 1
34 TOYOTA COROLLA/CIVIC/YARIS 12 12
35 TOYOTA PICKUP/ISUZU 5 7 12
36 NISSAN PATHFINDER/X-TRAIL 5 5
37 TOYOTA LAND CRUISER/FORTUNER 4 4
38 Total 49 51 100
DESCRIPTION
-
Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014
RENARDET S.A. & PARTNERS Page 26
Ja
n-1
4Fe
b-1
4M
ar-
14
Ap
r-1
4M
ay
-14
Ju
n-1
4Ju
l-1
4A
ug
-14
Se
p-1
4O
ct-
14
No
v-1
4D
ec-1
4Ja
n-1
5Fe
b-1
5M
ar-
15
Ap
r-1
5M
ay
-15
Ju
n-1
5Ju
l-1
5A
ug
-15
Se
p-1
5O
ct-
15
To
tal
PLA
NN
ED T
OTA
L P
ER M
ON
TH4
76
88
79
59
31
07
11
01
08
10
21
00
98
87
82
79
77
66
53
41
15
00
REV
ISED
PLA
NN
ED T
OTA
L P
ER M
ON
TH6
88
79
59
31
07
11
01
08
10
21
00
98
87
82
79
77
66
53
41
PLA
NN
ED C
UM
ULA
TIV
E4
71
15
20
22
97
39
04
97
60
77
15
81
79
17
1,0
15
1,1
02
1,1
84
1,2
63
1,3
40
1,4
06
1,4
59
1,5
00
1,5
00
1,5
00
1,5
00
1,5
00
AC
TUA
L TO
TAL
PER
MO
NTH
33
55
66
68
77
86
88
10
05
73
AC
TUA
L C
UM
ULA
TIV
E3
38
81
54
22
22
99
38
54
73
57
3
20
14
20
15
47
68
87
95
93
107
110
108
102
100
98
87
82
79
77
66
53
41
33
55
66
68
77
86
88
100
68
87
95
93
10
711
01
08
10
21
00
98
87
82
79
77
66
53
41
0
20
40
60
80
10
0
12
0
Jan-14
Feb-14
Mar-14
Apr-14
May-14
Jun-14
Jul-14
Aug-14
Sep-14
Oct-14
Nov-14
Dec-14
Jan-15
Feb-15
Mar-15
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
No. of EQUIPMENT
PR
OJ
EC
T M
ON
TH
S
PL
AN
NE
D T
OT
AL
PE
R M
ON
TH
AC
TU
AL
TO
TA
L P
ER
MO
NT
H
RE
VIS
ED
PL
AN
NE
D T
OT
AL
PE
R M
ON
TH
-
Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014
RENARDET S.A. & PARTNERS Page 27
20
13
De
c-1
3Jan
-14
Fe
b-1
4M
ar-
14
Ap
r-14
May-1
4Ju
n-1
4Ju
l-14
Au
g-1
4S
ep
-14
Oct-
14
No
v-1
4D
ec-1
4Jan
-15
Fe
b-1
5M
ar-
15
Ap
r-15
May-1
5Ju
n-1
5Ju
l-15
Au
g-1
5S
ep
-15
Oct-
15
To
tal
PL
AN
NE
D T
OT
AL
PE
R M
ON
TH
- (
DIR
EC
T )
634
186
375
586
791
792
799
794
793
701
480
381
269
246
307
307
305
149
8301
565
756
754
750
700
652
667
554
516
387
297
276
365
271
135
92
51
7788
PL
AN
NE
D T
OT
AL
PE
R M
ON
TH
- (
IN
DIR
EC
T )
523
36
50
52
57
59
59
60
61
63
61
61
57
51
47
44
35
30
914
RE
VIS
ED
- P
LA
NN
ED
TO
TA
L P
ER
MO
NT
H-(
IND
IRE
CT
)63
84
84
83
78
72
74
61
57
43
33
31
40
30
15
10
6862
PL
AN
NE
D T
OT
AL
PE
R M
ON
TH
- (
DIR
EC
T +
IN
DIR
EC
T )
11
57
222
425
638
848
851
858
854
854
764
541
442
326
297
354
351
340
179
9215
RE
VIS
ED
- P
LA
NN
ED
-
( D
IRE
CT
+ IN
DIR
EC
T )
627
840
838
833
778
725
741
616
573
429
330
306
406
301
150
102
57
8651
PL
AN
NE
D C
UM
UL
AT
IVE
11
68
291
715
1,3
53
2,2
02
3,0
52
3,9
10
4,7
64
5,6
18
6,3
83
6,9
23
7,3
65
7,6
91
7,9
88
8,3
42
8,6
93
9,0
33
9,2
12
9,2
12
AC
TU
AL
TO
TA
L P
ER
MO
NT
H -
( D
IRE
CT
)322
365
550
581
603
691
709
756
734
5311
AC
TU
AL
TO
TA
L P
ER
MO
NT
H -
( IN
DIR
EC
T )
18
26
46
49
54
57
64
69
68
451
AC
TU
AL
TO
TA
L P
ER
MO
NT
H -
( D
IRE
CT
+ IN
DIR
EC
T )
340
391
596
630
657
748
773
825
802
00
00
00
00
00
5762
AC
TU
AL
CU
MU
LA
TIV
E340
731
1,3
27
1,9
57
2,6
14
3,3
62
4,1
35
4,9
60
5,7
62
RE
VIS
ED
- P
LA
NN
ED
TO
TA
L P
ER
MO
NT
H -
( D
IRE
CT
)
20
14
20
15
11
57
222
425
638
848
851
858
854
854
764
541
442
326
297
354
351
340
179
340
391
596
630
657
748
773
825
802
0
0
0
0
0
0
0
0
0
0
0
10
0
20
0
30
0
40
0
50
0
60
0
70
0
80
0
90
0
Dec-13
Jan-14
Feb-14
Mar-14
Apr-14
May-14
Jun-14
Jul-14
Aug-14
Sep-14
Oct-14
Nov-14
Dec-14
Jan-15
Feb-15
Mar-15
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
No. of Men
PR
OJ
EC
T M
ON
TH
S
PL
AN
NE
D T
OT
AL P
ER
MO
NTH
- ( D
IRE
CT
+ IN
DIR
EC
T )
AC
TU
AL
TO
TA
L P
ER
MO
NT
H -
( D
IRE
CT
+ IN
DIR
EC
T )
RE
VIS
ED
- P
LA
NN
ED
-
( D
IRE
CT
+ IN
DIR
EC
T )
-
Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014
RENARDET S.A. & PARTNERS Page 28
-
Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014
RENARDET S.A. & PARTNERS Page 29
-
Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014
RENARDET S.A. & PARTNERS Page 30
-
Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014
RENARDET S.A. & PARTNERS Page 31
Date
Su
bm
itte
d
CC
C/F
QI/
RE
N/M
AS
/001
MA
S/C
CC
/FQ
I/B
BC
/001
Bitum
inous
Base
Cours
eT
arm
ac Z
aw
aw
i L
LC
Om
an
22/1
2/2
013
AP
PR
OV
ED
01/0
4/2
014
SO
/FQ
I/C
CC
/087
07/0
4/2
014
CC
C/F
QI/
RE
N/M
AS
/002
MA
S/C
CC
/FQ
I/G
TI/
002
Geote
chnic
al In
vest
igation
Sw
issb
ori
ng &
Com
pany L
LC
26/1
2/2
013
AP
PR
OV
ED
02/0
2/2
014
SO
/FQ
I/C
CC
/015
12/0
2/2
014
CC
C/F
QI/
RE
N/M
AS
/003
MA
S/C
CC
/FQ
I/M
SE
/003
MS
E W
all
Syst
em
Fre
yss
inet
Ara
bia
n S
ea L
LC
26/1
2/2
013
AP
PR
OV
ED
02/0
2/2
014
SO
/FQ
I/C
CC
/014
12/0
2/2
014
CC
C/F
QI/
RE
N/M
AS
/004
MA
S/C
CC
/FQ
I/P
VC
/004
UP
VC
Pip
es
Am
iantit
Om
an
26/1
2/2
013
AP
PR
OV
ED
09/0
2/2
014
SO
/FQ
I/C
CC
/019
18/0
2/2
014
CC
C/F
QI/
RE
N/M
AS
/005
MA
S/C
CC
/FQ
I/H
DP
E/0
05H
DP
E P
ipes
& F
ittings
Am
iantit
Om
an
26/1
2/2
013
AP
PR
OV
ED
09/0
2/2
014
SO
/FQ
I/C
CC
/020
18/0
2/2
014
CC
C/F
QI/
RE
N/M
AS
/006
MA
S/C
CC
/FQ
I/P
W/0
06
Pili
ng W
ork
sA
PC
C L
LC
26/0
1/2
014
AP
PR
OV
ED
19/0
2/2
014
SO
/FQ
I/C
CC
/026
25/0
2/2
014
CC
C/F
QI/
RE
N/M
AS
/007
MA
S/C
CC
/FQ
I/M
C/0
07
Bitnum
inous
Pri
me C
oat
(MC
-70)
Em
irate
s L
ube O
il C
o.
(Musc
at)
30/0
1/2
014
AP
PR
OV
ED
09/0
3/2
014
SO
/FQ
I/C
CC
/069
27/0
3/2
014
CC
C/F
QI/
RE
N/M
AS
/008
MA
S/C
CC
/FQ
I/R
S/0
08
Rein
forc
ing S
teel
Musc
at
Ste
el In
dust
ries
02/0
2/2
014
AP
PR
OV
ED
20/0
3/2
014
SO
/FQ
I/C
CC
/063
24/0
3/2
014
CC
C/F
QI/
RE
N/M
AS
/009-1
MA
S/C
CC
/FQ
I/P
T/0
09-1
Post
Tensi
onin
g W
ork
- A
nchora
ge
Fre
yss
inet
Ara
bia
n S
ea L
LC
22/0
2/2
014
AP
PR
OV
ED
27/0
3/2
014
SO
/FQ
I/C
CC
/089
14/0
4/2
014
CC
C/F
QI/
RE
N/M
AS
/009-2
MA
S/C
CC
/FQ
I/P
T/0
09-2
Post
Tensi
onin
g W
ork
- D
uct
Fre
yss
inet
Ara
bia
n S
ea L
LC
22/0
2/2
014
AP
PR