SULTANATE OF OMAN MINISTRY OF TRANSPORT AND COMMUNICATIONS DIRECTORATE GENERAL OF ROADS & LAND TRANSPORT MUSCAT UPGRADING OF FALAJ AL QABAIL ROUNDABOUT TENDER NO. 51/2012 MONTHLY PROGRESS REPORT NO. 8 AUGUST 2014 CONSULTANT: RENARDET S.A. & PARTNERS CONSULTING ENGINEERS LLC. P.O. Box 579, Muscat, P.C. 100, Sultanate of Oman CONTRACTOR: CONSOLIDATED CONTRACTORS CO. LLC P.O. Box 614, Muscat, P.C. 100, Sultanate of Oman

Upload: muneerpmh

Post on 28-Sep-2015

214 views

Category:

Documents


0 download

DESCRIPTION

monthly progress report for the month of July 2014 for an interchange project in Oman

TRANSCRIPT

  • SULTANATE OF OMAN

    MINISTRY OF TRANSPORT AND COMMUNICATIONS DIRECTORATE GENERAL OF ROADS & LAND TRANSPORT

    MUSCAT

    UPGRADING OF FALAJ AL QABAIL ROUNDABOUT TENDER NO. 51/2012

    MONTHLY PROGRESS REPORT NO. 8

    AUGUST 2014

    CONSULTANT:

    RENARDET S.A. & PARTNERS CONSULTING ENGINEERS LLC. P.O. Box 579, Muscat, P.C. 100, Sultanate of Oman

    CONTRACTOR:

    CONSOLIDATED CONTRACTORS CO. LLC P.O. Box 614, Muscat, P.C. 100, Sultanate of Oman

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014

    RENARDET S.A. & PARTNERS Page 1

    Table of Contents

    S. No. Description Page No.

    1. Project Particulars 2

    2. Scope of Work 3

    3. Typical Cross Sections 4

    4. Site visits/ Meetings 6

    5 Engineers Site Staff 7

    6. Progress Review 8

    7. Financial Status 22

    8. Contractors Resources 23

    9. QA/ QC Reports 27

    10. Engineers Comments 31

    11. Project Correspondence 32

    12. Progress Photographs 36

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014

    RENARDET S.A. & PARTNERS Page 2

    Project Particulars

    Client: Ministry of Transport &

    Communications

    P.O. Box 684, Muscat, Postal Code 113

    Directorate General of Roads

    Sultanate of Oman.

    Consultant: Renardet S.A & Partners L.L.C. P.O. Box 579, Muscat, Postal Code 100

    Sultanate of Oman.

    Contractor: Consolidated Contractors Company

    L.L.C.

    P.O. Box 614, Muscat, Postal Code 100

    Sultanate of Oman.

    Project Commencement Date: 30.10.2013

    Mobilization Period: 60 Days

    Construction Period: 548 Days

    Completion date: 29.06.2015

    Original Contract Value:

    (Including Contingencies) R.O. 17,884,403.000

    Amount of Contingencies: R.O. 1,402,155.613

    Original Contract Value:

    (Excluding Contingencies) R.O. 16,482,247.387

    Planned physical progress

    cumulative up to end of August 2014

    30.78%

    Achieved physical progress

    cumulative up to end of August 2014 29.80%

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014

    RENARDET S.A. & PARTNERS Page 3

    Scope of Work

    This project is located in Batinah Region on existing Batinah Highway in the Wilayat Sohar and

    consists of construction of an interchange in place of existing roundabout along with allied works.

    Total length of the project along Batinah highway is about 4.0 km which shall be converted from four

    lanes to six lanes with tapering back to 4lanes, all as shown on plans. Also included in the scope of

    work is the construction of service roads, pedestrian underpasses.

    The work also includes expropriation of properties, relocation/protection of services (sewerage,

    telephone, electricity, water, irrigation) road lighting works and traffic signals.

    Major items within the scope of work consist of but not limited to the following:

    Removal of existing asphalt surface, extension of existing embankment and earthwork to achieve

    the designed profile and gradient.

    Removal of existing drainage structures and construction of new ones including protection works

    as shown on construction drawings and as directed.

    Expropriation of open/built up properties and removal of existing structures thereupon.

    Construction of interchange ramps, Box Girder Bridge, roundabout, pedestrian underpasses and

    service roads.

    Provision of new street lighting system/traffic signals and removal/disposal of existing street light

    poles including conductors/cables, transformers, feeder pillars, foundations etc., all for the

    proper completion of the job.

    Construction of earthen embankment/sub grade, sub-base, aggregate base course, bituminous base

    course and bituminous wearing course as per details on the construction drawings.

    Installation of road side furniture (traffic signs, road marking etc.) and protection works on

    embankment slopes.

    Relocation/Protection of existing LT, 11KV and 33KV transmission lines and allied items

    (transformers etc.) as per the requirements of concerned authority.

    Relocation/Protection of existing utilities (sewerage, telephone, electricity, water lines and

    irrigation) as per the requirements of concerned authorities.

    Provision of ducts for future utilities as per the requirements of utility operator.

    Construction of concrete safety barriers, fixing of guard rails and paving tiles.

    Provision of traffic diversion in coordination with concerned authorities.

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014

    RENARDET S.A. & PARTNERS Page 4

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014

    RENARDET S.A. & PARTNERS Page 5

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014

    RENARDET S.A. & PARTNERS Page 6

    Site visits/ Meetings

    S. No. Details of Site Visit Date Final Outcome/ Decisions

    1 Meeting with QS and Projects

    Manager of DGR and CCC at QS

    department office in Muscat.

    19.08.2014 Issues regarding IPC No. 6,

    additional works and Variation

    Order No. 1 are discussed.

    2 Monthly Review meeting at DGR

    Office in Muscat along CCC and

    Renardet.

    27.08.2014 Various issues regarding the

    project execution are discussed.

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014

    RENARDET S.A. & PARTNERS Page 7

    Engineers Site Staff

    S.

    No. Name Designation

    Date of

    Joining

    1. Roberto Benigni Head Supervision Projects

    2. Muneer Abdul Resident Engineer 19.03.2014

    3. Hussein Shah Material Engineer 04.01.2014

    4. Ernesto B. Paredes Bridge Engineer 16.04.2014

    5. Sande H Tangaras Civil Engineer 08.06.2014

    6. Danilo Quantity Surveyor 19.06.2014

    6. Mohamed Safie Land Surveyor 04.01.2014

    7. Aseef Iqbal Site Inspector 10.02.2014

    8. Alaa Aldin Abdelfatah Site Inspector 30.03.2014

    9. Walid Samy Abdoh Mostafa Material Inspector 01.04.2014

    10. Haneefa Mohmmed Al Zadjali Secretary 13.04.2014

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014

    RENARDET S.A. & PARTNERS Page 8

    2013

    De

    cJan

    Fe

    bM

    ar

    Ap

    rM

    ay

    Ju

    nJu

    lA

    ug

    Se

    pO

    ct

    No

    vD

    ec

    Jan

    Fe

    bM

    ar

    Ap

    rM

    ay

    Ju

    nJu

    lA

    ug

    Se

    pO

    ct

    0.0

    1

    0.2

    5

    1.4

    2

    4.2

    3

    7.2

    5

    10.0

    6

    9.4

    2

    9.7

    3

    10.2

    1

    9.7

    9

    8.4

    9

    5.7

    2

    4.5

    5

    3.5

    6

    2.7

    9

    3.8

    3

    3.5

    5

    3.4

    7

    1.6

    7

    -

    -

    -

    -

    0.1

    1

    0.1

    4

    0.2

    3

    0.2

    8

    1.7

    1

    3.1

    8

    6.8

    4

    9.1

    6

    9.1

    4

    9.0

    8

    8.4

    9

    7.9

    0

    8.0

    8

    6.7

    1

    6.2

    5

    4.6

    8

    3.5

    9

    3.3

    4

    4.4

    2

    3.2

    9

    1.6

    4

    1.1

    1

    0.6

    2

    -

    0.2

    8

    0.1

    8

    1.0

    1

    2.9

    0

    5.6

    4

    5.1

    8

    7.3

    6

    7.3

    0

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    0.0

    10.2

    61.6

    75.9

    113.1

    523.2

    132.6

    442.3

    752.5

    862.3

    770.8

    676.5

    981.1

    384.6

    987.4

    891.3

    194.8

    698.3

    3100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0

    0.1

    10.2

    50.4

    80.7

    62.4

    75.6

    412.4

    821.6

    430.7

    839.8

    748.3

    556.2

    664.3

    471.0

    577.3

    181.9

    985.5

    988.9

    393.3

    596.6

    498.2

    799.3

    8100.0

    0

    -

    0.2

    8

    0.4

    5

    1.4

    6

    4.3

    7

    10.0

    1

    15.1

    9

    22.5

    5

    29.8

    6

    CU

    MU

    LA

    TIV

    E P

    RO

    GR

    ES

    S

    CL

    14 O

    rg P

    lan

    Cu

    mu

    lati

    ve

    %

    Actu

    al C

    um

    ula

    tive

    2014

    2015

    MO

    NT

    HL

    Y P

    RO

    GR

    ES

    S

    CL

    14 O

    rg P

    lan

    pe

    r M

    on

    th %

    Actu

    al p

    er

    Mo

    nth

    Re

    vis

    ed

    Sch

    . p

    er

    Mo

    nth

    %

    Re

    vis

    ed

    Sch

    . C

    um

    mu

    lati

    ve

    %

    0.0

    0

    20

    .00

    40

    .00

    60

    .00

    80

    .00

    10

    0.0

    0

    12

    0.0

    0

    - 2 4 6 8

    10

    12

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    Oct

    20

    13

    20

    14

    20

    15

    % Cumulative

    % MONTHLY

    MO

    NT

    HS

    UP

    GR

    AD

    ING

    OF

    FA

    LA

    J A

    L Q

    AB

    AIL

    RO

    UN

    DA

    BO

    UT

    PR

    OJ

    EC

    T -

    OM

    AN

    MO

    NT

    HLY

    CL

    14

    PL

    AN

    NE

    D V

    S. A

    CT

    UA

    L M

    AN

    HO

    UR

    S

    CL

    14

    Org

    Pla

    n p

    er

    Mo

    nth

    %R

    evis

    ed

    Sch

    . p

    er

    Mo

    nth

    %A

    ctu

    al p

    er

    Mo

    nth

    CL

    14

    Org

    Pla

    n C

    um

    ula

    tive %

    Revis

    ed

    Sch

    . C

    um

    mu

    lati

    ve %

    Actu

    al C

    um

    ula

    tiv

    e

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014

    RENARDET S.A. & PARTNERS Page 9

    2013

    De

    cJan

    Fe

    bM

    ar

    Ap

    rM

    ay

    Ju

    nJu

    lA

    ug

    Se

    pO

    ct

    No

    vD

    ec

    Jan

    Fe

    bM

    ar

    Ap

    rM

    ay

    Ju

    nJu

    lA

    ug

    Se

    pO

    ct

    CL

    14 P

    lan

    %0.3

    08.6

    719.2

    326.8

    931.7

    736.6

    441.5

    146.3

    951.2

    656.1

    361.0

    165.8

    870.7

    675.6

    380.5

    085.3

    890.2

    595.1

    3100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0

    Re

    vis

    ed

    Pla

    n %

    4.1

    1

    9.3

    0

    17.5

    8

    24.1

    8

    30.9

    0

    35.1

    6

    38.9

    7

    42.7

    8

    46.6

    0

    50.4

    1

    54.2

    3

    58.0

    4

    61.8

    6

    65.6

    7

    69.4

    8

    73.3

    0

    77.1

    1

    80.9

    3

    84.7

    4

    88.5

    6

    92.3

    7

    96.1

    8

    100.0

    0

    Actu

    al

    -

    6.6

    2

    13.0

    3

    22.3

    6

    37.3

    1

    43.0

    0

    44.1

    1

    51.2

    1

    56.2

    4

    CL

    14 P

    lan

    %0.0

    00.0

    00.3

    820.3

    747.7

    048.3

    348.3

    348.3

    348.3

    348.3

    348.3

    348.3

    348.3

    359.9

    177.8

    490.2

    794.9

    3100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0

    Re

    vis

    ed

    Pla

    n %

    -

    -

    -

    -

    -

    7.4

    0

    29.8

    5

    78.1

    3

    78.1

    3

    78.1

    3

    78.1

    3

    78.1

    3

    78.1

    3

    78.1

    3

    78.1

    3

    78.1

    3

    78.1

    3

    80.6

    6

    87.5

    9

    88.5

    7

    100.0

    0

    100.0

    0

    100.0

    0

    Actu

    al

    -

    10.0

    9

    10.0

    9

    17.5

    9

    19.5

    2

    77.4

    2

    69.9

    6

    70.1

    8

    70.1

    8

    CL

    14 P

    lan

    %0.0

    00.0

    00.0

    00.7

    86.5

    816.7

    629.3

    841.3

    758.6

    466.6

    074.1

    882.8

    584.7

    584.7

    585.2

    492.3

    492.3

    498.3

    6100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0

    Re

    vis

    ed

    Pla

    n %

    -

    -

    -

    -

    -

    -

    -

    3.3

    2

    12.8

    9

    28.8

    3

    43.8

    9

    60.0

    3

    74.8

    2

    90.0

    3

    95.2

    4

    95.9

    5

    95.9

    5

    96.0

    9

    98.3

    0

    99.4

    6

    99.5

    4

    100.0

    0

    100.0

    0

    Actu

    al

    -

    -

    -

    -

    4.3

    5

    4.8

    9

    -

    5.2

    7

    14.9

    3

    CL

    14 P

    lan

    %0.0

    00.0

    01.0

    19.2

    129.3

    045.9

    156.9

    062.2

    464.5

    967.9

    469.0

    869.0

    875.0

    582.8

    593.4

    898.6

    4100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0

    Re

    vis

    ed

    Pla

    n %

    -

    -

    -

    -

    -

    4.2

    6

    8.1

    7

    16.0

    3

    32.6

    8

    53.1

    3

    67.0

    5

    67.4

    7

    67.4

    7

    67.9

    0

    68.3

    2

    68.3

    2

    68.3

    2

    81.1

    1

    93.0

    2

    97.1

    1

    100.0

    0

    100.0

    0

    100.0

    0

    Actu

    al

    -

    -

    -

    5.0

    0

    5.0

    0

    53.2

    3

    62.1

    6

    74.9

    1

    78.2

    9

    CL

    14 P

    lan

    %0.0

    00.0

    00.0

    00.0

    00.0

    00.0

    00.0

    00.0

    011.0

    726.2

    741.9

    859.9

    878.7

    379.9

    079.9

    085.2

    089.4

    592.6

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0

    Re

    vis

    ed

    Pla

    n %

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    3.5

    8

    17.4

    2

    31.3

    7

    51.3

    2

    75.8

    2

    75.8

    2

    75.8

    2

    75.8

    2

    87.2

    5

    87.2

    5

    98.6

    0

    100.0

    0

    Actu

    al

    CL

    14 P

    lan

    %0.0

    00.0

    00.0

    00.0

    00.0

    00.0

    00.0

    00.0

    00.0

    00.0

    87.7

    719.3

    231.2

    244.9

    451.9

    852.1

    490.1

    490.1

    4100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0

    Re

    vis

    ed

    Pla

    n %

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    0.0

    8

    8.4

    4

    22.4

    2

    46.5

    7

    51.9

    7

    51.9

    7

    86.6

    6

    90.0

    5

    93.0

    3

    100.0

    0

    Actu

    al

    CL

    14 P

    lan

    %0.0

    00.0

    00.2

    31.4

    32.9

    710.1

    723.6

    536.5

    151.4

    763.0

    674.2

    675.9

    777.3

    780.0

    582.4

    088.9

    792.1

    398.5

    5100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0

    Re

    vis

    ed

    Pla

    n %

    -

    -

    -

    0.2

    6

    2.6

    4

    7.3

    3

    20.6

    2

    35.1

    4

    50.0

    6

    62.7

    6

    68.4

    0

    72.7

    8

    74.0

    7

    74.6

    7

    83.4

    2

    84.0

    4

    84.3

    0

    87.3

    2

    95.5

    8

    98.1

    1

    99.4

    4

    100.0

    0

    100.0

    0

    Actu

    al

    -

    -

    -

    0.4

    8

    1.2

    6

    5.5

    9

    14.9

    3

    27.7

    2

    40.0

    8

    CL

    14 P

    lan

    %0.0

    00.0

    04.0

    215.2

    134.6

    257.8

    969.2

    681.4

    083.3

    883.4

    684.5

    092.8

    999.9

    6100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0

    Re

    vis

    ed

    Pla

    n %

    -

    -

    -

    -

    2.7

    7

    7.7

    5

    13.7

    6

    22.0

    9

    29.6

    4

    39.0

    2

    49.6

    4

    59.5

    1

    71.3

    3

    85.1

    4

    87.0

    0

    93.5

    0

    100.0

    0

    100.0

    0

    100.0

    0

    100.0

    0

    100.0

    0

    100.0

    0

    100.0

    0

    Actu

    al

    -

    -

    -

    0.0

    1

    6.0

    5

    14.7

    3

    18.1

    4

    22.3

    3

    26.3

    0

    CL

    14 P

    lan

    %0.0

    00.0

    00.0

    00.0

    00.0

    00.3

    81.2

    12.6

    33.4

    24.2

    35.5

    06.0

    86.0

    834.3

    599.3

    899.7

    699.7

    6100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0

    Re

    vis

    ed

    Pla

    n %

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    61.4

    5

    74.6

    9

    90.1

    9

    94.7

    0

    94.7

    0

    94.7

    0

    94.7

    0

    94.7

    0

    98.4

    1

    100.0

    0

    100.0

    0

    100.0

    0

    100.0

    0

    Actu

    al

    -

    -

    -

    2.5

    0

    16.7

    2

    14.3

    9

    13.2

    4

    16.1

    9

    16.7

    2

    CL

    14 P

    lan

    %0.0

    00.0

    00.0

    00.0

    00.0

    00.0

    00.0

    02.8

    017.8

    743.8

    561.5

    972.9

    881.1

    583.9

    484.4

    285.3

    592.8

    696.3

    9100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0

    Re

    vis

    ed

    Pla

    n %

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    7.0

    2

    20.3

    3

    38.2

    9

    50.6

    0

    59.5

    2

    72.8

    9

    81.0

    7

    83.5

    5

    86.8

    9

    90.2

    6

    95.3

    4

    98.2

    7

    100.0

    0

    Actu

    al

    -

    -

    -

    -

    -

    2.6

    1

    4.9

    8

    6.4

    2

    8.3

    1

    CL

    14 P

    lan

    %0.0

    00.0

    00.0

    04.4

    317.2

    333.3

    649.1

    365.0

    780.7

    993.8

    2100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0

    Re

    vis

    ed

    Pla

    n %

    -

    -

    -

    -

    -

    0.9

    9

    2.3

    0

    17.2

    6

    33.6

    4

    49.0

    1

    64.7

    0

    79.8

    8

    95.4

    4

    100.0

    0

    100.0

    0

    100.0

    0

    100.0

    0

    100.0

    0

    100.0

    0

    100.0

    0

    100.0

    0

    100.0

    0

    100.0

    0

    Actu

    al

    -

    -

    -

    6.1

    6

    9.8

    7

    17.6

    3

    25.6

    9

    35.9

    0

    49.0

    3

    CL

    14 P

    lan

    %0.0

    00.0

    00.0

    00.0

    00.0

    00.1

    70.7

    91.4

    35.6

    513.4

    121.8

    430.5

    632.9

    470.9

    475.0

    494.0

    296.4

    3100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0

    Re

    vis

    ed

    Pla

    n %

    -

    -

    -

    -

    -

    -

    -

    0.3

    3

    2.3

    4

    9.4

    2

    17.0

    7

    23.5

    1

    31.4

    0

    41.6

    6

    47.4

    9

    47.5

    5

    47.5

    5

    83.2

    8

    93.9

    5

    97.6

    1

    100.0

    0

    100.0

    0

    100.0

    0

    Actu

    al

    -

    -

    -

    0.1

    3

    5.5

    2

    9.2

    6

    13.3

    8

    16.8

    7

    17.7

    5

    Re

    vis

    ed

    Pla

    n0.1

    1

    0.2

    5

    0.4

    8

    0.7

    6

    2.4

    7

    5.6

    4

    12.4

    8

    21.6

    4

    30.7

    8

    39.8

    7

    48.3

    5

    56.2

    6

    64.3

    4

    71.0

    5

    77.3

    1

    81.9

    9

    85.5

    9

    88.9

    3

    93.3

    5

    96.6

    4

    98.2

    7

    99.3

    8

    100.0

    0

    Actu

    al C

    um

    -

    0.2

    8

    0.4

    5

    1.4

    6

    4.3

    7

    10.0

    1

    15.1

    9

    22.5

    5

    29.8

    6

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    2013

    De

    cJan

    Fe

    bM

    ar

    Ap

    rM

    ay

    Ju

    nJu

    lA

    ug

    Se

    pO

    ct

    No

    vD

    ec

    Jan

    Fe

    bM

    ar

    Ap

    rM

    ay

    Ju

    nJu

    lA

    ug

    Se

    pO

    ct

    0.0

    1

    0.2

    5

    1.4

    2

    4.2

    3

    7.2

    5

    10.0

    6

    9.4

    2

    9.7

    3

    10.2

    1

    9.7

    9

    8.4

    9

    5.7

    2

    4.5

    5

    3.5

    6

    2.7

    9

    3.8

    3

    3.5

    5

    3.4

    7

    1.6

    7

    -

    -

    -

    -

    0.1

    1

    0.1

    4

    0.2

    3

    0.2

    8

    1.7

    1

    3.1

    8

    6.8

    4

    9.1

    6

    9.1

    4

    9.0

    8

    8.4

    9

    7.9

    0

    8.0

    8

    6.7

    1

    6.2

    5

    4.6

    8

    3.5

    9

    3.3

    4

    4.4

    2

    3.2

    9

    1.6

    4

    1.1

    1

    0.6

    2

    -

    0.2

    8

    0.1

    8

    1.0

    1

    2.9

    0

    5.6

    4

    5.1

    8

    7.3

    6

    7.3

    0

    0.0

    1

    0.2

    6

    1.6

    7

    5.9

    1

    13.1

    5

    23.2

    1

    32.6

    4

    42.3

    7

    52.5

    8

    62.3

    7

    70.8

    6

    76.5

    9

    81.1

    3

    84.6

    9

    87.4

    8

    91.3

    1

    94.8

    6

    98.3

    3

    100.0

    0

    100.0

    0

    100.0

    0

    100.0

    0

    100.0

    0

    0.1

    1

    0.2

    5

    0.4

    8

    0.7

    6

    2.4

    7

    5.6

    4

    12.4

    8

    21.6

    4

    30.7

    8

    39.8

    7

    48.3

    5

    56.2

    6

    64.3

    4

    71.0

    5

    77.3

    1

    81.9

    9

    85.5

    9

    88.9

    3

    93.3

    5

    96.6

    4

    98.2

    7

    99.3

    8

    100.0

    0

    -

    0.2

    8

    0.4

    5

    1.4

    6

    4.3

    7

    10.0

    1

    15.1

    9

    22.5

    5

    29.8

    6

    2014

    2015

    MO

    NT

    HL

    Y P

    RO

    GR

    ES

    S

    CL

    14 O

    rg P

    lan

    pe

    r M

    on

    th %

    Actu

    al p

    er

    Mo

    nth

    CU

    MU

    LA

    TIV

    E P

    RO

    GR

    ES

    S

    CL

    14 O

    rg P

    lan

    Cu

    mu

    lati

    ve

    %

    Actu

    al C

    um

    ula

    tive

    MM

    EP

    Wo

    rks

    &

    Du

    cts

    4.0

    3

    TO

    TA

    L100.0

    00

    Re

    vis

    ed

    Sch

    . p

    er

    Mo

    nth

    %

    Re

    vis

    ed

    Sch

    . C

    um

    mu

    lati

    ve

    %

    83,2

    64

    2,0

    63

    ,64

    4

    LM

    SE

    wa

    lls

    6.8

    4

    JD

    rain

    ag

    e W

    ork

    s1.5

    0

    KIn

    cid

    en

    tal

    Co

    ns

    tru

    cti

    on

    13.3

    3

    30,9

    20

    275,0

    37

    1

    41,1

    90

    IC

    on

    cre

    te f

    or

    Bri

    dg

    e22.1

    2

    H

    Co

    nc

    rete

    fo

    r

    Bo

    x C

    ulv

    ert

    /Un

    de

    rpa

    s

    38.1

    9788,1

    38

    4

    56,5

    22

    GB

    itu

    min

    ou

    s

    Pa

    ve

    me

    nt

    3.5

    7

    FS

    ub

    ba

    se

    &

    Ag

    gre

    ga

    te B

    as

    e2.4

    250,0

    04

    7

    3,7

    24

    ES

    tru

    ctu

    ral

    Ex

    ca

    va

    tio

    n0.7

    2

    DE

    mb

    an

    km

    en

    t3.5

    974,0

    43

    1

    4,8

    21

    C

    Cle

    ari

    ng

    &

    Re

    mo

    va

    l o

    f

    Ob

    str

    uc

    tio

    ns

    0.9

    5

    2015

    BR

    oa

    d D

    ive

    rsio

    ns

    2.7

    3

    Bu

    dg

    ete

    d

    Man

    -Hrs

    56,4

    23

    1

    9,5

    58

    Ite

    mD

    es

    cri

    pti

    on

    Wtd

    .

    %

    Pla

    n/

    Actu

    al

    2014

    PR

    OJ

    EC

    T S

    -CU

    RV

    E B

    AS

    ED

    ON

    PH

    YS

    ICA

    L P

    RO

    GR

    ES

    S (

    MA

    NH

    OU

    RS

    )

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014

    RENARDET S.A. & PARTNERS Page 10

    Progress of Permanent Works

    Sl. No.

    Description Unit BOQ Qty.

    (Revised)

    Actual Qty.

    % Completion

    1 Clearing & Grubbing M2 162,000 129,901 80.19%

    2 Borrow Excavation (to embankment)

    M3 340,000 30,500 8.97%

    3 Granular Sub-base M3 28,700 0.00 0.00%

    4 Concrete for Culverts M3 15,000 5,340 35.60%

    5 Concrete for Bridge M3 13,805 2,271 16.45%

    6 Steel reinforcement Fixing ton 4,900 1,457 29.73%

    7 Working Piles M3 2,826 2,826 100.00%

    8 Mortared Stone Riprap M3 5,210 0.00 0.00%

    9 MSE Walls M2 13,200 1,165 8.82%

    11 RCC Drainage Pipes LM 4,530 712 15.71%

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014

    RENARDET S.A. & PARTNERS Page 11

    LOCATIONPILE

    NO.

    CAS

    TING

    SETTING

    OUT

    BORING,

    REBARS, &

    CONCRETE

    INTEGRITY

    TESTLOCATION

    PILE

    NO.

    CAS

    TING

    SETTING

    OUT

    BORING,

    REBARS, &

    CONCRETE

    INTEGRITY

    TEST

    1 76 14/5/2014 15/5/2014 21/5/2014 56 73 12/5/2014 13/5/2014 21/5/2014

    2 81 15/5/2014 17/5/2014 21/5/2014 57 79 13/6/2014 14/6/2014 21/5/2014

    3 77 14/5/2014 15/5/2014 21/5/2014 58 74 12/5/2014 13/5/2014 21/5/2014

    4 82 15/5/2014 17/5/2014 21/5/2014 59 80 13/6/2014 14/6/2014 21/5/2014

    5 78 14/5/2014 15/5/2014 21/5/2014 60 75 12/5/2014 13/5/2014 21/5/2014

    6 23 16/4/2014 17/4/2014 11/5/2014 61 13 9/4/2014 13/4/2014 28/4/2014

    7 40 24/4/2014 26/4/2014 11/5/2014 62 16 12/4/2014 15/4/2014 28/4/2014

    8 34 22/4/2014 23/4/2014 11/5/2014 63 6 9/4/2014 10/4/2014 28/4/2014

    9 41 24/4/2014 26/4/2014 11/5/2014 64 22 16/4/2014 17/4/2014 28/4/2014

    10 35 22/4/2014 23/4/2014 11/5/2014 65 7 9/4/2014 10/4/2014 28/4/2014

    11 43 26/4/2014 27/4/2014 11/5/2014 66 12 12/4/2014 13/4/2014 28/4/2014

    12 36 22/4/2014 23/4/2014 11/5/2014 67 17 14/4/2014 15/4/2014 28/4/2014

    13 42 24/4/2014 26/4/2014 11/5/2014 68 11 12/4/2014 13/4/2014 28/4/2014

    14 24 16/4/2014 17/4/2014 11/5/2014 69 18 14/4/2014 15/4/2014 28/4/2014

    15 49 28/4/2014 29/4/2014 14/6/2014 70 51 28/4/2014 29/4/2014 11/5/2014

    16 44 26/4/2014 27/4/2014 14/6/2014 71 52 29/4/2014 30/4/2014 11/5/2014

    17 37 23/4/2014 24/4/2014 14/6/2014 72 47 27/4/2014 28/4/2014 11/5/2014

    18 38 23/4/2014 24/4/2014 14/6/2014 73 53 29/4/2014 30/4/2014 11/5/2014

    19 46 27/4/2014 28/4/2014 14/6/2014 74 30 19/4/2014 21/4/2014 11/5/2014

    20 50 27/4/2014 29/4/2014 14/6/2014 75 54 29/4/2014 30/4/2014 11/5/2014

    21 45 26/4/2014 27/4/2014 14/6/2014 76 29 19/4/2014 21/4/2014 11/5/2014

    22 39 23/4/2014 24/4/2014 14/6/2014 77 48 27/4/2014 28/4/2014 11/5/2014

    23 31 21/4/2014 22/4/2014 14/6/2014 78 28 19/4/2014 21/4/2014 11/5/2014

    24 32 21/4/2014 22/4/2014 28/4/2014 79 5 8/4/2014 9/4/2014 23/4/2014

    25 25 17/4/2014 20/4/2014 28/4/2014 80 14 13/4/2014 14/4/2014 23/4/2014

    26 19 15/4/2014 16/4/2014 28/4/2014 81 4 8/4/2014 9/4/2014 23/4/2014

    27 26 17/4/2014 20/4/2014 28/4/2014 82 10 10/4/2014 12/4/2014 23/4/2014

    28 15 13/4/2014 14/4/2014 28/4/2014 83 3 8/4/2014 9/4/2014 23/4/2014

    29 27 17/4/2014 20/4/2014 28/4/2014 84 9 10/4/2014 12/4/2014 23/4/2014

    30 20 15/4/2014 16/4/2014 28/4/2014 85 1 7/4/2014 8/4/2014 23/4/2014

    31 33 20/4/2014 22/4/2014 28/4/2014 86 8 10/4/2014 12/4/2014 23/4/2014

    32 21 15/4/2014 16/4/2014 28/4/2014 87 2 7/4/2014 8/4/2014 23/4/2014

    33 93 30/7/2014 31/7/2014 19/8/2014 88 102 4/8/2014 7/8/2014 19/8/2014

    34 105 7/8/2014 9/8/2014 19/8/2014 89 108 10/8/2014 11/8/2014 19/8/2014

    35 99 2/8/2014 4/8/2014 19/8/2014 90 103 4/8/2014 7/8/2014 19/8/2014

    36 100 2/8/2014 4/8/2014 19/8/2014 91 109 10/8/2014 11/8/2014 19/8/2014

    37 94 30/7/2014 31/7/2014 19/8/2014 92 96 31/7/2014 3/8/2014 19/8/2014

    38 106 7/8/2014 9/8/2014 19/8/2014 93 110 10/8/2014 11/8/2014 19/8/2014

    39 95 30/7/2014 31/7/2014 19/8/2014 94 97 31/7/2014 3/8/2014 19/8/2014

    40 107 7/8/2014 9/8/2014 19/8/2014 95 104 4/8/2014 7/8/2014 19/8/2014

    41 100 2/8/2014 4/8/2014 19/8/2014 96 98 31/7/2014 3/8/2014 19/8/2014

    42 67 10/5/2014 11/5/2014 3/6/2014 97 61 6/5/2014 7/5/2014 18/5/2014

    43 70 10/5/2014 12/5/2014 3/6/2014 98 62 6/5/2014 7/5/2014 18/5/2014

    44 68 10/5/2014 11/5/2014 3/6/2014 99 63 6/5/2014 7/5/2014 18/5/2014

    45 71 10/5/2014 12/5/2014 3/6/2014 100 60 5/5/2014 6/5/2014 18/5/2014

    46 69 10/5/2014 11/5/2014 3/6/2014 101 59 5/5/2014 6/5/2014 18/5/2014

    47 72 10/5/2014 12/5/2014 3/6/2014 102 58 5/5/2014 6/5/2014 18/5/2014

    48 64 7/5/2014 8/5/2014 3/6/2014 103 57 4/5/2014 5/5/2014 18/5/2014

    49 65 7/5/2014 8/5/2014 3/6/2014 104 56 4/5/2014 5/5/2014 18/5/2014

    50 66 7/5/2014 8/5/2014 3/6/2014 105 55 4/5/2014 5/5/2014 18/5/2014

    51 83 19/5/2014 20/5/2014 3/6/2014 106 86 19/5/2014 20/5/2014 3/6/2014

    52 90 21/5/2014 22/5/2014 3/6/2014 107 91 21/5/2014 22/5/2014 3/6/2014

    53 84 19/5/2014 20/5/2014 3/6/2014 108 88 20/5/2014 21/5/2014 3/6/2014

    54 87 20/5/2014 21/5/2014 3/6/2014 109 92 21/5/2014 22/5/2014 3/6/2014

    55 85 19/5/2014 20/5/2014 3/6/2014 110 89 20/5/2014 21/5/2014 3/6/2014

    = 55 = 55

    = 110

    PREVIOUSP R EVIOUS

    M ON T HTHIS MONTH

    TOTAL NO. OF PILES CAST

    AB2 L

    LHS

    AB1 R

    P1R

    P2R

    P3R

    P4R

    P5R

    AB2 R

    AB1 L

    P1L

    P2L

    P3L

    P4L

    NO. OF PILES CAST (LHS)

    PROGRESS STATUS OF PILE FOUNDATION WORKS

    as of 31 AUGUST 2014

    NO. OF PILES CAST (RHS)

    P5L

    RHS

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014

    RENARDET S.A. & PARTNERS Page 12

    ACTIVITY AB1 L P1L P2L P3L P4L P5L AB2 L

    PEDESTAL - - - - - - -

    PIER N/A - - - - - N/A

    2nd Lift - 12-Aug-14 19-Aug-14 24-Jul-14 - on-going -

    Height (m) - 6.920 6.920 6.920 6.920 6.920 -

    1st Lift - 23-Jul-14 7-Aug-14 29-Jun-14 - on-going -

    Height (m) - 1.153 1.210 1.440 1.248 1.225 -

    BIT. PAINTING - 28-May-14 26-Jun-14 17-May-14 - 23-Jun-14 -

    PILE CAP - 17-May-14 18-Jun-14 8-May-14 24-Aug-14 11-Jun-14 -

    F/P & BLINDING N/A 11-May-14 11-Jun-14 1-May-14 17-Aug-14 3-Jun-14 N/A

    ACTIVITY AB1 R P1R P2R P3R P4R P5R AB2 R

    PEDESTAL - - - - - - -

    PIER N/A - - - - - N/A

    2nd Lift N/A 9-Jun-14 28-Jun-14 22-Jun-14 - 10-Jul-14 N/A

    Height (m) - 6.920 6.920 6.920 6.920 6.920 -

    1st Lift N/A 20-May-14 11-Jun-14 26-May-14 - 22-Jun-14 N/A

    Height (m) - 0.366 0.423 0.649 0.461 0.438 -

    BIT. PAINTING - 12-May-14 25-May-14 8-May-14 - 31-May-14 -

    PILE CAP (Pier & Abut.)- 4-May-14 13-May-14 4/30/2014 27-Aug-14 20-May-14 -

    F/P & BLINDING N/A 27-Apr-14 7-May-14 22-Apr-14 20-Aug-14 14-May-14 N/A

    PREVIOUSPREVIOUS

    MONTHTHIS MONTH

    BRIDGE SUB-STRUCTURE PROGRESS SCHEDULE

    As of 31 AUGUST 2014

    SUB-STRUCTURE WORK PROGRESS (RHS)

    SUB-STRUCTURE WORK PROGRESS (LHS)

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014

    RENARDET S.A. & PARTNERS Page 13

    DATE Elevation DATE

    FROM TO

    FOUNDATI

    ON

    /BLINDING

    FROM TO

    FOUNDATI

    ON

    /BLINDING

    22+702 22+825 - 22+718 22+810 -

    - -

    22+825 22+840 13-Jul-14 22+810 22+893 9-Aug-14

    14-Jul-14 10-Aug-14

    22+840 22+880 6-Jul-14 22+893 22+976 13-Aug-14

    13-Jul-14 14-Aug-14

    22+880 22+908 10-Aug-14 22+976 23+040 18-Aug-14

    11-Aug-14 19-Aug-14

    22+908 22+969 3-Jul-14 23+040 23+088 26-Jul-14

    5-Jul-14 27-Jul-14

    22+969 23+000 4-Aug-14 23+088 23+130 21-Jul-14

    5-Aug-14 22-Jul-14

    23+000 23+025 20-Jul-14 23+130 23+191 7-Jul-14

    21-Jul-14 10-Jul-14

    23+025 23+070 17-Jul-14 23+191 23+270 26-Jun-14

    18-Jul-14 27-Jun-14

    23+070 23+140 30-Jun-14

    1-Jul-14

    23+140 23+164 16-Jun-14

    17-Jun-14 DATE

    23+164 23+237 23-Jun-14 FROM TO BLINDING

    24-Jun-14 23+270 (L) 23+270 (R ) 26-Jun-14

    23+237 23+270 17-Jun-14 27-Jun-14

    18-Jun-14El. 22.00

    El. 22.80

    El. 22.00

    MSE WALL MONTHLY SCHEDULE (FOUNDATION @ APPROACH 1)

    as of 31 AUGUST 2014

    El. 21.20

    LOCATION (AB 1)

    Elevation

    Elevation

    LOCATION (LHS)

    El. 20.40

    El. 21.20

    El. 22.00

    El. 22.80

    El. 22.00

    LOCATION (RHS)

    El. 20.40

    El. 22.00

    DATE DATEFROM TO FOUND'N FROM TO BLINDING

    23+508 23+520 - 23+508 (L) 23+508 (R ) -

    - -

    23+520 23+580 20-Aug-1421-Aug-14

    23+580 23+660 26-Aug-1427-Aug-14 DATE

    23+660 23+735 - FROM TO BLINDING

    - 23+508 23+607 -23+735 23+827 - -

    - 23+607 23+950 -23+827 23+949 - -

    -

    PREVIOUSP R EVIOUS

    M ON T HTHIS MONTH

    El. 24.90

    Elevation

    El. 23.30

    ElevationLOCATION (RHS)

    El. 23.30

    El. 24.10

    LOCATION (LHS) LOCATION (AB 2)Elevation

    MSE WALL MONTHLY SCHEDULE (FOUNDATION @ APPROACH 2)

    El. 23.30

    El. 24.10

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014

    RENARDET S.A. & PARTNERS Page 14

    22+825 22+840 22+880 22+908.387 22+969.478 22+991 23+084 23+164.573 23+237.536 23+270.762

    34.800 - - - - - - - - - -34.000 - - - - - - - - - -33.200 - - - - - - - - - -32.400 - - - - - - - - - -31.600 - - - - - - - - - -30.800 - - - - - - - - - -30.000 - - - - - - - - - -29.200 - - - - - - - - - -28.400 - - - - - - - - - -27.600 - - - - - - - - - -26.800 - - - - - - - - - -26.000 - - - - - - - - 28-Aug-14 28-Aug-1425.200 - - - - - - - 26-Aug-14 19-Aug-14 19-Aug-1424.400 - - - - - - - 18-Aug-14 6-Aug-14 6-Aug-1423.600 - - - - - - 27-Aug-14 13-Aug-14 24-Jul-14 24-Jul-1422.800 - - - - - 24-Aug-14 9-Aug-14 28-Jul-14 - 13-Jul-1422.000 - - - - 28-Aug-14 - - - - -21.200 - 28-Aug-14 28-Aug-14 28-Aug-14 - - - - - -

    20.400 - - - - - - - - - -

    22+810 22+893.03222+976.294 23+035 23+088.04623+191.77423+270.80023+270.762 (L)23+270.800 (R )

    34.000 - - - - - - - - -33.200 - - - - - - - - -32.400 - - - - - - - - -31.600 - - - - - - - - -30.800 - - - - - - - - -30.000 - - - - - - - - -29.200 - - - - - - - - -28.400 - - - - - - - - -27.600 - - - - - - - - -26.800 - - - - - - - - -26.000 - - - - - - 31-Aug-14 28-Aug-14 28-Aug-1425.200 - - - - - 24-Aug-14 18-Aug-14 18-Aug-14 18-Aug-1424.400 - - - - - 13-Aug-14 6-Aug-14 7-Aug-14 7-Aug-1423.600 - - - - - 9-Aug-14 24-Jul-14 24-Jul-14 24-Jul-1422.800 - - - 21-Aug-14 18-Aug-14 - 13-Jul-14 13-Jul-14 13-Jul-1422.000 - - 26-Aug-14 - - - - - -21.200 - - - - - - - - -

    20.400 - - - - - - - - -

    PREVIOUSP R EVIOUS

    M ON T HTHIS MONTH

    RHS (AB 1), from Sta. 22+718.936 to Sta. 23+270.800

    LHS (AB 1), from Sta. 22+702.653 to Sta. 23+270.762

    AB 1 Face

    MSE WALL MONTHLY SCHEDULE (PANELS FIXING @ APPROACH 1)as of 31 AUGUST 2014

    ELEV.

    ELEV.

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014

    RENARDET S.A. & PARTNERS Page 15

    Rebars Concrete Rebars Concrete Rebars Concrete

    1 21+260 3 cells - 2.0 x 1.5 43.039 0 - - - - - - - -LHS Block 1 3 cells - 2.0 x 1.5 19.526 0 - - - - - - - -RHS Block 2 3 cells - 2.0 x 1.5 23.493 0 - - - - - - - -

    2 21+485 1 cell - 2.0 x 1.5 49.750 0 - - - - - - - -Block 1a 1 cell - 2.0 x 1.5 3.000 0 - - - - - - - -Block 1b 1 cell - 2.0 x 1.5 17.290 0 7/1/14 8/31/14 8/31/14 8/31/14 8/31/14 8/31/14 8/31/14Block 2a 1 cell - 2.0 x 1.5 7.710 0 7/1/14 8/31/14 8/31/14 8/31/14 8/31/14 8/31/14 8/31/14 -Block 2b 1 cell - 2.0 x 1.5 21.730 0 - - - - - - - -

    3 21+838 2 x 4 cells (8) - 2.0 x 1.5 57.210 0 - - - - - - - -Block 1a 1 x 4 cells - 2.0 x 1.5 5.000 0 7/21/14 - - - - - - -Block 1b 1 x 4 cells - 2.0 x 1.5 17.600 0 7/3/14 - - - - - - -Block 2 1 x 4 cells - 2.0 x 1.5 22.600 0 7/3/14 8/20/14 8/20/14 - - - - -Block 3 1 x 4 cells - 2.0 x 1.5 11.970 0 - - - - - - - -

    Block 4a 1 x 4 cells - 2.0 x 1.5 5.000 0 7/21/14 - - - - - - -Block 4b 1 x 4 cells - 2.0 x 1.5 17.600 0 7/3/14Block 5 1 x 4 cells - 2.0 x 1.5 22.600 0 7/3/14 - - - - - - -Block 6 1 x 4 cells - 2.0 x 1.5 11.970 0 - - - - - - - -

    4 21+972.411 x 4 cells (44) - 3.0 x 2.0 57.629 0 - - - - - - - -Block 1 1 x 4 cells - 3.0 x 2.0 28.038 0 5/24/14 6/5/14 6/5/14 6/24/14 6/24/14 7/15/14 7/16/14 8/16/14Block 2 1 x 4 cells - 3.0 x 2.0 28.031 0 5/24/14 7/9/14 7/10/14 8/3/14 8/4/14 8/13/14 8/13/14 -Block 3 1 x 4 cells - 3.0 x 2.0 28.026 0 5/17/14 5/25/14 5/25/14 6/3/14 6/3/14 6/23/14 6/23/14 -Block 4 1 x 4 cells - 3.0 x 2.0 28.022 0 5/18/14 7/12/14 7/13/14 8/5/14 8/6/14 8/18/14 8/19/14 -Block 5 1 x 4 cells - 3.0 x 2.0 28.019 0 5/18/14 5/29/14 5/29/14 6/8/14 6/8/14 7/2/14 7/2/14 -Block 6 1 x 4 cells - 3.0 x 2.0 28.018 0 5/18/14 7/31/14 7/31/14 8/12/14 8/12/14 8/27/14 8/28/14 -Block 7 1 x 4 cells - 3.0 x 2.0 28.019 0 5/18/14 6/10/14 6/10/14 7/1/14 7/1/14 7/23/14 7/24/14 -Block 8 1 x 4 cells - 3.0 x 2.0 28.022 0 5/26/14 8/9/14 8/10/14 8/25/14 8/26/14 - - -Block 9 1 x 4 cells - 3.0 x 2.0 28.026 0 5/26/14 6/15/14 6/15/14 7/7/14 7/8/14 8/4/14 8/5/14 -

    Block 10 1 x 4 cells - 3.0 x 2.0 28.031 0 5/28/14 8/17/14 8/18/14 - - - - -Block 11 1 x 4 cells - 3.0 x 2.0 28.038 0 5/28/14 6/19/14 6/19/14 7/20/14 7/20/14 - - -Block 12 1 x 4 cells - 3.0 x 2.0 21.015 0 8/10/14 8/25/14 8/26/14 - - - - -Block 13 1 x 4 cells - 3.0 x 2.0 21.010 0 7/27/14 - - - - - - -Block 14 1 x 4 cells - 3.0 x 2.0 21.006 0 7/27/14 - - - - - - -Block 15 1 x 4 cells - 3.0 x 2.0 21.003 0 7/24/14 8/23/14 8/23/14 - - - - -Block 16 1 x 4 cells - 3.0 x 2.0 21.001 0 6/16/14 7/27/14 7/27/14 8/14/14 8/14/14 - - -Block 17 1 x 4 cells - 3.0 x 2.0 21.000 0 6/16/14 - - - - - - -Block 18 1 x 4 cells - 3.0 x 2.0 21.001 0 6/12/14 - - - - - - -Block 19 1 x 4 cells - 3.0 x 2.0 21.003 0 6/12/14 - - - - - - -Block 20 1 x 4 cells - 3.0 x 2.0 21.006 0 6/8/14 - - - - - - -Block 21 1 x 4 cells - 3.0 x 2.0 21.010 0 6/8/14 - - - - - - -Block 22 1 x 4 cells - 3.0 x 2.0 21.015 0 6/8/14 6/25/14 6/25/14 7/30/14 7/30/14 - - -

    4 21+972.4 11 x 4 cells - 3.0 x 2.0 57.629 0 - - - - - - - -Block 23 1 x 4 cells - 3.0 x 2.0 6.635 0 - - - - - - - -Block 24 1 x 4 cells - 3.0 x 2.0 6.782 0 - - - - - - - -Block 25 1 x 4 cells - 3.0 x 2.0 6.819 0 - - - - - - - -Block 26 1 x 4 cells - 3.0 x 2.0 7.217 0 - - - - - - - -Block 27 1 x 4 cells - 3.0 x 2.0 7.975 0 - - - - - - - -Block 28 1 x 4 cells - 3.0 x 2.0 8.571 0 - - - - - - - -Block 29 1 x 4 cells - 3.0 x 2.0 9.267 0 - - - - - - - -Block 30 1 x 4 cells - 3.0 x 2.0 9.949 0 - - - - - - - -Block 31 1 x 4 cells - 3.0 x 2.0 10.260 0 - - - - - - - -Block 32 1 x 4 cells - 3.0 x 2.0 10.262 0 - - - - - - - -Block 33 1 x 4 cells - 3.0 x 2.0 10.265 0 - - - - - - - -

    5 22+655 2 x 4 cells (8) - 2.0 x 2.0 95.482 45 R - - - - - - - -(9 cells) 1 cell - 2.0 x 2.0 - - - - - - - -Block 1 1 x 4 cells - 2.0 x 2.0 9.675 45 R - - - - - - - -Block 2 1 x 4 cells - 2.0 x 2.0 32.711 45 R 06/30/14 08/06/14 08/07/14 - - - - -Block 3 1 x 4 cells - 2.0 x 2.0 32.711 45 R 06/24/14 07/21/14 07/21/14 08/17/14 08/18/14 08/17/14 08/18/14 -Block 4 1 x 4 cells - 2.0 x 2.0 20.315 45 R - - - - - - - -Block 5 1 x 4 cells - 2.0 x 2.0 19.035 45 R - - - - - - - -Block 6 1 x 4 cells - 2.0 x 2.0 32.711 45 R 06/29/14 07/27/14 07/28/14 - - - - -Block 7 1 x 4 cells - 2.0 x 2.0 32.711 45 R 06/24/14 08/28/14 08/28/14 - - - - -Block 8 1 x 4 cells - 2.0 x 2.0 10.95 45 R - - - - - - - -Block 9 1 cell - 2.0 x 2.0 25.03 45 R - - - - - - - -

    Block 10 1 cell - 2.0 x 2.0 32.711 45 R 06/28/14 08/20/14 08/23/14 - - - - -Block 11 1 cell - 2.0 x 2.0 32.711 45 R 06/29/14 08/03/14 08/04/14 - - - - -Block 12 1 cell - 2.0 x 2.0 4.960 45 R - - - - - - - -

    RHS

    LHS

    RHS

    RHS

    RHS

    LHS

    RHS

    LHS

    LHS

    RHS

    TYPE & DIMENSIONSTATION

    RCBC PROGRESS SCHEDULE (BARREL)

    As of 31 AUGUST 2014

    BASE SLAB WALLNO.

    TOP SLABBitumin

    ous

    Paint (2

    Coats)

    LENGTH

    (m)

    SKEW

    ( )

    F/P &

    BLINDIN

    G

    LHS

    LHS

    RHS

    LHS

    RHS

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014

    RENARDET S.A. & PARTNERS Page 16

    Rebars Concrete Rebars Concrete Rebars Concrete

    6 23+492 1 x 4 cells (4) - 3.0 x 2.0 79.065 15 R - - - - - - - -(5 cells) 1 cell - 3.0 x 2.0 - - - - - - - -Block 1 1 x 4 cells - 3.0 x 2.0 6.457 15 R - - - - - - - -Block 2 1 x 4 cells - 3.0 x 2.0 31.546 15 R 06/24/14 07/09/14 07/09/14 07/30/14 07/30/14 08/16/14 08/17/14 -Block 3 1 x 4 cells - 3.0 x 2.0 31.546 15 R 06/24/14 07/14/14 07/15/14 08/03/14 08/03/14 08/21/14 08/21/14 -Block 4 1 x 4 cells - 3.0 x 2.0 7.982 15 R - - - - - - - -Block 5 1 cell - 3.0 x 2.0 7.039 15 R - - - - - - - -Block 6 1 cell - 3.0 x 2.0 31.546 15 R 06/24/14 08/05/14 08/05/149 & 20/8/20149 & 23/8/201408/28/14 08/28/14 -Block 7 1 cell - 3.0 x 2.0 31.546 15 R 06/24/14 08/06/14 08/06/1411 & 25/8/201411 & 26/8/201408/31/14 - -Block 8 1 cell - 3.0 x 2.0 5.525 15 R - - - - - - - -

    7 23+756.5 1 cell - 2.0 x 1.5 67.550 0 - - - - - - - -Block 1 1 cell - 2.0 x 1.5 12.090 0 - - - - - - - -Block 2 1 cell - 2.0 x 1.5 20.180 0 07/12/14 07/23/14 07/23/14 07/23/14 07/23/14 07/23/14 07/23/14 07/24/14

    Block 3a 1 cell - 2.0 x 1.5 14.430 0 07/12/14 07/23/14 07/23/14 07/23/14 07/23/14 07/23/14 07/23/14 07/24/14Block 3b 1 cell - 2.0 x 1.5 8.700 0 08/11/14 08/26/14 08/26/14 08/26/14 08/26/14 08/26/14 08/26/14 08/28/14Block 4 1 cell - 2.0 x 1.5 12.090 0 - - - - - - - -

    8 23+997 1 cell - 2.0 x 1.5 70.268 0 - - - - - - - -Block 1 1 cell - 2.0 x 1.5 16.128 0 - - - - - - - -

    Block 2a 1 cell - 2.0 x 1.5 4.933 0 - - - - - - - -Block 2b 1 cell - 2.0 x 1.5 13.860 0 07/08/14 07/23/14 07/23/14 07/23/14 07/23/14 07/23/14 07/23/14 07/24/14Block 3a 1 cell - 2.0 x 1.5 16.300 0 07/08/14 07/23/14 07/23/14 07/23/14 07/23/14 07/23/14 07/23/14 07/24/14Block 3b 1 cell - 2.0 x 1.5 4.942 0 08/10/14 08/26/14 08/26/14 08/26/14 08/26/14 08/26/14 08/26/14 08/31/14Block 4a 1 cell - 2.0 x 1.5 7.848 0 08/10/14 08/26/14 08/26/14 08/26/14 08/26/14 08/26/14 08/26/14 08/31/14Block 4b 1 cell - 2.0 x 1.5 6.197 0

    9 24+235 1 cell - 2.0 x 1.5 59.106 0 - - - - - - - -Block 1a 1 cell - 2.0 x 1.5 15.566 0 - - - - - - - -Block 1b 1 cell - 2.0 x 1.5 15.000 0 07/12/14 07/23/14 07/23/14 07/23/14 07/23/14 07/23/14 07/23/14 07/24/14Block 2a 1 cell - 2.0 x 1.5 8.900 0 07/12/14 07/23/14 07/23/14 07/23/14 07/23/14 07/23/14 07/23/14 07/24/14Block 2b 1 cell - 2.0 x 1.5 15.600 0 08/10/14 08/26/14 08/26/14 08/26/14 08/26/14 08/26/14 08/26/14 08/31/14Block 2c 1 cell - 2.0 x 1.5 4.020 0 - - - - - - - -

    10 24+570 1 cell - 2.0 x 1.5 51.953 0 - - - - - - - -LHS Block 1 1 cell - 2.0 x 1.5 25.846 0 08/14/14 08/25/14 08/25/14 08/25/14 08/25/14 08/25/14 08/25/14 08/31/14

    Block 2a 1 cell - 2.0 x 1.5 13.500 0 08/14/14 08/25/14 08/25/14 08/25/14 08/25/14 08/25/14 08/25/14 08/31/14Block 2b 1 cell - 2.0 x 1.5 12.587 0 - - - - - - - -

    Note: Precast RCBC were used for all 1 cell - 2.0m x 1.5m locations.

    PREVIOUSPREVIOU

    S MONTHTHIS MONTH

    LHS

    RHS

    RHS

    RHS

    LHS

    LHS

    RHS

    LHS

    RHS

    RCBC PROGRESS SCHEDULE (BARREL)

    As of 31 AUGUST 2014

    NO. STATIONTOP SLAB

    Bitumin

    ous

    Paint (2

    BASE SLAB WALL

    LHS

    RHS

    TYPE & DIMENSIONLENGTH

    (m)

    SKEW

    ( )

    F/P &

    BLINDIN

    G

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014

    RENARDET S.A. & PARTNERS Page 17

    DIA TYPESettingout-

    Exc/InstallCONCRETE Backfil l

    L

    M

    R

    L

    M

    R

    L

    M

    R

    L

    M

    R

    L 5/15/14 5/15/14 5/18/14 6/12/14 UTL-LAY- 81 UTL-CON- 65 UTL-BF- 01

    M 6/11/14 6/11/14 6/12/14 7/10/14 UTL-LAY- 104 UTL-CON- 83 UTL-BF- 20

    R

    L 5/19/14 5/19/14 5/20/14 6/4/14 UTL-LAY- 87 UTL-CON- 66 UTL-BF- 03

    M 6/14/14 14/06/014 6/14/14 6/21/14 UTL-LAY- 108 UTL-CON- 84 UTL-BF- 21

    R

    L 5/19/14 5/19/14 5/20/14 5/31/14 UTL-LAY- 85 UTL-CON- 63 UTL-BF- 02

    M 6/15/14 6/15/14 6/15/14 UTL-LAY- 107 UTL-CON- 85 UTL-BF-

    R

    L 5/20/14 5/20/14 5/25/14 6/4/14 UTL-LAY- 86 UTL-CON- 64 UTL-BF- 05

    M 6/15/14 6/15/14 6/15/14 7/8/14 UTL-LAY- 109 UTL-CON- 87 UTL-BF- 23

    R

    L 5/25/14 5/25/14 5/25/14 6/4/14 UTL-LAY- 90 UTL-CON-68 UTL-BF- 07

    M 6/16/14 6/16/14 6/17/14 7/10/14 UTL-LAY- 111 UTL-CON- 88 UTL-BF- 28

    R

    L 6/17/14 6/17/14 6/18/14 7/9/14 UTL-LAY- 112 UTL-CON- 89 UTL-BF- 33

    M 7/20/14 7/20/14 7/21/14 7/27/14 UTL-LAY- 131 UTL-CON- 106 UTL-BF-44

    R

    L 6/19/14 6/19/14 6/19/14 7/6/14 UTL-LAY- 114 UTL-CON- 92 UTL-BF- 31

    M 7/20/14 7/20/14 7/21/14 7/17/14 UTL-LAY- 132 UTL-CON- 107 UTL-BF-46

    R

    L 6/19/14 6/19/14 6/19/14 7/5/14 UTL-LAY- 113 UTL-CON- 91 UTL-BF- 30

    M 7/20/14 7/20/14 7/21/14 7/17/14 UTL-LAY- 133 UTL-CON- 108 UTL-BF-45

    R

    L

    M

    R

    L

    M

    R

    L 5/26/14 5/26/14 5/26/14 6/8/14 UTL-LAY- 88 UTL-CON- 69 UTL-BF- 08

    M 6/11/14 6/11/14 6/11/14 7/22/14 UTL-LAY-106 UTL-CON- 81 UTL-BF-26

    R

    L

    M

    R

    L 6/16/14 6/16/14 6/16/14 7/20/14 UTL-LAY- 102 UTL-CON- UTL-BF-19

    M 7/8/14 7/8/14 7/9/14 7/27/14 UTL-LAY- 125 UTL-CON-99 UTL-BF-42

    R

    L 5/25/14 5/25/14 5/26/14 6/14/14 UTL-LAY- 91 UTL-CON- 71 UTL-BF- 06

    M 11/06/201 6/11/14 6/11/14 6/23/14 UTL-LAY- 105 UTL-CON- 82 UTL-BF- 25

    R

    L 5/27/14 5/27/14 5/27/14 6/17/14 UTL-LAY- 92 UTL-CON- 72 UTL-BF- 09

    M

    R

    L 5/28/14 5/28/14 5/28/14 6/17/14 UTL-LAY- 93 UTL-CON- 70 UTL-BF- 10

    M

    R

    L 5/29/14 5/29/14 5/29/14 6/17/14 UTL-LAY- 94 UTL-CON- 73 UTL-BF- 11

    M 7/30/14 8/12/14 8/19/14 8/26/14 UTL-LAY-142 UTL-CON-115 UTL-BF-48

    R

    DRAWING No.

    Sta

    ge

    s

    NO.

    OF

    Ways

    SETOUT/E

    XCV/BED

    PREP

    Progress Status of Underground Road Crossing Utilities

    2

    2

    2

    2

    3

    2

    3

    2

    3

    3

    3

    2

    2

    2

    3

    1

    1

    3

    4

    3

    4

    UPVC

    UPVC

    UPVC

    UPVC

    UPVC

    UPVC

    UPVC

    UPVC

    UPVC

    RC

    UPVC

    UPVC

    UPVC

    UPVC

    150

    200

    200

    200

    150

    300

    900

    150

    150

    150

    150

    23+060

    23+210

    23+240

    23+560

    19 CCC/FQI/EL/13

    CCC/FQI/EL/0820

    CCC/FQI/EL/0921

    11 CCC/FQI/EL/05 22+510

    14CCC/FQI/IR/05

    JUNCTION

    CROSSING

    22+587

    LHS

    12 CCC/FQI/IR/03

    18 CCC/FQI/EL/07

    15 CCC/FQI/EL/06

    22+520

    13CCC/FQI/IR/04

    JUNCTION

    CROSSING

    22+520

    LHS

    CCC/FQI/WA/01

    CCC/FQI/WA/02

    JUNCTION16

    17

    23+008

    LHS

    23+020

    22+760

    300 UPVC

    7 CCC/FQI/EL/02 21+660

    10

    150 UPVC

    8 CCC/FQI/IR/02 21+780 300

    150

    150

    9 CCC/FQI/EL/03 21+880

    CCC/FQI/EL/04 22+260

    BACKFILLI

    NG

    REF.S.

    NO.

    CHAINAG

    E

    PIPEINSTALLAT

    IONCONCRETE

    1CCC/FQI/IR/06

    SERVICE ROAD-30+030 200 UPVC

    2CCC/FQR/IR/11

    SOL-20+150 300 UPVC

    3CCC/FQR/IR/10

    SOL-30+300 200 UPVC

    4CCC/FQR/WA/05

    SR-10+600 300 UPVC

    5 CCC/FQI/EL/01 21+360 150 UPVC

    6 CCC/FQI/IR/01 21+460

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014

    RENARDET S.A. & PARTNERS Page 18

    DIA TYPESettingout-

    Exc/InstallCONCRETE Backfil l

    L 5/29/14 6/2/14 6/2/14 6/17/14 UTL-LAY- 95 UTL-CON- 75 UTL-BF- 15

    M 7/14/14 7/14/14 7/14/14 8/20/14 UTL-LAY- 124 UTL-CON- 102 UTL-BF- 36

    R

    L 5/29/14 6/2/14 6/2/14 6/17/14 UTL-LAY-97 UTL-CON- 76 UTL-BF- 13

    M 7/14/14 7/14/14 7/15/14 8/20/14 UTL-LAY- 127 UTL-CON- 101 UTL-BF- 38

    R

    L

    M 8/10/14 8/11/14 8/11/14 8/26/14 UTL-LAY-149A UTL-CON- 120AUTL-BF- 58

    R

    L 5/29/14 6/2/14 6/3/14 6/19/14 UTL-LAY- 98 UTL-CON- 77 UTL-BF- 14

    M 8/6/14 8/6/14 8/9/14 UTL-LAY- 134-R1UTL-CON- 109A

    R

    L

    M

    R

    L 6/3/14 6/4/14 6/4/14 6/23/14 UTL-LAY- 99 UTL-CON- 78 UTL-BF- 16

    M 8/11/14 8/11/14 8/19/14 8/26/14 UTL-LAY-140 R1UTL-CON-114 UTL-BF- 52

    R

    L 6/4/14 6/5/14 6/10/14 23/06/201 UTL-LAY- 100 UTL-CON- 79 UTL-BF- 17

    M 7/23/14 7/24/14 8/19/14 8/26/14 UTL-LAY-139 UTL-CON-112-R1UTL-BF- 47

    R

    L 6/9/14 6/9/14 6/10/14 6/23/14 UTL-LAY- 101 UTL-CON- 80 UTL-BF- 18

    M 8/6/14 8/6/14 8/6/14 8/26/14 UTL-LAY-138-R1UTL-CON-111-BUTL-BF- 56

    R

    L 7/5/14 7/5/14 7/5/14 UTL-LAY- 123 UTL-CON- 94

    M

    R

    L 7/16/14 7/16/14 7/17/14 7/27/14 UTL-LAY- 130 UTL-CON- 105 UTL-BF- 43

    M

    R

    L

    M

    R

    L

    M

    R

    L

    M

    R

    L 5/21/14 5/21/14 5/21/14 6/4/14 UTL-LAY- 89 UTL-CON- 67 UTL-BF- 04

    M 6/16/14 6/16/14 6/18/14 7/10/14 UTL-LAY- 110 UTL-CON- 90 UTL-BF- 29

    R

    L 5/29/14 5/31/14 5/31/14 6/17/14 UTL-LAY- 96 UTL-CON- 74 UTL-BF- 12

    M 7/10/14 7/10/14 8/13/14 8/26/14 UTL-LAY- 120 R1UTL-CON- 95 UTL-BF- 49

    R

    L 8/6/14 8/6/14 UTL-LAY-137-R1

    M 8/8/14 8/9/14 8/9/14 UTL-LAY-148A UTL-CON- 117

    R

    L 7/7/14 7/8/14 7/8/14 UTL-LAY-103A UTL-CON-98

    M 8/12/14 8/13/14 8/14/14 8/15/14 UTL-LAY-150 UTL-CON-122 UTL-BF- 37A

    R

    L

    M

    R

    L 7/9/14 7/9/14 UTL-LAY- 116

    M 8/12/14 8/13/14 8/14/14 UTL-LAY-151 UTL-CON-100C

    R

    L

    M 7/10/14 7/10/14 7/14/14 UTL-LAY-126 UTL-CON-103

    R 7/22/14 7/22/14 7/23/14 8/20/14 UTL-LAY-136 UTL-CON-110 UTL-BF- 50

    B 8/30/14 8/31/14 UTL-LAY-158

    T

    S.

    NO.DRAWING No.

    Sta

    ge

    s

    CHAINAG

    E

    PIPE NO.

    OF

    Ways

    SETOUT/E

    XCV/BED

    PREP

    INSTALLAT

    IONCONCRETE

    BACKFILLI

    NG

    REF.

    40 CCC/FQI/SL/02 22+080 150 UPVC 4

    3

    1

    2

    2

    3

    3

    2

    3

    3

    2

    3

    2

    2

    UPVC

    UPVC

    UPVC

    UPVC

    UPVC

    4

    3

    1

    UPVC

    UPVC

    UPVC

    22+810 100 UPVC

    100

    21+870

    23+580

    24+720

    150

    150

    300

    150

    100

    100

    37CCC/FQI/OMANT

    EL.1

    UPVC

    RC

    UPVC

    RC

    UPVC

    UPVC

    UPVC

    150

    150

    300

    150

    600

    150

    600

    300

    33

    CCC/FQI/WA/0425

    CCC/FQI/IR/0726

    34

    35

    36

    CCC/FQI/EL/14

    CCC/FQI/IR/08

    CCC/FQI/EL/15

    CCC/FQI/EL/16

    CCC/FQI/IR/09

    CCC/FQI/EL/17

    CCC/FQI/NAW.2

    CCC/FQI/NAW.3

    CCC/FQI/NAW.4

    CCC/FQI/EL/1227

    23+820

    23+900

    23+980

    24+000

    24+020

    24+120

    CCC/FQI/EL/1022

    CCC/FQI/WA/0323

    24 CCC/FQI/EL/11

    CCC/FQI/OMANT

    EL.2100 UPVC38

    0+140

    SOL-34

    39 CCC/FQI/SL/03 22+820 150 UPVC 4

    40 CCC/FQI/SL/04 22+990 150 UPVC 4

    23A 23+960 UPVC 2

    24+220

    24+340

    24+520

    24+820

    24+960

    25+160

    28

    29

    30

    31

    32

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014

    RENARDET S.A. & PARTNERS Page 19

    SUBGRADE IN CUT COMPLETED 21+000-21+500 As of August 30 2014BWC 6 cmTack Coat BBC 12 cmPRIME COAT ABC 2 ND 15 cmABC 1 ST 15 cmGSB 20 cmLayr 10Layr 9Layr 8Layr 7Layr 6Layr 5Layr 4Layr 3Layr 2

    EMBANKMENT Layer 1 BED PREPRATION OGL SURVEY

    21

    +0

    00

    21

    +0

    20

    21

    +0

    40

    21

    +0

    60

    21

    +0

    80

    21

    +1

    00

    21

    +1

    20

    21

    +1

    40

    21

    +1

    60

    21

    +1

    80

    21

    +2

    00

    21

    +2

    20

    21

    +2

    40

    21

    +2

    60

    21

    +2

    80

    21

    +3

    00

    21

    +3

    20

    21

    +3

    40

    21

    +3

    60

    21

    +3

    80

    21

    +4

    00

    21

    +4

    20

    21

    +4

    40

    21

    +4

    60

    21

    +4

    80

    21

    +5

    00

    OGL SURVEY BED PREPRATION EMBANKMENT Layer 1layer 2layer 3layer 4layer 5layer 6layer 7layer 8layer 9layer 10

    GSB 20 cmABC 1 ST 15 cmABC 2 ND 15 cmPRIME COAT BBC 12 cmTack Coat BWC 6 cm

    21+500-22+000BWC 6 cmTack Coat BBC 12 cmPRIME COAT ABC 2 ND 15 cmABC 1 ST 15 cmGSB 20 cmLayer 10Layer 9Layer 8Layer 7Layer 6Layer 5Layer 4Layer 3Layer 2

    EMBANKMENT Layer 1BED PREPRATION OGL SURVEY

    21

    +5

    00

    21

    +5

    20

    21

    +5

    40

    21

    +5

    60

    21

    +5

    80

    21

    +6

    00

    21

    +6

    20

    21

    +6

    40

    21

    +6

    60

    21

    +6

    80

    21

    +7

    00

    21

    +7

    20

    21

    +7

    40

    21

    +7

    60

    21

    +7

    80

    21

    +8

    00

    21

    +8

    20

    21

    +8

    40

    21

    +8

    60

    21

    +8

    80

    21

    +9

    00

    21

    +9

    20

    21

    +9

    40

    21

    +9

    60

    21

    +9

    80

    22

    +0

    00

    OGL SURVEY BED PREPRATION EMBANKMENT Layer 1layer 2layer 3layer 4layer 5layer 6layer 7layer 8layer 9layer 10

    GSB 20 cmABC 1 ST 15 cmABC 2 ND 15 cmPRIME COAT BBC 12 cmTack Coat BWC 6 cm

    RH

    S

    FQI PROJECT - PROGRESS STRIP CHART FOR ROAD WORKS

    LHS

    RH

    SLH

    S

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014

    RENARDET S.A. & PARTNERS Page 20

    COMPLETED 22+000-22+500 As of August 30 2014BWC 6 cmTack Coat BBC 12 cmPRIME COAT ABC 2 ND 15 cmABC 1 ST 15 cmGSB 20 cmLayr 10Layr 9Layr 8Layr 7Layr 6Layr 5Layr 4Layr 3Layr 2EMBANKMENT Layer 1 BED PREPRATION OGL SURVEY

    22

    +00

    0

    22

    +02

    0

    22

    +04

    0

    22

    +06

    0

    22

    +08

    0

    22

    +10

    0

    22

    +12

    0

    22

    +14

    0

    22

    +16

    0

    22

    +18

    0

    22

    +20

    0

    22

    +22

    0

    22

    +24

    0

    22

    +26

    0

    22

    +28

    0

    22

    +30

    0

    22

    +32

    0

    22

    +34

    0

    22

    +36

    0

    22

    +38

    0

    22

    +40

    0

    22

    +42

    0

    22

    +44

    0

    22

    +46

    0

    22

    +48

    0

    22

    +50

    0

    OGL SURVEY BED PREPRATION EMBANKMENT Layer 1layer 2layer 3layer 4layer 5layer 6layer 7layer 8layer 9layer 10GSB 20 cmABC 1 ST 15 cmABC 2 ND 15 cmPRIME COAT BBC 12 cmTack Coat BWC 6 cm

    22+500-23+000BWC 6 cmTack Coat BBC 12 cmPRIME COAT ABC 2 ND 15 cmABC 1 ST 15 cmGSB 20 cmLayer 10Layer 9Layer 8Layer 7Layer 6Layer 5Layer 4Layer 3Layer 2EMBANKMENT Layer 1BED PREPRATION OGL SURVEY

    22

    +50

    0

    22

    +52

    0

    22

    +54

    0

    22

    +56

    0

    22

    +58

    0

    22

    +60

    0

    22

    +62

    0

    22

    +64

    0

    22

    +66

    0

    22

    +68

    0

    22

    +70

    0

    22

    +72

    0

    22

    +74

    0

    22

    +76

    0

    22

    +78

    0

    22

    +80

    0

    22

    +82

    0

    22

    +84

    0

    22

    +86

    0

    22

    +88

    0

    22

    +90

    0

    22

    +92

    0

    22

    +94

    0

    22

    +96

    0

    22

    +98

    0

    23

    +00

    0

    OGL SURVEY BED PREPRATION EMBANKMENT Layer 1layer 2layer 3layer 4layer 5layer 6layer 7layer 8layer 9layer 10GSB 20 cmABC 1 ST 15 cmABC 2 ND 15 cmPRIME COAT BBC 12 cmTack Coat BWC 6 cm

    LHS

    RH

    SLH

    SR

    HS

    FQI PROJECT - PROGRESS STRIP CHART FOR ROAD WORKS

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014

    RENARDET S.A. & PARTNERS Page 21

    COMPLETED 23+000-23+500 As of August 30 2014BWC 6 cmTack Coat BBC 12 cmPRIME COAT ABC 2 ND 15 cmABC 1 ST 15 cmGSB 20 cmLayr 10 LAYER 18Layr 9Layr 8Layr 7Layr 6Layr 5Layr 4Layr 3Layr 2EMBANKMENT Layer 1 BED PREPRATION OGL SURVEY

    23

    +00

    0

    23

    +02

    0

    23

    +04

    0

    23

    +06

    0

    23

    +08

    0

    23

    +10

    0

    23

    +12

    0

    23

    +14

    0

    23

    +16

    0

    23

    +18

    0

    23

    +20

    0

    23

    +22

    0

    23

    +24

    0

    23

    +26

    0

    23

    +28

    0

    23

    +30

    0

    23

    +32

    0

    23

    +34

    0

    23

    +36

    0

    23

    +38

    0

    23

    +40

    0

    23

    +42

    0

    23

    +44

    0

    23

    +46

    0

    23

    +48

    0

    23

    +50

    0

    OGL SURVEY BED PREPRATION EMBANKMENT Layer 1layer 2layer 3layer 4layer 5layer 6layer 7layer 8 LAYER 18layer 9layer 10GSB 20 cmABC 1 ST 15 cmABC 2 ND 15 cmPRIME COAT BBC 12 cmTack Coat BWC 6 cm

    23+500-24+000BWC 6 cmTack Coat BBC 12 cmPRIME COAT ABC 2 ND 15 cmABC 1 ST 15 cmGSB 20 cmLayer 10Layer 9Layer 8Layer 7Layer 6Layer 5Layer 4Layer 3Layer 2EMBANKMENT Layer 1BED PREPRATION OGL SURVEY

    23

    +50

    0

    23

    +52

    0

    23

    +54

    0

    23

    +56

    0

    23

    +58

    0

    23

    +60

    0

    23

    +62

    0

    23

    +64

    0

    23

    +66

    0

    23

    +68

    0

    23

    +70

    0

    23

    +72

    0

    23

    +74

    0

    23

    +76

    0

    23

    +78

    0

    23

    +80

    0

    23

    +82

    0

    23

    +84

    0

    23

    +86

    0

    23

    +88

    0

    23

    +90

    0

    23

    +92

    0

    23

    +94

    0

    23

    +96

    0

    23

    +98

    0

    24

    +00

    0

    OGL SURVEY BED PREPRATION EMBANKMENT Layer 1layer 2layer 3layer 4layer 5layer 6layer 7layer 8layer 9layer 10GSB 20 cmABC 1 ST 15 cmABC 2 ND 15 cmPRIME COAT BBC 12 cmTack Coat BWC 6 cm

    LHS

    RH

    SLH

    SR

    HS

    FQI PROJECT - PROGRESS STRIP CHART FOR ROAD WORKS

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014

    RENARDET S.A. & PARTNERS Page 22

    COMPLETED 24+000-24+500 As of August 30 2014

    BWC 6 cmTack Coat BBC 12 cmPRIME COAT ABC 2 ND 15 cmABC 1 ST 15 cmGSB 20 cmLayer 10Layer 9Layer 8Layer 7Layer 6Layer 5Layer 4Layer 3Layer 2

    EMBANKMENT Layer 1 BED PREPRATION OGL SURVEY

    24

    +00

    0

    24

    +02

    0

    24

    +04

    0

    24

    +06

    0

    24

    +08

    0

    24

    +10

    0

    24

    +12

    0

    24

    +14

    0

    24

    +16

    0

    24

    +18

    0

    24

    +20

    0

    24

    +22

    0

    24

    +24

    0

    24

    +26

    0

    24

    +28

    0

    24

    +30

    0

    24

    +32

    0

    24

    +34

    0

    24

    +36

    0

    24

    +38

    0

    24

    +40

    0

    24

    +42

    0

    24

    +44

    0

    24

    +46

    0

    24

    +48

    0

    24

    +50

    0

    OGL SURVEY BED PREPRATION EMBANKMENT Layer 1layer 2layer 3layer 4layer 5layer 6layer 7layer 8layer 9layer 10

    GSB 20 cmABC 1 ST 15 cmABC 2 ND 15 cmPRIME COAT BBC 12 cmTack Coat BWC 6 cm

    24+500-25+000

    BWC 6 cmTack Coat BBC 12 cmPRIME COAT ABC 2 ND 15 cmABC 1 ST 15 cmGSB 20 cmLayer 10Layer 9Layer 8Layer 7Layer 6Layer 5Layer 4Layer 3Layer 2

    EMBANKMENT Layer 1BED PREPRATION OGL SURVEY

    24

    +50

    0

    24

    +52

    0

    24

    +54

    0

    24

    +56

    0

    24

    +58

    0

    24

    +60

    0

    24

    +62

    0

    24

    +64

    0

    24

    +66

    0

    24

    +68

    0

    24

    +70

    0

    24

    +72

    0

    24

    +74

    0

    24

    +76

    0

    24

    +78

    0

    24

    +80

    0

    24

    +82

    0

    24

    +84

    0

    24

    +86

    0

    24

    +88

    0

    24

    +90

    0

    24

    +92

    0

    24

    +94

    0

    24

    +96

    0

    24

    +98

    0

    25

    +00

    0

    OGL SURVEY BED PREPRATION EMBANKMENT Layer 1layer 2layer 3layer 4layer 5layer 6layer 7layer 8layer 9layer 10

    GSB 20 cmABC 1 ST 15 cmABC 2 ND 15 cmPRIME COAT BBC 12 cmTack Coat BWC 6 cm

    LHS

    RH

    SLH

    SR

    HS

    FQI PROJECT - PROGRESS STRIP CHART FOR ROAD WORKS

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014

    RENARDET S.A. & PARTNERS Page 23

    COMPLETED 25+000-25+500 As of August 30 2014

    BWC 6 cm

    Tack Coat

    BBC 12 cm

    PRIME COAT

    ABC 2 ND 15 cm

    ABC 1 ST 15 cm

    GSB 20 cm

    Layr 10

    Layr 9

    Layr 8

    Layr 7

    Layr 6

    Layr 5

    Layr 4

    Layr 3

    Layr 2

    EMBANKMENT Layer 1

    BED PREPRATION

    OGL SURVEY

    25

    +0

    00

    25

    +0

    20

    25

    +0

    40

    25

    +0

    60

    25

    +0

    80

    25

    +1

    00

    25

    +1

    20

    25

    +1

    40

    25

    +1

    60

    25

    +1

    80

    25

    +2

    00

    25

    +2

    20

    25

    +2

    40

    25

    +2

    60

    25

    +2

    80

    25

    +3

    00

    25

    +3

    20

    25

    +3

    40

    25

    +3

    60

    25

    +3

    80

    25

    +4

    00

    25

    +4

    20

    25

    +4

    40

    25

    +4

    60

    25

    +4

    80

    25

    +5

    00

    OGL SURVEY

    BED PREPRATION

    EMBANKMENT Layer 1

    layer 2

    layer 3

    layer 4

    layer 5

    layer 6

    layer 7

    layer 8

    layer 9

    layer 10

    GSB 20 cm

    ABC 1 ST 15 cm

    ABC 2 ND 15 cm

    PRIME COAT

    BBC 12 cm

    Tack Coat

    BWC 6 cm

    LHS

    RH

    SFQI PROJECT - PROGRESS STRIP CHART FOR ROAD WORKS

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014

    RENARDET S.A. & PARTNERS Page 24

    Sl.

    No

    .D

    ESC

    RIP

    TIO

    NP

    AYM

    ENT

    FOR

    THE

    MO

    NTH

    OF

    GR

    OSS

    AM

    OU

    NT

    (R.O

    .)

    GR

    OSS

    AM

    OU

    NT

    CLA

    IMED

    (R

    .O.)

    NET

    AM

    OU

    NT

    CLA

    IMED

    (R.O

    .)

    DA

    TE

    SUB

    MIT

    TED

    AM

    OU

    NT

    CER

    TIFI

    ED (

    R.O

    .)D

    ATE

    CER

    TIFI

    ED

    AM

    OU

    NT

    REC

    EIV

    ED

    (R.O

    .)

    DA

    TE

    PA

    YMEN

    T D

    UE

    DA

    TE

    PA

    YMEN

    T

    REC

    EIV

    ED

    1PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 1

    (AD

    VA

    NC

    E PA

    YMEN

    T)D

    ec-1

    3

    1,6

    48,2

    25

    1,6

    48,2

    25

    1,64

    8,22

    5 23

    -Nov

    -13

    1,6

    48,2

    25

    29-J

    an-1

    41,

    648,

    225

    6-

    Feb

    -14

    2PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 2

    Jan-

    14

    2,2

    91,2

    77

    643,

    052

    51

    4,44

    2

    12-F

    eb-1

    451

    4,44

    2

    02

    -Apr

    -14

    513,

    608

    10-A

    pr-1

    4

    3PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 3

    Feb

    &M

    ar-1

    4

    2,8

    08,6

    44

    517,

    367

    50

    4,14

    7

    06-A

    pr-1

    443

    4,91

    7

    03

    -May

    -14

    434,

    917

    13-A

    ug-1

    4

    4PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 4

    Apr

    -14

    3

    ,315

    ,692

    50

    7,04

    8

    417,

    900

    08

    -May

    -14

    407,

    538

    05-J

    un-1

    437

    5,01

    3

    13

    -Aug

    -14

    5PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 5

    May

    -14

    4

    ,109

    ,460

    79

    3,76

    8

    650,

    802

    05

    -Jun

    -14

    445,

    708

    04-J

    ul-1

    437

    4,17

    2

    13

    -Aug

    -14

    6PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 6

    Jun-

    14

    4,2

    93,7

    64

    184,

    304

    38

    2,11

    6

    15-J

    ul-1

    438

    2,11

    6

    16

    -Jul

    -14

    14-S

    ep-1

    4

    7PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 7

    Jul-

    14

    8PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 8

    Aug

    -14

    9PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 9

    Sep

    -14

    10PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 1

    0O

    ct-1

    4

    11PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 1

    1N

    ov-1

    4

    12PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 1

    2D

    ec-1

    4

    13PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 1

    3Ja

    n-15

    14PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 1

    4Fe

    b-1

    5

    15PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 1

    5M

    ar-1

    5

    16PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 1

    6A

    pr-1

    5

    17PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 1

    7M

    ay-1

    5

    18PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 1

    8Ju

    n-15

    4,29

    3,76

    4

    4,

    293,

    764

    4,11

    7,63

    2

    3,

    832,

    946

    3,

    345,

    935

    TO

    TAL

    AM

    OU

    NT

    (R.O

    .)

    ST

    AT

    US

    OF

    PA

    YM

    EN

    T A

    PP

    LIC

    AT

    ION

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014

    RENARDET S.A. & PARTNERS Page 25

    LIST OF AVAILABLE EQUIPMENTS AT SITE

    Sl.

    No.CCC HIRED

    TOTAL

    AVAILABLE

    AT SITE

    1 COMPRESSOR

    2 AIR COMPRESSOR 1 1 2

    3 MILLER WELDING MECHINE 2 2

    4 GENERATOR 3 3

    5 CRANES -

    6 CRANES 30 TON / 25 TON / 70 TON 2 2 4

    7 VEHICLES H.D. -

    8 DIESEL TANKER -

    9 FLAT TRAILER 1 1

    10 HIAB TRUCK 2 2

    11 P/MOVER + TIPPING TRAILER 3 3

    12 TIPPER TRUCKS 13 1 14

    13 WATER TANKER 5000 GAL 2 2 4

    14 EARTH MOVING PLANT

    15 BOBCAT 2 2

    16 EXCAVATOR 2 2

    17 JCB 4CX / 3CX 1 4 5

    18 SHOVEL / WHEEL LOADER 3 1 4

    19 DOZER D9N/D8R 1 1

    20 TELEHANDLER -

    21 CIVIL ENGINEERING EQUIPMENT

    22 GREEN STABILIZER PLANT 1 1

    23 DYNAPAC S/ROLLER -

    24 E/WORK ROLLER 1 2 3

    25 MOTOR GRADER 1 2 3

    26 TITAN PAVER MACHINE -

    27 TYRE / PTR ROLLER -

    28 PAVER MACHINE -

    29 L. D. VEHICLES & TRUCKS

    30 DYNA TRUCK 1 2 3

    31 MAINTENANCE TRUCKS 1 1

    32 ASHOK LEYLAND BUS 55 SEAT 6 6

    33 TOYOTA COASTER BUS 24 S 1 1

    34 TOYOTA COROLLA/CIVIC/YARIS 12 12

    35 TOYOTA PICKUP/ISUZU 5 7 12

    36 NISSAN PATHFINDER/X-TRAIL 5 5

    37 TOYOTA LAND CRUISER/FORTUNER 4 4

    38 Total 49 51 100

    DESCRIPTION

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014

    RENARDET S.A. & PARTNERS Page 26

    Ja

    n-1

    4Fe

    b-1

    4M

    ar-

    14

    Ap

    r-1

    4M

    ay

    -14

    Ju

    n-1

    4Ju

    l-1

    4A

    ug

    -14

    Se

    p-1

    4O

    ct-

    14

    No

    v-1

    4D

    ec-1

    4Ja

    n-1

    5Fe

    b-1

    5M

    ar-

    15

    Ap

    r-1

    5M

    ay

    -15

    Ju

    n-1

    5Ju

    l-1

    5A

    ug

    -15

    Se

    p-1

    5O

    ct-

    15

    To

    tal

    PLA

    NN

    ED T

    OTA

    L P

    ER M

    ON

    TH4

    76

    88

    79

    59

    31

    07

    11

    01

    08

    10

    21

    00

    98

    87

    82

    79

    77

    66

    53

    41

    15

    00

    REV

    ISED

    PLA

    NN

    ED T

    OTA

    L P

    ER M

    ON

    TH6

    88

    79

    59

    31

    07

    11

    01

    08

    10

    21

    00

    98

    87

    82

    79

    77

    66

    53

    41

    PLA

    NN

    ED C

    UM

    ULA

    TIV

    E4

    71

    15

    20

    22

    97

    39

    04

    97

    60

    77

    15

    81

    79

    17

    1,0

    15

    1,1

    02

    1,1

    84

    1,2

    63

    1,3

    40

    1,4

    06

    1,4

    59

    1,5

    00

    1,5

    00

    1,5

    00

    1,5

    00

    1,5

    00

    AC

    TUA

    L TO

    TAL

    PER

    MO

    NTH

    33

    55

    66

    68

    77

    86

    88

    10

    05

    73

    AC

    TUA

    L C

    UM

    ULA

    TIV

    E3

    38

    81

    54

    22

    22

    99

    38

    54

    73

    57

    3

    20

    14

    20

    15

    47

    68

    87

    95

    93

    107

    110

    108

    102

    100

    98

    87

    82

    79

    77

    66

    53

    41

    33

    55

    66

    68

    77

    86

    88

    100

    68

    87

    95

    93

    10

    711

    01

    08

    10

    21

    00

    98

    87

    82

    79

    77

    66

    53

    41

    0

    20

    40

    60

    80

    10

    0

    12

    0

    Jan-14

    Feb-14

    Mar-14

    Apr-14

    May-14

    Jun-14

    Jul-14

    Aug-14

    Sep-14

    Oct-14

    Nov-14

    Dec-14

    Jan-15

    Feb-15

    Mar-15

    Apr-15

    May-15

    Jun-15

    Jul-15

    Aug-15

    Sep-15

    Oct-15

    No. of EQUIPMENT

    PR

    OJ

    EC

    T M

    ON

    TH

    S

    PL

    AN

    NE

    D T

    OT

    AL

    PE

    R M

    ON

    TH

    AC

    TU

    AL

    TO

    TA

    L P

    ER

    MO

    NT

    H

    RE

    VIS

    ED

    PL

    AN

    NE

    D T

    OT

    AL

    PE

    R M

    ON

    TH

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014

    RENARDET S.A. & PARTNERS Page 27

    20

    13

    De

    c-1

    3Jan

    -14

    Fe

    b-1

    4M

    ar-

    14

    Ap

    r-14

    May-1

    4Ju

    n-1

    4Ju

    l-14

    Au

    g-1

    4S

    ep

    -14

    Oct-

    14

    No

    v-1

    4D

    ec-1

    4Jan

    -15

    Fe

    b-1

    5M

    ar-

    15

    Ap

    r-15

    May-1

    5Ju

    n-1

    5Ju

    l-15

    Au

    g-1

    5S

    ep

    -15

    Oct-

    15

    To

    tal

    PL

    AN

    NE

    D T

    OT

    AL

    PE

    R M

    ON

    TH

    - (

    DIR

    EC

    T )

    634

    186

    375

    586

    791

    792

    799

    794

    793

    701

    480

    381

    269

    246

    307

    307

    305

    149

    8301

    565

    756

    754

    750

    700

    652

    667

    554

    516

    387

    297

    276

    365

    271

    135

    92

    51

    7788

    PL

    AN

    NE

    D T

    OT

    AL

    PE

    R M

    ON

    TH

    - (

    IN

    DIR

    EC

    T )

    523

    36

    50

    52

    57

    59

    59

    60

    61

    63

    61

    61

    57

    51

    47

    44

    35

    30

    914

    RE

    VIS

    ED

    - P

    LA

    NN

    ED

    TO

    TA

    L P

    ER

    MO

    NT

    H-(

    IND

    IRE

    CT

    )63

    84

    84

    83

    78

    72

    74

    61

    57

    43

    33

    31

    40

    30

    15

    10

    6862

    PL

    AN

    NE

    D T

    OT

    AL

    PE

    R M

    ON

    TH

    - (

    DIR

    EC

    T +

    IN

    DIR

    EC

    T )

    11

    57

    222

    425

    638

    848

    851

    858

    854

    854

    764

    541

    442

    326

    297

    354

    351

    340

    179

    9215

    RE

    VIS

    ED

    - P

    LA

    NN

    ED

    -

    ( D

    IRE

    CT

    + IN

    DIR

    EC

    T )

    627

    840

    838

    833

    778

    725

    741

    616

    573

    429

    330

    306

    406

    301

    150

    102

    57

    8651

    PL

    AN

    NE

    D C

    UM

    UL

    AT

    IVE

    11

    68

    291

    715

    1,3

    53

    2,2

    02

    3,0

    52

    3,9

    10

    4,7

    64

    5,6

    18

    6,3

    83

    6,9

    23

    7,3

    65

    7,6

    91

    7,9

    88

    8,3

    42

    8,6

    93

    9,0

    33

    9,2

    12

    9,2

    12

    AC

    TU

    AL

    TO

    TA

    L P

    ER

    MO

    NT

    H -

    ( D

    IRE

    CT

    )322

    365

    550

    581

    603

    691

    709

    756

    734

    5311

    AC

    TU

    AL

    TO

    TA

    L P

    ER

    MO

    NT

    H -

    ( IN

    DIR

    EC

    T )

    18

    26

    46

    49

    54

    57

    64

    69

    68

    451

    AC

    TU

    AL

    TO

    TA

    L P

    ER

    MO

    NT

    H -

    ( D

    IRE

    CT

    + IN

    DIR

    EC

    T )

    340

    391

    596

    630

    657

    748

    773

    825

    802

    00

    00

    00

    00

    00

    5762

    AC

    TU

    AL

    CU

    MU

    LA

    TIV

    E340

    731

    1,3

    27

    1,9

    57

    2,6

    14

    3,3

    62

    4,1

    35

    4,9

    60

    5,7

    62

    RE

    VIS

    ED

    - P

    LA

    NN

    ED

    TO

    TA

    L P

    ER

    MO

    NT

    H -

    ( D

    IRE

    CT

    )

    20

    14

    20

    15

    11

    57

    222

    425

    638

    848

    851

    858

    854

    854

    764

    541

    442

    326

    297

    354

    351

    340

    179

    340

    391

    596

    630

    657

    748

    773

    825

    802

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    10

    0

    20

    0

    30

    0

    40

    0

    50

    0

    60

    0

    70

    0

    80

    0

    90

    0

    Dec-13

    Jan-14

    Feb-14

    Mar-14

    Apr-14

    May-14

    Jun-14

    Jul-14

    Aug-14

    Sep-14

    Oct-14

    Nov-14

    Dec-14

    Jan-15

    Feb-15

    Mar-15

    Apr-15

    May-15

    Jun-15

    Jul-15

    Aug-15

    Sep-15

    Oct-15

    No. of Men

    PR

    OJ

    EC

    T M

    ON

    TH

    S

    PL

    AN

    NE

    D T

    OT

    AL P

    ER

    MO

    NTH

    - ( D

    IRE

    CT

    + IN

    DIR

    EC

    T )

    AC

    TU

    AL

    TO

    TA

    L P

    ER

    MO

    NT

    H -

    ( D

    IRE

    CT

    + IN

    DIR

    EC

    T )

    RE

    VIS

    ED

    - P

    LA

    NN

    ED

    -

    ( D

    IRE

    CT

    + IN

    DIR

    EC

    T )

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014

    RENARDET S.A. & PARTNERS Page 28

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014

    RENARDET S.A. & PARTNERS Page 29

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014

    RENARDET S.A. & PARTNERS Page 30

  • Project: Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report August 2014

    RENARDET S.A. & PARTNERS Page 31

    Date

    Su

    bm

    itte

    d

    CC

    C/F

    QI/

    RE

    N/M

    AS

    /001

    MA

    S/C

    CC

    /FQ

    I/B

    BC

    /001

    Bitum

    inous

    Base

    Cours

    eT

    arm

    ac Z

    aw

    aw

    i L

    LC

    Om

    an

    22/1

    2/2

    013

    AP

    PR

    OV

    ED

    01/0

    4/2

    014

    SO

    /FQ

    I/C

    CC

    /087

    07/0

    4/2

    014

    CC

    C/F

    QI/

    RE

    N/M

    AS

    /002

    MA

    S/C

    CC

    /FQ

    I/G

    TI/

    002

    Geote

    chnic

    al In

    vest

    igation

    Sw

    issb

    ori

    ng &

    Com

    pany L

    LC

    26/1

    2/2

    013

    AP

    PR

    OV

    ED

    02/0

    2/2

    014

    SO

    /FQ

    I/C

    CC

    /015

    12/0

    2/2

    014

    CC

    C/F

    QI/

    RE

    N/M

    AS

    /003

    MA

    S/C

    CC

    /FQ

    I/M

    SE

    /003

    MS

    E W

    all

    Syst

    em

    Fre

    yss

    inet

    Ara

    bia

    n S

    ea L

    LC

    26/1

    2/2

    013

    AP

    PR

    OV

    ED

    02/0

    2/2

    014

    SO

    /FQ

    I/C

    CC

    /014

    12/0

    2/2

    014

    CC

    C/F

    QI/

    RE

    N/M

    AS

    /004

    MA

    S/C

    CC

    /FQ

    I/P

    VC

    /004

    UP

    VC

    Pip

    es

    Am

    iantit

    Om

    an

    26/1

    2/2

    013

    AP

    PR

    OV

    ED

    09/0

    2/2

    014

    SO

    /FQ

    I/C

    CC

    /019

    18/0

    2/2

    014

    CC

    C/F

    QI/

    RE

    N/M

    AS

    /005

    MA

    S/C

    CC

    /FQ

    I/H

    DP

    E/0

    05H

    DP

    E P

    ipes

    & F

    ittings

    Am

    iantit

    Om

    an

    26/1

    2/2

    013

    AP

    PR

    OV

    ED

    09/0

    2/2

    014

    SO

    /FQ

    I/C

    CC

    /020

    18/0

    2/2

    014

    CC

    C/F

    QI/

    RE

    N/M

    AS

    /006

    MA

    S/C

    CC

    /FQ

    I/P

    W/0

    06

    Pili

    ng W

    ork

    sA

    PC

    C L

    LC

    26/0

    1/2

    014

    AP

    PR

    OV

    ED

    19/0

    2/2

    014

    SO

    /FQ

    I/C

    CC

    /026

    25/0

    2/2

    014

    CC

    C/F

    QI/

    RE

    N/M

    AS

    /007

    MA

    S/C

    CC

    /FQ

    I/M

    C/0

    07

    Bitnum

    inous

    Pri

    me C

    oat

    (MC

    -70)

    Em

    irate

    s L

    ube O

    il C

    o.

    (Musc

    at)

    30/0

    1/2

    014

    AP

    PR

    OV

    ED

    09/0

    3/2

    014

    SO

    /FQ

    I/C

    CC

    /069

    27/0

    3/2

    014

    CC

    C/F

    QI/

    RE

    N/M

    AS

    /008

    MA

    S/C

    CC

    /FQ

    I/R

    S/0

    08

    Rein

    forc

    ing S

    teel

    Musc

    at

    Ste

    el In

    dust

    ries

    02/0

    2/2

    014

    AP

    PR

    OV

    ED

    20/0

    3/2

    014

    SO

    /FQ

    I/C

    CC

    /063

    24/0

    3/2

    014

    CC

    C/F

    QI/

    RE

    N/M

    AS

    /009-1

    MA

    S/C

    CC

    /FQ

    I/P

    T/0

    09-1

    Post

    Tensi

    onin

    g W

    ork

    - A

    nchora

    ge

    Fre

    yss

    inet

    Ara

    bia

    n S

    ea L

    LC

    22/0

    2/2

    014

    AP

    PR

    OV

    ED

    27/0

    3/2

    014

    SO

    /FQ

    I/C

    CC

    /089

    14/0

    4/2

    014

    CC

    C/F

    QI/

    RE

    N/M

    AS

    /009-2

    MA

    S/C

    CC

    /FQ

    I/P

    T/0

    09-2

    Post

    Tensi

    onin

    g W

    ork

    - D

    uct

    Fre

    yss

    inet

    Ara

    bia

    n S

    ea L

    LC

    22/0

    2/2

    014

    AP

    PR