fort goff creek bridge r04 abc project -...

31
Fort Goff Creek Bridge R04 ABC Project Dorie Mellon, PE Structure Policy & Innovation Division of Engineering Services Caltrans May 20, 2015

Upload: others

Post on 31-May-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Fort Goff Creek Bridge R04 ABC Project - Transportationshrp2.transportation.org/documents/renewal/1_SHRP2FortGoffCreek_Mellon.pdfConstruction: Foundation 12 - 30” CIDH Piles. June

Fort Goff Creek Bridge R04 ABC ProjectDorie Mellon, PEStructure Policy & InnovationDivision of Engineering ServicesCaltransMay 20, 2015

Page 2: Fort Goff Creek Bridge R04 ABC Project - Transportationshrp2.transportation.org/documents/renewal/1_SHRP2FortGoffCreek_Mellon.pdfConstruction: Foundation 12 - 30” CIDH Piles. June

26/4/2015

Fort Goff Creek Bridge

Lead AdopterSHRP2 Solutions Innovative Bridge Designs for Rapid Renewal

Page 3: Fort Goff Creek Bridge R04 ABC Project - Transportationshrp2.transportation.org/documents/renewal/1_SHRP2FortGoffCreek_Mellon.pdfConstruction: Foundation 12 - 30” CIDH Piles. June

36/4/2015

• California law requires unimpaired passage for all anadromous fish at stream crossings

• Replace 60-year-old culvert with 60’ long single span bridge

Fort Goff Creek Bridge

Fort Goff Creek Bridge Streambed Restoration Project

Page 4: Fort Goff Creek Bridge R04 ABC Project - Transportationshrp2.transportation.org/documents/renewal/1_SHRP2FortGoffCreek_Mellon.pdfConstruction: Foundation 12 - 30” CIDH Piles. June

46/4/2015

Fisheries Restoration Grant Program (FRGP) [capital]

Cal Department of Fish & Wildlife (CDFW)

National Oceanic & Atmospheric

Administration (NOAA) Fisheries

National Marine Fisheries Service (NMFS)

Caltrans SHOPP (Minor fund) [support]

Office of Traffic Safety [capital]

SHRP2 (Strategic Highway Research Program #2) [support & capital]

American Association of State Highway & Transportation Officials (AASHTO)

Federal Highway Administration (FHWA)

United States Fish & Wildlife Service (USFWS) [support]

PacifiCorp Coho Enhancement Fund (CEF) [capital]

Fort Goff Bridge

Funding Sources

Page 5: Fort Goff Creek Bridge R04 ABC Project - Transportationshrp2.transportation.org/documents/renewal/1_SHRP2FortGoffCreek_Mellon.pdfConstruction: Foundation 12 - 30” CIDH Piles. June

5

Fort Goff Creek Bridge

Challenges:• Project in severe

climate area• Freeze-thaw

cycles and heavy salting

• Nearest batch plant located 90 minutes away from site

Fort Goff Creek Bridge

Page 6: Fort Goff Creek Bridge R04 ABC Project - Transportationshrp2.transportation.org/documents/renewal/1_SHRP2FortGoffCreek_Mellon.pdfConstruction: Foundation 12 - 30” CIDH Piles. June

66/4/2015

Advance Planning Study Alternatives

Cast-in-place$1,043,000

Precast Superstructure$937,000

All Precast Elements$928,000

Early Analysis for Structure Type

Page 7: Fort Goff Creek Bridge R04 ABC Project - Transportationshrp2.transportation.org/documents/renewal/1_SHRP2FortGoffCreek_Mellon.pdfConstruction: Foundation 12 - 30” CIDH Piles. June

76/4/2015

Type Selection

Prefabricated Elements

•PC Voided Deck Slabs•PC Abutment Elements•PC Wingwalls•Prefabricated Rail

Advantages

•Ensure concrete quality•Reduce MOT•Reduce creek impacts•Reduce risk of extending to second season

Page 8: Fort Goff Creek Bridge R04 ABC Project - Transportationshrp2.transportation.org/documents/renewal/1_SHRP2FortGoffCreek_Mellon.pdfConstruction: Foundation 12 - 30” CIDH Piles. June

86/4/2015

• Single row of piles• Repeatable elements• Pick weight under 95K• Pre-assemble substructure

elements prior to shipping• Fabrication tolerances in

specifications

ABC Toolkit Implementation

Page 9: Fort Goff Creek Bridge R04 ABC Project - Transportationshrp2.transportation.org/documents/renewal/1_SHRP2FortGoffCreek_Mellon.pdfConstruction: Foundation 12 - 30” CIDH Piles. June

96/4/2015

Design-Bid-Build/Low BidderStructure estimate at time of bid: $978,572Successful bid: $1,309,843Final Cost: $1,400,303 ($660/sqft)Difference due to

• Award to 3rd bidder• Remote location• Aesthetics• 7 bidders but only 1 prefab subcontractor

Bid Process

Page 10: Fort Goff Creek Bridge R04 ABC Project - Transportationshrp2.transportation.org/documents/renewal/1_SHRP2FortGoffCreek_Mellon.pdfConstruction: Foundation 12 - 30” CIDH Piles. June

106/4/2015

Construction: Detour

One way signalized traffic Temporary culvert for detour

Page 11: Fort Goff Creek Bridge R04 ABC Project - Transportationshrp2.transportation.org/documents/renewal/1_SHRP2FortGoffCreek_Mellon.pdfConstruction: Foundation 12 - 30” CIDH Piles. June

116/4/2015

Construction: Foundation

12 - 30” CIDH PilesJune 4-September 10

71 Working Days!

Page 12: Fort Goff Creek Bridge R04 ABC Project - Transportationshrp2.transportation.org/documents/renewal/1_SHRP2FortGoffCreek_Mellon.pdfConstruction: Foundation 12 - 30” CIDH Piles. June

126/4/2015

Construction: Foundation

4 sac slurry for abutment bearing pad proved an effective leveling pad.

September 12, 2014

Page 13: Fort Goff Creek Bridge R04 ABC Project - Transportationshrp2.transportation.org/documents/renewal/1_SHRP2FortGoffCreek_Mellon.pdfConstruction: Foundation 12 - 30” CIDH Piles. June

136/4/2015

Construction: Abutments

•6 precast abutment elements, 85kips each•Voids formed with 36” diameter corrugated metal pipe

Page 14: Fort Goff Creek Bridge R04 ABC Project - Transportationshrp2.transportation.org/documents/renewal/1_SHRP2FortGoffCreek_Mellon.pdfConstruction: Foundation 12 - 30” CIDH Piles. June

146/4/2015

Construction: Abutments

Sept 16 & 17, 2014

Page 15: Fort Goff Creek Bridge R04 ABC Project - Transportationshrp2.transportation.org/documents/renewal/1_SHRP2FortGoffCreek_Mellon.pdfConstruction: Foundation 12 - 30” CIDH Piles. June

156/4/2015

Construction: Abutments

September 18 & 19, 2014

Page 16: Fort Goff Creek Bridge R04 ABC Project - Transportationshrp2.transportation.org/documents/renewal/1_SHRP2FortGoffCreek_Mellon.pdfConstruction: Foundation 12 - 30” CIDH Piles. June

166/4/2015

Construction: Precast Erection

September 23, 3014

Page 17: Fort Goff Creek Bridge R04 ABC Project - Transportationshrp2.transportation.org/documents/renewal/1_SHRP2FortGoffCreek_Mellon.pdfConstruction: Foundation 12 - 30” CIDH Piles. June

176/4/2015

Construction: Precast Erection

September 23, 2014

Page 18: Fort Goff Creek Bridge R04 ABC Project - Transportationshrp2.transportation.org/documents/renewal/1_SHRP2FortGoffCreek_Mellon.pdfConstruction: Foundation 12 - 30” CIDH Piles. June

186/4/2015

Construction: Connections

October 13, 2014

Page 19: Fort Goff Creek Bridge R04 ABC Project - Transportationshrp2.transportation.org/documents/renewal/1_SHRP2FortGoffCreek_Mellon.pdfConstruction: Foundation 12 - 30” CIDH Piles. June

196/4/2015

Construction: Rail & Aesthetics

California ST-70 Bridge RailArchitectural treatment achieved by

the use of form liners and on-site staining.

Page 20: Fort Goff Creek Bridge R04 ABC Project - Transportationshrp2.transportation.org/documents/renewal/1_SHRP2FortGoffCreek_Mellon.pdfConstruction: Foundation 12 - 30” CIDH Piles. June

206/4/2015

Completed Project

Page 21: Fort Goff Creek Bridge R04 ABC Project - Transportationshrp2.transportation.org/documents/renewal/1_SHRP2FortGoffCreek_Mellon.pdfConstruction: Foundation 12 - 30” CIDH Piles. June

216/4/2015

Lessons Learned: CIDH Piling

1. Take foundation risk into account when developing schedule

2. Consider drilling system submittal to ensure drilling contractor shows up with the right equipment for the job.

3. Use spread footing or driven piles when possible to control schedule.

Page 22: Fort Goff Creek Bridge R04 ABC Project - Transportationshrp2.transportation.org/documents/renewal/1_SHRP2FortGoffCreek_Mellon.pdfConstruction: Foundation 12 - 30” CIDH Piles. June

226/4/2015

Lesson Learned: PC Abutments

Fort Goff Creek Bridge

Impact of abutment segment connection method on working days

Page 23: Fort Goff Creek Bridge R04 ABC Project - Transportationshrp2.transportation.org/documents/renewal/1_SHRP2FortGoffCreek_Mellon.pdfConstruction: Foundation 12 - 30” CIDH Piles. June

236/4/2015

Lessons Learned: PC Abutments

Grouting keyways and post tensioning ducts proved challenging

Page 24: Fort Goff Creek Bridge R04 ABC Project - Transportationshrp2.transportation.org/documents/renewal/1_SHRP2FortGoffCreek_Mellon.pdfConstruction: Foundation 12 - 30” CIDH Piles. June

246/4/2015

•Increased lead time for shop plan review•Develop guidance for shop plan review•Allocate adequate resources for source inspections•Abutment seat grades require close review on shop plans•Precast QC/QA needs to be closely monitored and enforced•Review all shop plans concurrently to avoid conflict (precast, post-tension, and prefab rail)

Lessons Learned: Review & Inspection

Page 25: Fort Goff Creek Bridge R04 ABC Project - Transportationshrp2.transportation.org/documents/renewal/1_SHRP2FortGoffCreek_Mellon.pdfConstruction: Foundation 12 - 30” CIDH Piles. June

256/4/2015

Lesson Learned: Rebar Congestion

Pay close attention to steel congestion,particularly in skewed elements.

Page 26: Fort Goff Creek Bridge R04 ABC Project - Transportationshrp2.transportation.org/documents/renewal/1_SHRP2FortGoffCreek_Mellon.pdfConstruction: Foundation 12 - 30” CIDH Piles. June

266/4/2015

Lessons Learned: Deck Overlay

Differential girder elevations are smoothed over with deck overlay

Page 27: Fort Goff Creek Bridge R04 ABC Project - Transportationshrp2.transportation.org/documents/renewal/1_SHRP2FortGoffCreek_Mellon.pdfConstruction: Foundation 12 - 30” CIDH Piles. June

276/4/2015

•Clearly define fabrication and erection tolerances •Use slurry pad for setting abutment•Be proactive to ensure fit-up in the field•Keep PC elements reasonable weights•Overlay thickness accommodates tolerances

Best Practices

Page 28: Fort Goff Creek Bridge R04 ABC Project - Transportationshrp2.transportation.org/documents/renewal/1_SHRP2FortGoffCreek_Mellon.pdfConstruction: Foundation 12 - 30” CIDH Piles. June

286/4/2015

Fish Passage

"The Fort Goff Fish passage project is a big success so far – King salmon got right in there right away and ended up making 64 redds this fall! King salmon probably could not get in there at all before the passage project as determined by spot checking for King salmon adults and juveniles over the years."Happy holidays,FlickDon FlickingerNOAA Fisheries West Coast RegionU.S. Department of Commerce

Page 29: Fort Goff Creek Bridge R04 ABC Project - Transportationshrp2.transportation.org/documents/renewal/1_SHRP2FortGoffCreek_Mellon.pdfConstruction: Foundation 12 - 30” CIDH Piles. June

296/4/2015

2013 Fish Passage Annual Report to LegislatureCoastal Anadromous Fish Passage Assessment and Remediation

Progress Report

Fish Passage Program

569 estimated Caltrans fish passage barriers!

Page 30: Fort Goff Creek Bridge R04 ABC Project - Transportationshrp2.transportation.org/documents/renewal/1_SHRP2FortGoffCreek_Mellon.pdfConstruction: Foundation 12 - 30” CIDH Piles. June

306/4/2015

•Successfully implemented SHRP2 ABC Toolkit

•Gathered Lessons Learned to further develop ABC Toolkit

•CT Construction and Program Managers have already targeted multiple projects for similar ABC approach

•Potential for widespread application in fish passage projects

•Caltrans is pursuing ABC on a larger scale

In Review

Page 31: Fort Goff Creek Bridge R04 ABC Project - Transportationshrp2.transportation.org/documents/renewal/1_SHRP2FortGoffCreek_Mellon.pdfConstruction: Foundation 12 - 30” CIDH Piles. June

316/4/2015

Thank you