FORT BLISS HOSPITAL REPLACEMENT PROJECT
EL P ASO, TEXAS
El Paso Community CollegeContractors Networking & Teaming Forum
January 17, 2012
Jeffrey Allen, Senior Project Manager, USACE, Ft. Worth DistrictMitchell Alguadich, Senior Project Manager, HDR ArchitectsMaurice Salata, Senior Architect, HDR Architects
FO
RT
BLIS
S
HO
SP
ITA
L
REP
LA
CEM
EN
T
– S
4 B
RIE
FIN
G
Project Team
Overview
Project Award Packages
Projected Schedule
HDR Presentation
Contractors Networking & Teaming Forum
2
FO
RT
BLIS
S
HO
SP
ITA
L
REP
LA
CEM
EN
T
– S
4 B
RIE
FIN
G
Project Team
HA/TMA – Health Affairs/Tricare Management ActivityACSFAC (MEDCOM) – Assistant Chief of Staff, Facilities
HFPA – Army Health Facilities Planning AgencyWBAMC – William Beaumont Army Medical CenterUSACE Ft. Worth District / Ft. Bliss Program Office
Ft. Bliss Garrison
ContractorsInfrastructure Project – Sundt Construction, Inc.
Water Tower Project – Jamco Ventures, LLC
FO
RT
BLIS
S
HO
SP
ITA
L
REP
LA
CEM
EN
T
– S
4 B
RIE
FIN
G
Overview
• Ft. Bliss Hospital Replacement project includes a 1.132 M square foot World-Class Medical Facility
• Replaces William Beaumont Army Medical Center (WBAMC)
• Design-Bid-Build execution
• Campus buildings & features include - hospital, clinics, admin, research, central utility plant, access control points, therapeutic gardens, nature trails, and surface parking
• The Project Delivery Team have endeavored to incorporate state-of-art design ideas including the latest in Evidence-Based Design (EBD) and Sustainability as well as design innovations promoting family and patient-centered care
FO
RT
BLIS
S
HO
SP
ITA
L
REP
LA
CEM
EN
T
– S
4 B
RIE
FIN
G
Project Award Packages
5*Dates subject to change
FO
RT
BLIS
S
HO
SP
ITA
L
REP
LA
CEM
EN
T
– S
4 B
RIE
FIN
G
CONSTRUCTION PHASING*
2011 2012 2013 2014 2015 2016 2017
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Water Tower MAY 11 - SEPT
12
Infrastructure AUG 11 - DEC
12
Parking A JUL12 – FEB 14
Hospital DEC 12 – JAN 16
Helipad JUN 13 – JUN 14
Parking B DEC 13 – MAR
15
ACPs MAR 14 – DEC
15
Landscaping MAR 14 – DEC
15
Projected Schedule(calendar year)
6
FOD – Facility Operations Date
Construction CompletionInitial Outfitting / Transition
Construction DurationConstruction in-Progress/Duration
Legend*Dates subject to change