FORM-4 ARCHITECT ’S CERTIFICATE (To be issued on completion of each of the Building/Block/Tower) Date: To (Name & Address of Promoter) Subject: Certificate of Completion of Construction Work of Building/ Block of the Building of the Project (TNRERARegistration Number ) situated on the Plot bearing Survey no./Plot no./Door No. demarcated by its boundaries (latitude and longitude of the end points) to the North to the South to the East to the West of Division Village Taluk District PIN measuring sq.mts. area being developed by (Promoter’s Name) Sir, I/W have undertaken assignment as Architect/Engineer of certifying completion of Construction Work of Building/Block/Tower of the Building situated on the plot No./Survey no./ Door no of Division Village Taluk District PIN measuring sq.mts. area being developed by (Promoter’s Name) 2. Following technical professionals are appointed by Owner/Promoter: (as applicable) (i) M/s/Thiru/Tmt. asArchitect/Engineer (ii) M/s/Thiru/Tmt. as Structural Consultant (iii) M/s/Thiru/Tmt. as MEP Consultant (iv) M/s/Thiru/Tmt. as Site Supervisor/Clerk of Works 3. Based on Completion Certificate received from Structural Engineer and Site Supervisor and to the best of my/our knowledge, I/We hereby certify that Building/ Block of the Building has been completed in all aspects. The Building/ Block of the Building is granted Completion Certificate bearing number dated by (Competent Authority) . Yours Faithfully, Signature & Name (IN BLOCK LETTERS) of L.S/Architect with (License No.....................)

Upload: others

Post on 26-Nov-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: fORM-4 ARCHITECT ’S CERTIfICATE(iv) M/s/Thiru/Tmt. as Site Supervisor/ clerk of works 3. Based on Completion Certificate received from Structural Engineer and Site Supervisor and

fORM-4

ARCHITECT ’S CERTIfICATE

(To be issued on completion of each of the Building/Block/Tower)

Date:

To

(Name&AddressofPromoter)

Subject: CertificateofCompletionofConstructionWorkof Building/ Blockof theBuildingoftheProject(TNRERARegistrationNumber ) situated on the Plot bearing Survey no./Plot no./Door No. demarcatedbyitsboundaries(latitudeandlongitudeoftheendpoints) to the North to the South to the East to the west of Division Village Taluk DistrictPIN measuring sq.mts.areabeingdevelopedby(Promoter’s Name)

Sir,

I/w haveundertakenassignmentasArchitect/Engineerofcertifyingcompletion ofConstructionWorkof Building/Block/Tower of the Building situated on the plot No./Survey no./ Door no of Division

Village Taluk District PIN measuring sq.mts.area being developedby(Promoter’sName)

2. FollowingtechnicalprofessionalsareappointedbyOwner/Promoter:(asapplicable)

(i) M/s/Thiru/Tmt. asArchitect/Engineer

(ii) M/s/Thiru/Tmt. asStructuralConsultant

(iii) M/s/Thiru/Tmt. as MEP consultant

(iv) M/s/Thiru/Tmt. as Site Supervisor/clerk of works

3. Based on Completion Certificate received from Structural Engineer and Site Supervisor and tothe best of my/our knowledge, I/We hereby certify that Building/ BlockoftheBuildinghasbeencompletedinallaspects. The Building/ BlockoftheBuildingisgrantedCompletionCertificatebearing number dated by (competent Authority) .

Yours Faithfully,

Signature&Name(INBLOCKLETTERS)ofL.S/Architectwith(LicenseNo.....................)