forces-kickoff template balakrishnan at testbed · kick off meeting – april 12, 2013 –...

6

Upload: others

Post on 19-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FORCES-Kickoff template Balakrishnan AT Testbed · Kick Off Meeting – April 12, 2013 – Washington, DC 5 Field-testing opportunities Design and field-testing of airport congestion
Page 2: FORCES-Kickoff template Balakrishnan AT Testbed · Kick Off Meeting – April 12, 2013 – Washington, DC 5 Field-testing opportunities Design and field-testing of airport congestion

2 Kick Off Meeting – April 12, 2013 – Washington, DC

Data sources

  Airport, airspace, delays, weather data archives

Air Transportation Testbed

LGA

PHL

BOS

Page 3: FORCES-Kickoff template Balakrishnan AT Testbed · Kick Off Meeting – April 12, 2013 – Washington, DC 5 Field-testing opportunities Design and field-testing of airport congestion

3 Kick Off Meeting – April 12, 2013 – Washington, DC

Simulation environments

  Validated fast-time simulations of airport and airspace operations –  In-house, SIMMOD (ATAC/FAA), FACET (NASA)

Air Transportation Testbed

[Le Ny, Balakrishnan 2010] [Kannan 2009]

[Khadilkar, Balakrishnan 2013]

[Lee, Balakrishnan 2012]

[FACET, courtesy NASA]

Page 4: FORCES-Kickoff template Balakrishnan AT Testbed · Kick Off Meeting – April 12, 2013 – Washington, DC 5 Field-testing opportunities Design and field-testing of airport congestion

4 Kick Off Meeting – April 12, 2013 – Washington, DC

Control-communication interactions

  Simulations of interactions between air traffic control (e.g. conflict detection & resolution algorithms) and communication, navigation and surveillance (CNS) systems

–  Interactions of new technologies (e.g. ADS-B) with legacy infrastructure (e.g. beacon radars)

–  Tradeoffs in centralized vs. distributed control strategies

Air Transportation Testbed

[Park et al. 2013, submitted] [Park and Tomlin, 2012]

Page 5: FORCES-Kickoff template Balakrishnan AT Testbed · Kick Off Meeting – April 12, 2013 – Washington, DC 5 Field-testing opportunities Design and field-testing of airport congestion

5 Kick Off Meeting – April 12, 2013 – Washington, DC

Field-testing opportunities

  Design and field-testing of airport congestion management algorithms (BOS in 2010-2011, …)

Air Transportation Testbed

Before gate-holds

During gate-holds

Page 6: FORCES-Kickoff template Balakrishnan AT Testbed · Kick Off Meeting – April 12, 2013 – Washington, DC 5 Field-testing opportunities Design and field-testing of airport congestion

6 Kick Off Meeting – April 12, 2013 – Washington, DC

Open questions

  EI + RC integration for resource allocation –  Improve overall system efficiency

  Risk assessment and incentives for information-sharing –  Collaborative Decision Making in the current system only considers

incentives for information sharing, but neglects risks –  Design of strategies to incentivize equipage –  Identification of “true” utility functions of human elements

  Resilient & secure ATC and CNS protocols –  Evaluation of ADS-B protocols –  Layered, adaptive security for NextGen –  Safe integration of unmanned aircraft into the civilian airspace

  Algorithms for secure, resilient and efficient air traffic control

Air Transportation Testbed