  • Coal Conference Feb07 

    Northern Energy and the Yamala Coal Project 

    Presentation to Bowen Basin Coal Conference 

    Keith Barker

    For

    per

    sona

    l use

    onl

    y

  • PORTFOLIO Quality, Diverse Portfolio 

    PROJECT  COAL  STATUS Elimatta  Thermal / 

    Coaloil? 285Mt 

    Indicated & Inferred Resource + 2040Mt Target 

    Yamala Coal Joint Venture 

    Low Ash Thermal 

    190Mt Inferred resource 

    +Target  260Mt (92%/8% JV with Sojitz) 

    Maryborough  Hard Coking 

    Hard Coking coal project 

    Ashford  Hard Coking 

    18Mt Inferred Resource (50% JV) 

    Tenements: North NSW & QLD

    For

    per

    sona

    l use

    onl

    y

  • Capital Raising History & Structure 

    DATE  ITEM  DETAILS Feb 2005  IPO (raised $4m)  53.6M @ 

    20c Oct 2005  Placement  4.9M   @ 

    45c May 2007  Placement  8.77M  @ 

    68c Oct 2007  Market Cap. 

    67.25M shares @1.65c 

    $111M 

    Cash (approx.)  $6M 

    Fraters (Marley Group)  10% 

    Samuel Capital  7.5% 

    Belgravia Group  7% AMP  4.3% 

    Major Shareholders 

    Options on issue 4million @25/30c expire Feb 08For

    per

    sona

    l use

    onl

    y

  • Steady Exploration ProgressF

    or p

    erso

    nal u

    se o

    nly

  • YAMALA COAL JOINT VENTURE 

    §  EPC 927 between Emerald and Comet, 96 sub blocks 

    §  April 05  EPC granted, collation of historical data from previous drilling by other parties –DME, Ensham, Ingwe, Santos 

    §  August 06  Exploration Target of 410460Mt established 

    §  November 06  MOU with Sojitz §  February 07  Yamala Coal JV §  March 07 exploration commences §  June 07 – Inferred Resource 190Mt §  October 07 – stage 2 explorationF

    or p

    erso

    nal u

    se o

    nly

  • §  Aries ll seam in Late Permian Rangal Coal Measures 1.82m thickness in target area §  190Mt Inferred Resource §  Additional Exploration Target 1 220 260Mt to 300m depth §  Located on existing rail infrastructure §  Good quality low ash thermal coal 

    »  Raw Ash 11% » Raw Energy 27.5MJ/kg gad »  Volatiles 2829% »  Sulphur 0.4% 

    §  Potential for SS coking product from bottom ply to be examined in further exploration programmes 

    EMERALD Yamala Coal Joint Venture Initial Resource 

    11Note that coal quantity and quality within the exploration target areas is conceptual only as there has been insufficient exploration to define any coal resources. It is uncertain whether future exploration in any of these exploration target areas will result in quantification of coal resources

    For

    per

    sona

    l use

    onl

    y

  • YAMALA COAL JOINT VENTURE STAGE 2 CONCEPTS 

    §  Focus on upgrading resource close to subcrop and infrastructure as offering most attractive initial development potential; 

    §  Drilling, seismic, coal quality geotechnical and groundwater programme to commence shortly 

    §  Conceptual / prefeasibility engineering and development studies to follow; 

    §  Current concept »  Open Cut at sub crop »  Punch bord and pillar / welsh bord »  Full extraction longwall / bord and 

    pillar

    For

    per

    sona

    l use

    onl

    y

  • YAMALA COAL JOINT VENTURE STAGE 2 CONCEPTS 

    §  Stage 2 focus to increase resource definition rather than add tonnes 

    §  100Mt target area §  Provide input to initial studies §  Then move to Stage 3 – feasibility 

    study. §  Stage 2 complete around 3 rd qtr 08, 

    Stage 3 by end 09 §  Timetable fits with availability of 

    infrastructure capacity  2012 (port) §  Sequencing of mining concepts (series 

    or parallel) will be determined following development studies and availability of infrastructure. 

    §  Current concept for 4Mtpa operationFor

    per

    sona

    l use

    onl

    y

  • YAMALA COAL JOINT VENTURE SOJITZ FARM IN 

    Sojitz Corporation– §  substantial Japanese trading 

    house §  Investment in 

    »  Coal & Allied »  Coppabella »  Jellinbah »  Minerva »  Moolarben »  Lake Vermont »  Others inc. Indonesia 

    §  Significant trading position in global coal 

    §  JV formed in March 07 covers EPC927 

    §  3 STAGE $5.3M Farm in Agreement 

    §  SOJITZ to fund $5.3M to earn 30% JV interest 

    §  On completion Sojitz will have an option to acquire add’l 19% for $6.65M. 

    §  Sojitz will have marketing rights for Yamala JV 

    §  NEC 92% / SOJITZ 8% following Stage 1

    For

    per

    sona

    l use

    onl

    y

  • Key Issues for Yamala 

    §  Majority of resource will be extracted by underground methods 

    §  Initial UG mining areas planned to be shallow (50200m) with direct highwall entry 

    §  In situ coal quality offers potential for unwashed product, particularly in conjunction with open cut mining 

    §  Concepts offer potential for low capital start up 

    §  Roof, floor & structure characteristics will determine mining method, layout and speed of production build up. 

    §  Developments in continuous haulage and roof support will be of interest.F

    or p

    erso

    nal u

    se o

    nly

  • Market outlook 

    Australian Exports 

    100 

    200 

    300 

    400 

    500 

    600 

    700 

    800 

    900 

    1000 

    1980  2006  2010  2030  2030alt 

    Million tonn

    es 

    6.7%pa growth 

    Source IEA Abare 06, NEC 

    why not 6.7%? 

    2.5%p a 

    §  Internationally traded coal has increased market share of coal supply 

    §  Australia has increased its share of this trade 

    §  There remains an enormous market to be won 

    §  Increased resources are required to both maintain and capture market share 

    §  Yamala JV and Northern Energy objective to be part of this growth 

    Historical and Forecast Global Coal Trade 

    1000 

    2000 

    3000 

    4000 

    5000 

    6000 

    7000 

    8000 

    9000 

    10000 

    1980  2006  2010  2030 

    Millions Ton

    nes 

    Australia  Other Exports  Domestic Australian Market Potential 

    Source IEA, ABARE,NEC

    For

    per

    sona

    l use

    onl

    y

  • Depletion – the explorers best friend 

    ØSince 1980 Australia has mined >5 Billion tonnes coal ØOver the next twenty years at CURRENT rates we will mine >8billion tonnes ØGlobally this only represents 18 months consumption ØGlobal coal consumption to continue to grow ØThere is an ongoing need for delineation and development of resources and reserves just to maintain current production 

    P R O G R E S S

    For

    per

    sona

    l use

    onl

    y

  • NEC – summing up 

    §  Substantial resource base now established 

    §  Coal focussed group §  Multi project exposure §  Yamala is a key part of the 

    portfolio §  NEC and Yamala Funded to 

    progress to next stage – decision to mine 

    §  Links established with customer groups 

    §  Objective to add value through development stage 

    §  To introduce strategic partners at appropriate time 

    §  Looking to make transition to producer status

    For

    per

    sona

    l use

    onl

    y

  • CONTACT

    COMPANY: Northern Energy Corporation LtdASX CODE: NECCONTACT: Keith Barker, Managing DirectorPHONE: 07 3303 0695 (Brisbane)EMAIL: [email protected]: www.northernenergy.com.auQualifications and StatementThe information in this report that relates to Mineral Resources at the Yamala, Elimatta and Ashford projects is based on information compiled by (Norman) Andrew McLaughlin, who is a Member of the Australasian Institute of Mining and Metallurgy. Andrew McLaughlin is a full time employee of Northern Energy Corporation Limited. Andrew McLaughlin has sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration and to the activity, which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Andrew McLaughlin consents to the inclusion in the report of the matters based on his information in the form and context in which they appear.

    For

    per

    sona

    l use

    onl

    y

    http://www.northernenergy.com.au/

    JORC Sign off.pdfCONTACT