for lease 3433...multi-modal path p auto entry with gate designed by david baker and partners, the...

11
3433 3RD STREET FOR LEASE INDIA BASIN TOUCHSTONE COMMERCIAL PARTNERS, INC. // Corp. Lic. 01112906 // www.tcpre.com // www.zm-tcpre.com

Upload: others

Post on 07-Feb-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • 34333RD STREET

    F O R L E A S E

    I N D I A B A S I N

    TOUCHSTONE COMMERCIAL PARTNERS, INC. // Corp. Lic. 01112906 // www.tcpre.com // www.zm-tcpre.com

  • TOUCHSTONE COMMERCIAL PARTNERS | 2

    Feeding off of Mission Bay’s recent development frenzy, San Francisco’s India Basin is positioning itself as the next hotbedfor commercial, laboratory, office and mixed-use development in the Bay Area. 3433 3rd Street is a proposed 46,507 square footcommercial/laboratory/office/flex development, which includes a large public assembly hall, ground floor retail, outdoor parking, andmore. San Francisco’s Carpenter Union (Local Union No. 22) is committed to occupy the entire second floor of the development and will play a pivotal role in the construction of the building. The site is located at the intersection of 3rd Street and Cargo Way and boasts environmentally sustainable design with state-of-the-art features from David Baker and Partners.

    3433 3RD STREET

    EXECUTIVE SUMMARY

  • TOUCHSTONE COMMERCIAL PARTNERS | 3

    ADDRESS 3433 3rd StreetSan Francisco, CA 94124

    APN # 5203-083

    RENTABLE AREA +/- 41,434 Square Feet

    NO. OF STORIES 5

    FLOOR PLATE SIZE 10,891 (Floors 3-5)

    USE Legal Office Approved

    PROPERTY SUMMARY

    DEVELOPMENT DETAILS

    3433 3RD STREET

    The proposed development will also offer approximately 1,717 square feet of corner retail space and shared use of an assembly/meeting hall.

    PLANNING

    Fully Entitled For Office

    RETAIL

    Ground Floor Corner Space

    DESIGN

    David Baker and Partners

    SUSTAINABILITY

    Lead Gold

    PARKING

    34 SpacesDELIVERY

    Spring 2019

  • TOUCHSTONE COMMERCIAL PARTNERS | 4

    SITE PLAN 3433 3RD STREET

    A Bioswale to Treat RunoffB PlantingC Concrete SidewalkD Cut [E] Sidewalk for 4’-0” Wide Planting Strip and 6’-0” Wide SidewalkE [E] Street Trees to RemainF Specimen Tree in PlazaG Cafe Table and ChairsH Custom Sculptural Wood Seating Elements

    I Bike ParkingJ [E] Brick Sidewalk BandK DG with Grove of Shade TreesL Chainlink Fence at PLM Parking Area (34 Spaces)N Steel Grate Over Sunken/Infiltration Bed with TreesO Multi-Modal PathP Auto Entry with Gate

    Designed by David Baker and Partners, the building’s state-of-the-art and innovative architecture integrates the latest in environmentally sustainable design and sets the standard for upcoming development projects in the neighborhood.

    Cargo Way

    Cargo Way

    Cargo Way

    C

  • TOUCHSTONE COMMERCIAL PARTNERS | 5

    3433 3RD STREET

    SECOND FLOOR

    Office Space235

    elev

    ator

    mec

    h24

    4

    service245

    stair #1218

    e219

    e223

    Vestibule250

    w221

    m222

    lobby248

    lobby249

    stair #2246

    open to below 1/16" = 1'-0"

    2Level 2- Site Permit

    Office Space139

    stair #1239

    e213

    e237

    Vestibule251

    w216

    m238

    Lobby224

    stair #2227

    common236

    data243

    1/16" = 1'-0"

    3Level 3- Site Permit

    Office Space125

    stair #1194

    e195

    e261

    Vestibule262

    263

    m265

    Lobby266

    Stair #2267

    data260

    common259

    1/16" = 1'-0"

    4Level 4- Site Permit

    Office Space138

    stair #1206

    e207

    e211

    Vestibule270

    209

    wc210

    Lobby226

    Stair #2268

    common269

    data208

    1/16" = 1'-0"

    5Level 5- Site Permit

    mech penthouse252

    e254

    stair #1253

    solar DHWpanels

    pv array

    pv array

    pv array

    pv array

    1/16" = 1'-0"

    6Roof- Site Permit

    Office Space

    Office Space

    Office Space

    Office Space

    Retail

    Meeting Hall

    Office Space

    Office Space

    Office Space

    mech penthouse

    common

    common

    common

    restrooms

    restrooms

    restrooms

    restrooms

    restrooms

    elev

    ator

    sha

    ft

    elev

    ator

    lobb

    ies

    FLOOR PLANS

    Office Space235

    elev

    ator

    mec

    h24

    4

    service245

    stair #1218

    e219

    e223

    Vestibule250

    w221

    m222

    lobby248

    lobby249

    stair #2246

    open to below 1/16" = 1'-0"

    2Level 2- Site Permit

    Office Space139

    stair #1239

    e213

    e237

    Vestibule251

    w216

    m238

    Lobby224

    stair #2227

    common236

    data243

    1/16" = 1'-0"

    3Level 3- Site Permit

    Office Space125

    stair #1194

    e195

    e261

    Vestibule262

    263

    m265

    Lobby266

    Stair #2267

    data260

    common259

    1/16" = 1'-0"

    4Level 4- Site Permit

    Office Space138

    stair #1206

    e207

    e211

    Vestibule270

    209

    wc210

    Lobby226

    Stair #2268

    common269

    data208

    1/16" = 1'-0"

    5Level 5- Site Permit

    mech penthouse252

    e254

    stair #1253

    solar DHWpanels

    pv array

    pv array

    pv array

    pv array

    1/16" = 1'-0"

    6Roof- Site Permit

    Office Space

    Office Space

    Office Space

    Office Space

    Retail

    Meeting Hall

    Office Space

    Office Space

    Office Space

    mech penthouse

    common

    common

    common

    restrooms

    restrooms

    restrooms

    restrooms

    restrooms

    elev

    ator

    sha

    ft

    elev

    ator

    lobb

    ies

  • TOUCHSTONE COMMERCIAL PARTNERS | 6

    3433 3RD STREETFLOOR PLANS

    THIRD FLOOR

    Office Space235

    elev

    ator

    mec

    h24

    4

    service245

    stair #1218

    e219

    e223

    Vestibule250

    w221

    m222

    lobby248

    lobby249

    stair #2246

    open to below 1/16" = 1'-0"

    2Level 2- Site Permit

    Office Space139

    stair #1239

    e213

    e237

    Vestibule251

    w216

    m238

    Lobby224

    stair #2227

    common236

    data243

    1/16" = 1'-0"

    3Level 3- Site Permit

    Office Space125

    stair #1194

    e195

    e261

    Vestibule262

    263

    m265

    Lobby266

    Stair #2267

    data260

    common259

    1/16" = 1'-0"

    4Level 4- Site Permit

    Office Space138

    stair #1206

    e207

    e211

    Vestibule270

    209

    wc210

    Lobby226

    Stair #2268

    common269

    data208

    1/16" = 1'-0"

    5Level 5- Site Permit

    mech penthouse252

    e254

    stair #1253

    solar DHWpanels

    pv array

    pv array

    pv array

    pv array

    1/16" = 1'-0"

    6Roof- Site Permit

    Office Space

    Office Space

    Office Space

    Office Space

    Retail

    Meeting Hall

    Office Space

    Office Space

    Office Space

    mech penthouse

    common

    common

    common

    restrooms

    restrooms

    restrooms

    restrooms

    restrooms

    elev

    ator

    sha

    ft

    elev

    ator

    lobb

    ies

    FOURTH FLOOR

    Office Space235

    elev

    ator

    mec

    h24

    4

    service245

    stair #1218

    e219

    e223

    Vestibule250

    w221

    m222

    lobby248

    lobby249

    stair #2246

    open to below 1/16" = 1'-0"

    2Level 2- Site Permit

    Office Space139

    stair #1239

    e213

    e237

    Vestibule251

    w216

    m238

    Lobby224

    stair #2227

    common236

    data243

    1/16" = 1'-0"

    3Level 3- Site Permit

    Office Space125

    stair #1194

    e195

    e261

    Vestibule262

    263

    m265

    Lobby266

    Stair #2267

    data260

    common259

    1/16" = 1'-0"

    4Level 4- Site Permit

    Office Space138

    stair #1206

    e207

    e211

    Vestibule270

    209

    wc210

    Lobby226

    Stair #2268

    common269

    data208

    1/16" = 1'-0"

    5Level 5- Site Permit

    mech penthouse252

    e254

    stair #1253

    solar DHWpanels

    pv array

    pv array

    pv array

    pv array

    1/16" = 1'-0"

    6Roof- Site Permit

    Office Space

    Office Space

    Office Space

    Office Space

    Retail

    Meeting Hall

    Office Space

    Office Space

    Office Space

    mech penthouse

    common

    common

    common

    restrooms

    restrooms

    restrooms

    restrooms

    restrooms

    elev

    ator

    sha

    ft

    elev

    ator

    lobb

    ies

  • TOUCHSTONE COMMERCIAL PARTNERS | 7

    3433 3RD STREETFLOOR PLANS

    SIXTH FLOOR

    Office Space235

    elev

    ator

    mec

    h24

    4

    service245

    stair #1218

    e219

    e223

    Vestibule250

    w221

    m222

    lobby248

    lobby249

    stair #2246

    open to below 1/16" = 1'-0"

    2Level 2- Site Permit

    Office Space139

    stair #1239

    e213

    e237

    Vestibule251

    w216

    m238

    Lobby224

    stair #2227

    common236

    data243

    1/16" = 1'-0"

    3Level 3- Site Permit

    Office Space125

    stair #1194

    e195

    e261

    Vestibule262

    263

    m265

    Lobby266

    Stair #2267

    data260

    common259

    1/16" = 1'-0"

    4Level 4- Site Permit

    Office Space138

    stair #1206

    e207

    e211

    Vestibule270

    209

    wc210

    Lobby226

    Stair #2268

    common269

    data208

    1/16" = 1'-0"

    5Level 5- Site Permit

    mech penthouse252

    e254

    stair #1253

    solar DHWpanels

    pv array

    pv array

    pv array

    pv array

    1/16" = 1'-0"

    6Roof- Site Permit

    Office Space

    Office Space

    Office Space

    Office Space

    Retail

    Meeting Hall

    Office Space

    Office Space

    Office Space

    mech penthouse

    common

    common

    common

    restrooms

    restrooms

    restrooms

    restrooms

    restrooms

    elev

    ator

    sha

    ft

    elev

    ator

    lobb

    ies

    FIFTH FLOOR

    Office Space235

    elev

    ator

    mec

    h24

    4

    service245

    stair #1218

    e219

    e223

    Vestibule250

    w221

    m222

    lobby248

    lobby249

    stair #2246

    open to below 1/16" = 1'-0"

    2Level 2- Site Permit

    Office Space139

    stair #1239

    e213

    e237

    Vestibule251

    w216

    m238

    Lobby224

    stair #2227

    common236

    data243

    1/16" = 1'-0"

    3Level 3- Site Permit

    Office Space125

    stair #1194

    e195

    e261

    Vestibule262

    263

    m265

    Lobby266

    Stair #2267

    data260

    common259

    1/16" = 1'-0"

    4Level 4- Site Permit

    Office Space138

    stair #1206

    e207

    e211

    Vestibule270

    209

    wc210

    Lobby226

    Stair #2268

    common269

    data208

    1/16" = 1'-0"

    5Level 5- Site Permit

    mech penthouse252

    e254

    stair #1253

    solar DHWpanels

    pv array

    pv array

    pv array

    pv array

    1/16" = 1'-0"

    6Roof- Site Permit

    Office Space

    Office Space

    Office Space

    Office Space

    Retail

    Meeting Hall

    Office Space

    Office Space

    Office Space

    mech penthouse

    common

    common

    common

    restrooms

    restrooms

    restrooms

    restrooms

    restrooms

    elev

    ator

    sha

    ft

    elev

    ator

    lobb

    ies

  • ON-SITE MEETING HALL

    [REPRESENTATIVE PHOTOS]

    The 3,791 square foot on-site meeting hall at 3433 3rd Street will provide an open and flexible space for tenants to leverage at their hosting convenience. Imagine a Biotech group using the space to promote the launch of a new drug, or a tech group using the hall to host a networking event — the possibilities are endless and the ability to use the hall comes at no charge to building occupants. In addition, the Carpenter’s Union will use the hall to host monthly gatherings and will play an important role in establishing a home base for all those San Franciscans who work in construction related trades.

    TOUCHSTONE COMMERCIAL PARTNERS | 8

    3433 3RD STREET

  • ISLAIS CREEK

    INDIA BASIN

    MISSION BAY

    DOGPATCH

    POTRERO HILL

    3433 3RD STREET

    LOCATION OVERVIEW

    TOUCHSTONE COMMERCIAL PARTNERS | 9

  • TOUCHSTONE COMMERCIAL PARTNERS | 10

    INDIA BASIN SHORELINE PARK

    The India Basin, once a defunct section of the city, is completely reinventing itself. In fact, the City is in the process of redeveloping the India Basin Shoreline Park, dubbed “San Francisco’s Next Frontier of Development”. The redevelopment of India Basin will be a legacy waterfront park for the City of San Francisco and greater Bay Area.

    In 2014, the City acquired the 900 Innes property, which is adjacent to the existing India Basin Shoreline Park and India Basin Shoreline Open Space. The city plans to design and build a new, world class 8-acre park will provide local residents with direct access to parks, open space, and new recreational opportunities. The Trust for Public Land conducted a “Designs Ideas Competition” for the future of the combined 900 Innes and India Basin Shoreline Park Sites. Five talented landscape architecture teams submitted design ideas, and were reviewed by a jury. The competition was guided by the technical information contained in the India Basin Waterfront Study. The winning firm was Seattle-based Gustafson Guthrie Nichol.

    The current park is 5.6-acres and will be redesigned to better serve the surrounding community and enhance citywide programs. Hunters Point Boulevard and the adjacent new park at 900 Innes Street will be connected via new biking and walking paths. Closer to the shoreline, a new wetland habitat, an enhanced playground and recreational facilities will be developed.

    3433 3RD STREET

  • TOUCHSTONE COMMERCIAL PARTNERS | 11

    *The information presented has been secured from sources we believe to be reliable but we make no representations or warranties, expressed or implied, as to the accuracy of the information. Lessee must verify the information and bears all risk for any inaccuracies.

    TOUCHSTONE COMMERCIAL PARTNERS, INC. // Corp. Lic. 01112906 // www.tcpre.com // www.zm-tcpre.com

    ZACHHAUPERT

    direct (415) 539-1121 // cell (415) [email protected] // BRE # 01822907

    MICHAELSANBERG

    TREVORGUDIM

    direct (415) 539-1103 // cell (415) [email protected] // BRE # 01930041

    direct (415) 539-1122 // cell (858) [email protected] // BRE # 01979980

    3433 3RD STREET