foph hira1

Upload: myforum1

Post on 04-Apr-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/29/2019 Foph HIRA1

    1/6

    LC(Y-Yes,N-NO)

    IPC(Y-Yes,N-NO)

    1 Excavation

    NFalling of person or

    vehicle into the

    excavated area

    Minor/Major injury N Y

    Vehicle accident may

    cause major/fatal

    Y Y

    Fall down cause minor

    injury

    N N

    Collision vehicle to

    vehicle or to structure

    cause major/ fatal

    Y Y

    1.Fall of tools and

    structure parts from

    height.

    Major injury / fatal

    Y Y

    2.Rolling of Plate. Major injury / fatal

    3.Lifting of plate from

    grond.Major injury / fatal

    4.1

    Electrical construction

    power distribution:-

    1.PSS Installation N

    Above ground cable open

    termination,loose

    connection, improper

    earthing ,ingress protection

    overload.

    Y Y

    2

    N

    3

    LANCO BABANDH POWER LTD

    HAZARDS I

    Doc No: LBPL/Ele/ HIRA/SWYD/01 Issue No: 1

    SlNO

    Activities

    Condition

    (N/AB/E)

    Hazards Identification Risk Identification

    Department: Electrical

    OH & S Participation: Mukesh Behera

    Material Handling and

    Transportation

    Vehicle movement at site

    for shifting of material.

    Structure(Shell) erection N

  • 7/29/2019 Foph HIRA1

    2/6

    4.2 2.Cable Laying N

    Above ground cable open

    termination,over load,loose

    termination,improper

    clipping,cable damage.

    Y Y

    4.33.Installation of

    Distribution boardN

    Improper earthing,loose

    termination,ingress

    protection,improper

    clipping,improper housing

    of electrical equipment.

    Y Y

    4.45.Power Supply to the

    equipment

    N Improper switching. 1.Electrocution,

    2.Damage of materials

    3.Job hamper.

    Y Y

    4.5 Testing of equipment-

    5

    Area Lighting N

    Improper of lack of

    lighting Injury to person,

    vehicle accident Y Y

  • 7/29/2019 Foph HIRA1

    3/6

    BC(Y-Yes,N-NO)

    E(Y-Yes,N-NO)

    Ref of Legal

    requirementS L

    RiskLevel

    Riskcontrol

    Plan

    ExistingControl

    RefOCP

    Anyadditional

    controlproposed

    Y N NO 4 3 E CP2 Barricading the

    excavated area

    LBPL

    Y Y NO 3 4 M CP2 LBPL

    N N NO 2 4 L CP1 LBPL

    Y Y NO 4 4 E CP2 Vehicle moving to other

    site location are not

    allowed to enter into work

    area for taking any

    short cut way. Continuous

    supervision.

    LBPL

    Y Y 3 3 H LBPL

    Y Y

    ENTIFICATION AND RISK ASSESMENT (HIRA)

    Date- 31.10.12 Rev. No: 0/ Date- 31.10.12

    Area : FOPH AREA

    Proper approach road need

    to be made using stone or

    stone dust , short cut

    approach not to be allowed ,

    rain boot must be used during

    walk

    1.All armoured power cable

    tobe undergrounded,

    unarmourpower cable to be

    over headed or

    undergrounded in movement

    area Damaged cable should

    be removed from the work

    Barricading the protected

    area where height work is

    going on, proper tieing of

    tools , use of PPE as

    mandatory.

  • 7/29/2019 Foph HIRA1

    4/6

    Y Y

    Y Y

    Y Y 4 3 E CP3 LBPL

    Y Y 3 4 M CP2

    Proper planning of night work

    and be it informed well

    before evening, Use of

    fluorescent dress

    at night. LBPL

    area. 2.Earthing should

    be provided to the elecrical

    DB and equipment. RCCB and

    earth pit to be tested at

    regular interval. 3.

    Sufficient no of standard

    measuring electrical tools to

    be used.

    4.IP 55 protection of the

    equipment should be

    provided.

    5.Proper cable termination

    with proper tightness of the

    joint.

    6.Bare wire connection

    should be prohibited and

    proper plug top should be

    provided.