Page 1: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

BUILDING ENVELOPE CONSULTING SERVICES

Page 2: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

CONSTRUCTION COMPLIANCE TESTING

STORM RELATED ROOF DAMAGE ASSESSMENTS

FORENSIC INVESTIGATIONS

LITIGATION SUPPORT

Page 3: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

FM GLOBAL 1 – 52 FIELD UPLIFT TESTS

ASTM E 907 FIELD TESTING UPLIFT RESISTANCE OF ADHERED MEMBRANE ROOFING SYSTEMS

ASTM E 1105 STANDARD TEST METHOD FOR FIELD DETERMINATION OF WATER PENETRATION OF INSTALLED EXTERIOR WINDOWS, SKYLIGHTS, DOORS, AND CURTAIN WALLS

Page 4: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

NEGATIVE PRESSURE TESTING

FM GLOBAL 1-

52

ASTM E 907

SIMULATING WIND UPLIFT PRESSURE TO

VERIFY RESISTANCE OF LOW-SLOPE

MEMBRANE ROOFS

Page 5: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

WIND

WIND ACTS A FLUID FLOWING

OVER AND AROUND

STANTIONARY OBJECTS

Page 6: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

WIND

25 psf

~ 25 psf

WIND CAUSES A POSITIVE

PRESSURE ON THE WINDWARD

SIDE OF THE OBJECT

AND CAN CAUSE A NEGATIVE (UPWARD)

PRESSURE ON THE ROOF

Page 7: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

WIND

Page 8: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

AFTER THE STORM

Page 9: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

BUR - DELAMINATION

Poor Adhesion Between Deck and Insulation

Poor Adhesion Between Insulation and Cover

BoardPoor Adhesion Between

Cover Board and Membrane

Page 10: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

BUR - DELAMINATION

Poor Adhesion Between Cover Board and

Membrane

Page 11: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

TPO - DELAMINATION

Poor Adhesion Between Insulation and

Membrane

Page 12: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

TPO - DELAMINATION

Page 13: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

BUR - FASTENER FAILURE

Page 14: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

BEFORE THE STORM…

NEGATIVE PRESSURE TESTINGCONSTRUCTION COMPLIANCE AND RISK ASSESSMENT

Page 15: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

NEGATIVE PRESSURE TESTING

Page 16: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

NEGATIVE PRESSURE TESTING

5’ SQ Chamber Imposes an Uplift

Force on the MembranePressure is

Incrementally Increased to the

Design Test Pressure

Deflection of the Membrane is

Measured and Compared to Performance

Criteria

Page 17: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

NEGATIVE PRESSURE TESTING

Fastener holding adequately at test

pressure

Page 18: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

NEGATIVE PRESSURE TEST

Application Acceptance of new (including re-roofed and

re-covered) above-deck roofing assemblies by FM Global…in regions that are both prone to hurricanes, typhoons or tropical cyclones and where design wind speeds are at least 100 mph (FM 1-52).

Field verification of adhesion of low-slope roof for the issuance of a certificate of insurability. For example WPI-8 for the Texas Department of Insurance (TDI).

Page 19: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

NEGATIVE PRESSURE TEST

Application Risk Assessment – as part of the evaluation

of a property this test could be used to determine probable loss at incremental pressure (Hurricane Strengths).

Page 20: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

CURTAIN WALL TESTING

NEW CONSTRUCTIONFORENSIC INVESTIGATIONSRISK ASSESSMENTDUE DILIGENCE

Page 21: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

CURTAIN WALL TESTING

Rack Calibrated to Deliver 5 gal / sf /

hr

Page 22: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

CURTAIN WALL TESTING

Page 23: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

CURTAIN WALL TESTING

Pressure Differential

Imposed Across System

Page 24: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

CURTAIN WALL TESTING

Page 25: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

CURTAIN WALL TESTING

Page 26: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

CURTAIN WALL TESTING

Page 27: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

CURTAIN WALL TESTING

Page 28: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

CURTAIN WALL TESTING

Water Infiltration

Page 29: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

FORENSIC – COMPONENT ISOLATION

The Forensic Version of the Test Allows For

Isolation of Various

Components to Determine Mode

of Failure.

Page 30: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

FORENSIC – COMPONENT ISOLATION

Page 31: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

FORENSIC – COMPONENT ISOLATION

IR Images During Test Help Indentify Path of

Water Intrusion

Page 32: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

FORENSIC – COMPONENT ISOLATION

IR Images During Test Help Indentify Path of

Water Intrusion

Page 33: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

DESTRUCTIVE OBSERVATIONS…SOMETIMES YOU JUST NEED TO OPEN THE WALL AND SEE WHAT IS HAPPENING

FORENSIC INVESTIGATIONSLITIGATION SUPPORT

Page 34: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

WATER INFILTRATION INVESTIGATIONS

Page 35: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

WATER INFILTRATION INVESTIGATIONS

Page 36: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

WATER INFILTRATION INVESTIGATIONS

Page 37: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

WATER INFILTRATION INVESTIGATIONS

Page 38: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

WATER INFILTRATION INVESTIGATIONS

Remove Finish Materials

Page 39: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

WATER INFILTRATION INVESTIGATIONS

Document MC of Framing

Page 40: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

WATER INFILTRATION INVESTIGATIONS

Run Component Isolating Water Test to

Determine Mode of Failure

Page 41: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

BUILDING ENVELOPE SURVEY

NEW CONSTRUCTIONLITIGATION SUPPORTFORENSIC INVESTIGATIONSRISK ASSESSMENTDUE DILIGENCE

Page 42: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

BUILDING ENVELOPE SURVEYS

Page 43: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

BUILDING ENVELOPE SURVEYS

Page 44: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

BUILDING ENVELOPE SURVEYS

Page 45: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

BUILDING ENVELOPE SURVEYS

Page 46: FM GLOBAL 1-52 ASTM E 907 SIMULATING WIND UPLIFT PRESSURE TO VERIFY RESISTANCE OF LOW-SLOPE MEMBRANE ROOFS

BUILDING ENVELOPE SURVEYS