Flow Variations at Entry Update. Transmission Workstream Martin Watson 6 th December 2007. Easington Oct 2006 – Oct 2007. Backloading +ve Net Input flows in period 06.00 to 22.00 BELOW average flows for the day. - PowerPoint PPT PresentationTRANSCRIPT
Flow Variations at EntryUpdate
Transmission WorkstreamMartin Watson6th December 2007
© NGG Transmission Workstream 1st November 2007 2 of 18
Easington Flow Variations Oct 2006 - Oct 2007
-10
-5
0
5
10
01/1
0/06
01/1
1/06
01/1
2/06
01/0
1/07
01/0
2/07
01/0
3/07
01/0
4/07
01/0
5/07
01/0
6/07
01/0
7/07
01/0
8/07
01/0
9/07
01/1
0/07
Year
Mcm
/dEasington Oct 2006 – Oct 2007
Backloading +ve Net Input flows in period 06.00 to 22.00 BELOW average flows for the day
Frontloading -ve Net Input flows in period 06.00 to 22.00 ABOVE average flows for the day
© NGG Transmission Workstream 1st November 2007 3 of 18
Easington Flow Variations November 2007
-10
-5
0
5
10
01/1
1/07
03/1
1/07
05/1
1/07
07/1
1/07
09/1
1/07
11/1
1/07
13/1
1/07
15/1
1/07
17/1
1/07
19/1
1/07
21/1
1/07
23/1
1/07
25/1
1/07
27/1
1/07
29/1
1/07
Day
mcm
/dEasington Nov 2007
Backloading +ve Net Input flows in period 06.00 to 22.00 BELOW average flows for the day
Frontloading -ve Net Input flows in period 06.00 to 22.00 ABOVE average flows for the day
End