In an onshore or offshore field development, the successful operation of any multiphase production transport system needs robust and cost-effective engineering solutions to ensure reliable flow from reservoir to the process facility over the life of field. Proven processes Petrofac’s flow assurance team delivers this through its thorough understanding of flow assurance basics, such as reservoir behaviour, fluid chemistry, production profiles and the potential risks of solids deposition, for example asphaltenes, wax, hydrates, emulsions, soaps, scale and sand. These foundations are supported by an extensive knowledge of other system design parameters such as tubing, flowline and pipeline diameters, insulation, trenching with back-fill and operating limits, for example, maximum and minimum production rates. By considering these parameters, the team can achieve a clear view on how they affect system operability (including slugging, hydrate formation and wax deposition risk assessments) for all production modes, including start-up, normal operation, rate change and shutdown throughout the system life cycle. Expert analysis The flow assurance team’s analysis dictates the operating philosophy and operating strategies for managing hydrates risks (chemicals, thermal or depressurisation), wax deposition (chemicals and/or pigging) and slugging (gas lifting, slug catcher). It also allows the engineers to translate operating philosophies and strategies into solid operating procedures, to cover initial start-up and life cycle field production operations. Additional flow assurance support to operations may also be required to confirm the feasibility of operating procedures used during the hook-up and commissioning phases. System operability Hydrates Slugging Wax Sand Emulsions, soaps Corrosion Scale Asphaltenes Flow assurance

Upload: lamtuong

Post on 01-Feb-2018

223 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Flow assurance - · PDF filePetrofac’s flow assurance team delivers this through its ... assess liquids management (slugging/slug catcher sizing) Russia Oil & gas production system

In an onshore or offshore field development, the successful operation of any multiphase production transport system needs robust and cost-effective engineering solutions to ensure reliable flow from reservoir to the process facility over the life of field.

Proven processesPetrofac’s flow assurance team delivers this through its thorough understanding of flow assurance basics, such as reservoir behaviour, fluid chemistry, production profiles and the potential risks of solids deposition, for example asphaltenes, wax, hydrates, emulsions, soaps, scale and sand.

These foundations are supported by an extensive knowledge of other system design parameters such as tubing, flowline and pipeline diameters, insulation, trenching with back-fill and operating limits, for example, maximum and minimum production rates. By considering these parameters, the team can achieve a clear view on how they affect system operability (including slugging, hydrate formation and wax deposition risk assessments) for all production modes, including start-up, normal operation, rate change and shutdown throughout the system life cycle.

Expert analysisThe flow assurance team’s analysis dictates the operating philosophy and operating strategies for managing hydrates risks (chemicals, thermal or depressurisation), wax deposition (chemicals and/or pigging) and slugging (gas lifting, slug catcher). It also allows the engineers to translate operating philosophies and strategies into solid operating procedures, to cover initial start-up and life cycle field production operations. Additional flow assurance support to operations may also be required to confirm the feasibility of operating procedures used during the hook-up and commissioning phases.System

operability

Hydrates

Slugging

Wax

Sand

Emulsions,soaps

Corrosion

Scale

Asphaltenes

Flow assurance

Page 2: Flow assurance - · PDF filePetrofac’s flow assurance team delivers this through its ... assess liquids management (slugging/slug catcher sizing) Russia Oil & gas production system

Middle EastStabilised crude export pipeline system Detailed design - Pipeline steady state thermal hydraulic analysis and transient (surge) analysis

AlgeriaGas condensate gathering system networkPre Front End Engineering Design (FEED) - Pipeline steady state thermal hydraulic analysis on production and export lines

AlgeriaGas condensate gathering system networksFEED - Pipeline steady state and transient analysis of production and gas export systems

KazakhstanGas condensate gathering system networkPipeline steady state thermal hydraulic analysis

Middle EastOil & gas (heavy and light oil) production gathering system Conceptual engineering - Production gathering systems, oil & gas export, water lines

Middle EastOil & gas gathering system networkDetailed design - Pipeline steady state and transient analysis on production transfer lines and liquid lines

Global supportPetrofac’s dedicated team of experienced flow assurance and process engineers are fully conversant in Pipesim/Pipesim-Net, OLGA and flow assurance analysis work. As a specialist team, it provides consultancy support to a wide range of onshore and offshore customers as well as to Petrofac’s engineering centres around the world.

www.petrofac.com

Dynamic simulationPetrofac’s dynamic modelling expertise has been further strengthened by the recent formation of a process dynamic simulation team. Along with the flow assurance team, it can deliver a one-stop shop to customers for a fully integrated upstream-downstream dynamic modelling solution for both current and future projects and studies.

Flow assurance in practicePetrofac’s flow assurance team has been involved in a variety of projects that include:

Middle EastGas condensate gathering system networkDetailed design - Steady state and transient analysis to assess liquids management (slugging/slug catcher sizing)

RussiaOil & gas production systemDetailed design - Steady state and transient analysis of production, water injection and gas export systems

Contact:Petrofac Engineering Services, Chester House, 76-78 Chertsey Road, Woking, Surrey, GU21 5BJ, United KingdomTel: +44 1483 738544 Fax: +44 1483 738501 email: [email protected] www.petrofac.com