Page 1: Fiscal Challenges Since  2009

53% drop = State Transit Assistance

SAFETEA-LU Reauthorization = TBDLocal Tax Funding = Up/Down

FY 12-13 = Projected $5 million deficit

Fiscal Challenges Since 2009

Item 8-B: Service Changes August 2012

Page 2: Fiscal Challenges Since  2009

Efficiencies to Date = $423,000 saved

Legislative recovery of federal funds

Service Changes/Reductions

Deficit Mitigation Strategies

Item 8-B: Service Changes August 2012

Page 3: Fiscal Challenges Since  2009

Downtown Ride: Ending Service 6/17

$210,000

Rapid 10: Cancel 6 trips $84,000(b/w Venice & 2nd/Colorado)

Route 2: Truncate route $191,000between Pico & Hill St.

Service Changes

Item 8-B: Service Changes August 2012

Cost Savings/yr.

Page 4: Fiscal Challenges Since  2009

Original 2010 proposal: End at Civic Center (redundant w/Route 1)

Adopted compromise: Continue to Hill St.; report on ridership

Route 2 - Background

Item 8-B: Service Changes August 2012

Page 5: Fiscal Challenges Since  2009
Page 6: Fiscal Challenges Since  2009

• Avg. ridership: 40 riders/$ hour

• South of Pico: 17 riders/$ hour

• South of Pico: 3 riders/bus

Route 2 Productivity: Pico to Hill

Item 8-B: Service Changes August 2012

Page 7: Fiscal Challenges Since  2009

Segment Operating Cost: $191,600/yr.

Per Trip Subsidy: South of Pico: $4.25 (north of Pico: $2.75)

(system-wide: $1.98)

South of Pico Costs

Item 8-B: Service Changes August 2012

Page 8: Fiscal Challenges Since  2009

RouteSubsidie

s

Page 9: Fiscal Challenges Since  2009

Route 1, 8 & Dial-a-Ride Services

Saves 1 bus/full-time operator

Helps keep fares low for everyone

Result? More Resources for All

Item 8-B: Service Changes August 2012

Page 10: Fiscal Challenges Since  2009

Approve changes* for Route 2 and Rapid 10 to save

$275,000/yr.

(*starting August 26, 2012)

Staff Recommendation

Item 8-B: Service Changes August 2012