First wall mods status. Points at 0, 30, 60 degrees from Art Points x 1.025 in cross sections RF launchers bigger issue than trim coils. NCSX SIT Meeting July 1, 2002. Model. Vessel with insulation. RF launcher locations, typ 6 places. FW panels, 360 deg shown. - PowerPoint PPT PresentationTRANSCRIPT
1
First wall mods status
NCSX SIT Meeting
July 1, 2002
•Points at 0, 30, 60 degrees from Art
•Points x 1.025 in cross sections
•RF launchers bigger issue than trim coils
2
Model
RF launcher locations, typ 6 places
FW panels, 360 deg shown
Modular coil partial assembly
Vessel with insulation
3
Plan cross section
10 deg
0 deg
20 deg
30 deg
40 deg
50 deg60 deg
RF launcher locations
Trim coils
4
Cross section at 0 degrees
Trim coils intersect this section
Almost all points are inside first wall
5
Cross section at 10, 20 degrees Points not available yet Trim coils intersect 10 deg section
20 deg
10 deg
6
Cross section at 30 degrees
Trim coils do not intersect this section
Closest approach to first wall
7
Cross section at 40, 50 degrees Points not available yet RF launchers intersect these sections
40 deg
50 deg
Co-ax
Faraday shield
8
Cross section at 60 degrees
Field joint and limiters are around this section
RF launchers on either side
Almost all points are inside first wall
9
Cross section at 60 degrees
Cross section changes abruptly
Limiter visible in this view
RF launchers on either side of this section mostly hidden by limiter
limiter
10
RF launcher options
Reduce number of launchers to 4 instead of 6 per section Less power?, unless strap lengths can be increased
Reduce coax to 4 inches instead of 6, maybe smaller
Move feeds farther out by running strap through “tunnels” to get straight-in shot at feed, but need more than 3 cm behind FW in these areas.
11
PFC panel / rib detail
Details for one concept for panel attachment developed with BFG Aerospace
Plasma
Vacuum vessel
Heated / Cooled RibThermally insulated connection to vessel
Panel installed
Panel ass’y retracted