First wall mods status
NCSX SIT Meeting
July 1, 2002
•Points at 0, 30, 60 degrees from Art
•Points x 1.025 in cross sections
•RF launchers bigger issue than trim coils
![Page 2: First wall mods status](https://reader035.vdocuments.us/reader035/viewer/2022062516/56812c39550346895d90bf11/html5/thumbnails/2.jpg)
2
Model
RF launcher locations, typ 6 places
FW panels, 360 deg shown
Modular coil partial assembly
Vessel with insulation
![Page 3: First wall mods status](https://reader035.vdocuments.us/reader035/viewer/2022062516/56812c39550346895d90bf11/html5/thumbnails/3.jpg)
3
Plan cross section
10 deg
0 deg
20 deg
30 deg
40 deg
50 deg60 deg
RF launcher locations
Trim coils
![Page 4: First wall mods status](https://reader035.vdocuments.us/reader035/viewer/2022062516/56812c39550346895d90bf11/html5/thumbnails/4.jpg)
4
Cross section at 0 degrees
Trim coils intersect this section
Almost all points are inside first wall
![Page 5: First wall mods status](https://reader035.vdocuments.us/reader035/viewer/2022062516/56812c39550346895d90bf11/html5/thumbnails/5.jpg)
5
Cross section at 10, 20 degrees Points not available yet Trim coils intersect 10 deg section
20 deg
10 deg
![Page 6: First wall mods status](https://reader035.vdocuments.us/reader035/viewer/2022062516/56812c39550346895d90bf11/html5/thumbnails/6.jpg)
6
Cross section at 30 degrees
Trim coils do not intersect this section
Closest approach to first wall
![Page 7: First wall mods status](https://reader035.vdocuments.us/reader035/viewer/2022062516/56812c39550346895d90bf11/html5/thumbnails/7.jpg)
7
Cross section at 40, 50 degrees Points not available yet RF launchers intersect these sections
40 deg
50 deg
Co-ax
Faraday shield
![Page 8: First wall mods status](https://reader035.vdocuments.us/reader035/viewer/2022062516/56812c39550346895d90bf11/html5/thumbnails/8.jpg)
8
Cross section at 60 degrees
Field joint and limiters are around this section
RF launchers on either side
Almost all points are inside first wall
![Page 9: First wall mods status](https://reader035.vdocuments.us/reader035/viewer/2022062516/56812c39550346895d90bf11/html5/thumbnails/9.jpg)
9
Cross section at 60 degrees
Cross section changes abruptly
Limiter visible in this view
RF launchers on either side of this section mostly hidden by limiter
limiter
![Page 10: First wall mods status](https://reader035.vdocuments.us/reader035/viewer/2022062516/56812c39550346895d90bf11/html5/thumbnails/10.jpg)
10
RF launcher options
Reduce number of launchers to 4 instead of 6 per section Less power?, unless strap lengths can be increased
Reduce coax to 4 inches instead of 6, maybe smaller
Move feeds farther out by running strap through “tunnels” to get straight-in shot at feed, but need more than 3 cm behind FW in these areas.
![Page 11: First wall mods status](https://reader035.vdocuments.us/reader035/viewer/2022062516/56812c39550346895d90bf11/html5/thumbnails/11.jpg)
11
PFC panel / rib detail
Details for one concept for panel attachment developed with BFG Aerospace
Plasma
Vacuum vessel
Heated / Cooled RibThermally insulated connection to vessel
Panel installed