INDUSTRIAL TRAINING TECHNICAL REPORT

BEC 308

SUSTAIN GEOTECHNICS SDN. BHD

558749-A ,SUSTAIN GEOTECHNICS SDN. BHD. 519 Blok A (5th

 Floor)

Kelana Business Centre 97, Jalan Ss7/2 Kelana Jaya

47301 Petaling Jaya

GHAMDAN FARHAN

102906468

Technical Report submitted as a partial fulfillment of the requirement of

Bachelor of Civil Engineering

FACULTY OF ENGINEERING & TECHNOLOGY INFRASTRUCTURE

INFRASTRUCTURE UNIVERSITY KUALA LUMPUR

2013

Page 2: First Part Chamdan Technical Report

8/11/2019 First Part Chamdan Technical Report

http://slidepdf.com/reader/full/first-part-chamdan-technical-report 2/5

 

ENDORSEMENT SHEET

This Technical Report is prepared as a requirement for BEC 308 Industrial Training.

All information in this report is with permission of the company for the purpose of

education only.

 _______________________

STUDENT’S

 SIGNATURE

Student’s name  : _________________________________________

Matric No : ________________________________

Date of submission : ________________________________

ENDORSEMENT

I hereby endorsed that this student had submitted the appropriate Technical Report

content which had been given during his/her training under my supervision.

 ______________________________________

TRAINING SUPERVISOR ’S SIGNATURE 

 Name : _________________________________________

Email : _________________________________________

Position : ________________________________

Tel / Hp No : ________________________________

Date : ________________________________

Company Stamp :

Page 3: First Part Chamdan Technical Report

8/11/2019 First Part Chamdan Technical Report

http://slidepdf.com/reader/full/first-part-chamdan-technical-report 3/5

 

ACKNOWLEDGEMENT

Our utmost gratitude to Allah Almighty for His blessings upon me that had brought to

the completion of this Industrial Training. 

I would like to thank firstly my Supervisor Mr. Khairul as construction manager for

 being very helpful with his guidance and knowledge about giving me the experience that

hone my thought. Our appreciation also goes to Mr. Usmile and Mr .Fadhel as the site

engineers with their helping hands to teach me and brief about design calculation whereby,

without their helping we would not be able to succeed in completing this project.

Secondly, I would like to thank our friends and colleagues that had been sharing their

time and cherished us with ideas and encouragement throughout the duration of our studies.

May Almighty Allah bless us all for the good?.

Last but not least, we dedicated our effort to our beloved parents and families their

continuous supports and with whom we share the glorious moments together.

Finally, I hope that my industrial training on this particular subject will lead me to be

a good engineer.

Page 4: First Part Chamdan Technical Report

8/11/2019 First Part Chamdan Technical Report

http://slidepdf.com/reader/full/first-part-chamdan-technical-report 4/5

Page 5: First Part Chamdan Technical Report

8/11/2019 First Part Chamdan Technical Report

http://slidepdf.com/reader/full/first-part-chamdan-technical-report 5/5

 

REFERENCES

SECTION B SUPPORTED DOCUMENTS

Industrial Training Application Letter

Acceptance Letter from the organization

Log Book and Monthly Training Performance

Student Attendance Form

SECTION C APPENDICES

Appendix A  Bill of quantity (BQ)

Appendix B  Site photos

Appendix C  Master planning schedule for PML Project

Appendix D 

Technical drawing