![Page 1: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/1.jpg)
1/3/2008 1
Fire Safety of Wood Floor Assembly:
Model and Full-Scale Test
Hisa TakedaFire Research Canada (LGS)
![Page 2: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/2.jpg)
Sub-floor
Joist
Ceiling
F I R E
![Page 3: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/3.jpg)
Model employs two dimensional heat conduction equation to calculate the flow of heat through the ceiling, wood joist and sub-floor.
Cpρ(∂T/∂t) = ∂/∂x(k∂T/∂x)+∂/∂y(k∂T/∂y)
![Page 4: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/4.jpg)
Sub-floor
Joist
Ceiling
Boundary condition at the surface of the ceiling which is exposed to fire can be described by this equation,
-ks(∂T/∂x) = hf(Tf - Tsf) + εffσ(Tf4 - Tsf
4)
![Page 5: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/5.jpg)
εff is the effective emissivity calculated from the
furnace gas emissivity εf and surface emissivity
of the ceiling(gypsum board) εs.
εff = 1 / ( 1 / εf + 1 / εs - 1 )
![Page 6: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/6.jpg)
Sub-floor
Joist
Ceiling
Boundary condition at the sub-floor surface facing
the inside the room
k(∂ T/ ∂ x) = ha(Ta - Tga) + εffσ(Ta4 - Tsa
4)
![Page 7: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/7.jpg)
Sub-floor
Joist
Ceiling
The boundary condition at the surface of the ceiling board facing cavity-k(∂T/∂x) = h(Tcf - Tc) + F12σ (Tcf
4 - Tcs4) + F13σ
(Tcf4 - Tcw
4)
![Page 8: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/8.jpg)
View factors F12 and F13 for radiation heat exchange in the ceiling cavity
YL
F12
Joist
F13 F13
Sub-floor
Ceiling
![Page 9: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/9.jpg)
0
10
20
30
40
50
60
70
80
0 50 100 150 200
Distance YL (mm)
%F1313
F12F12
F
![Page 10: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/10.jpg)
Sub-floor
Joist
Ceiling
The boundary condition at the joist surface -k(∂T/∂y) = h(Tcf - Tcw) + F31σ (Tcf
4 - Tcw4) +
F32σ (Tcs4 - Tcw
4)
![Page 11: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/11.jpg)
View factors F21 and F31 for radiation heat exchange in the ceiling cavity
Sub-floor
XL F31
JoistF32
Ceiling
![Page 12: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/12.jpg)
0
10
20
30
40
50
60
0 50 100 150 200 250
Distance XL (mm)
%F32F32
F31F31
![Page 13: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/13.jpg)
Boundary condition at the interface between
ceiling and wood joist, wood joist and sub-floor
can be described using continuity equation,
k(∂ T/ ∂ x) o = k(∂ T/ ∂ x) w
![Page 14: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/14.jpg)
Initial condition can be described by using initial
temperature in the assembly,
T = Ta at any x and y
TF = Ta
![Page 15: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/15.jpg)
0
0.1
0.2
0.3
0.4
0.5
0 200 400 600 800 1000
Temperature (C)
Ther
mal
con
duct
ivity
(W/m
C)
Gypsum boardGypsum board
WoodWood
![Page 16: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/16.jpg)
0
5
10
15
20
25
30
0 200 400 600 800 1000Temperature (C)
Spec
ific
heat
(J/g
C) Gypsum boardGypsum board
WoodWood
![Page 17: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/17.jpg)
Gypsum boardGypsum board
WoodWood
0
20
40
60
80
100
0 200 400 600 800 1000
Temperature (°C)
Mas
s(%
)
Gypsum boardGypsum board
WoodWood
![Page 18: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/18.jpg)
Full-Scale Test
Test floor was 4.8m long and 3.9m wide.
The ceiling was exposed to heat in a propane
fired horizontal furnace, in accordance with
CAN/ULC-S191-M89(ASTM E119) standard.
![Page 19: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/19.jpg)
![Page 20: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/20.jpg)
Test specimen:
2 x 10 wood joist
½ inch type X gypsum board as a ceiling
5/8 inch plywood as a sub-floor.
![Page 21: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/21.jpg)
Wood joist 235 x 38
3874
11 joists @ 406 O.C.
![Page 22: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/22.jpg)
[ FROM FULL-SCALE TEST]
Visual observations demonstrate that gypsum
filler-compound used to cover fasteners and
joints, loosens and begins to fall from the ceiling,
5 minutes after exposure to the fire, and after 15
minutes almost all filler compound fell from the
ceiling.
![Page 23: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/23.jpg)
CeilingFiller
Joist
Joist
Joint
Joist
Ceiling tends to separate
![Page 24: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/24.jpg)
Once the joints open, the gypsum ceiling board
was seriously heated by convection and radiation.
Therefore the temperature of the board rapidly
increases and the ceiling tends to separate from
the assemblies.
![Page 25: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/25.jpg)
AA
BB CC
DD
A
B C
D
TEMP (C)
A
FIREJoint No Joint
B
CD
A
1000
0500 TIME (min)
![Page 26: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/26.jpg)
0
200
400
600
800
1000
0 10 20 30 40 50
TIME (min)
TEM
PER
ATU
RE
(C)
B
ASTM E119ASTM E119Furnace
ACBB
AA
CC
DDD
FIREJoint No Joint
B
CD
AE
CA
B
E
![Page 27: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/27.jpg)
Char formation in joists
25 26 27 28 29 min
![Page 28: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/28.jpg)
Char formation in joists
30 31 32 33 34 min
![Page 29: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/29.jpg)
Yield Stress of Wood
0
20
40
60
80
100
0 100 200 300 400
TEMPERATURE (C)
% Compressive stress by BenichouTensile stress by Benichou
Kacikova
![Page 30: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/30.jpg)
Modulus of Elasticity of Wood
0
20
40
60
80
100
0 100 200 300 400
Konig
Glos
Kacikova
Benichou
%
TEMPERATURE (C)
![Page 31: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/31.jpg)
Resistive moment
Applied load
Deflection (model)
Deflection (test)
![Page 32: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/32.jpg)
The results show that the model prediction for the joist deflection agrees well with the test results.
The model predicted the mechanical failure occurred at 28min 49sec. Actual test was terminated at 30min, because the flame penetrated through the sub-floor
![Page 33: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/33.jpg)
Mechanical failure
0
20
40
60
80
100
120
0 10 20 30 40
Thickness of ceiling (mm)
Tim
e (m
in)
![Page 34: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/34.jpg)
0
20
40
60
80
100
0 2000 4000 6000 8000
Load (N/m2)
Tim
e of
mec
hani
cal f
ailu
re (m
in)
![Page 35: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/35.jpg)
1/3/2008 35
Concluding Remarks
1. A computer model to predict the fire resistance of load bearing wood-framed floor / ceiling assemblies has been developed.
![Page 36: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/36.jpg)
1/3/2008 36
2. The model includes the heat transfer model to calculate the flow of heat in the floor / ceiling assemblies and the mechanical model to calculate the strength of the assemblies.
![Page 37: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/37.jpg)
1/3/2008 37
3. The results from the heat transfer model had a good agreement with the results from the full-scale tests.
Char formation in wood joists predicted by the model were favourably consistent with the pictures of the actual char formation in wood obtained from the full-scale tests.
![Page 38: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/38.jpg)
1/3/2008 38
4. Structural model predicted the deflection and strength (resistive moment) of wood joists. The results were compared to the results from the full-scale tests and a good agreement was observed.
![Page 39: Fire Safety of Wood Floor Assembly: Model and Full-Scale Testiufro-archive.boku.ac.at/iufro/D5-conference07/10.30tuesday/105/5.03...1/3/2008 1 Fire Safety of Wood Floor Assembly: Model](https://reader030.vdocuments.us/reader030/viewer/2022041206/5d5e02be88c993406d8b9db5/html5/thumbnails/39.jpg)
1/3/2008 39
5. Calculated results show that the thickness of ceiling would be rather important for fire resistance of floor / ceiling assemblies.