Page 1: Finnish Capability Development and Procurement Plans

Nimi

Työ

Osasto

Defence Command

12/05/2016 1 UNCLASSIFIED

Finnish Capability Development

and Procurement Plans

Nordic Defence Industry Seminar 2016

Page 3: Finnish Capability Development and Procurement Plans

Defence Command Finland

DCOS Logistics and Armaments

LTG Kyösti Halonen

Capability Development Programme 2017-2028 - Schedule and Focus

2017 2021 2025 2029

Joint Capabilities

Readiness capabilities and Cyber

IOC FOC

Page 4: Finnish Capability Development and Procurement Plans

Defence Command Finland

DCOS Logistics and Armaments

LTG Kyösti Halonen

STRATEGIC CAPABILITY PROGRAMS

12.5.2016 4

2015 2016 2017 2020 2023 2026

RFI RFQ CONT

RACT IOC FOC

ML Pohjanmaa (2013)

2xML Hämeenmaa cl. (2025)

4xPBG Rauma cl. (2025)

New Fighter Programme-HX SQUADRON-2020

Page 5: Finnish Capability Development and Procurement Plans

Defence Command Finland

DCOS Logistics and Armaments

LTG Kyösti Halonen

Replacing the capabilities of

the Hornet aircraft - HX

• According to the current life cycle plan, the Finnish Air Force F/A-

18 fighters become obsolete by 2030

• Phasing out of the aircraft is scheduled to start in 2025; the last

aircraft would be disposed of in 2030

12.5.2016 5

Page 6: Finnish Capability Development and Procurement Plans

Defence Command Finland

DCOS Logistics and Armaments

LTG Kyösti Halonen

Program execution schedule

12.5.2016 6

Page 7: Finnish Capability Development and Procurement Plans

Defence Command Finland

DCOS Logistics and Armaments

LTG Kyösti Halonen 12.5.2016 7

Replacing ships scheduled for

retirement - Squadron 2020

Squadron 2020

FNS Pohjanmaa (2013)

2 Hämeenmaa class minelayers (approx. 2025)

4 Rauma class fast attack

missile craft (approx. 2025)

Page 8: Finnish Capability Development and Procurement Plans

Defence Command Finland

DCOS Logistics and Armaments

LTG Kyösti Halonen 12.5.2016 8

2015 2016 2017 2018 2019 2020

Comparing quotes Planning

Contract negotiations

RFI RFQ

Construction

Contract

Naval engineering study

Operational-tactical study

Planning and construction 2015-2024

Page 9: Finnish Capability Development and Procurement Plans

Defence Command Finland

DCOS Logistics and Armaments

LTG Kyösti Halonen

Main Procurement programmes - Services

Page 10: Finnish Capability Development and Procurement Plans

Defence Command Finland

DCOS Logistics and Armaments

LTG Kyösti Halonen

155 mm SPG -program

Development of Army striking power with long range and

mobile artillery system

Main goals

• Weapon system capable of independent action

• 155 mm artillery system single caliber in the future

• Allready in operational use (no time for development)

• Modern, "shoot&scoot" –capability

• Logistic support will be created into Finland

• Contract in 2017

Replacing aging artillery systems

152mm 2S5 122mm 2S1

122mm RM-70/85

122mm D-30

130mm M-46

12.5.2016 10

Page 11: Finnish Capability Development and Procurement Plans

Defence Command Finland

DCOS Logistics and Armaments

LTG Kyösti Halonen

Sensorit

Main Procurement programmes - Joint Capabilities

Page 12: Finnish Capability Development and Procurement Plans

Defence Command Finland

DCOS Logistics and Armaments

LTG Kyösti Halonen

Industry Partners

12

−Establish security of supply and support military

component

Page 13: Finnish Capability Development and Procurement Plans

Defence Command Finland

DCOS Logistics and Armaments

LTG Kyösti Halonen

Thank you for your attention.

Any questions?